Supporting
European
Aviation
2020 LSSIP Event
New in the 2020 LSSIP cycle & Best Practices
Véronique Martou
Outline of this presentation
3
The LSSIP Expert Group
Best Practices - Roadmap
What is new in the 2020 LSSIP Working Instructions?
What is new in the 2020 LSSIP Template?
Conclusions
The 2020 Awareness Webinar for NewComers
What is new in the 2020 LSSIP Template (2)
5
• Executive
Summary:
• The Graphic of Progression per
SESAR Phases: grouping of
objectives per “Essential
Operational Changes”
• ICAO progress
will take into
account the new
GANP 2019
structure
What is new in the 2020 LSSIP Template (4)
7
• Chapter 1: National ATM Environment - no change (except the removal of the U-
space Info)
• Chapter 2: Traffic and Capacity – provided by our colleagues from the Operations Planning Unit
• Capacity requirements and delay breakdown: Not included as the performance targets for
RP3 are not agreed yet
• Capacity plans: only the plans for Summer 2021
• Chapter 3: Implementation Projects - no change (except the removal of the U-space
Projects)
• At the freezing of the DB, it is still possible to update the description and progress status of
the projects but not their numbers and name.
• Chapter 4: Cooperation activities - no change
What is new in the 2020 LSSIP Template (6)
9
• Chapter 5:
Implementation Objectives Progress
• ICAO objective progress
will take into account the
new GANP 2019
structure and granularity
What is new in the 2020 LSSIP Template (7)
10
• Annex A : Specialists involved in the ATM implementation - LSSIP FPs : no change
• Annex B: National stakeholders organisation charts: no change
• Annex C: Implementation Objectives’ links with other plans
• for each implementation objective, mapping to the corresponding SESAR, ICAO, SDM, EASA,
NM, AAS, KF
• Annex D: SESAR Solutions implemented in a voluntary way
• Solutions are now grouped by EOC instead of KF
• 3 solutions/objectives considered as initial and not monitored in the LSSIP DB are added
• #18 - Calculated take-off time (CTOT) and target time of arrival (TTA) (linked to FCM07)
• #34 - Digital integrated briefing (INF09)
• #55 - Precision approaches using GBAS CAT II/III (NAV11)
• 34 additional new solutions added – contextual notes with scope on LSSIP SP
What is new in the 2020 LSSIP Template (8)
11
• Annex E: A new annex on Surveillance Data will be added to the LSSIP 2020.
• Surveillance info, related to projects, sensors and data integration, previously collected
through SUR working arrangements
• Inclusion in the LSSIP process aims to consolidate the data collection process and
increase efficiency by avoiding parallel surveys
• Info prefilled by the CP
What is new in the 2020 LSSIP Template (9)
12
• Annex F: Glossary of abbreviations
• Acronyms: on one page only with referral to the ARIAL website
• The Implementation of U-Space Services Annex will not be shown in
the LSSIP Document in 2020 as the final U-Space report was just
published and it is now too short to start the new U-Space cycle at
the same time of LSSIP.
• The Questionnaire for States Military Organisations on infrastructure
Annex for EDA and NATO will not be shown in the LSSIP Document
in 2020, to avoid double reporting as NATO/EDA in cooperation with
EUROCONTROL/PAS have decided to use the NATO 2 years’ cycle
CEDAR exercise to capture the sensible data.
2020 LSSIP Template - Deadlines
13
• The pre-filled LSSIP documents (Initial Draft, in Word) will be
delivered to the States via the LSSIP SharePoint by the 13th
November 2020.
• The Executive summary graphics, the Chapter 3 Implementation
Projects data, the Chapter 5 Implementation Objectives Progress
(graphics and Objectives data) require the freezing of the DB on
14 February 2021 and will be then updated by the LSSIP team
as soon as possible after that date.
• The Working Level Agreed (WLA) Document shall be reached by
the 1st March 2021.
• The signed LSSIP final document shall be reached by 31 March
2021 – for the publication of the data in the European ATM Portal
(working).
2020 LSSIP Working Instructions (1)
14
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns LSSIP roles and responsibilities
Production of LSSIP document
Determination of Implementation Progress
LSSIP Database User Guide
LSSIP SharePoint User Guide
Ge
ne
ric in
tro
ductio
n f
or all
chap
ters Available on the
LSSIP SharePoint website
2020 LSSIP Working Instructions (2)
15
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns LSSIP roles and responsibilities
• Developed in cooperation with LSSIP
EG on request of the States.
• Describes in details roles and
responsibilities of the States, LSSIP
FPs and CPs.
• To support the organization of the
national LSSIP process in case of new
States/ problems within the State.
• Reference to the NETSYS Working
Instructions added.
2020 LSSIP Working Instructions (3)
16
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns
Production of LSSIP document
• Who does what and when to produce the LSSIP document.
• Deadlines:• 14 February (freezing of DB), 31 March (publication of data).
2020 LSSIP Working Instructions (6)
19
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns
Determination of Implementation Progress
• How to establish progress for Objectives at all levels (Checkpoint, SLoA,
Stakeholder, State)
• Clarification on inclusion and/or exclusion in the applicability area
Local Scope: if there are more than one organisational unit (Local Scope)
within the same organisation (for example several ACCs), an individual ‘’Local
Scope’’ shall be created properly for each of them within the applicable SLoA.
2020 LSSIP Working Instructions (7)
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns
LSSIP Database User Guide
• Introduction to the LSSIP DB
• Regularly updated with the new
features, and better clarification of
certain functionalities
• New: the LSSIP DB tutorial
20
2020 LSSIP Working Instructions (8)
21
20
20
LS
SIP
Wo
rkin
g In
str
uctio
ns
LSSIP SharePoint User Guide
• Introduction to the LSSIP SharePoint
• Regularly updated
• New: the LSSIP SP tutorial 2020
2020 LSSIP Working Instructions (9)
Your Ways of cooperation for LSSIP
• Your CP(s)
• The LSSIP Expert Group representatives
• The LSSIP Support Team: [email protected]
22
2020 Awareness Webinar for NewComers
23
It took place on the 13th October 2020
It gives an introduction to the European ATM Master Plan Level 3 &
the Local Single Sky ImPlementation (LSSIP) reporting.
The aim of the webinar session is to facilitate the LSSIP related
work of the stakeholders and in particular of the new comers during
the 2020 cycle.
The webinar was presented under 6 modules which were recorded
that are available on our LSSIP SP website.
The LSSIP Expert Group
• LSSIP EG is your sounding board for all LSSIP related items
• What are the Main activities of the LSSIP EG?
• 3 standard meetings / correspondences scheduled
• For setting up of new cycle (before summer holidays)
• Review of satisfaction survey results after the LSSIP Event,
• Involvement in developments for LSSIP cycle,
• LSSIP Event Dry Run (after summer holidays)
• Involvement in preparation of LSSIP Event
(including development of Agenda and Dry Run),
• Support to update of LSSIP Template and Working Instructions
• Mid-term meeting to check on cycle progress (winter)
• Other (Webex) meetings on request whenever new ideas/changes to
the process appear
24
LSSIP Expert Group: Your current representatives
Do you want to join us?
• smooth and minimal efforts from members: it will enable YOU to ensure the LSSIP is fully fit -for-your-purposes
• All welcome!!
Contact: your CP or [email protected] or [email protected] or [email protected]
Members of LSSIP EG Representing Stakeholders group
André MUEHLIG DE - NSA NSA
Stéphane LAFOURCADE FR - DGAC NSA
Eric CHAMBROY (from 07/2020) FR - DGAC NSA
Anca CIREASA - IRMIE RO - RCAA NSA
Craig KING (until 05/2020) UK - CAA NSA
Markos KALLIAS UK - CAA NSA
Lieutenant Colonel Jose Javier CHUECA IBANEZ ES - Ministry of Defence MIL
Pedro REIS PT - ANA APO
Martin STIEBER AT – Austro Control ANSP
Ralf REISER (alternate - Annette BREMES) DE - DFS ANSP
Estibaliz SALAZAR FERNANDEZ ES - ENAIRE ANSP
Andrea RUZZOLINI IT - ENAV ANSP
Šarunas MURAUSKAS LT - SE "Oro navigacija" ANSP
Michael FIDOM NL - LVNL ANSP
Virginia COMAN RO - ROMATSA ANSP
25
Conclusions – 2020 LSSIP cycle
What’s in it for you?
• The requests of our stakeholders are the driving force for changes,
• Improvements in the Template (EOC and High Level Summary Table) + new SUR Annex –
EDA/NATO and U-space Annexes
• No change in the methodology, BUT precision on the applicability area and the Local scope
• The burden for the States is reduced to minimal – full support of EUROCONTROL NM/INF/PAS Team.
26
More during your bilateral meetings with your EUROCONTROL Contact Person