Installation and SWAP guide for MTN Hybrid power system
Liu Feng
秘密▲
![Page 2: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/2.jpg)
The topology of the Hybrid power system秘密▲
Generator1
Generator2ATS BAT
48V
Power-48V24V
220V
RBS24V
MW48V
![Page 3: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/3.jpg)
Content
—Install the hybrid power system Install the power and battery cabinet Install the battery Install the load cables Install power alarm cables Install ATS Make the labels —The SWAP procedure
![Page 4: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/4.jpg)
Install the power and battery cabinet
Content
![Page 5: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/5.jpg)
Install the power and battery cabinet-fix the cabinet
Expand bolts(total 8 bolts for each cabinet)
The RD engineer will design paper footprint of the power and battery cabinet to help the subcontractor to make hole.
![Page 6: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/6.jpg)
Battery Cabinet with DC Air Conditioner
Dimension:2100 mm × 1050 mm × 1110 mm
(H × W × D)
Dimension:2100 mm × 1050 mm × 1110 mm
(H × W × D)
Battery quantity :24*2 V/1000 AH battery cells
Battery quantity :24*2 V/1000 AH battery cells
Cabinet Weight:250 kg approximately
Cabinet Weight:250 kg approximately
![Page 7: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/7.jpg)
Install the power and battery cabinet-install AC cable
This breaker to ZTE power
ZTE AC input power
ZTE AC input breaker
The specification of AC cable is 4*10mm2 and it must be outdoor used
![Page 8: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/8.jpg)
Install the power and battery cabinet-install battery
Install the battery cableThe biggest screw is for the battery cable.
The breaker must be off
![Page 9: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/9.jpg)
Install the power and battery cabinet-install battery temp sensor
Battery temp sensor should be in the top of the battery cabinet( 2nd battery of top layer)
The other side of battery temp sensor should be installed here. You can see the terminal mark on the cover
![Page 10: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/10.jpg)
Install the power and battery cabinet-install environment temp sensor
The environment temp sensor should be installed in the top of the power cabinet
![Page 11: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/11.jpg)
Install the power and battery cabinet-install cable for battery cabinet cooling
Alarm cable for Cooling Power cable The terminals should be covered with tap very well
the other side of the power cable should be in fuse F204
The alarm cable should be installed here
![Page 12: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/12.jpg)
Install the power and battery cabinet-install door alarm cable for battery cabinet
The door alarm cable should be installed here
![Page 13: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/13.jpg)
Install battery
Content
![Page 14: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/14.jpg)
Battery Cabinet with DC Air Conditioner
Dimension:2100 mm × 1050 mm × 1110 mm
(H × W × D)
Dimension:2100 mm × 1050 mm × 1110 mm
(H × W × D)
Battery quantity :24*2 V/1000 AH battery cells
Battery quantity :24*2 V/1000 AH battery cells
Cabinet Weight:250 kg approximately
Cabinet Weight:250 kg approximately
![Page 15: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/15.jpg)
Install battery
The battery layout of top layer
The battery layout of bottom layer
The layout should strictly follow thisWhen connect the battery to the Power ,the battery breaker must be off
Breaker
Battery voltage detect signal cable .each battery has one cable
![Page 16: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/16.jpg)
Install battery
The battery cell voltage detect cable
![Page 17: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/17.jpg)
Install the load cables
Content
![Page 18: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/18.jpg)
Install load cable –Load distribution
Breaker-48V
F10125A
F10225A
F10325A
F10425A
F10525A
F10625A
F10720A
F10825A
F10925A
F11025A
F11163A
F11263A
F11363A
F11463A
F11540A
Load
ZXD2430-1
ZXD2430-2
ZXD2430-3
ZXD2430-4
ZXD2430-5
ZXD2430-6
INV Dc cooling
Spare Spare RBS1 RBS2 RBS3 RBS4 3G
Breaker-48V
F20116A
F20116A
F20316A
F20416A
F20510A
F20610A
Load
MW1 MW2 MW3 Battery cooling
DC security light
AWL
24V NO1100A
NO2100A
NO3100A
NO4100A
RBS1 RBS2 RBS3 RBS4
The load connection should strictly obey the following tableF101-F114 means breaker of LLVD1 F201-F205 means breaker of LLVD2INV : inverter MW : micro wave
![Page 19: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/19.jpg)
Install the load cables-RBS cable(+24V RBS)
24V +(red 35mm2)
GND ( black 35mm2)
Make terminals and labels in RBS side
There are 4 pcs 24V breakers ,from left to right, RB1-RBS4
![Page 20: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/20.jpg)
-48V GND
Make terminal in IDU side Make sure the -48V and GND are right
Install the load cables-microwave cable
![Page 21: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/21.jpg)
Install alarm cable
Content
![Page 22: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/22.jpg)
Install alarm cable
Here 8 alarms, 16pcs signal cables.
relay 8 Alarms
A1 Generator alarm
A2 Battery alarm
A3 Rectifiers alarm
A4 System alarm
A5 High temp alarm
A6 Battery discharge
A7 Air conditioner alarm
A8 reversed
![Page 23: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/23.jpg)
Install alarm cable
PIN Cable connection alarm definition
X15 Pin 2 : white 3 ; bluePin 5: white 6: orange
Generator alarmBattery alarm
X16 Pin 2 : white 3 ; greenPin 5: white 6: brown
Rectifier alarmSystem alarm
X17 Pin 2 : red 3 ; bluePin 5: red 6: orange
High temp alarmBattery discharge
X18 Pin 2 : red 3 ; greenPin 5: red 6: brown
Air conditioner alarmReversed alarm
16 cores twisted-pair as alarm cable
white/blue white/orange white/green white/brown
red/blue red/orange red/green red/brown
X18
X17
X16
X15
![Page 24: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/24.jpg)
Install ATS
Content
![Page 25: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/25.jpg)
ATS
Dimension:1200mm × 890 mm × 300 mm
( H × W × D)
Dimension:1200mm × 890 mm × 300 mm
( H × W × D)
Weight:The whole machine < 130kg.
Weight:The whole machine < 130kg.
![Page 26: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/26.jpg)
Install ATS-Signal cable (power-ATS)
Color Cable connection
Definition
Orange/white EXB X3Pin2 whitePin3 orange
Start Generator1
Green/white EXB X3Pin 5 whitePin5 Green
Start Generator2
Brown/white SIB X12(pin1 brown(Pin3 white)
Grid feedback
Blue/white Reserved Reserved
![Page 27: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/27.jpg)
Make the labels
Content
![Page 28: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/28.jpg)
Make the labels
All the cable must have label ZTE will give the label template
![Page 29: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/29.jpg)
The SWAP procedure
Content
![Page 30: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/30.jpg)
Preparation work before SWAP-install and Debug ZTE power
Debug the power:Check whether the can work normallySet the parameters Check whether the generator can start when the battery charge current is 0.1C
![Page 31: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/31.jpg)
Preparation work before SWAP-connect RBS cable
24V +
GND
Make terminals and labels in RBS side
![Page 32: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/32.jpg)
-48V
Preparation work before SWAP-connect IDU cable
GND
Make terminal in IDU side Make sure the -48V and GND are right
![Page 33: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/33.jpg)
SWAP procedure-SWAP RBS power cable
After start the generator , please call MTN staff about the SWAP
![Page 34: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/34.jpg)
SWAP procedure-SWAP RBS power cable
24V battery +
24V battery -Take the battery + and battery – cable from RBS. And it must be covered with insulation tap
Do not touch the breaker here
![Page 35: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/35.jpg)
SWAP procedure-SWAP RBS power cable
Install new 24v power cable from ZTE powerMake sure the Positive and negative poles are right
![Page 36: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/36.jpg)
SWAP procedure-SWAP RBS power cable
AC input of 24v power module
1.Switch on the breaker of the new power cable and check the power voltage (27V)
2.Take off the A C input socket of 24V power module and check if the RF module can work
If every thing is ok, take off power alarm cable
![Page 37: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/37.jpg)
SWAP procedure-SWAP IDU power cable
Switch on the breaker of new IDU power cable, and check the power voltage
Take AC input power cable of IDU Insert the new DC power for IDU If the IDU can not work, rollback
After SWAP , call MTN engineer to check if every is OK
![Page 38: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/38.jpg)
Tidy UP the side
1.Tidy the cable and make label2.Clean up the site3.If there is commercial power , turn off the generator
![Page 39: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/39.jpg)
CONNECTION OF THE SIGNAL INTERFACE
• X22 -------------------------- BMU 1• BACK 17 ------------------- VB1• DMS OUT ------------------- DMS IN• X11 OUT -------------------- X11 IN• BATT SENSOR ------------- SIB X6• X12 IN ---------------------- X 12 OUT• ALM IN ---------------------------- ALM OUT
![Page 40: ZTE HYBRID Installation Guide](https://reader035.fdocuments.us/reader035/viewer/2022082206/55cf9a87550346d033a22ec7/html5/thumbnails/40.jpg)
GEN to ATS SIGNAL CONNECTIVITY
• BROWN +12 6• BLUE -12 5• BLACK START 4• BLUE FUEL SOLENOID{33/3}• BROWN D+(NIL) DYNAMO 19(not terminated)• BLACK HWT TEMP SWITCH (16)• BROWN LOP OP(17)