2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA...

18
FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT NIPPON KOEI CO.,LTD. 2-156 NIPPON KOEI LAC CO.,LTD 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure (1) Objectives The objective of the present Study is to optimize the existing secondary sewers in the Study Area by rehabilitation or replacement; the Study Area is defined in Section 2.5.1. This Section analyzes the current condition of the secondary sewers in order to diagnose the problems and requirements. The rehabilitation of primary sewers will take place through a study called “Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II.” It is known that SEDAPAL has finished carrying out the Terms of Reference for the study of this project at Pre F/S level (Perfil). This Perfil shall be included in the 2011 annual budget, under the consideration that the Perfil should conclude in 2012 1 . (2) Background The Study Area is part of two large drainage areas called Puente Piedra and Comas, and a small drainage area called Márquez-Oquendo, which can be seen in Figure 2.5.9-1. Some remaining parts of the Study Area have no sewerage system, thus it is not part of any drainage area. In this figure, there are sewerage systems in the area below Marquez drainage area, but not under SEDAPAL administration yet, thus it is beyond the scope of this Study. 1 Memorandum N° -368-2010-GDI directed to Polo Agüero, Leader of North Management Team; Project for Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II

Transcript of 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA...

Page 1: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-156 NIPPON KOEI LAC CO.,LTD

2.5.9 Diagnosis of the Existing Sewerage System Infrastructure

(1) Objectives The objective of the present Study is to optimize the existing secondary sewers in the Study Area by rehabilitation or replacement; the Study Area is defined in Section 2.5.1. This Section analyzes the current condition of the secondary sewers in order to diagnose the problems and requirements.

The rehabilitation of primary sewers will take place through a study called “Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II.” It is known that SEDAPAL has finished carrying out the Terms of Reference for the study of this project at Pre F/S level (Perfil). This Perfil shall be included in the 2011 annual budget, under the consideration that the Perfil should conclude in 20121.

(2) Background The Study Area is part of two large drainage areas called Puente Piedra and Comas, and a small drainage area called Márquez-Oquendo, which can be seen in Figure 2.5.9-1. Some remaining parts of the Study Area have no sewerage system, thus it is not part of any drainage area. In this figure, there are sewerage systems in the area below Marquez drainage area, but not under SEDAPAL administration yet, thus it is beyond the scope of this Study.

1 Memorandum N° -368-2010-GDI directed to Polo Agüero, Leader of North Management Team; Project for Rehabilitation for Primary Sewers Related with the Water and Sewerage Network Rehabilitation Projects – Lima Norte I and Lima Norte II

Page 2: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

RIO

CH

ILL

ON

RIO CHILLON

OC

EA

NO

P

AC

IF

IC

O

AREA DE DRENAJEMARQUEZ

AREA DE DRENAJECOMAS

AREA DE DRENAJEPUENTE PIEDRA

CALLAO

CB-41CAMARA DE BOMBEO

DE DESAGUE(VOL= 6.80 MĮ)

RIO

CH

ILL

ON

RIO

CH

ILL

ON

REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA

N

GRAFICO 2.5.9.1 : AREAS DE DRENAJE EXISTENTE

FIGURE 2.5.9.1: EXISTING DRAINAGE AREAS

Page 3: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-158 NIPPON KOEI LAC CO.,LTD

The extension of the drainage areas and their portions in the Study Area is shown in Table 2.5.9-1.

Table 2.5.9-1: Drainage Area and Wastewater Treatment

Drainage Area (AD)

Area Wastewater Treatment Area included in the Study Area (ha)

Total Area (ha) Present Future

Comas 2,206.40 11,908.4 - Taboada WWTP*

Puente Piedra 297.80 5,271.8Puente Piedra

WWTP Puente Piedra

WWTP Márquez 36.80 36.80 - Taboada WWTP* Grand Total 2,541.00 1,721.7 - -

*: scheduled to begin operation in 2013 Source: SEDAPAL Cadastre and JICA Study Team

As shown in the table above, wastewater generated in Puente Piedra AD is treated in the Puente Piedra Wastewater Treatment Plant (WWTP) by primary treatment. On the other hand, however, Comas AD and Márquez AD do not have treatment plant and the wastewater generated in those AD are currently discharged to the sea without treatment.

SEDAPAL has agreed with a Spanish private company on a 25-year BOT contract on construction and operation of a new wastewater treatment plant with a capacity of 14m3/s, named Taboada WWTP. The treatment method is primary treatment process with sedimentation tanks, which is designed based on the National Sanitation Standard, and the treated water will be diffused to the sea at a point distanced 3.8 km from the seashore through a discharge pipe. The WWTP is currently under the design stage and is scheduled to begin operation in 2013. All wastewater generated in Comas AD and Márquez AD is planned to be treated by the Taboada WWTP after completion of the project (2015).

Figure 2.5.9-2 shows the future discharge point; the areas not shown in yellow are not going to be included in the Study area because the sewer pipes in the areas have been rehabilitated by other projects as mentioned in detail in section 2.5.9 (3).

Page 4: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

CARABAYLLO

PUENTE PIEDRA

VENTANILLA

COMAS

LOS OLIVOS

SAN MARTIN DEPORRESCALLAO

INDEPENDENCIA

OC

EA

NO

P

AC

IF

IC

O

RIO

CH

ILL

ON

RIO CHILLON

CB-02CAMARA DE BOMBEO

DE DESAGUE(VOL=47.60MĮ)

CB-41CAMARA DE BOMBEO

DE DESAGUE(VOL= 6.80 MĮ)

REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA

N

Preparation of the Perfil Study of the Project : “Installation of theWater and Sewerage System for Oquendo, Santa Rosa andNaranjal Scheme (sectors 251, 252, 256 and 257)”. This projectinvolves Comas and Marquez drainage area

Project of Sanitation Enlargement of the Socially Excluded Area ofLima Loan Agreement PE-P30.Lot 10: District of Puente Piedra, Works of Water and SewerageSecondary Networks, Valle Chillon Gardens - La Ensenada -Chillon Housing Association Schemes

Execution of General Works of Water and Seweragethat are executed by L.P.N.N 0029-2003 “GeneralWorks of Water and Sewerage for Oquendo, Santa Rosaand Naranjal Scheme” (sectors 251, 252, 256 and 257)executed by “Santa Rosa” Joint Venture.

Contract of Work 023-2007-CW-31960/IBRD-SEDAPALEnlargement of Water and Sewerage Networks byCondominium Systems in Several Districts of NorthArea Package 2

LEGEND

GRAFICO 2.5.9.2: SISTEMA DE ALCANTARILLADO FUTURO

FIGURE 2.5.9.2: FUTURE SEWERAGE SYSTEM

Preparation of Perfil Study of the Project of Enlargement andImprovement of the Water and Sewerage System, Las Animas hilland attachments scheme

Project of Sanitation Improvement of Socially Excluded Areas ofLima, Loan Agreement PE-P30 Lot 7

Works Pro-Networks Alfredo Villa Calderon Shanty Town

PROMESAL Works Lot 6-9B Valle Chillon, Primavera, AnoNuevo: Independencia-Comas-Carabayllo Sector Scheme

Works in Las Magnolias Shanty Town

PAC Works - Package 4 Comas, Carabayllo, Independencia,Puente Piedra

Lima North II Study Area

Page 5: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-160 NIPPON KOEI LAC CO.,LTD

Table 2.5.9-2 shows the three drainage areas that are functioning in the Study area. The table also gives the areas of drainage sub areas as defined in the Perfil Study based on flow direction, and level of manholes.

Table 2.5.9-2: Drainage Sub-areas

Drainage Areas (AD) Sewers Drainage Sub-Areas

Name Hectares

Comas

Prolg. Lima Sewer AD-PL1 108.8 AD-PL2 108.2

Chillón Sewer

AD-CH1 105.2 AD-CH2 45.9 AD-CH3 96.9 AD-CH4 137.5

Ramal 13 and 17 SewerAD-R1 103.3 AD-R2 78.3

Naranjal Sewer AD-N1 118.6 AD-N2 84.1

Los Alisos Sewer AD-A1 132.3 AD-A2 96.6

Comas Sewer AD-CO1 80.2 AD-CO2 107.6

Collique Sewer

ADC-1 40.1 ADC-2 64.6 ADC-3 48.9 ADC-4 24.3 ADC-5 46.9 ADC-6 58.2

San Agustín Sewer

AD-AG1 17.7 AD-AG2 113.8 AD-AG3 49.2 AD-AG4 110.9

Tungasuca Sewer AD-T1 67.8 AD-T2 29.2 AD-T3 87.4

Carabayllo Sewer AD-CA1 44.0 Total 2206.4

Puente Piedra Puente Piedra Sewer

AD-P1 116.1 AD-P2 62.6 AD-P3 49.1 AD-P4 69.9

Total 297.8

Márquez Márquez Sewer AD-M1 36.8

Total 36.8 Grand Total 2541.0

Source: JICA Study Team

Page 6: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-161 NIPPON KOEI LAC CO.,LTD

It must be pointed out that the Master Plan contemplates the future construction of 2 wastewater treatment plants in the study area, the San Felipe WWTP and the Sinchi Roca WWTP.

According to the SEDAPAL’s Investigation and Development Management’s Research, Standardization, and Physical Planning Team, the San Felipe WWTP cannot be built as the planned location for its construction has no available land area. Instead, a possibility to extend the Puente Piedra WWTP is being analyzed.

As the Sinchi Roca WWTP is located on the Sinchi Roca Park Zone, no decisions have been made to build a plant yet.

(3) Sewerage System SEDAPAL differentiates the primary sewers and the secondary sewers in the following way:

• The primary sewers are pipes with a diameter between 350 mm (14”) and 1,800 mm (72”).

• The secondary sewers are pipes with a diameter between 160 mm (6”) and 350 mm (14”).

Figure 2.5.9-3 shows the existing drainage sub-areas, as well as the primary sewers that go through this drainage area.

Page 7: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

RIO

CH

ILL

ON

RIO CHILLON

OC

EA

NO

P

AC

IF

IC

O

AD-R1

AD-CH3

AD-R2

AD-N1

AD-CO1

AD-CO2

AD-A2

AD-A1

AD-N2

AD-CH4

AD-CH2

AD-PL1

AD-PL2

AD-T1

AD-T2AD-CA1 AD-AG3

AD-AG2

AD-AG4

AD-T3ADC-6

ADC-5

ADC-3

ADC-2

ADC-4 ADC-1

AD-AG1

AD-M1

AD-P1

AD-P2

AD-P3

AD-P4

CARABAYLLO

COMAS

LOS OLIVOS

SAN MARTIN DEPORRES

INDEPENDENCIA

CALLAO

VENTANILLA

N

Drainage Area(AD) Sewers

Sub Drainage AreaNomenc. Has

Comas

Prolg. Lima SewersAD - PL1 108.8AD - PL2 108.2

SewersChillon

AD - CH1 105.2AD - CH2 45.9AD - CH3 96.9AD - CH4 137.5

Ramal 13 y 17 SewersAD - R1 103.3AD - R2 78.3

Naranjal SewersAD - N1 118.6AD - N2 84.1

Los Alisos SewersAD - A1 132.3AD - A2 96.6

Comas SewersAD - CO1 80.2AD - CO2 107.6

Collique Sewers

ADC -1 40.1ADC -2 64.6ADC -3 48.9ADC -4 24.3ADC -5 46.9ADC -6 58.2

San Agustin Sewers

AD - AG1 17.7AD - AG2 113.8AD - AG3 49.2AD - AG4 110.9

Tungasuca SewersAD - T1 67.8AD - T2 29.2AD - T3 87.4

Carabayllo Sewers AD - CA1 44.0Total 2206.4

Puente PiedraPuente Piedra Sewers

AD - P1 116.1AD - P2 62.6AD - P3 49.1AD - P4 69.9

Total 297.8

M§rquezMarquez Sewers AD - M1 36.8

Total 36.8Total 2541.0

REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA

GRAFICO 2.5.9-3: COLECTORES PRIMARIOS Y SUB AREAS DE DRENAJE EXISTENTE

FIGURE 2.5.9-3: EXISTING PRIMARY SEWERS AND SUB DRAINAGE AREA

Page 8: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-163 NIPPON KOEI LAC CO.,LTD

1) Primary Sewerage System

The drainage areas in the Study area and their respective sewerage systems are detailed in the following items.

(a) Comas Drainage Area

This drainage area involves the districts of Comas, Independencia, Los Olivos, and a part of the districts of Carabayllo, San Martín de Porres and Callao; it has a total drainage area of 11,908.4 hectares.

The Study Area included in this Comas drainage area includes parts of the Comas, Los Olivos and San Martín de Porres districts, with a total drainage area of 2,206.4 hectares.

The Comas-Chillón main collector is the main sewer in this drainage area, and the sewage from the area flows to the main collector by gravity. This sewer collects wastewater from the districts of Carabayllo, Comas, and Los Olivos, as well as partially from Independencia; San Martín de Porres and Callao, and discharges to the sea without treatment.

The technical information about this main collector is given here:

• Diameter of pipe: 1,350 mm (54”)

• Drainage Area: 11,908.4 hectares

Main contributors: Comas, Chillón, Garagay, Palao, Ingeniería, Carabayllo.

This main collector discharges directly to the sea at Oquendo Beach – Callao. Opposite Av. El Emisor, but part of its waters are used raw for agricultural purposes.

The total length of the main collector is 82.537km.

Primary Sewers:

In the Study Area, the Comas drainage area contains the following primary sewers:

- Comas Sewer - Naranjal Sewer - Túpac Amaru Sewer - Ingeniería Sewer - Infantas Sewer - Carabayllo Sewer - San Agustín Sewer - San Diego Sewer - Trapiche Sewer - 13 and 17 Sewers - Chillón Sewer - Naranjal Spillway

Page 9: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-164 NIPPON KOEI LAC CO.,LTD

In terms of pipe material, pipes are predominantly made of Simple Standard Concrete (64.8%). See Table 2.5.9-3.

Table 2.5.9-3: Length of Primary Sewers by Material

Drainage Area

Diameter Type of Material / Length (m) Sub Total (m)

% Mm AC RC SC PSC PVC

Comas

350 12,225.5 2.10 12,227.6 24.96

355 1,574.50 1,574.5 3.21

400 291.4 4,491.9 4,783.3 9.76

450 6,249.2 6,249.2 12.76

525 1,290.1 1,290.1 2.63

600 14.5 3,992.6 4,007.0 8.18

750 514.5 514.5 1.05

800 1,244.9 1,244.9 2.54

900 1,479.0 1,221.7 2,700.7 5.51

1000 26.0 232.6 1,558.9 1,817.6 3.71

1100 672.7 814.1 1,486.8 3.04

1200 2,014.3 2,014.3 4.11

1300 4,307.3 4,307.3 8.79

1400 2,813.1 2,813.1 5.74

1500 842.8 842.8 1.72

1800 1,113.1 1,113.1 2.27

Total 291.4 11,803.8 31,720.3 3,594.7 1,576.6 48,986.9 100.00

% 0.6 24.1 64.8 7.3 3.2 Note: AC = Asbestos Cement, RC = Reinforced Concrete, SC = Simple Concrete, PSC = Pre Stressed Concrete, PVC = Poly Vinyl Chloride Source: ECRF

The pipes with an age of between 10 and 25 years represent 25.5 % of the total. See Table 2.5.9-4.

Within this drainage area, the drainage sub-areas have also been defined:

Sinchi Roca: Located in the Comas district; according to SEDAPAL’s Master Plan, the Sinchi Roca WWTP is proposed to treat the wastewater generated in the Collique zone. However, as mentioned above, SEDAPAL has not decided the construction of this WWTP yet.

Oquendo: Located in the San Martín and Comas districts, it is proposed that wastewater will be treated in the Taboada WWTP.

Page 10: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-165 NIPPON KOEI LAC CO.,LTD

Table 2.5.9-4: Length of Primary Sewers by Age

Drainage Area

Diameter Age / Length (m) Sub Total (m)

% Mm

No Data

< 10 > 35 10 to 25 25 to 35

Comas

350 5,054.2 1,827.2 486.2 4,060.9 799.1 12,227.6 25.0

355 24.6 1,549.9 1,574.5 3.2

400 1,961.4 828.2 145.4 1,848.3 4,783.3 9.8

450 2,862.3 558.2 2,461.9 366.8 6,249.2 12.80

525 707.0 399.6 183.5 1,290.1 2.60

600 2,782.7 948.8 275.5 4,007.0 8.20

750 514.5 514.5 1.10

800 150.1 1,094.7 1,244.9 2.50

900 1,237.3 282.9 614.9 565.7 2,700.7 5.50

1000 1,610.8 206.8 1,817.6 3.70

1100 1,486.8 1,486.8 3.00

1200 938.7 400.2 675.4 2,014.3 4.10

1300 2,937.7 135.1 898.8 335.8 4,307.3 8.80

1400 2,266.9 396.0 150.2 2,813.1 5.70

1500 842.8 842.8 1.70

1800 1,113.1 1,113.1 2.30

Total 25,976.2 5,294.7 2,009.2 12,505.1 3,201.7 48,986.9 100.00

% 53.0 10.8 4.1 25.5 6.5 Source: ECRF

(b) Puente Piedra Drainage Area

This drainage area involves the Puente Piedra district and part of the Carabayllo district and it has a Drainage Area of 5,271.8 hectares.

The Study area included in this Puente Piedra drainage area includes part of the Puente Piedra district and has a Drainage area of 297.8 hectares.

The Puente Piedra main collector is the main sewer, and the sewage from the Study Area flows to the main collector by gravity. The main collector discharges in the Puente Piedra Wastewater Treatment Plant (WWTP). This treatment plant uses an activated sludge process with a capacity of 450 l/s.

Main Collector: The Puente Piedra main collector is the main sewer, and various interceptors called primary sewers join it by gravity. It partially covers the districts of Los Olivos, San Martín de Porres and Puente Piedra.

The most relevant information about this main collector is as follows:

• Discharge diameter : 914 mm

• Drainage Area: : 5,271.8 hectares

Page 11: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-166 NIPPON KOEI LAC CO.,LTD

This main collector delivers sewage to the Puente Piedra WWTP, which is then discharged into the Chillón River.

Primary Sewers: The primary sewers of this drainage system included in the Study area are comprised of approximately 9.8 km of pipes, whose diameters range from 350mm to 1219mm.

The piping material is predominantly made up of PE, which accounts for 77.2% of the total. See Table 2.5.9-5.

Table 2.5.9-5: Length of Primary Sewers by Type of Material

Drainage Area

Diameter Material / Length (m) Sub Total (m)

% Mm AC PE PVC

Puente Piedra

350 968.7 968.7 9.80

355 251.8 251.8 2.60

400 748.1 274.3 1,022.4 10.40

610 792.2 792.2 8.10

762 5,529.3 5,529.3 56.20

914 1,022.9 1,022.9 10.40

1219 252.8 252.8 2.60

Total 748.1 7,597.2 1,494.8 9,840.1 100.00

% 7.6 77.2 15.2 Source: ECRF

The pipes with less than 10 years of age represent 24.9% of the total. See Table 2.5.9-6.

Table 2.5.9-6: Length of Primary Sewers by Age

Drainage Area

Diameter Age / Length (m) Sub Total (m)

% Mm No Data < 10 10 to 25

Puente Piedra

350 147.9 589.5 231.3 968.7 9.80

355 251.8 251.8 2.60

400 800.3 222.1 1,022.4 10.40

610 792.2 792.2 8.10

762 3,992.3 1,537.0 5,529.3 56.20

914 1,022.9 1,022.9 10.40

1219 153.5 99.3 252.8 2.60

Total 7,161.1 2,447.8 231.3 9,840.1 100.00

% 72.8 24.9 2.4 Source: ECRF

(c) Márquez-Oquendo Drainage Area

This area is limited by the coastline of the sea and the Comas drainage area. It has a drainage area of 36.8 hectares, and it includes part of the Callao district. Area south of this drainage area has a sewerage system which is not administrated by SEDAPAL yet.

Page 12: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-167 NIPPON KOEI LAC CO.,LTD

The Study Area included in this drainage area includes part of the Callao district. The entire drainage area is included in the Study area.

Because of the drainage area’s topography, it requires a pumping system, which discharges wastewater to the Chillón River without any treatment.

Main Collector: The technical information regarding the main collector is as follows:

• The discharge diameter is 350 mm

• Area of Drainage: 839.7 hectares

• This main collector discharges to the Chillón River without any treatment.

Primary Sewers: The primary sewer in the Study Area is made up of approximately 0.2 km of piping with a diameter of 350 mm.

The single material used in the sewer is Simple Standard Concrete. See Table 2.5.9-7.

Table 2.5.9-7: Length of Primary Sewers by Type of Material

Drainage Area Diameter

Material / Length (m)

Sub Total (m)

% Mm CSN

Márquez 350 165.70 165.70 100.00

Total 165.70 165.70 100.00

% 100.00 Source: ECRF

Pipes with between 10 and 25 years of age represent 100% of the total. See Table 2.5.9-8.

Table 2.5.9-8: Length of Primary Sewers by Type of Material

Drainage Area Diameter Age / Length (m)

Sub Total (m) % Mm 10 to 25

Márquez 350 165.70 165.70 100.00

Total 165.70 165.70 % 100.00

Source: ECRF

2) Secondary Sewers

The secondary networks in the Study Area are made up of approximately 652 km of pipes, whose diameters range from 100 mm to 315 mm.

The piping materials are mostly CSN and PVC. Table 2.5.9-9 shows the distribution of piping according to type of material.

Page 13: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-168 NIPPON KOEI LAC CO.,LTD

Table 2.5.9-9: Piping in the Study Area

Material Quantity (Km)

Percentage

Asbestos Cement 0.175 0.027%

PVC 210.000 32.202%

Simple Standard Concrete 441.960 67.700%

Cast Iron 0.008 0.001% Source: ECRF

Figure 2.5.9-4 is a map showing the distribution of pipes in the Study area, considering the different types of material.

It is to be noted that there are some other studies and projects which are either ongoing or completed related to water supply and/or secondary sewerage upgrading. The names are given below and their respective influence areas are shown in Figure 2.5.9-5. Thus, these areas will not be investigated further in this Study.

1. Elaboration of the study of the proposed expansion and improvement of drinking water system and sewerage scheme in Cerro Las Animas and adjacent areas.

2. Health Improvement Project of the marginal areas of Lima. Loan Agreement Pe -930. Lot 10 Puente Piedra district, water networks and secondary sewage. Schemes Chillon Valley Gardens, La Ensenada, Chillon Housing Association.

3. Health Improvement Project for Marginal Areas in Lima, Loan Agreement - PE-P30, Lot 7.

4. Perfil of the “Installation of the Water Supply and Sewerage Scheme for the Oquendo Santa Rosa and El Naranjal (Sectors 251, 252, 256, and 257) Scheme” Project. This Project involves the Comas Drainage areas and the Valle Chillón, Primavera, Año Nuevo, Independencia, Comas, and Carabayllo sectors. General Water Supply Works have been executed for this scheme, by means of LP 0029-2003 Contract.

5. Promesal works, Lot 6B, Valle Chillón Chillon, Primavera, Ano Nuevo, Independencia, Comas, and Carabayllo Sector Scheme. Improvement Works in the Water Supply General Works. No improvement Works have been carried out for the sewerage network.

6. Works contract L.P. 021-2007-CW -31960 IBRD- SEDAPAL Water supply and sewerage network extensions through condominium systems in various districts. These condominium systems have carried out works on sewerage networks with diameters of less than 200 mm, and have not been included in this Study.

7. PAC 4 Comas Carabayllo Independencia, and Puente Piedra works. Reservoir rehabilitation Works.

Page 14: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

VENTANILLA

CALLAO

COMAS

SAN JUAN DE LURIGANCHO

CARABAYLLO

LOS OLIVOS

PUENTE PIEDRA

SAN MARTIN DE PORRES

INDEPENDENCIA

SAN MARTIN DE PORRES RIMAC

LURIGANCHO

AD-0 PT1

PT6

A16

A18

AD-A1

AD-P0

AD-CH1

AD-N1

ADC-1

ADC-2

AD-CH4

PT4

AD-R1

AD-A2

AD-CA1

AD-CA2

ADC-5

AD-AG4

AD-PL1

AD-PL2

AD-AG2

AD-N2

AD-CO2

PT3

AD-CA3

AD-R2

AD-P2

AD-T2

AD-CH3

PT2

PT5

AD-T1

AD-T4

AD-CO1

ADC-6

AD-AG1

PT7

AD-T3

AD-T5

SA-42

SA-30

SA-8

AD-1Ab

SA-55

SA-57

ADC-3

SA-25SA-40B

SA-56A

SA-24

SA-56B

SA-6

AD-AG3

ADC-4

A19

AD-CH2SA-37

AD-M1

SA-12

SA-33

AD-T6

SA-52

SA-41

AD-01BAD-AG5

SA-50

AD-1Aa

SA-15

SA-4

AD-02B

SA-26

SA-54

SA-51

SA-10

SA-39A

SA-5

SA-27

SA-14

AD-3

SA-13

SA-35

SA-53

SA-34

SA-48

SA-28

SA-21

SA-16ASA-47SA-9

SA-20

AD-01A

SA-3

AD-02A

SA-31

A15

SA-7

SA-58

SA-32

SA-11

AD-04

SA-49

SA-29

SA-39B

SA-23

OCEANO PACIFICO

AV CE NTRA L

AV CHILL

ON

AV IN

DOAM

ERIC

A

AV P UNO

AV C

AV S

ANTA

ANA

AV CANTA CALLAO

AV P

ERIM

ETRAL

AV C

ARAB

AYLL

O

AV C

HACR

A CER

RO

AV 1

AV O LIV OS , LOS

AV T ANTAMAYO

AV UNGER, G

ERARDO

AV H

EROE

S DEL

ALTO

CEN

EPA

AV S

INCH

I ROC

A

A V S A N T A EL V IR A

AV R

ETAB

LO, E

L

AV RIO M A RA ÑON

AV SAN JOSE

AV MENDIOLA , A LF REDO

AV C

UZC O

AV P ARA MONGA

AV R EV OLUCIO N

A V 20 0 MI LL

A S

AV SO L DE NA R AN JA L

AV D

AV UNIVERS ITARIA

AV B

AV JUPIT ER

AV ALIS OS , LOS

AV LIM A

AV TA

Z A, LA

AV PANAMERICANA NORTE

AV 17

A V SAN DI EGO DE A LCA LA

AV SA N FE L IP E

AV PA RIA HUA NCA

AV METROPOLITANA

AV ACA P ULCO

AV E

AV C

OND OR

CANQ

UI, M

ARIA

NO

AV CONTISUYO

AV INDEPENDENCIA

AV PA

RADO DE BELL

IDO, MAR

IA

AV 4

AV RIO TAM

BO

AV INDUSTRIAL

AV INCA S, LO S

AV CH INCHA YS U YO

AV ACA C I AS , L AS

AV H

UAYL

AS

AV FA M ES A

AV D OM INIC OS , LOS

AV A

A V SA N RE MO

AV T

UPAC

AM

ARU

AV ROS ARIO , E L

A V SA N JUA N

AV S

AN M

ATE O

AV J AM A ICA

AV M E XICO

A V M

ALECO N

CHIL

LON

AV H

UAND

OY

A V ANG ELES , LO S

AV A

RTES

ANOS

, LO S

AV CED RO S, LOS

AV S ANG A RARA

A V U GA RTE , A LFONS O

AV SOL DE ORO

AV JA ZMIN E S , LOS

AV P AR R AL , E L

AV E COLO GICO

AV ZINC, E L

AV RO SAL, EL

AV M IRAFLORES

AV DE SA N M ART IN, J OS E

AV C

HASQ

UIS ,

LOS

AV M IRA MA R

AV ROS A LU Z

AV PACASMAYO

AV NO VIE M BRE , 17 DE

AV CA NA DA

A V LIBE RT A D

A V S ETIEM BR

E , 25 DE

AV EU CAL IP TO S, LO S

AV NIÑO S M A RT IRES , LOS

AV R

EGLA

, LA

AV CARR IO N, DANIEL AL CIDES

AV SAN C ARLO S

AV JA

CARA

NDA

AV HURIN CUZCO

AV M

UJIC

A GA

LLO

, MAN

UEL

AV 2

AV BOLOGNESI, FRANCISCO

AV HUA NA CAURE

AV MAN CO CAPA C

AV ANT UNE Z DE M AY OL O, S ANTIA GO

AV CO RICANCHA

AV O CTUB RE, 2 DE

AV TO RRES , LAS

A V N A RA NJAL , E L

AV P ORTA LE S , LO S

AV REPU BL IC A DE L PER U

A V DICIEM BR E, 20 D E

AV CO LE CTO RA

AV A GOSTO, 1 1 DE

AV F A UCE TT , EL ME R

AV PO MAB

A MBA

AV S

AN R

O Q UE

AV S ANTA MA R IA A LT A

AV CO ND ORCA NQ UI, J OSE G AB RIEL

AV V IRGEN DEL ROSARIO

AV ALAMO S, L OS

AV JUNIO, 15 DE

AV VALL EJO , CE SAR

AV GL O BO

T E R RA Q U E O

AV M ILAG RO D E JESUS

A V M AE STRO P E RU ANO

A V S AN E NRIQUE

AV NE PT UNO

AV VENUS

AV AL

BORA

DA, L

A

AV VI RG EN DE L CA R M EN

AV GONZALE S P RADA, MA NUE L

AV 7

AV C

ENTE

NARI

O

AV P

INO S,

LOS

AV ROSA DE AM

ERICA

AV TR

APICHE

CHIL LON

AV NARANJAL

A V IN TE GR A C IO N

AV U N IO N, L A

AV HUAMACHUCO

AV E NER O, 25 DE

AV O RQUIDEAS , LAS

A V PALME RAS , LAS

AV AM A NCA ES , LOS

AV PERIF ERICA

AV BERT ELLO, A LE JANDRO

AV BERT ELLO B O

LL AT I, AL E JA N DRO

AV AG OS TO, 22 DE

AV M

AYO,

11 D

E

AV O LIVAR, E L

AV S AN B E RNARDO

A V BET AN COU RT, R OMU LO

A V DE LA FUENT E, GUIL LE R MO

AV VE NCED ORE S, L OS

AV P RA DO , M A NUE L

A V B AS TID A S, MICAELA

AV SAN A NTO NIO

A V G AMBETT A , CRNE L NES TOR

AV MONITO

R HUASCAR

AV ANT ISUYO

AV IZA GUIR RE, CA RLOS A LBE RTO

AV DE SAN MARTIN, DO N JO

SE

AV HO NDURAS

A V PE RU AN IDAD DE LA

AV TUL IP AN ES, LO S

AV S ANTA RO SA

A V ES T

A DO

S UN

IDOS

AV D

EL B

IERZ

O

AV B END EZU, W ILBE R

AV MERINO RE YN A

AV SAN JUAN MAS IAS

AV SANTA CRUZ

AV BELAUN DE O ESTE, VICTO R A

AV CHO CAN O, JOS E SANTOS

AV JULI

O, 1

DE

AV PUNCHAUCA

AV P

LATI

NOS ,

LOS

AV SAN PEDRO DE CARABAYLLO

AV S

AN A LBIN O

AV G UARDIA CIV IL

AV AG OSTO, 25 DE

AV SO L, EL

AV PROCERES, DE LOSA V OC TUBRE , 12 DE

AV CO RDIALIDAD, LA

A V SE ÑOR DE CAUD IV ILL A

AV P ROCE RE S, LOS

A V GU AR DIA R EP UBLICAN A

AV PA RA ISO

AV MARTIN, JUAN MANUEL

AV HA YA DE LA TORR E,

VICT OR R

AV CO LE CTO R COM AS

AV SANT A AD ELA

A V CH IMP U O C L LO , ISA BE L

AV S

AUC

ES, L

OS

AV TREBOL, EL

AV V IOL E T AS , L A S

AV IZA GUIRRE , CA RLO S A

AV S AN

F RANC

ISCO

AV S AN P E DR O

AV E NER O, 22 DE

AV GRANADAS, L

AS

AV BO LO G NESI, C RNL FRAN CI SCO

AV RESIDENCIAL

AV DE LA TORRE UGA RTE , JOS E

AV CAC ERES, MRC AL AND RES A

AV VEN EZU ELA

AV M

AGNO

LIAS ,

LAS

AV AM E RICAS , LAS

AV LIBERTAD, LA

A V JE R U SALEN

AV CO NFR ATE R NID AD , LA

AV ALAMEDA DEL PINAR

AV PALMA, RICARDO

AV SAN NICO LAS

A V HE ROES

DE

P UCU

TA

AV OLA

YA, MARTIR JO

SE

AV DE L

A MU JE R PER UAN A

AV SANTI SIMA C R U Z D E SAN D IEGO

AV JUL IO, 2 8 DE

A V G RAU, A LM T E MIG UEL

AV VILLAR RE AL, FE DER ICO

AV M AL VI NAS , LAS

AV RE PU BLICA DE ISRA E L

AV S A N M AR TIN

AV PRINCIPAL

AV B ELA UNDE ES TE , VICTO R A

AV R

EPU B

LICA D

E ARG

ENTIN

A

AV M ER CURIO

AV BELEN

AV RO BLE S, LO S

AV A

LHEL

IE S, LO

S

AV VAL LE, T OMAS

AV C

AV UNG ER, G ERARDO

AV AL ISO S, LOS AV CO RICANCHA

AV CA NTA C AL LAO

AV COLEC TOR A

AV A

AV SA NT A ROS A

AV O LIVAR, E L

AV PRINCIPAL

A V S AN CA RLOS

AV ALISO S, L OS

AV U

NIVER

S ITARIA

AV F AU C ETT, E LM ER

AV CA NTA C ALLAO

AV C

ENTR

AL

AV MA NC O C A P AC

AV U

N IV

ERSI

TAR I

A

A V PRO CE RE S, LOS

AV S ANTA ANA

AV S ANTA RO SA

AV SANTA RO SA

AV R

ETAB

LO, E

L

AV INDO AMERICA

AV SAN DIEGO DE ALCALA

A V IZA G UIRRE , CA RLOS A

AV P

INOS , L

OS

AV A

AV UNGER, G

ERARDO

AV S ANTA RO SA

AV P

ACAS

MAYO

AV PANAMERICANA NORTE

AV M E RINO RE YNA

AV 200 MILLAS

AV S

ANTA

RO SA

AV S

ANTA

RO SA

AV O LIV OS , LOS

AV ME ND IO

L A, A LF RE DO

AV DO MINICOS , L OS

AV INCA S, LO S

AV NARA NJA L, E L

AV A

A V M ALE CON CH IL LON

AV SAN NICO LAS

AV ROSA DE AM

ERICA

AV S ANG A RARA

AV T UPAC AMARU

AV OCTUBRE, 12 DE

AV CANTA C

ALLA

O

AV SANTA ADELA

AV SA N C ARLOS

AV SANTA RO SA

AV B ERTEL LO BOL LATI, ALE JAN DRO

AV E

AV CO NFRATE RNIDA D, LA

AV G

AMBE

TTA,

CR N

EL N

EST O

R

AV SAN PEDRO D E CA RAB AY LLO

AV ALIS OS , LOS

AV PRINCIPA L

AV C EDR OS, L OS

AV TAN TA MAY O

AV TU

PAC

AMAR

U

AV ANT ISUYO

AV PACASMAYO

AV IZA GUIRRE , CA RLOS ALB ERTO

A V JA ZM INE S, LOS

AV CENTRAL

AV ALIS OS , LOS

AV P LATINOS , LOS

A V UNI

VERS

I TA R

I A

AV U

N IVER

S ITA

RIA

A V PALMER AS , LAS

AV U

N IV E

R SI T

ARIA

AV A

AV C U ZCO

AV CHO CANO , JOSE SANTO S

AV J AZ MINE S , LO S

AV UNIVERS ITARIA

AV CHACRA C ERRO

AV MENDIOLA , A LF REDO

AV OLIVOS , LO S

AV SA U C ES, LOS

A V TOR RES, L

A S

AV ALIS OS , LOS

AV CAN TA C A LLA O

AV S

AN

TA R OS A

AV P IN OS , LOS

AV TO RRES , LAS

AV SAN NICO LAS

AV A LIS OS , LOSAV S

AN J

OSE

AV U

NIVE

RSIT

A RI A

AV PANAMERICANA NORTE

A V CH

ACRA

CER

RO

AV U

NIVE

RSITA

RIA

A V UN G ER , GE R ARDO

AV PACASMAYO

AV TORRES , LAS

A V AGOSTO, 22 D E

AV M AG

N OLIA

S, LA

S

AV B OLO GNE SI, CRNL FRA NCIS CO

AV PA

NAMERICANA N

ORTE

AV 1

AV C

ARAB

AYLL

O

AV CENTRAL

AV TRAP ICHE CHILLON

A V NARA NJA L, E L

AV CEDRO S, LOS

AV A

AV DOMINICO S, LOS

AV P

A CA S

MAY

O

AV B

AV T U

P AC

A MAR

U

AV M EN D IO L A, A L FR EDO

AV RO SA DE AME RICA

AV SAN F ELIPE

AV INDUSTRIAL

AV VA LLEJ O, CE SA R

AV CA N T A C AL L AO

A V 200 M ILL AS

AV LIM A

AV T

UPAC

AM AR

U

A V RIO MAR AÑON

AV H

UAND

OY

AV SAUCES , LOS

AV SAN M

ATEO

AV B

AV S EÑ OR DE CA UDIV ILLA

AV UNIVERS ITARIA

AV MENDIOLA , A LF REDO

AV S

ANTA

RO SA

AV C

A V ROS ARIO, EL

AV B

AV PI

NO S , LOS

AV A

AV M E N DI OL A , A L FR E D OAV PERIM

ETRAL

AV B

AV M

UJIC

A G

A LL O

, MAN

UEL

AV PACASMAYO

AV PALMA, RICARDO

AV B

AV METROPOLITANA

AV MENDIOLA , A LF REDO

AV M ETROPOL ITANA

AV C

ANTA

CAL

LAO

A V A NG ELE S, L OS

AV U

N IVE

RSIT A RI

A

AV R

ETAB

LO, E

L

AV C

A V ME

NDIO

L A, A

L FRE

DO

AV BAV

R EPUBL

ICA D

EL P

ERU

AV B

AV A

A V UN G ER , G ERAR DO

AV TU

PAC

AMAR

U

AV CE NTRA L

AV M E ND IO L A , A L FR E DO

AV SAUC ES , LOS

A V S AN FE LIP E

AV CAN TA

C ALLAO

AV SAN ENRIQUE

AV S ANG A RARA

AV C

AV CA CE RES , MRCA L A NDRE S A

AV FA UCET T, E LM E R

AV A

A V SA N J UA N MA SIA S

AV PR AD O, M ANUE L

AV CHIMPU OCLLO, I SABEL

AV A

AV CANTA CALLAO

AV C

ENTE

NARI

O

A V S A NTA RO SA

AV CE NTRA L

AV PANAMERICANA NORTE

AV B

AV NAR AN JAL

AV P INOS , LOS

AV A

AV C

A V CE N TRA L

AV C

A V SANT A RO SA

AV S

AN F

RANCIS

CO

AV 2

AV P

RINC

IPAL

AV EUCALIPTOS , LOS

AV R

ETAB

LO, E

L

AV C

A RA B

A YLL

O

AV IN DEP ENDE N CI A

AV A

AV 17

AV IN

TEGR

ACIO

N

AV A

AV DO MINICOS, LO S

AV INDO AMERICA

AV CHILLON

AV SANTA RO SA

AV TRAP ICHE CHILLON

AV 2

AV CENTRAL

A V INT EG

R ACIO

N

AV PACASMAYO

AV N ARA NJA L

AV VENUS

AV B

A V RE VOLUCIO N

AV O LIV OS , LOS

AV T

UPAC

AMA R

U

A V H UA ND OY

AV C

AV B

AV H

UAYL

AS

AV SAN CARLOS

A V UNIV ERS IT ARIA

A V ALISOS , LO S

AV FA UCET T, E LM E R

AV SAN G ARAR A

AV ME N D IO

L A, A LF R ED O

AV IZA GUIRRE , CA RLO S A LBE RTO

SA-22

SA-16B

AD-05A

SA-40A

AD-5C

AD-05D

AD-5B

270000

270000

275000

275000

280000

280000

285000

285000

8675

000

8675

000

8680

000

8680

000

8685

000

8685

000·

LEGEND

SEWERAGE SECONDARY NETWORKMaterial

AC (Asbest Cement)CSN (Structural Plain Concrete)FOFO (Cast Iron)PVC (Vinyl Polychloride)

STUDY AREADISTRICT BOUNDARYDRAINAGE AREAROADSGREEN AREABLOCKSRIVERSCOAST1:50,000Proyección: UTM

Datum: WGS-84Zona: 18 sur

0 1 20.5km

PROYECTO :

GRAFICO 2.5.9.4: DISTRIBUCION DE TUBERIAS DEALCANTARILLADO EN AREA DE ESTUDIO SEGUN TIPO DE MATERIAL

SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMAREPUBLICA DEL PERU

FIGURE 2.5.9.4: DISTRIBUTION OF SEWERAGE PIPES IN THE STUDY AREA, BY TYPE OF MATERIAL

AC CSN FOFO PVC T otal Gener al

A16 7.522 7.522A18 0.827 10.703 11.529A19 5.732 5.732AD-0 0.969 0.735 1.704AD-01B 0.000 0.947 0.947AD-A1 18.945 11.370 30.315AD-A2 19.610 4.553 24.163AD-AG1 1.921 2.755 4.676AD-AG2 26.523 3.387 29.910AD-AG3 11.998 0.131 12.129AD-AG4 24.097 2.338 26.435ADC-1 10.078 10.078ADC-2 13.495 0.019 13.514ADC-3 4.974 4.974ADC-4 6.906 6.906ADC-5 13.657 0.036 13.693ADC-6 11.368 0.008 11.376AD-CA1 8.802 8.802AD-CA3 0.824 0.824AD-CH1 24.166 7.949 32.115AD-CH2 12.016 0.558 12.574AD-CH3 21.762 0.123 21.884AD-CH4 11.149 19.723 30.872AD-CO1 19.992 0.852 20.844AD-CO2 21.699 5.133 26.833AD-M 1 0.175 11.754 1.490 13.419AD-N1 19.231 5.554 24.785AD-N2 22.503 1.028 23.531AD-P2 0.455 0.455AD-PL1 22.179 22.179AD-PL2 20.149 2.436 22.585AD-R1 13.886 0.928 14.814AD-R2 16.435 0.925 17.360AD-T 1 11.078 3.455 14.533AD-T 2 2.515 4.305 6.819AD-T 3 0.035 0.035AD-T 4 12.392 0.147 12.539AD-T 5 10.062 10.062AD-T 6 2.606 2.606PT 1 22.992 22.992PT 2 6.592 6.592PT 3 12.996 12.996PT 4 0.018 11.667 11.685PT 5 0.929 7.850 8.779PT 6 25.445 25.445PT 7 7.544 7.544SA-57 0.032 0.032T otal 0.175 441.958 0.008 210.000 652.141Per centaj e 0.027% 67.770% 0.001% 32.202% 100.000%

Length (km) per M ater i al Dr ai nage A r ea

LENGT H (Km) OF SECONDARY NET WORKS OF SEWERAGE IN T HE ST UDY AREA

Page 15: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

CARABAYLLO

PUENTE PIEDRA

VENTANILLA

COMAS

LOS OLIVOS

SAN MARTIN DEPORRESCALLAO

INDEPENDENCIA

OC

EA

NO

P

AC

IF

IC

O

RIO

CH

ILL

ON

RIO CHILLON

CB-02CAMARA DE BOMBEO

DE DESAGUE(VOL=47.60MĮ)

REPUBLICA DEL PERUSERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMA

N

LEGEND

Preparation of the Perfil Study of the Project : “Installation of theWater and Sewerage System for Oquendo, Santa Rosa andNaranjal Scheme (sectors 251, 252, 256 and 257)”. This projectinvolves Comas and Marquez drainage area

Project of Sanitation Enlargement of the Socially Excluded Area ofLima Loan Agreement PE-P30.Lot 10: District of Puente Piedra, Works of Water and SewerageSecondary Networks, Valle Chillon Gardens - La Ensenada -Chillon Housing Association Schemes

Execution of General Works of Water and Seweragethat are executed by L.P.N.N 0029-2003 “GeneralWorks of Water and Sewerage for Oquendo, Santa Rosaand Naranjal Scheme” (sectors 251, 252, 256 and 257)executed by “Santa Rosa” Joint Venture.

Contract of Work 023-2007-CW-31960/IBRD-SEDAPALEnlargement of Water and Sewerage Networks byCondominium Systems in Several Districts of NorthArea Package 2

Preparation of Perfil Study of the Project of Enlargement andImprovement of the Water and Sewerage System, Las Animas hilland attachments scheme

Project of Sanitation Improvement of Socially Excluded Areas ofLima, Loan Agreement PE-P30 Lot 7

Works Pro-Networks Alfredo Villa Calderon Shanty Town

PROMESAL Works Lot 6-9B Valle Chillon, Primavera, AnoNuevo: Independencia-Comas-Carabayllo Sector Scheme

Works in Las Magnolias Shanty Town

PAC Works - Package 4 Comas, Carabayllo, Independencia,Puente Piedra

GRAFICO 2.5.9-5: OBRAS Y ESTUDIOS DE ALCANTARILLADO EN EJECUCION EN LA ZONA DE ESTUDIO

FIGURE 2.5.9.5: ON-GOING SEWERAGE WORKS AND STUDIESIN THE STUDY AREA

Page 16: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-171 NIPPON KOEI LAC CO.,LTD

Table 2.5.9-10 shows the distribution of pipes by material according to the drainage areas.

Table 2.5.9-10: Drainage Area Distribution of Pipes by Type of Material in the Study Area

Drainage Area

Length by Material (Km) Demand of Pipe Km AC CSN FOFO PVC

A16 7.52 7.52 A18 0.83 10.70 11.53 A19 5.73 5.73 AD-0 0.97 0.73 1.70 AD-01B 0.00 0.95 0.95 AD-A1 18.94 11.37 30.31 AD-A2 19.61 4.55 24.16 AD-AG1 1.92 2.76 4.68 AD-AG2 26.52 3.39 29.91 AD-AG3 12.00 0.13 12.13 AD-AG4 24.10 2.34 26.44 ADC-1 10.08 10.08 ADC-2 13.50 0.02 13.52 ADC-3 4.97 4.97 ADC-4 6.91 6.91 ADC-5 13.66 0.04 13.70 ADC-6 11.37 0.01 11.38 AD-CA1 8.80 8.80 AD-CA3 0.82 0.82 AD-CH1 24.17 7.86 32.03 AD-CH2 12.02 0.56 12.58 AD-CH3 21.76 0.12 21.88 AD-CH4 11.15 19.72 30.87 AD-CO1 19.99 0.85 20.84 AD-CO2 21.70 5.13 26.83 AD-M1 0.08 11.75 1.49 13.32 AD-N1 19.04 5.53 24.57 AD-N2 22.50 1.03 23.53 AD-P2 0.46 0.46 AD-PL1 22.18 22.18 AD-PL2 20.15 2.44 22.59 AD-R1 13.88 0.93 14.81 AD-R2 16.43 0.93 17.36 AD-T1 11.08 3.46 14.54 AD-T2 2.33 4.28 6.61 AD-T3 0.04 0.04 AD-T4 12.39 0.15 12.54 AD-T5 10.06 10.06 AD-T6 2.61 2.61 PT1 22.99 22.99 PT2 6.59 6.59 PT3 13.00 13.00 PT4 0.02 11.68 11.70 PT5 0.93 7.85 8.78 PT6 25.44 25.44 PT7 7.54 7.54 SA-57 0.03 0.03

Total 0.08 441.59 0.01 209.88 651.56 Percentage 0.01% 67.77% 0.00% 32.21% 100.00%

Source: JICA Study Team

Page 17: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II)

FINAL REPORT

NIPPON KOEI CO.,LTD. 2-172 NIPPON KOEI LAC CO.,LTD

Figure 2.5.9.6 shows a map with the distribution of the pipes in the Study Area, according to pipe material.

Table N° 2.5.9.11 shows pipe distribution, according to pipe material, in the Study area.

Table 2.5.9-11: Drainage Area Distribution of Pipes by Type of Material in the Influence Area

Length of pipes (Km) in Secondary Sewerage Networks by Type of Material

Drainage Area Length by Material (Km)

Total AC CSN FOFO PVC

AD-A1 18.94 11.37 30.31

AD-A2 19.61 4.55 24.16

AD-AG1 1.92 2.76 4.68

AD-AG2 26.52 3.39 29.91

AD-AG3 12.00 0.13 12.13

AD-AG4 24.10 2.34 26.44

ADC-1 10.08 10.08

ADC-2 13.50 0.02 13.52

ADC-3 4.97 4.97

ADC-4 6.91 6.91

ADC-5 13.66 0.04 13.70

ADC-6 11.37 0.01 11.38

AD-CH1 24.17 7.86 32.03

AD-CH2 12.02 0.56 12.58

AD-CH3 21.76 0.12 21.88

AD-CO1 19.99 0.85 20.84

AD-CO2 21.70 5.13 26.83

AD-M1 0.08 11.75 1.49 13.32

AD-N1 19.04 5.53 24.57

AD-N2 22.50 1.03 23.53

AD-PL1 22.18 22.18

AD-PL2 20.15 2.44 22.59

AD-R1 13.88 0.93 14.81

AD-R2 16.43 0.93 17.36

AD-T1 11.08 3.46 14.54

AD-T2 2.33 4.28 6.61

AD-T3 0.04 0.04

AD-T4 12.39 0.15 12.54

AD-T5 10.06 10.06

AD-T6 2.61 2.61

Total 0.08 427.66 0.01 59.36 487.11

Source: JICA Study Team

Page 18: 2.5.9 Diagnosis of the Existing Sewerage System Infrastructure · FEASIBILITY STUDY ON NORTH LIMA METROPOLITAN AREA WATER SUPPLY AND SEWERAGE OPTIMIZATION PROJECT (II) FINAL REPORT

VENTANILLA

CALLAO

COMAS

SAN JUAN DE LURIGANCHO

CARABAYLLO

LOS OLIVOS

PUENTE PIEDRA

SAN MARTIN DE PORRES

INDEPENDENCIA

SAN MARTIN DE PORRES RIMAC

LURIGANCHO

AD-0 PT1

PT6

A16

A18

AD-A1

AD-P0

AD-CH1

AD-N1

ADC-1

ADC-2

AD-CH4

PT4

AD-R1

AD-A2

AD-CA1

AD-CA2

ADC-5

AD-AG4

AD-PL1

AD-PL2

AD-AG2

AD-N2

AD-CO2

PT3

AD-CA3

AD-R2

AD-P2

AD-T2

AD-CH3

PT2

PT5

AD-T1

AD-T4

AD-CO1

ADC-6

AD-AG1

PT7

AD-T3

AD-T5

SA-42

SA-30

SA-8

AD-1Ab

SA-55

SA-57

ADC-3

SA-25SA-40B

SA-56A

SA-24

SA-56B

SA-6

AD-AG3

ADC-4

A19

AD-CH2

SA-37

AD-M1

SA-12

SA-33

AD-T6

SA-52

SA-41

AD-01BAD-AG5

SA-50

AD-1Aa

SA-15

SA-4

AD-02B

SA-26

SA-54

SA-51

SA-10

SA-39A

SA-5

SA-27

SA-14

AD-3

SA-13

SA-35

SA-53

SA-34

SA-48

SA-28

SA-21

SA-16ASA-47SA-9

SA-20

AD-01A

SA-3

AD-02A

SA-31

A15

SA-7

SA-58

SA-32

SA-11

AD-04

SA-49

SA-29

SA-39B

SA-23

OCEANO PACIFICO

AV CENTRAL

AV CHILL

ON

AV IN

DOAM

ERIC

A

AV PUNO

AV C

AV SAN

TA ANA

AV CANTA CAL LAO

AV PER

IMET

RAL

AV CA

RABA

YLLO

AV CH

ACRA

CER

R O

AV 1

AV OLIVOS, LOS

AV T ANT AMAYO

AV UNGER, GERARDO

AV HE

ROES

DEL A

LTO C

ENEP

A

AV S

INCH

I RO

CA

AV S A NT A EL VIR A

A V R

ETAB

LO, E

L

AV RIO M ARA ÑON

AV SAN JOSE

AV MENDIOLA, ALFREDO

AV C UZC

O

AV P A RAMO

N GA

AV REVOLUCION

A V 2 00 M

ILLAS

AV S OL DE NA RANJAL

AV D

AV UNIVERSITARIA

AV B

AV JUPITER

AV AL ISOS, LOS

AV LIMA

AV TA

ZA, LA

AV PANAMERICANA NORTE

AV 17

A V SAN

DIEGO DE AL CAL A

AV SAN FE LI PE

AV P A RIA HUA NCA

AV METROPOLITANA

AV ACAPULCO

AV E

AV C

ONDO

RCA N

QUI , M

ARIA

NO

AV CONT ISUYO

AV INDEPENDENC IA

AV PA

R ADO D

E BEL

LIDO , M

A RIA

AV 4

AV RIO TAMBO

AV INDUSTRIAL

AV INCAS, LO S

AV CHINCHA YS UYO

A V AC ACI AS , LAS

AV HU

AYLA

S

AV F AMESA

AV DOMINIC OS, LOS

AV A

AV SAN REM O

AV T

UPA C

AM

ARU

AV RO SA RIO , EL

A V SAN JUAN

AV S

AN M

ATEO

AV JAMAICA

AV M EXICO

AV M ALEC

ON C

HILL

ON

AV HU

ANDO

Y

AV AN GELES, LOS

AV AR

TESA

NOS,

LOS

A V CEDR OS , L OS

AV SANG ARARA

AV UGART E, ALF ONS O

AV SOL DE ORO

AV J A ZMINE S, LOS

A V PA RRA L, EL

AV ECOLO GICO

AV ZINC, EL

AV ROSAL, EL

AV M IRAFLO RES

AV DE SAN M ARTIN, JO SE

AV CH

ASQ UIS

, LO S

AV M IRAM AR

AV RO SA LUZ

AV PACASMAYO

AV NOVIEM BRE, 1 7 DE

AV CANAD A

AV LIBERTA D

A V SETIEM

BRE,

25 D E

AV E UC ALIPT O S , LOS

AV NIÑOS M ART IRES, LOS

AV R E

G LA,

LA

AV C AR RI ON , D AN IEL ALC IDE S

AV SAN CARLOS

AV JA

CARA

NDA

AV HURIN CUZCO

AV M

UJIC

A GA

LLO

, MAN

UEL

AV 2

AV BOLOGNESI , FRANCISCO

AV HUANACAURE

AV MAN CO CAP AC

A V A NTUNE Z DE M A YOLO, S ANT IA GO

AV CORICANCHA

AV OCT UBRE, 2 DE

AV TO RRES, LAS

AV NARAN JAL, E L

AV PORTALES, LO S

AV RE PUBL ICA DEL PERU

AV D ICI

EM

BRE , 20 DE

AV COLECTO RA

A V AGOST O, 11 DE

A V F AUCETT , ELM E R

A V PO

MABA

MBA

AV S

A N R

O QUE

AV SANTA MARIA ALTA

AV CONDORCANQUI , JOSE GA B R IEL

AV V IRG EN

DEL ROSARIO

AV ALAMOS, LOS

AV J UNIO , 1 5 DE

AV VALLEJO, C ESAR

A V G LO BO T ER R AQ U EO

AV MILAGRO D E JESU S

AV MA ES TRO PE R UAN O

A V SA N ENRIQ UE

AV NEPT UNO

AV VENUS

AV AL

BORA

DA, L

A

AV VIRGE N DEL CAR M EN

A V GONZ ALES PRADA, M ANUEL

AV 7

AV C

ENTE

NARI

O

A V P

INOS

, LO S

AV ROSA DE AMERICA

AV T R

APICH

E CH ILL

ON

AV NARAN JAL

A V IN T EG RA CI ON

A V UN IO N, L A

AV HUAMACHUCO

AV ENERO , 25 DE

AV O RQUIDE A S, L AS

AV P ALM ERAS, LA

S

AV AM ANCAES, LOS

AV PERIFERICA

AV BERTEL LO, AL EJANDRO

AV BE RTELLO BOLL AT I, A LE JA

NDRO

AV AGOS TO , 22 DE

AV M

AYO,

11 D

E

AV OLIVAR, EL

AV SAN BERNARDO

AV B ETAN COURT , R OM

U LO

A V DE LA F UENT E, G UI LLERM O

AV VE NCEDORE S , LO S

AV P RADO, M ANUEL

AV BASTIDAS, MICA ELA

AV S AN

ANT ON IO

AV GAM

BE TTA , C RN EL NE ST OR

AV MONITOR HUASCAR

AV ANT ISUYO

AV IZ AG UIRR E, CA RLOS A LB E RTO

AV D E SAN MARTIN , DO N JOSE

AV HONDURAS

AV PER UAN IDAD D E LA

AV TULIP

ANES,

LOS

AV SANTA RO SA

AV E

STAD

O S U

N IDO

S

AV DE

L BIER

ZO

AV BENDEZ U, WIL BER

A V MER INO REYN A

AV SAN

JUAN MAS

IAS

AV SANTA CRUZ

AV BE LA UNDE OE STE , VICTOR A

A V C HOCANO, JOS E S AN TO S

A V JU L

I O, 1

DE

AV PUNCHAUCA

AV P

LAT I

NOS,

LOS

AV SAN PEDRO DE CARABAYLLO

AV S AN

ALBINO

AV GUARDIA CIV IL

AV AG OSTO, 25 DE

AV S OL, E L

AV PROCERES, DE LOSA V OCT UBR E, 12 D E

AV CORDIALIDAD, LA

AV SEÑO R DE CAU DIVI LL A

AV PROCERES, LO S

AV GUA RDIA R EPUB LICA NA

AV PARAISO

AV MART IN, JUAN MANUEL

AV H AY

A DE

LA TO

RRE,

V ICTO R R

AV COLECTO R CO MAS

AV S A NTA ADE LA

AV CHIMP U OCLLO , ISA B EL

AV S

AUCE

S, L

OS

AV TREBOL, EL

AV VI OL E TA S , L A S

AV IZAGUIRRE, CARLO S A

AV SA

N FRA

NCI S

CO

AV S AN P EDR O

AV ENERO , 22 DE

AV GRANADAS, L

AS

A V B OLO G NESI , CR NL FRANCIS CO

AV RESIDENCIAL

AV DE LA T ORRE UGART E, JOSE

AV CA CERES

, MR CA L A NDRES A

AV V EN EZUELA

AV M

AGNO

LIAS,

LAS

AV AM ERICAS, LAS

AV LIBERTAD, LA

A V JE RUS ALE N

A V CONFRA TERNIDA D, LA

AV AL AMEDA DEL PINAR

AV PALMA, RICARDO

AV SAN NICOLAS

AV HE

ROES

DE P

UCU

T A

AV OLA

YA, M

ART IR JOSE

A V DE

L A M

UJE R PER UA NA

AV SA NT ISIMA CR U Z D E SA N DIE GO

A V JULIO , 28 D E

A V GRA U, A LMT E M IGUEL

AV V ILL ARREAL , F ED ER ICO

AV M A LVIN AS, LA

S

AV REPUBLICA DE ISRAEL

AV SA N M AR TIN

AV PRINCIPAL

AV BEL AUNDE ESTE, V ICT OR A

AV RE

PUBL

ICA D

E ARG

ENTIN

A

AV M ERCURIO

AV BEL EN

AV ROBLES, LOS

A V A

LHEL

IES, L

OS

AV VA LL E, TOMAS

AV SANTA ADELA

AV CORICANCHA

AV INDOAMERICA

AV TR

APICHE CHILLO N

AV UNGER, G ERARDO

AV SAN NICOLAS

AV INCAS, LO S

AV PANAMERICANA NORTE

AV CACER ES, M RCAL ANDRES A

AV IZAGUIRRE, CARLO S A

A V FA UCE TT, E LME R

AV SA NTA ROS A

AV OLIVAR, EL

AV OCTUBRE, 12 DE

AV METROPOLITANA

AV P

RINC

IPAL

A V RI O MA RA ÑON

AV S AN PED RO DE C ARABAYLLO

AV SAN DIEG O DE ALCALA

AV CENTRAL

AV J AZ MINE S, LO S

AV MA N CO C A PA C

AV A

AV PROCE RE S, L OS

AV SANTA RO SA

AV SA N JUAN MA SI AS

AV P RADO, M ANUEL

AV P INO S,

L OS

A V IZ AG UIRRE , CARLO S A

AV SAN

TA RO SA

A V TU

PAC

AMAR

U

AV 1

AV M ERINO REYNA

A V SANT A R OSA

AV UN

IVERS

ITARI

A

AV C

ENTR

AL

AV SA

NTA R

O SA

AV U

N IV E

RSIT

ARI A

A V C

O NDO

R CANQUI,

JOS E G

A BRIE L

AV SAN

TA RO SA

AV C

AV MEN DIOLA, ALF RED O

AV UNGER, GERARDO

AV CA

RABA

YLLO

AV A

AV R

EPU BL

ICA D

EL P

ERU

AV PAR ADO DE BELLIDO,

MARIA

A V CAN

TA C

ALLA

O

AV SAN CARLOS

AV SANG ARARA

AV P

A CA S

MAY O

AV U

N IV E

R SI TA

RIA

AV PRINCIP A L

AV PALMA, RICARDO

A V MA LECON CHILLON

AV PRINCIPAL

AV CE DR OS, LOS

AV MENDIOLA, ALFREDO

AV OLIVOS, LOS

AV PA

NAMERICAN

A NO RTE

AV TO RRES, LAS

AV ANT ISUYO

AV A

AV CENTRAL

AV AL ISOS, LOS

AV U

N IVE

RSI T

A RI A

AV PA LME RAS, L AS

AV SAN ENRIQ UE

AV SANTA RO SA

A V E

AV CUZCO

AV CHOCANO, JO SE SANTO S

AV MENDIOLA, ALFREDO

AV AL ISOS, LOS

AV CANTA

CALLA O

AV JAZM INES, LOS

AV UNIVERSITARIA

AV CH

ACRA C

E RRO

AV A

AV RE

TABL

O , EL

AV OL IVOS, LO S

AV U

NIVE

R SIT

ARI A

AV ROSA DE AMERICA

AV PA

CASMAY

O

AV IN

TEGR

ACIO

N

A V T ORRES,

L AS

AV CANT A C

ALL AO

AV AL ISOS, LOS

AV SANT A AN

A

AV U

NIV E

R SIT A

R IA

AV A

AV CONF RAT ERNIDAD, LA

AV B

AV CENTRAL

AV ALISOS, LOS

AV PACASMAYO

AV CENTRAL

AV PANAMERICANA NORTE

AV CH

ACR A

CERR

O

AV CA

NTA C

ALLA

O

AV UN G ER , G E RA R D O

AV AL ISOS, LOS

AV PA

CASM

A YO

AV TORRES, LAS

AV SA

N FR

ANCI

SCO

AV NARA NJA L, E L

AV AGOS TO , 2 2 D E

A V TUPA C AMARU

AV SA

NTA R

O SA

AV SAN CA RLOS

A V CHI MPU OCLL O, I SAB EL

AV A

AV FAUCETT, ELMER

A V NARA NJA L, E L

AV TR

APICHE CHILLO N

AV RIO M ARAÑON

AV G

AMBE

TTA,

CRN

EL N

E STO

R

AV NARAN JAL

AV RE

TABL

O , EL

AV ALISO S, LO S

AV CEDROS, LOS

AV P

ACAS

MAYOAV

B

AV SANTA RO SA

AV SAUCES, LOS

AV MEN D IO LA , A L FR ED O

AV INDUSTRIAL

A V B ERTE LL O B OLL ATI , A L EJANDRO

AV SAN FEL IPE

AV CANTA CAL LAO

AV VALLEJO, CESAR

AV TU

PAC

AMAR

U

AV P INO S, L OS

AV UN

IVERS

ITARI

A

AV 200 M ILLAS

AV SA U CES, LO S

AV IZAGUIRRE, CARLO S ALBERTO

AV LIMA

AV SA

NTA R

O SA

AV TO RRES, LAS

AV SAUCES, LOS

AV SA

N MAT

EO

AV B

AV DOM INICOS, LO S

AV SEÑOR D E CAUDIVI LLA

AV UNIVERSITARIA

AV 2

AV NARAN JAL, EL

AV M

ENDI

OLA,

AL F

R ED O

AV 20

0 MILL

AS

AV C

AV RO SA RIO, E L

AV B

AV BA V ME ND IO

LA , A LF R ED OAV

PERIM

ETRAL

AV B

AV M

UJI C

A G

ALLO

, MAN

U EL

AV PA

CASMAY

O

AV ROSA DE AME R ICA

AV B

AV ME TROP OL IT A NA

AV MENDIOLA, ALFREDO

A V ANGE LE S, LO S

AV U

N IV E

RSITA

RIA

AV A

AV C

AV CE N TR

AL

A V P

INOS , L

O S

AV B

AV CO

LE CTORA

A V CAN

TA

CALLAO

AV C

AV A

A V U NGE R, GERARDO

AV IZAGUIRRE, CARLO S ALBERTO

AV M EN D IO LA , A LF RE D O

AV SAN FEL IPE

AV VENUS

AV S A NGA RA RA

AV C

AV FAUCETT, ELMER

AV A

A V M AG

NOLIA

S, L A

S

AV CANTA

CALLAO

AV C

ENTE

NARI

O

AV PANAMERICANA NORTE

AV NARA NJA L

AV A

A V T

UPAC

AMAR

U

AV HU

ANDO

Y

AV S

AN J

OSE

AV C

AV CAN TA CALLA O

AV NARANJA L, E L

AV T ANT AMAYO

AV EUCAL IPTOS, LO S

AV TU

PAC

AMAR

U

AV C

ARAB

AYLL

O

AV INDEPENDENC IA

AV A

AV 17

AV IN

TEGR

ACIO

N

A V A

A V D OMIN IC OS, LOS

AV INDOAMERICA

AV CHILLON

AV 2

AV CE

N TRAL

AV PACASMAYO

AV NARAN JA L

AV PINOS, LO S

AV S ANTA ROSA

AV B

A V REV OLUCION

AV PLAT INOS, LO S

AV OLIVOS, LOS

AV TU

PAC

AMAR

U

AV H U AN D OY

AV HU

AYLA

S

A V S

AN TA RO SA

AV C

AV B

A V DOMIN IC OS, LOS

AV UNIV ERS IT ARIA

AV ALI SOS, LOS

AV SANG ARARA

A V ME N DI OL A, A LF RE DO

AV BOLOG NESI , CRNL F RANC ISCO

SA-22

SA-16B

AD-05A

SA-40A

AD-5C

AD-05D

AD-5B

270000

270000

275000

275000

280000

280000

285000

285000

8675

000

8675

000

8680

000

8680

000

8685

000

8685

000·

LEGEND

SEWERAGE SECONDARY NETWORKMaterial

AC (Asbest Cement)CSN (Structural Plain Concrete)FOFO (Cast Iron)PVC (Vinyl Polychloride)

STUDY AREADISTRICT BOUNDARYDRAINAGE AREAROADSGREEN AREABLOCKSRIVERSCOAST

PR OYECTO :

GRAFICO 2.5.9.6: REDES SECUNDARIAS DE ALCANTARILLADOEN AREA DE INFLUENCIA POR TIPO DE MATERIAL

SERVICIO DE AGUA POTABLE Y ALCANTARILLADO DE LIMAREPUBLICA DEL PERU

FIGURE 2.5.9-6: SECONDARY SEWERAGE NETWORK IN THEINFLUENCE AREA BY TYPE OF MATERIAL

1:50,000Proyection: UTMDatum: WGS-84

Zone: 18 sur

0 1 20.5km

AC CSN FOFO PVC

AD-A1 18.945 11.370 30.315AD-A2 19.610 4.553 24.163AD-AG1 1.921 2.755 4.676AD-AG2 26.523 3.387 29.910AD-AG3 11.998 0.131 12.129AD-AG4 24.097 2.338 26.435ADC-1 10.078 0.000 10.078ADC-2 13.495 0.019 13.514ADC-3 4.974 4.974ADC-4 6.906 6.906ADC-5 13.657 0.036 13.693ADC-6 11.368 0.008 11.376AD-CH1 24.166 7.855 32.021AD-CH2 12.016 0.558 12.574AD-CH3 21.762 0.123 21.884AD-CH4 0.022 0.022AD-CO1 19.992 0.852 20.844AD-CO2 21.699 5.133 26.833AD-M 1 0.077 11.754 1.490 13.321AD-N1 19.041 5.528 24.569AD-N2 22.503 1.028 23.531AD-PL1 22.179 22.179AD-PL2 20.149 2.436 22.585AD-R1 13.886 0.928 14.814AD-R2 16.435 0.925 17.360AD-T 1 11.078 3.455 14.533AD-T 2 2.330 4.278 6.607AD-T 3 0.035 0.035AD-T 4 12.392 0.147 12.539AD-T 5 10.062 10.062AD-T 6 2.606 2.606T otal 0.077 427.659 0.008 59.345 487.089

LENGT H (Km) OF SECONDARY NET WORKS OF SEWERAGE IN T HE INFLUENCE AREA BY T YPE OF M AT ERIAL

Dr ai nage A r eaT otal (km)

M ater i al