UNDERGROUND CONSTRUCTION MANUAL
HV SWITCHGEAR Go to SECTION INDEX Back to MAIN INDEX
DESCRIPTION DWG
INDEX
31/5/11
62 5254 1 1
5229/1
5229/3
CONSTRUCTION CONSTRUCTION DESCRIPTION DWG
5234/1
5229/2
HARD COPYUNCONTROLLED
HV SWITCHGEAR
C. Noel
A. Bletchly
L. Burton
Construction code guide - Foundation & site finishConstruction code guide - 22kV Ring main unit
Construction code guide - 11kV Ring main unit
Location in council parklandsLocation in council parklands 5234/2
Location in residential allotments 5233
5230
Outdoor RMU with precast concrete fdn -Site finish concrete suround
5217
RING MAIN UNIT
5232/15232/2
Culvert Foundation details - MaterialCulvert Foundation details - Construction
11RMU/ASL
5236/15236/2
ABB 11kV ring main unit Safelink - Material11RMU/O/ASL2S1F11RMU/O/ASL2S2F
11RMU/O/ASL3S1F11RMU/O/ASL3S
11RMU/O/ASL4S
ABB 11kV ring main unit Safelink -Construction
Site preperation sloping site - Maximum cut & fill
5237/1
5237/2
5238/15238/2
5253/1ABB 11kV Safeplus / Safering - HV switchgear schematic
ABB 11kV Safeplus / Safering - Material
5243/15243/2
22RMU/O/FGA2S1F F & G 22kV ring main unit - MaterialF & G 22kV ring main unit - Construction22RMU/O/FGA2S2F
22RMU/O/FGA3S1F
22RMU/O/FGA2S1CB
22RMU/O/FGA3S
22RMU/O/FGA4S22RMU/O/FGA1S1CB1F22RMU/O/FGA1S1CB2F
5252/15252/2
F & G 22kV ring main unit - SchematicF & G 22kV ring main unit - Schematic
5252/3F & G 22kV ring main unit - Schematic
ABB 11kV Safelink - HV switchgear schematic
ABB 11kV Safelink - HV switchgear schematic
ABB 11kV Safeplus / SaferingConstruction
5255/1Ring main unit installation5255/2Ring main unit installation5255/3Ring main unit installation5255/4Ring main unit installation
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
5217
C.Lindsay
23/11/01
62 5217 1
SITE FINISH CONCRETE SURROUNDOUTDOOR RMU WITH PRECAST CONCRETE FDN
F
30
00
F
F 2800F
Concrete EdgeBeam
F
Fall
F
F
FFall
Fall
F
F
surround slab cast
F
SiteBoundary(Level Site)
A_
PLAN
FO
OT
PA
TH
AlignmentR.P. Street
F
Reinforced concrete
around plinth
between plinth andAbelflex sealant joint
concrete slab
NOTES:
2. Reinforced concrete surround slab: a) 100/125mm thick slab: b) 11 TM trench mesh reinforcement in centre of slab: c) 25 MPa grade concrete: d) Finish by wood float or by nylon broom.
4. The concrete slab is to slope away from plinth falling at a slope of 1 in 25.
5. Cable apertures through the precast concrete plinth shall be backfilled to 50mm from the top of plinth. A 30mm deep layer of 1:16 ratio weak mix concrete shall be placed to seal aperture.
6. The surface of the surround slab may be finished with a stencil pattern surface to match the surrounding pavements of the development. (Use Textcrete or equivalent product. Construct to suppliers specifications).
3. The top face of the concrete surround slab shall be 100mm Min. above the final surface level (when turf is laid).
LineGroundFinished
_
SECTION ABackfillCable PitRefer note 1.
F
Earth grid underconcrete edge beam
FallF
FFall
50 F
F
F
F100
Min
.
F
F
HV SWITCHGEAR
_
SECTION B
Concrete edge beam to perimeter 150 wide x 150 deep below finished surface.Foundation
Finish ground line
_
B
F
C. Noel
A. Bletchly
F
Construction Type
11RMUF/ASL
Pre-cast foundation
1. Backfill Cable Pit with bedding sand and compact in place. Refer TRENCHING Drawing No. 5227.
B 02.11.11
B
Refer Note 7
F
F
F
7. Concrete slab to be cast in separate sections on side/s where cables enter/exit to allow future access. Provide Abelflex between sections and around plinth.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
CONSTRUCTIONSVOLTAGE
CONSTRUCTION CODE GUIDE
Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.
A
522962 5229 1T.Borg
11kV RING MAIN UNIT CONSTRUCTION CODE
11 RMU/O/ASL 2S1F
11 = 11kV RMU = Ring Main Unit
LOCATION
O = Outdoor
HV SWITCHGEAR
ASL = ABB SafeLink
ASP = ABB SafePlus
ASR = ABB SafeRing
CONFIGURATION
2S1F = 2 switch + 1 fuse
2S2F = 2 switch + 2 fuse
3S = 3 switch
4S = 4 switch
3S1F = 3 switch + 1 fuse
1S1CB1F = 1 switch + 1 circuit breaker + 1 fuse
1S1CB2F = 1 switch + 1 circuit breaker + 2 fuse
2S1CB = 2 switch + 1 circuit breaker
11RMU/O/ASL2S1F = 11kV, Ring Main Unit, outdoor, ABB SafeLink, 2 switches + 1 fuse.
C. Noel
A. Bletchly
111kV RING MAIN UNIT
9/9/10HV SWITCHGEARHARD COPY
UNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
CONSTRUCTION CODE GUIDE
5229 262 5229 2
C. Noel
A. Bletchly
EXAMPLE:-
Required only where foundationis not provided by others.
Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.
A
FOUNDATION AND SITE FINISH
3/5/11
RING MAIN UNIT FOUNDATION & SITE FINISH CONSTRUCTION CODE
11 RMUF / ASL
11 = 11kV
VOLTAGE RMU FOUNDATION
RMUF = Ring Main Unit Foundation
HV SWITCHGEAR
ASL = ABB Safelink
11RMUF/ASL = 11kV, Ring main unit foundation, ABB Safelink
L. Burton
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
EXAMPLE:-
CONSTRUCTIONSVOLTAGE
CONSTRUCTION CODE GUIDE
Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.
A
5229 362 5229 3T.Borg
22kV RING MAIN UNIT CONSTRUCTION CODE
22 RMU/O/FGA 3S1F
22 = 22kV RMU = Ring Main Unit
LOCATION
O = Outdoor
HV SWITCHGEAR CONFIGURATION
2S1F = 2 switch + 1 fuse
FGA = Felton & Guillaume (F&G) 1S1CB1F = 1 switch + 1 circuit breaker + 1 fuse1S1CB2F = 1 switch + 1 circuit breaker + 2 fuse
2S1CB = 2 switch + 1 circuit breaker
2S2F = 2 switch + 2 fuse
3S = 3 switch
3S1F = 3 switch + 1 fuse
4S = 4 switch
22RMU/O/FGA3S1F = 22kV, Ring Main Unit, outdoor, Felton and Guillaume (F&G), 3 switches + 1 fuse.
C. Noel
A. Bletchly
22kV RING MAIN UNIT
9/9/10HV SWITCHGEARHARD COPY
UNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
FO
OT
PA
TH
NOTES:
PLAN
L. Burton
MAXIMUM CUT & FILL
(shown dashed)
30
00
800
A_
FIL
L
100
MA
X
R.P. StreetAlignment
_
150
MA
X
CU
T
2800
SECTION A
2. Ergon Energys 3000mm x 2800mm (minimum) site shall be levelled and surrounding area graded to ensure NO PONDING of water occurs.
523062 5230 1
8.3.11 SITE PREPARATION SLOPING SITE
Outline of RMU foundation over
1. Refer drawing 5226 for installation requirements.
3. No services other than the Ergon Energys electric cables shall pass through this RMU site.
4. Clear access to the RMU shall be maintained for Ergon Energys personnel & heavy equipment.
6. Mature landscaping (including trees, sprinklers etc) shall not encroach onto the RMU site.
7. The finished surface of the adjacent footpath, in front of the RMU cabinet, shall be level to ensure that the cabinet doors will swing into the fully open position.
FF
F
F
F
F
F
F
F
F
F
F
F
R.P. StreetAlignment
= =
==
SiteBoundary
F
5. After installation is complete the site surface is to be finished with a concrete slab. (Refer drawing 5217).
HV SWITCHGEAR
A.Bletchly
C.Noel
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
NOTES:
B 1/2 DISC
L. Burton
1. Foundation design details are as follows:1
ASSY QTYDESCRIPTIONMATERIAL
1523262 5232 1
583-2 CulvertUnstable soils are soft clay to sandy gravel with a soil strength 50-150 kPa. Stable soils are very stiff clay to shale/rock with soil strength of150kPa or higher.
2. Lift the culvert separately with 4 x 1.3 tonnes Reid Swiftlift lifting eyes.
3. Position the top face of the culvert at the finished ground level of the site, as detailed on the Projects Civil Construction drawings.4. Do NOT remove the culvert end wall knockouts.
5. The culvert shall be constructed level. Under no circumstances shall it be allowed to tilt forward towards the footpath.
7. Refer drawing No. 5217 for site finish concrete surround.
CULVERT FOUNDATION DETAILS
A. Bletchly
C. Noel
4/5/11
MATERIAL
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton 523262 5232 1
8.3.11
C. Noel
A. Bletchly
F
_
SECTION A
B_
=
=
A_
3000 S
ite
Compact pit sandSECTION B
_
PLAN
Backfill with approvedsuitable material andcompact in place
R.P. StreetAlignment
2800 SiteF
F
FF
FFF
F
SiteBoundary
F
Finished GroundLine (Site)
Cableentry
Assy 583-2
Footpath
F
Precast concreteplinth suppliedwith RMU
F
F
HV cables
F
F
F
F
F
StableUn-stable100
50
F
F
1180 S
table
12
80
Un
stab
le
2
Construction Type
11RMU/ASLF
F
F
F= =
CULVERT FOUNDATION DETAILSCONSTRUCTION
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton 523362 5233 1
8/3/11
C. Noel
A. Bletchly
F
F
FO
OT
PA
TH
R.P. StreetAlignmentF
6000
F
F
30
00
NOTE:
Real Property Boundary
F
F2800
Dwelling
Dwelling
As
Req
dA
s R
eqd
FF
FF
Ring main units may be in 1 or 2 allotments
F
A reduction in dwelling setbackof 6000mm from the R.P. StreetAlignment will require relocationof the ring main unit to an alternative site to achieve the acceptable separation.
LOCATION IN RESIDENTIAL ALLOTMENTSHV SWITCHGEARHARD COPY
UNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton 523462 5234 1
C. Noel
A. Bletchly
10.3.11
NOTES:
Parklands
1.
2.
3.
2.5m Min.
2.5
m M
in.
4.
Apron
PLAN
Dwelling
Real PropertyBoundary
1.5m Min.
R.P. StreetAlignment
FOOTPATH
Kerb
ROAD2.0
m
F
F
F
F
F
F
F
F
F
F
F
F
F
F
Dwelling
1.5
m
Min
.
F
F
SiteBoundary
As Reqd
3.0m
Away from residential dwellings and surroundingproperties to minimise visual and sound impact;
As close as possible to the road kerb to allow 24 hourall weather access for personnel, a coventional craneand heavy equipment.
ReferNote 4
ReferNote 4
F
F
F
F
RMU SET BACK FROM R.P. STREET ALIGNMENT
When planting vegetation in parklands, ensure vegetationdoes not encroach on the ring main unit site.Take into consideration the fully matured size of vegetationto allow continuing access to the site.
A ring main unit in parkland shall be located:
The location of ring main unit sites is based on acceptable separation to adjacent dwellings located as shown. Any reduction in the 1.5m minimum dimension shown on the drawings requires a corresponding relocation of the ring main unit site to maintain the acceptable separation.
LOCATION IN COUNCIL PARKLANDS
A 3.0m wide cable and access easement or road reserveshall be provided between the ring main unit site and the R.P. Street Alignment.
1
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton 523462 5234 2
C. Noel
A. Bletchly
10.3.11
FOOTPATH
ROAD
Parklands
Kerb
PLAN
Dwelling
R.P. StreetAlignment
6.0m Min.
F
SiteBoundary
F
F
F
F
F
As Reqd
Real Property Boundary
FOOTPATH
ROAD
Parklands
Kerb
PLAN
Dwelling
F
SiteBoundary
F
F
F
F
F
Real Property Boundary
Less than6.0m
2.5m Min.F
F
1.5mMin.
F
F
Refer Note 4Sheet 1.
R.P. StreetAlignment
RMU ADJOINING R.P. STREET ALIGNMENT
LOCATION IN COUNCIL PARKLANDS
2
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
ASSY DESCRIPTIONQTY
NOTES:
10/3/11
567-9
62 5236 1 5236
C. Noel
A. Bletchly
567-1
567-5567-3
567-7
555-4555-5555-7555-8555-9555-10
11kV ABB safelink 2 switch 1 fuse c/w cubical and plinth
11kV ABB safelink 2 switch 2 fuse c/w cubical and plinth
11kV ABB safelink 3 switch 1 fuse c/w cubical and plinth
11kV ABB safelink 3 switch c/w cubical and plinth
11kV ABB safelink 4 switch c/w cubical and plinth
1
2S1F 2S2F 3S1F3S 4S
1.
2.
The gland plates supplied with the units are not required to be fitted on the ground mounted RMU
3.
The HV cables must be clamped to the unistrut provided as per construction standards and the opening on the plinth for cable entry must be filled with a weak concrete mix and compacted
MATERIAL - FREESTANDING RING MAIN UNIT
ASSY DESCRIPTION QTY
3
1
1
1
1
1MATERIAL
MATERIAL - HV FUSE - EACH CIRCUIT
Refer note 1
555-2 Cartridge fuse link 10A HRCCartridge fuse link 20A HRC
Cartridge fuse link 25A HRC
Cartridge fuse link 40A HRC
Cartridge fuse link 50A HRC
Cartridge fuse link 63A HRC
Cartridge fuse link 80A HRC
Designer to nominate HV fuse link current rating
CONTRACT No. 2008 / 024 / T
ABB 11kV RING MAIN UNIT SAFELINKHV SWITCHGEARB 24.11.11
B
4.
Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5237 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
10/3/11HARD COPYUNCONTROLLED
62 5236 2 5236
C. Noel
A. Bletchly
CONTRACT No. 2008 / 024 / T
2
Construction Type
11RMU/O/ASL2S1F
11RMU/O/ASL2S2F
11RMU/O/ASL3S
11RMU/O/ASL3S1F
11RMU/O/ASL4S
Assy Selection567-1 to 9 and555-2 to 10
F
F
F
Concrete plinth
F
Refer HV CONSTRUCTION drawing no. 5244 or 5245 for feeder cable connections
Side View Plan
F
Lifting points4 x M12 ferrules
Lifting points4 x M12 ferrules
CONSTRUCTIONABB 11kV RING MAIN UNIT SAFELINKHV SWITCHGEAR
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
10/3/11HARD COPYUNCONTROLLED
62 5237 1 5237
C. Noel
A. Bletchly
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
2S1F 11kV ABB safelink RMU 2 switch 1 fuse
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
2S2F 11kV ABB safelink RMU 2 switch 2 fuse
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
3S1F 11kV ABB safelink RMU 3 switch 1 fuse
FEEDERCABLE
F
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
1
ABB 11kV SAFELINK - HV SWITCHGEARSCHEMATIC
HV SWITCHGEAR
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
10/3/11
62 5237 2 5237
C. Noel
A. Bletchly
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
2
F
FEEDERCABLE
F
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
F
4S 11kV ABB safelink RMU 4 switch 3S 11kV ABB safelink RMU 3 switch
ABB 11kV SAFELINK - HV SWITCHGEARSCHEMATIC
HV SWITCHGEARHARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton 62 5238 1 5238
C. Noel
A. Bletchly
ASSY DESCRIPTIONQTY
NOTES:
578-1
578-5578-3
1
1.
MATERIAL - FREESTANDING RING MAIN UNIT
For circuit breaker setting refer to protection.
1S1CB1F 1S1CB2F 2S1CB
1
1
MATERIAL
9/5/11
1
11kV ABB safeplus RMU 1 switch 1 circuit breaker 1 fuse c/w cubical and plinth
11kV ABB safeplus RMU 1 switch 1 circuit breaker 2 fuse c/w cubical and plinth
11kV ABB safering 2 switch 1 curcuit breaker c/w cubical and plinth
ABB 11kV SAFEPLUS / SAFERINGHV SWITCHGEARB 24.11.11
B
2. Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5253 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
HARD COPYUNCONTROLLED
62 5238 2 5238
C. Noel
A. Bletchly
9/5/11
2CONSTRUCTION
Assy Selection 578-1, 3 or 5
F
Lifting point
F
Lifting point
F
Lifting point
FF
ABB 11kV SAFEPLUS / SAFERINGHV SWITCHGEAR
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
ASSY DESCRIPTIONQTY
16/3/11
579-9
62 5243 1 5243
C. Noel
A. Bletchly
579-1
579-5579-3
579-7
579-11
1
2S1F 2S2F 3S1F3S 4S
MATERIAL - FREESTANDING RING MAIN UNIT
CONTRACT No. 2008 / 024 / T
CONSTRUCTION
22kV F&G 2 switch 1 fuse c/w cubical & plinth
579-13579-15
22kV F&G 2 switch 2 fuse c/w cubical & plinth
22kV F&G 3 switch 1 fuse c/w cubical & plinth
22kV F&G 3 switch c/w cubical & plinth
22kV F&G 4 switch
22kV F&G 1 switch 1 circuit breaker 1 fuse c/w cubical & plinth
22kV F&G 1 switch 1 circuit breaker 2 fuse c/w cubical & plinth
22kV F&G 2 switch 1 circuit breaker c/w cubical & plinth
1S1CB1F 1S1CB2F 2S1CB
1
1
1
1
1
1
1
NOTE:
1.
1
Designer to nominate HV fuse links
F&G 22kV
2. For circuit breakers refer to protection for setting
556-3556-4556-7
Cartridge fuse link 16A
Cartridge fuse link 20A
Cartridge fuse link 40A
3 6 3 3 6
QTY2S1F 2S2F 3S1F3S 4S 1S1CB1F 1S1CB2F 2S1CB
ASSY DESCRIPTION
MATERIAL - HV FUSE - EACH CIRCUIT
HV SWITCHGEARB 24.11.11
B
Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5252 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.
3.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
HARD COPYUNCONTROLLED
62 5243 2 5243
C. Noel
A. Bletchly
HV SWITCHGEARF&G 22kV RING MAIN UNIT
CONTRACT No. 2008 / 024 / T
Construction Type
CONSTRUCTION
22RMU/O/FGA2S1F
22RMU/O/FGA2S2F
22RMU/O/FGA3S1F
22RMU/O/FGA2S1CB
22RMU/O/FGA3S
22RMU/O/FGA4S
22RMU/O/FGA1S1CB1F
22RMU/O/FGA1S1CB2F
Assy Selection579-1 to 15 and556-3 to 7
F
Refer HV CONSTRUCTION drawing no. 5044 for feeder cable connection
2
9/5/11
Lifting point
F F
Lifting point
Lifting point
F
F
F
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
HARD COPYUNCONTROLLED
62 5252 1 5252
C. Noel
A. Bletchly
HV SWITCHGEAR
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
1SCHEMATIC
9/5/11F & G 22kV RING MAIN UNIT
2S1F 22kV F & G ring main unit
2 switch, 1 fuse
2S2F 22kV F & G ring main unit
2 switch, 2 fuse
3S1F 22kV F & G ring main unit
3 switch, 1 fuse
F F F
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
10/3/11HARD COPYUNCONTROLLED
62 5252 2 5252
C. Noel
A. Bletchly
HV SWITCHGEAR
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
2
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
SCHEMATICF & G 22kV RING MAIN UNIT
4S 22kV F & G ring main unit
4 switch
3S 22kV F & G ring main unit
3 switch
F F F F
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
HARD COPYUNCONTROLLED
62 5252 3 5252
C. Noel
A. Bletchly
HV SWITCHGEARF & G 22kV HV SWITCHGEAR
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
F
Note:
Represents circuit fault indicator
F
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F F
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
3
9/5/11
1S1CB1F 22kV F & G ring main unit
1 switch, 1 circuit breaker, 1 fuse
(CFI) on this switch disconnector unit
1S1CB2F 22kV F & G ring main unit
1 switch, 1 circuit breaker, 2 fuse
2S1CB 22kV F & G ring main unit
2 switch, 1 circuit breaker
SCHEMATIC
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
L. Burton
HARD COPYUNCONTROLLED
62 5253 1 5253
C. Noel
A. Bletchly
HV SWITCHGEAR
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
F
Note:
(CFI) on this switch disconnector unitRepresents circuit fault indicator
F
Note:
Represents circuit fault indicator
F
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
F F
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
FEEDERCABLE
1
9/5/11
(CFI) on this switch disconnector unit
HV SWITCHGEAR - SCHEMATIC
1S1CB1F 11kV ABB Safeplus ring main unit
1 switch, 1 circuit breaker, 1 fuse
1S1CB2F 11kV ABB Safeplus ring main unit
1 switch, 1 circuit breaker, 2 fuse
2S1CB 11kV ABB Saferingring main unit
2 switch, 1 circuit breaker
ABB 11kV SAFEPLUS / SAFERING
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
1 SITE
INSTALLATION
General1.1
Stable (soil conditions)
Free from steep batters
Flood freeLevel (topography) where possible
1.4
1.2
1
1/6/11
Site Size
1.3
URD
Along coastal areas the site must be located as far as possiblefrom the shoreline and sheltered from salt spray.
Common earthing sitesLevel sites - 3000mm width x 2800mm depth.Retaining wall sites - 3400mm width x 3000mm depth.
The site shall be to the satisfaction of Ergon Energy, including
A site should not be located where impact by traffic is likely and,if at a truncated section of the street alignment or other non-regular shaped site the following shall apply:
The specified rectangular size of the site shall not be reduced.
a) In the Road Reserve:-
The Developer shall obtain all necessary approvals from theDepartment of Transport or the Local Authority.
b) On Freehold property (including residential or parkland):-
The Developer shall provide Ergon Energy with a registeredeasement at no cost to Ergon Energy.
HARD COPYUNCONTROLLED
L. Burton
A. Bletchly
C. Noel
62 5255 1 5255
HV SWITCHGEARRING MAIN UNIT
The minimum area required to accommodate a ring main unitshall be:
Ring Main Unit Orientation
The developer shall provide a ring main unit site(s) asrequired by Ergon Energy at no cost to Ergon Energy. The site shallbe included in the road reserve, or located on freehold property.No ring main units are to be located in Trustee Reserves.
Where the developer required the ring main unit to be included:
Acceptable separation of ring main unit to adjacent dwellings is provided if the front of dwellings are set back 6.0m from the R.P. Street Alignment and the padmount is located as shown in drawings No. 5233, 5234 Sheets 1 or 2.
Developments including streets where the allowable dwelling set back is less than 6.0m will require ring main unit siting on either an alternative street, where the dwelling set back is 6.0m, or in Parklands.
RING MAIN UNIT INSTALLATION
Free from other services
The front edge of the ring main unit shall be as near to parallel as possible to the R.P. Street Alignment.
Ring main units shall be oriented such that the HV panels are easily accessible from the dedicated footpath.
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
2
1 SITE
1.5
(CONTD)Commercial and Industrial or Landscaped Areas
1.6 Parklands - for other than URD
1.7
Cabling Only
Cabling and Access
2 SITE PREPARATION
Sites shall be prepared in accordance with the includedconstruction drawings.
3 CONSTRUCTION OF RETAINING WALLS
4
4.1 Uniculvert
Cabling and Access Requirement
A 3.0m wide easement, or road reserve, from the front ofthe site is required for cabling and access.
62 5255 2 5255
HV SWITCHGEAR
INSTALLATIONRING MAIN UNIT
1/6/11
C. Noel
A. Bletchly
L. Burton
Whether the ring main unit is for the sole use of thatcomplex, or is required as part of the distribution network, theowner is required to grant Ergon Energy an easement for thering main unit site, access and cabling.
Obtain the necessary approval for an easement to accommodate the ring main unit, cabling and access to site.
Acceptable separation of ring main unit to adjacent dwellings isshown in drawings No. 5234 Sheets 1 & 2.
Should the cabling route not be available in conjunction withaccess, a 1.0m wide cable easement is required to the frontof the ring main unit. Additionally 2.0m x 3.0m (ring main unit site width) is required immediately in front to allow spreading ofcables for entry to the ring main unit and also include the buriedearth cable.
Retaining walls shall be constructed around the perimeter of aring main unit site where:
A change in ground level of 300mm or more occurs within 2.0mof the boundary of the ring main unit site.
RING MAIN UNIT FOUNDATION
Separation of 5.0m between ring main unit and thenearest room or habitable area should be providedwhere possible.
Uniculvert foundations shall not be constructed where site andground conditions do not provide an even or equal bearingcapacity for the ring main unit.
Uniculvert foundations for stable soil conditions shallbe constructed in accordance with Drawing No. 5232.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
INSTALLATION
3
4 (CONTD)Unstable SitesWhere sites are very unstable, and conventional foundationconstruction techniques as described in this document cannotbe applied, a special design shall be required.
5 BACKFILLING AND FINAL SITE FINISH
5.1 Common Earthing Sites
6
6.1
ADDITIONAL REQUIREMENTSCommercial and Industrial Installation
All backfill of the site must be compacted before final site finish inaccordance with the applicable drawing.
Easy access for a mobile crane must be available for the purpose ofinstallation or replacement.
Ergon Energy cable conduits for the development may be placed inthe substation site and shall pass down the sides of the uniculvertfoundation. No conduits shall pass through or under the uniculvertfoundation. Conduits shall be 750mm minimum depth below thefinished surface level. The substation site surface is to be finishedwith a concrete slab (refer to drawing No. 5004). The 2.0m apron infront of the substation cabinet shall be finished with a concrete slabsectioned with construction joints for ease of future removal.
6.2
An additional 2.0m apron shall be provided in front of, and for thefull width of the site (ie 4.8m depth). This will provide a safeworking platform and access around latched open doors foremergency operations.
C. Noel
A. Bletchly
1/6/11
L. Burton 26 5255 3 5255
RING MAIN UNIT FOUNDATION
In such circumstances, the developer shall obtain a certifieddesign from a Civil Engineer (RPEQ) for Ergon Energysconsideration. No special designs for ring main unitfoundation construction shall be used without the approval ofErgon Energy.
The preferred location of ring main unit sites atcommercial and industrial developments is at the real propertystreet alignment. Switchgear cabinet doors shall face theadjoining footpath.
Ring main units shall be located on the development inareas where clear, all weather access is provided for personneland heavy equipment at all times.
Ring Main Units in Landscaped AreasWhere the ring main unit is located in a landscapedarea (gardens) the following shall apply:
The ring main unit site surface is to be finished with a concrete slab(refer to drawing No. 5217).
The 2.0m apron in front of the ring main unit site shall be finished witha concrete slab sectioned with construction joints for ease of futureremoval.
HV SWITCHGEARRING MAIN UNIT
4.2
Sealing of the cable apertures in the precast concrete plinthand construction of the concrete surround slab over theground surface shall be in accordance with drawing No. 5217.
Should the site be located in restricted areas such as carparks and between buildings, an additional minimum 2.0m of clear access shall be provided in front of, and for the full width of the site (ie 4.8m depth). This will provide a safe working platform and access around latched open doors for emergency operations.
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
INSTALLATION
4
6.2 (CONTD)
6.3
7
Ring Main Unit in Landscaped AreasWhen planting vegetation in landscaped areas and gardens,ensure vegetation does not encroach on the ring main unitsite. Take into consideration the fully matured sizeof vegetation to allow continuing access to the site.
Ergon Energy cable conduits for the development may beplaced in the ring main unit site and shall pass down the sidesof the uniculvert foundation. No conduits shall pass throughor under the uniculvert foundation. Conduits shall be 750mmminimum depth below the finished surface level.
Ring Main Units Installation in ParklandsWhere the ring main unit is located in CouncilParklands, the installation shall be in accordance with therequirements of drawing No. 5234 Sheets 1 or 2.A 2.0m apron as specified in Clause 6.2 shall be provided.
No buildings/residences, fences, including their foundations, LVswitchboard earths, or metalic objects are permitted within theclearance zone around the RING MAIN UNIT.Clearance to Telstra assets shall be as noted on EARTHINGdrawing No. 5221 Sheet 1.
62 5255 4 5255
HV SWITCHGEARRING MAIN UNIT
1/6/11
C. Noel
A. Bletchly
L. Burton
SPACING BETWEEN RING MAIN UNIT AND OTHER METAL OBJECTS
HARD COPYUNCONTROLLED
A ORIGINAL ISSUE
DRAWN
DATE
PASSED
APPROVED
Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5
UNDERGROUND DISTRIBUTION
00 HV Switchgear01 HV Switchgear Index Sh1
5217 Sh1 Outdoor RMU with Precast Conc Fdn5229 Sh1 Construction Code Guide 11kV RMU5229 Sh2 Construction Code Guide Foundation and Site Finish5229 Sh3 Construction Code Guide 22kV RMU
5230 Sh1 Site Preparation Sloping Site Max Cut and Fill5232 Sh1 Culvert Foundation Details Material5232 Sh2 Culvert Foundation Details Construction
5233 Sh1 Location in Residential Allotments5234 Sh1 Location in Council Parklands5234 Sh2 Location in Council Parklands
5236 Sh1 ABB 11kV RMU Safelink Material5236 Sh2 ABB 11kV RMU Safelink Construction
5237 Sh1 ABB 11kV Switchgear - HV Switchgear Schematic5237 Sh2 ABB 11kV Safelink - HV Swtichgear Schematic
5238 Sh1 ABB 11kV Safeplus,Safering Material5238 Sh2 ABB 11kV Safeplus, Safering Construction
5243 Sh1 FandG 22kV Construction5243 Sh2 FandG 22kV RMU Construction
5252 Sh1 FandG 22kV RMU Schematic5252 Sh2 FandG 22kV RMU Schematic
5252 Sh3 FandG 22kV HV Switchgear Schematic5253 Sh1 ABB 11kV Safeplus, Safering HV Switchgear Schematic5255 Sh1 RMU Installation5255 Sh2 RMU Installation5255 Sh3 RMU Installation5255 Sh4 RMU Installation