Title of Presentationwww.leduc.ca
2018 Capital Design &
Construction
Presented by:
Kyle van Steenoven, P.Eng.Manager, Capital Projects and Development
2018 CEA Edmonton Area
January 18, 2018
Insert Title HereThank you to our consultants throughout 2017
Insert Title Here
City of Leduc Engineering
Insert Title Here
Capital Projects and Development
• Design and construction of capital projects• Review, inspection and acceptance of new developments • Review, inspection and approval of residential, commercial and
industrial lot grading.
Insert Title Here
Infrastructure• Condition assessments• Functional, master and multi-jurisdictional
planning• Offsite Levy Model
Environmental• Environmental policies, initiatives and
projects• Curbside cart collection & recycling
program
Insert Title Here
Overview
• 65 Avenue Interchange
• New Infrastructure
• Capital Road Rehabilitation Program
• North Telford Reconstruction
• CDC Program
• Telford Lake Multiway and Parking Lot
• Capital Utility Program
• Master Plans
• Smart Traffic/Smart City Feasibility Study
• CRSWC
Insert Title Here
65 Avenue Interchange
• Detailed design procurement took place in 2017.
• Awarded to Stantec/Associated Engineering/McElhanney
• Designed expected to be completed by the end of 2019
• Construction is currently dependent on funding
• Additional design and construction projects will be required to support this project once a construction timeline has been established.
Insert Title Here
New InfrastructureNew major transportation and infrastructure projects are generally RFP’ed in individual projects. A recent example of this is the Southeast Boundary Road which was awarded to Al-Terra Engineering in 2017.
• Future new infrastructure projects may include:
• 65th Ave East
• 65th Ave West
• Grant MacEwan North
• Spine Road
Insert Title Here
• Two year contract that was awarded to Select Engineering Consultants in 2016
• Contract includes 2016/2017 design and corresponding 2017/2018 construction management.
• This program includes reconstruction, overlay and restoration of City roads, multiway and lanes.
• Separate request for proposals (RFPs) are issued for all new major transportation and infrastructure projects (Example: Southeast Boundary Road)
•Up for renewal in 2018/2019 depending on the duration of the North Telford Reconstruction.
Capital Road Rehabilitation Program
Insert Title Here
Underground Utilities
• 720 meters of Water Main Replacement
• 15 Manhole Replacements
• 150 Meters of Main Line CIPP
• 15 Service Lateral Liners
Road Construction
• 16,000 m2 of Reconstruction
• 3,200 m of Curb Replacement
• 1,500 m of Separate-walk Replacement
• 550 m of Mono-walk Replacement
North Telford Reconstruction
Insert Title Here
• Two year contract that was awarded to Associated Engineering in 2017
• Contract includes 2017/2018 design and corresponding 2018/2019 construction management.
• This program includes community driven projects such as park upgrades, art installations, and multiway.
Community Development and
Culture (CDC) Program
Insert Title Here
Telford Lake Multiway and Parking Lot2,700 meters of asphalt trail construction within environmentally sensitive land along the Telford Lake
Construction of a trail over top of the Telford Lake control weir.Rowing Club Parking Lot• 170 meters of concrete walks• 3,575 m2 asphalt paving
Minor Collector Road Construction• 8,000 m2 of New Road Construction• 1,100 m of Rural Road Ditching• 60 m of Culvert Installation• 750 m of Curb Installation• Construction of approx. 200 stalls
Insert Title Here
Capital Utility Program
• This contract is up for renewal for 2018/2019 design and construction management. The RFP is expected to be posted in the Spring 2018
•This program includes any upgrade and repairs required to the City of Leduc’s storm, sanitary and water networks.
• The successful proponent will be responsible for helping the City develop a 5 year plan for infrastructure renewal based on provided condition assessments
Insert Title Here
Transportation Master Plan
• Currently underway by Castleglenn Consultants with completion targeted in 2018• Intended to create a document that will support and guide future growth decision, priorities and initiatives• Will provide valuable background information for completing and reviewing development plans and traffic impact assessments
Sanitary Master Plan
• Currently underway by Cole Engineering with completion targeted in 2018• Intended as an update to the 2013 Sanitary Master Plan
Water Master Plan
• Completion of a new Water Master Plan• Expected to begin in 2019
Storm Master Plan
• Creation of the City’s first Storm Water Master Plan• Expected to begin in 2019 or 2020 depending on initial information required
All master plans are on a 5 year update/renewal rotation.
Engineering Master Plans
Insert Title Here
Smart Traffic/Smart City
Feasibility Study
The City of Leduc is currently looking at the shift towards Smart Cities and as a starting point we are looking at the feasibility of different forms of smart traffic systems throughout the City and the associated benefits.
This initial study has the potential of helping the City better defined what Smart Traffic and Smart Cities will look like for the City of Leduc.
The RFP for this study is expected to be out in late Spring
Insert Title Here
Capital Region
Southwest Water
Commission
• The City of Leduc currently manages the Capital Region Southwest Water Commission.
• Currently in the process of procuring a consultant to act as the Commission Engineer for the next 2 years
• Scope includes updating the commission master plan and providing technical support for day to day operations as required
• RFP is currently out and closes on January 22, 2018
Insert Title Here
Questions?