09 HV Switchgear

download 09 HV Switchgear

of 28

description

Ergon energy

Transcript of 09 HV Switchgear

  • UNDERGROUND CONSTRUCTION MANUAL

    HV SWITCHGEAR Go to SECTION INDEX Back to MAIN INDEX

  • DESCRIPTION DWG

    INDEX

    31/5/11

    62 5254 1 1

    5229/1

    5229/3

    CONSTRUCTION CONSTRUCTION DESCRIPTION DWG

    5234/1

    5229/2

    HARD COPYUNCONTROLLED

    HV SWITCHGEAR

    C. Noel

    A. Bletchly

    L. Burton

    Construction code guide - Foundation & site finishConstruction code guide - 22kV Ring main unit

    Construction code guide - 11kV Ring main unit

    Location in council parklandsLocation in council parklands 5234/2

    Location in residential allotments 5233

    5230

    Outdoor RMU with precast concrete fdn -Site finish concrete suround

    5217

    RING MAIN UNIT

    5232/15232/2

    Culvert Foundation details - MaterialCulvert Foundation details - Construction

    11RMU/ASL

    5236/15236/2

    ABB 11kV ring main unit Safelink - Material11RMU/O/ASL2S1F11RMU/O/ASL2S2F

    11RMU/O/ASL3S1F11RMU/O/ASL3S

    11RMU/O/ASL4S

    ABB 11kV ring main unit Safelink -Construction

    Site preperation sloping site - Maximum cut & fill

    5237/1

    5237/2

    5238/15238/2

    5253/1ABB 11kV Safeplus / Safering - HV switchgear schematic

    ABB 11kV Safeplus / Safering - Material

    5243/15243/2

    22RMU/O/FGA2S1F F & G 22kV ring main unit - MaterialF & G 22kV ring main unit - Construction22RMU/O/FGA2S2F

    22RMU/O/FGA3S1F

    22RMU/O/FGA2S1CB

    22RMU/O/FGA3S

    22RMU/O/FGA4S22RMU/O/FGA1S1CB1F22RMU/O/FGA1S1CB2F

    5252/15252/2

    F & G 22kV ring main unit - SchematicF & G 22kV ring main unit - Schematic

    5252/3F & G 22kV ring main unit - Schematic

    ABB 11kV Safelink - HV switchgear schematic

    ABB 11kV Safelink - HV switchgear schematic

    ABB 11kV Safeplus / SaferingConstruction

    5255/1Ring main unit installation5255/2Ring main unit installation5255/3Ring main unit installation5255/4Ring main unit installation

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 5217

    C.Lindsay

    23/11/01

    62 5217 1

    SITE FINISH CONCRETE SURROUNDOUTDOOR RMU WITH PRECAST CONCRETE FDN

    F

    30

    00

    F

    F 2800F

    Concrete EdgeBeam

    F

    Fall

    F

    F

    FFall

    Fall

    F

    F

    surround slab cast

    F

    SiteBoundary(Level Site)

    A_

    PLAN

    FO

    OT

    PA

    TH

    AlignmentR.P. Street

    F

    Reinforced concrete

    around plinth

    between plinth andAbelflex sealant joint

    concrete slab

    NOTES:

    2. Reinforced concrete surround slab: a) 100/125mm thick slab: b) 11 TM trench mesh reinforcement in centre of slab: c) 25 MPa grade concrete: d) Finish by wood float or by nylon broom.

    4. The concrete slab is to slope away from plinth falling at a slope of 1 in 25.

    5. Cable apertures through the precast concrete plinth shall be backfilled to 50mm from the top of plinth. A 30mm deep layer of 1:16 ratio weak mix concrete shall be placed to seal aperture.

    6. The surface of the surround slab may be finished with a stencil pattern surface to match the surrounding pavements of the development. (Use Textcrete or equivalent product. Construct to suppliers specifications).

    3. The top face of the concrete surround slab shall be 100mm Min. above the final surface level (when turf is laid).

    LineGroundFinished

    _

    SECTION ABackfillCable PitRefer note 1.

    F

    Earth grid underconcrete edge beam

    FallF

    FFall

    50 F

    F

    F

    F100

    Min

    .

    F

    F

    HV SWITCHGEAR

    _

    SECTION B

    Concrete edge beam to perimeter 150 wide x 150 deep below finished surface.Foundation

    Finish ground line

    _

    B

    F

    C. Noel

    A. Bletchly

    F

    Construction Type

    11RMUF/ASL

    Pre-cast foundation

    1. Backfill Cable Pit with bedding sand and compact in place. Refer TRENCHING Drawing No. 5227.

    B 02.11.11

    B

    Refer Note 7

    F

    F

    F

    7. Concrete slab to be cast in separate sections on side/s where cables enter/exit to allow future access. Provide Abelflex between sections and around plinth.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • EXAMPLE:-

    CONSTRUCTIONSVOLTAGE

    CONSTRUCTION CODE GUIDE

    Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.

    A

    522962 5229 1T.Borg

    11kV RING MAIN UNIT CONSTRUCTION CODE

    11 RMU/O/ASL 2S1F

    11 = 11kV RMU = Ring Main Unit

    LOCATION

    O = Outdoor

    HV SWITCHGEAR

    ASL = ABB SafeLink

    ASP = ABB SafePlus

    ASR = ABB SafeRing

    CONFIGURATION

    2S1F = 2 switch + 1 fuse

    2S2F = 2 switch + 2 fuse

    3S = 3 switch

    4S = 4 switch

    3S1F = 3 switch + 1 fuse

    1S1CB1F = 1 switch + 1 circuit breaker + 1 fuse

    1S1CB2F = 1 switch + 1 circuit breaker + 2 fuse

    2S1CB = 2 switch + 1 circuit breaker

    11RMU/O/ASL2S1F = 11kV, Ring Main Unit, outdoor, ABB SafeLink, 2 switches + 1 fuse.

    C. Noel

    A. Bletchly

    111kV RING MAIN UNIT

    9/9/10HV SWITCHGEARHARD COPY

    UNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • CONSTRUCTION CODE GUIDE

    5229 262 5229 2

    C. Noel

    A. Bletchly

    EXAMPLE:-

    Required only where foundationis not provided by others.

    Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.

    A

    FOUNDATION AND SITE FINISH

    3/5/11

    RING MAIN UNIT FOUNDATION & SITE FINISH CONSTRUCTION CODE

    11 RMUF / ASL

    11 = 11kV

    VOLTAGE RMU FOUNDATION

    RMUF = Ring Main Unit Foundation

    HV SWITCHGEAR

    ASL = ABB Safelink

    11RMUF/ASL = 11kV, Ring main unit foundation, ABB Safelink

    L. Burton

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • EXAMPLE:-

    CONSTRUCTIONSVOLTAGE

    CONSTRUCTION CODE GUIDE

    Code shown within dashed boxappears on relevant constructiondetail drawings in this manual.

    A

    5229 362 5229 3T.Borg

    22kV RING MAIN UNIT CONSTRUCTION CODE

    22 RMU/O/FGA 3S1F

    22 = 22kV RMU = Ring Main Unit

    LOCATION

    O = Outdoor

    HV SWITCHGEAR CONFIGURATION

    2S1F = 2 switch + 1 fuse

    FGA = Felton & Guillaume (F&G) 1S1CB1F = 1 switch + 1 circuit breaker + 1 fuse1S1CB2F = 1 switch + 1 circuit breaker + 2 fuse

    2S1CB = 2 switch + 1 circuit breaker

    2S2F = 2 switch + 2 fuse

    3S = 3 switch

    3S1F = 3 switch + 1 fuse

    4S = 4 switch

    22RMU/O/FGA3S1F = 22kV, Ring Main Unit, outdoor, Felton and Guillaume (F&G), 3 switches + 1 fuse.

    C. Noel

    A. Bletchly

    22kV RING MAIN UNIT

    9/9/10HV SWITCHGEARHARD COPY

    UNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • FO

    OT

    PA

    TH

    NOTES:

    PLAN

    L. Burton

    MAXIMUM CUT & FILL

    (shown dashed)

    30

    00

    800

    A_

    FIL

    L

    100

    MA

    X

    R.P. StreetAlignment

    _

    150

    MA

    X

    CU

    T

    2800

    SECTION A

    2. Ergon Energys 3000mm x 2800mm (minimum) site shall be levelled and surrounding area graded to ensure NO PONDING of water occurs.

    523062 5230 1

    8.3.11 SITE PREPARATION SLOPING SITE

    Outline of RMU foundation over

    1. Refer drawing 5226 for installation requirements.

    3. No services other than the Ergon Energys electric cables shall pass through this RMU site.

    4. Clear access to the RMU shall be maintained for Ergon Energys personnel & heavy equipment.

    6. Mature landscaping (including trees, sprinklers etc) shall not encroach onto the RMU site.

    7. The finished surface of the adjacent footpath, in front of the RMU cabinet, shall be level to ensure that the cabinet doors will swing into the fully open position.

    FF

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    R.P. StreetAlignment

    = =

    ==

    SiteBoundary

    F

    5. After installation is complete the site surface is to be finished with a concrete slab. (Refer drawing 5217).

    HV SWITCHGEAR

    A.Bletchly

    C.Noel

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • NOTES:

    B 1/2 DISC

    L. Burton

    1. Foundation design details are as follows:1

    ASSY QTYDESCRIPTIONMATERIAL

    1523262 5232 1

    583-2 CulvertUnstable soils are soft clay to sandy gravel with a soil strength 50-150 kPa. Stable soils are very stiff clay to shale/rock with soil strength of150kPa or higher.

    2. Lift the culvert separately with 4 x 1.3 tonnes Reid Swiftlift lifting eyes.

    3. Position the top face of the culvert at the finished ground level of the site, as detailed on the Projects Civil Construction drawings.4. Do NOT remove the culvert end wall knockouts.

    5. The culvert shall be constructed level. Under no circumstances shall it be allowed to tilt forward towards the footpath.

    7. Refer drawing No. 5217 for site finish concrete surround.

    CULVERT FOUNDATION DETAILS

    A. Bletchly

    C. Noel

    4/5/11

    MATERIAL

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 523262 5232 1

    8.3.11

    C. Noel

    A. Bletchly

    F

    _

    SECTION A

    B_

    =

    =

    A_

    3000 S

    ite

    Compact pit sandSECTION B

    _

    PLAN

    Backfill with approvedsuitable material andcompact in place

    R.P. StreetAlignment

    2800 SiteF

    F

    FF

    FFF

    F

    SiteBoundary

    F

    Finished GroundLine (Site)

    Cableentry

    Assy 583-2

    Footpath

    F

    Precast concreteplinth suppliedwith RMU

    F

    F

    HV cables

    F

    F

    F

    F

    F

    StableUn-stable100

    50

    F

    F

    1180 S

    table

    12

    80

    Un

    stab

    le

    2

    Construction Type

    11RMU/ASLF

    F

    F

    F= =

    CULVERT FOUNDATION DETAILSCONSTRUCTION

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 523362 5233 1

    8/3/11

    C. Noel

    A. Bletchly

    F

    F

    FO

    OT

    PA

    TH

    R.P. StreetAlignmentF

    6000

    F

    F

    30

    00

    NOTE:

    Real Property Boundary

    F

    F2800

    Dwelling

    Dwelling

    As

    Req

    dA

    s R

    eqd

    FF

    FF

    Ring main units may be in 1 or 2 allotments

    F

    A reduction in dwelling setbackof 6000mm from the R.P. StreetAlignment will require relocationof the ring main unit to an alternative site to achieve the acceptable separation.

    LOCATION IN RESIDENTIAL ALLOTMENTSHV SWITCHGEARHARD COPY

    UNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 523462 5234 1

    C. Noel

    A. Bletchly

    10.3.11

    NOTES:

    Parklands

    1.

    2.

    3.

    2.5m Min.

    2.5

    m M

    in.

    4.

    Apron

    PLAN

    Dwelling

    Real PropertyBoundary

    1.5m Min.

    R.P. StreetAlignment

    FOOTPATH

    Kerb

    ROAD2.0

    m

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    F

    Dwelling

    1.5

    m

    Min

    .

    F

    F

    SiteBoundary

    As Reqd

    3.0m

    Away from residential dwellings and surroundingproperties to minimise visual and sound impact;

    As close as possible to the road kerb to allow 24 hourall weather access for personnel, a coventional craneand heavy equipment.

    ReferNote 4

    ReferNote 4

    F

    F

    F

    F

    RMU SET BACK FROM R.P. STREET ALIGNMENT

    When planting vegetation in parklands, ensure vegetationdoes not encroach on the ring main unit site.Take into consideration the fully matured size of vegetationto allow continuing access to the site.

    A ring main unit in parkland shall be located:

    The location of ring main unit sites is based on acceptable separation to adjacent dwellings located as shown. Any reduction in the 1.5m minimum dimension shown on the drawings requires a corresponding relocation of the ring main unit site to maintain the acceptable separation.

    LOCATION IN COUNCIL PARKLANDS

    A 3.0m wide cable and access easement or road reserveshall be provided between the ring main unit site and the R.P. Street Alignment.

    1

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 523462 5234 2

    C. Noel

    A. Bletchly

    10.3.11

    FOOTPATH

    ROAD

    Parklands

    Kerb

    PLAN

    Dwelling

    R.P. StreetAlignment

    6.0m Min.

    F

    SiteBoundary

    F

    F

    F

    F

    F

    As Reqd

    Real Property Boundary

    FOOTPATH

    ROAD

    Parklands

    Kerb

    PLAN

    Dwelling

    F

    SiteBoundary

    F

    F

    F

    F

    F

    Real Property Boundary

    Less than6.0m

    2.5m Min.F

    F

    1.5mMin.

    F

    F

    Refer Note 4Sheet 1.

    R.P. StreetAlignment

    RMU ADJOINING R.P. STREET ALIGNMENT

    LOCATION IN COUNCIL PARKLANDS

    2

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    ASSY DESCRIPTIONQTY

    NOTES:

    10/3/11

    567-9

    62 5236 1 5236

    C. Noel

    A. Bletchly

    567-1

    567-5567-3

    567-7

    555-4555-5555-7555-8555-9555-10

    11kV ABB safelink 2 switch 1 fuse c/w cubical and plinth

    11kV ABB safelink 2 switch 2 fuse c/w cubical and plinth

    11kV ABB safelink 3 switch 1 fuse c/w cubical and plinth

    11kV ABB safelink 3 switch c/w cubical and plinth

    11kV ABB safelink 4 switch c/w cubical and plinth

    1

    2S1F 2S2F 3S1F3S 4S

    1.

    2.

    The gland plates supplied with the units are not required to be fitted on the ground mounted RMU

    3.

    The HV cables must be clamped to the unistrut provided as per construction standards and the opening on the plinth for cable entry must be filled with a weak concrete mix and compacted

    MATERIAL - FREESTANDING RING MAIN UNIT

    ASSY DESCRIPTION QTY

    3

    1

    1

    1

    1

    1MATERIAL

    MATERIAL - HV FUSE - EACH CIRCUIT

    Refer note 1

    555-2 Cartridge fuse link 10A HRCCartridge fuse link 20A HRC

    Cartridge fuse link 25A HRC

    Cartridge fuse link 40A HRC

    Cartridge fuse link 50A HRC

    Cartridge fuse link 63A HRC

    Cartridge fuse link 80A HRC

    Designer to nominate HV fuse link current rating

    CONTRACT No. 2008 / 024 / T

    ABB 11kV RING MAIN UNIT SAFELINKHV SWITCHGEARB 24.11.11

    B

    4.

    Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5237 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    10/3/11HARD COPYUNCONTROLLED

    62 5236 2 5236

    C. Noel

    A. Bletchly

    CONTRACT No. 2008 / 024 / T

    2

    Construction Type

    11RMU/O/ASL2S1F

    11RMU/O/ASL2S2F

    11RMU/O/ASL3S

    11RMU/O/ASL3S1F

    11RMU/O/ASL4S

    Assy Selection567-1 to 9 and555-2 to 10

    F

    F

    F

    Concrete plinth

    F

    Refer HV CONSTRUCTION drawing no. 5244 or 5245 for feeder cable connections

    Side View Plan

    F

    Lifting points4 x M12 ferrules

    Lifting points4 x M12 ferrules

    CONSTRUCTIONABB 11kV RING MAIN UNIT SAFELINKHV SWITCHGEAR

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    10/3/11HARD COPYUNCONTROLLED

    62 5237 1 5237

    C. Noel

    A. Bletchly

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    2S1F 11kV ABB safelink RMU 2 switch 1 fuse

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    2S2F 11kV ABB safelink RMU 2 switch 2 fuse

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    3S1F 11kV ABB safelink RMU 3 switch 1 fuse

    FEEDERCABLE

    F

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    1

    ABB 11kV SAFELINK - HV SWITCHGEARSCHEMATIC

    HV SWITCHGEAR

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    10/3/11

    62 5237 2 5237

    C. Noel

    A. Bletchly

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    2

    F

    FEEDERCABLE

    F

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    F

    4S 11kV ABB safelink RMU 4 switch 3S 11kV ABB safelink RMU 3 switch

    ABB 11kV SAFELINK - HV SWITCHGEARSCHEMATIC

    HV SWITCHGEARHARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton 62 5238 1 5238

    C. Noel

    A. Bletchly

    ASSY DESCRIPTIONQTY

    NOTES:

    578-1

    578-5578-3

    1

    1.

    MATERIAL - FREESTANDING RING MAIN UNIT

    For circuit breaker setting refer to protection.

    1S1CB1F 1S1CB2F 2S1CB

    1

    1

    MATERIAL

    9/5/11

    1

    11kV ABB safeplus RMU 1 switch 1 circuit breaker 1 fuse c/w cubical and plinth

    11kV ABB safeplus RMU 1 switch 1 circuit breaker 2 fuse c/w cubical and plinth

    11kV ABB safering 2 switch 1 curcuit breaker c/w cubical and plinth

    ABB 11kV SAFEPLUS / SAFERINGHV SWITCHGEARB 24.11.11

    B

    2. Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5253 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    HARD COPYUNCONTROLLED

    62 5238 2 5238

    C. Noel

    A. Bletchly

    9/5/11

    2CONSTRUCTION

    Assy Selection 578-1, 3 or 5

    F

    Lifting point

    F

    Lifting point

    F

    Lifting point

    FF

    ABB 11kV SAFEPLUS / SAFERINGHV SWITCHGEAR

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    ASSY DESCRIPTIONQTY

    16/3/11

    579-9

    62 5243 1 5243

    C. Noel

    A. Bletchly

    579-1

    579-5579-3

    579-7

    579-11

    1

    2S1F 2S2F 3S1F3S 4S

    MATERIAL - FREESTANDING RING MAIN UNIT

    CONTRACT No. 2008 / 024 / T

    CONSTRUCTION

    22kV F&G 2 switch 1 fuse c/w cubical & plinth

    579-13579-15

    22kV F&G 2 switch 2 fuse c/w cubical & plinth

    22kV F&G 3 switch 1 fuse c/w cubical & plinth

    22kV F&G 3 switch c/w cubical & plinth

    22kV F&G 4 switch

    22kV F&G 1 switch 1 circuit breaker 1 fuse c/w cubical & plinth

    22kV F&G 1 switch 1 circuit breaker 2 fuse c/w cubical & plinth

    22kV F&G 2 switch 1 circuit breaker c/w cubical & plinth

    1S1CB1F 1S1CB2F 2S1CB

    1

    1

    1

    1

    1

    1

    1

    NOTE:

    1.

    1

    Designer to nominate HV fuse links

    F&G 22kV

    2. For circuit breakers refer to protection for setting

    556-3556-4556-7

    Cartridge fuse link 16A

    Cartridge fuse link 20A

    Cartridge fuse link 40A

    3 6 3 3 6

    QTY2S1F 2S2F 3S1F3S 4S 1S1CB1F 1S1CB2F 2S1CB

    ASSY DESCRIPTION

    MATERIAL - HV FUSE - EACH CIRCUIT

    HV SWITCHGEARB 24.11.11

    B

    Designer to nominate the position(s) of the outgoing cable circuits (Refer dwg 5252 for schematic) as follows:* Radial feeders - switch disconnector(s) provided with CFI unit(s)* Ring feeders - determine the circuit arrangement in consultation with system operations staff.

    3.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    HARD COPYUNCONTROLLED

    62 5243 2 5243

    C. Noel

    A. Bletchly

    HV SWITCHGEARF&G 22kV RING MAIN UNIT

    CONTRACT No. 2008 / 024 / T

    Construction Type

    CONSTRUCTION

    22RMU/O/FGA2S1F

    22RMU/O/FGA2S2F

    22RMU/O/FGA3S1F

    22RMU/O/FGA2S1CB

    22RMU/O/FGA3S

    22RMU/O/FGA4S

    22RMU/O/FGA1S1CB1F

    22RMU/O/FGA1S1CB2F

    Assy Selection579-1 to 15 and556-3 to 7

    F

    Refer HV CONSTRUCTION drawing no. 5044 for feeder cable connection

    2

    9/5/11

    Lifting point

    F F

    Lifting point

    Lifting point

    F

    F

    F

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    HARD COPYUNCONTROLLED

    62 5252 1 5252

    C. Noel

    A. Bletchly

    HV SWITCHGEAR

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    1SCHEMATIC

    9/5/11F & G 22kV RING MAIN UNIT

    2S1F 22kV F & G ring main unit

    2 switch, 1 fuse

    2S2F 22kV F & G ring main unit

    2 switch, 2 fuse

    3S1F 22kV F & G ring main unit

    3 switch, 1 fuse

    F F F

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    10/3/11HARD COPYUNCONTROLLED

    62 5252 2 5252

    C. Noel

    A. Bletchly

    HV SWITCHGEAR

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    2

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    SCHEMATICF & G 22kV RING MAIN UNIT

    4S 22kV F & G ring main unit

    4 switch

    3S 22kV F & G ring main unit

    3 switch

    F F F F

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    HARD COPYUNCONTROLLED

    62 5252 3 5252

    C. Noel

    A. Bletchly

    HV SWITCHGEARF & G 22kV HV SWITCHGEAR

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    F

    Note:

    Represents circuit fault indicator

    F

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F F

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    3

    9/5/11

    1S1CB1F 22kV F & G ring main unit

    1 switch, 1 circuit breaker, 1 fuse

    (CFI) on this switch disconnector unit

    1S1CB2F 22kV F & G ring main unit

    1 switch, 1 circuit breaker, 2 fuse

    2S1CB 22kV F & G ring main unit

    2 switch, 1 circuit breaker

    SCHEMATIC

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • L. Burton

    HARD COPYUNCONTROLLED

    62 5253 1 5253

    C. Noel

    A. Bletchly

    HV SWITCHGEAR

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    F

    Note:

    (CFI) on this switch disconnector unitRepresents circuit fault indicator

    F

    Note:

    Represents circuit fault indicator

    F

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    F F

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    FEEDERCABLE

    1

    9/5/11

    (CFI) on this switch disconnector unit

    HV SWITCHGEAR - SCHEMATIC

    1S1CB1F 11kV ABB Safeplus ring main unit

    1 switch, 1 circuit breaker, 1 fuse

    1S1CB2F 11kV ABB Safeplus ring main unit

    1 switch, 1 circuit breaker, 2 fuse

    2S1CB 11kV ABB Saferingring main unit

    2 switch, 1 circuit breaker

    ABB 11kV SAFEPLUS / SAFERING

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 1 SITE

    INSTALLATION

    General1.1

    Stable (soil conditions)

    Free from steep batters

    Flood freeLevel (topography) where possible

    1.4

    1.2

    1

    1/6/11

    Site Size

    1.3

    URD

    Along coastal areas the site must be located as far as possiblefrom the shoreline and sheltered from salt spray.

    Common earthing sitesLevel sites - 3000mm width x 2800mm depth.Retaining wall sites - 3400mm width x 3000mm depth.

    The site shall be to the satisfaction of Ergon Energy, including

    A site should not be located where impact by traffic is likely and,if at a truncated section of the street alignment or other non-regular shaped site the following shall apply:

    The specified rectangular size of the site shall not be reduced.

    a) In the Road Reserve:-

    The Developer shall obtain all necessary approvals from theDepartment of Transport or the Local Authority.

    b) On Freehold property (including residential or parkland):-

    The Developer shall provide Ergon Energy with a registeredeasement at no cost to Ergon Energy.

    HARD COPYUNCONTROLLED

    L. Burton

    A. Bletchly

    C. Noel

    62 5255 1 5255

    HV SWITCHGEARRING MAIN UNIT

    The minimum area required to accommodate a ring main unitshall be:

    Ring Main Unit Orientation

    The developer shall provide a ring main unit site(s) asrequired by Ergon Energy at no cost to Ergon Energy. The site shallbe included in the road reserve, or located on freehold property.No ring main units are to be located in Trustee Reserves.

    Where the developer required the ring main unit to be included:

    Acceptable separation of ring main unit to adjacent dwellings is provided if the front of dwellings are set back 6.0m from the R.P. Street Alignment and the padmount is located as shown in drawings No. 5233, 5234 Sheets 1 or 2.

    Developments including streets where the allowable dwelling set back is less than 6.0m will require ring main unit siting on either an alternative street, where the dwelling set back is 6.0m, or in Parklands.

    RING MAIN UNIT INSTALLATION

    Free from other services

    The front edge of the ring main unit shall be as near to parallel as possible to the R.P. Street Alignment.

    Ring main units shall be oriented such that the HV panels are easily accessible from the dedicated footpath.

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • 2

    1 SITE

    1.5

    (CONTD)Commercial and Industrial or Landscaped Areas

    1.6 Parklands - for other than URD

    1.7

    Cabling Only

    Cabling and Access

    2 SITE PREPARATION

    Sites shall be prepared in accordance with the includedconstruction drawings.

    3 CONSTRUCTION OF RETAINING WALLS

    4

    4.1 Uniculvert

    Cabling and Access Requirement

    A 3.0m wide easement, or road reserve, from the front ofthe site is required for cabling and access.

    62 5255 2 5255

    HV SWITCHGEAR

    INSTALLATIONRING MAIN UNIT

    1/6/11

    C. Noel

    A. Bletchly

    L. Burton

    Whether the ring main unit is for the sole use of thatcomplex, or is required as part of the distribution network, theowner is required to grant Ergon Energy an easement for thering main unit site, access and cabling.

    Obtain the necessary approval for an easement to accommodate the ring main unit, cabling and access to site.

    Acceptable separation of ring main unit to adjacent dwellings isshown in drawings No. 5234 Sheets 1 & 2.

    Should the cabling route not be available in conjunction withaccess, a 1.0m wide cable easement is required to the frontof the ring main unit. Additionally 2.0m x 3.0m (ring main unit site width) is required immediately in front to allow spreading ofcables for entry to the ring main unit and also include the buriedearth cable.

    Retaining walls shall be constructed around the perimeter of aring main unit site where:

    A change in ground level of 300mm or more occurs within 2.0mof the boundary of the ring main unit site.

    RING MAIN UNIT FOUNDATION

    Separation of 5.0m between ring main unit and thenearest room or habitable area should be providedwhere possible.

    Uniculvert foundations shall not be constructed where site andground conditions do not provide an even or equal bearingcapacity for the ring main unit.

    Uniculvert foundations for stable soil conditions shallbe constructed in accordance with Drawing No. 5232.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • INSTALLATION

    3

    4 (CONTD)Unstable SitesWhere sites are very unstable, and conventional foundationconstruction techniques as described in this document cannotbe applied, a special design shall be required.

    5 BACKFILLING AND FINAL SITE FINISH

    5.1 Common Earthing Sites

    6

    6.1

    ADDITIONAL REQUIREMENTSCommercial and Industrial Installation

    All backfill of the site must be compacted before final site finish inaccordance with the applicable drawing.

    Easy access for a mobile crane must be available for the purpose ofinstallation or replacement.

    Ergon Energy cable conduits for the development may be placed inthe substation site and shall pass down the sides of the uniculvertfoundation. No conduits shall pass through or under the uniculvertfoundation. Conduits shall be 750mm minimum depth below thefinished surface level. The substation site surface is to be finishedwith a concrete slab (refer to drawing No. 5004). The 2.0m apron infront of the substation cabinet shall be finished with a concrete slabsectioned with construction joints for ease of future removal.

    6.2

    An additional 2.0m apron shall be provided in front of, and for thefull width of the site (ie 4.8m depth). This will provide a safeworking platform and access around latched open doors foremergency operations.

    C. Noel

    A. Bletchly

    1/6/11

    L. Burton 26 5255 3 5255

    RING MAIN UNIT FOUNDATION

    In such circumstances, the developer shall obtain a certifieddesign from a Civil Engineer (RPEQ) for Ergon Energysconsideration. No special designs for ring main unitfoundation construction shall be used without the approval ofErgon Energy.

    The preferred location of ring main unit sites atcommercial and industrial developments is at the real propertystreet alignment. Switchgear cabinet doors shall face theadjoining footpath.

    Ring main units shall be located on the development inareas where clear, all weather access is provided for personneland heavy equipment at all times.

    Ring Main Units in Landscaped AreasWhere the ring main unit is located in a landscapedarea (gardens) the following shall apply:

    The ring main unit site surface is to be finished with a concrete slab(refer to drawing No. 5217).

    The 2.0m apron in front of the ring main unit site shall be finished witha concrete slab sectioned with construction joints for ease of futureremoval.

    HV SWITCHGEARRING MAIN UNIT

    4.2

    Sealing of the cable apertures in the precast concrete plinthand construction of the concrete surround slab over theground surface shall be in accordance with drawing No. 5217.

    Should the site be located in restricted areas such as carparks and between buildings, an additional minimum 2.0m of clear access shall be provided in front of, and for the full width of the site (ie 4.8m depth). This will provide a safe working platform and access around latched open doors for emergency operations.

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

  • INSTALLATION

    4

    6.2 (CONTD)

    6.3

    7

    Ring Main Unit in Landscaped AreasWhen planting vegetation in landscaped areas and gardens,ensure vegetation does not encroach on the ring main unitsite. Take into consideration the fully matured sizeof vegetation to allow continuing access to the site.

    Ergon Energy cable conduits for the development may beplaced in the ring main unit site and shall pass down the sidesof the uniculvert foundation. No conduits shall pass throughor under the uniculvert foundation. Conduits shall be 750mmminimum depth below the finished surface level.

    Ring Main Units Installation in ParklandsWhere the ring main unit is located in CouncilParklands, the installation shall be in accordance with therequirements of drawing No. 5234 Sheets 1 or 2.A 2.0m apron as specified in Clause 6.2 shall be provided.

    No buildings/residences, fences, including their foundations, LVswitchboard earths, or metalic objects are permitted within theclearance zone around the RING MAIN UNIT.Clearance to Telstra assets shall be as noted on EARTHINGdrawing No. 5221 Sheet 1.

    62 5255 4 5255

    HV SWITCHGEARRING MAIN UNIT

    1/6/11

    C. Noel

    A. Bletchly

    L. Burton

    SPACING BETWEEN RING MAIN UNIT AND OTHER METAL OBJECTS

    HARD COPYUNCONTROLLED

    A ORIGINAL ISSUE

    DRAWN

    DATE

    PASSED

    APPROVED

    Ergon Energy Corporation LtdABN 50 087 646 062 Dwg ShFILE: 5

    UNDERGROUND DISTRIBUTION

    00 HV Switchgear01 HV Switchgear Index Sh1

    5217 Sh1 Outdoor RMU with Precast Conc Fdn5229 Sh1 Construction Code Guide 11kV RMU5229 Sh2 Construction Code Guide Foundation and Site Finish5229 Sh3 Construction Code Guide 22kV RMU

    5230 Sh1 Site Preparation Sloping Site Max Cut and Fill5232 Sh1 Culvert Foundation Details Material5232 Sh2 Culvert Foundation Details Construction

    5233 Sh1 Location in Residential Allotments5234 Sh1 Location in Council Parklands5234 Sh2 Location in Council Parklands

    5236 Sh1 ABB 11kV RMU Safelink Material5236 Sh2 ABB 11kV RMU Safelink Construction

    5237 Sh1 ABB 11kV Switchgear - HV Switchgear Schematic5237 Sh2 ABB 11kV Safelink - HV Swtichgear Schematic

    5238 Sh1 ABB 11kV Safeplus,Safering Material5238 Sh2 ABB 11kV Safeplus, Safering Construction

    5243 Sh1 FandG 22kV Construction5243 Sh2 FandG 22kV RMU Construction

    5252 Sh1 FandG 22kV RMU Schematic5252 Sh2 FandG 22kV RMU Schematic

    5252 Sh3 FandG 22kV HV Switchgear Schematic5253 Sh1 ABB 11kV Safeplus, Safering HV Switchgear Schematic5255 Sh1 RMU Installation5255 Sh2 RMU Installation5255 Sh3 RMU Installation5255 Sh4 RMU Installation