Zoheb risk assessment 2 for grm

2
STUDENT RISK ASSESSMENT Date 18 th January 2016 Location: Assembly hall/ studio Task being assessed: Students taking photos in college General Risk assessment Student Name: Zoheb Ashraf HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLAN Hazard Regardless of control measures Perso ns at risk *1 Worst outcom e *2 Probabili ty *3 Risk Ratin g A-E Existing control measures taken against the risk What further control measures are required when and by whom Overcrowding Litter on the floor Sf, St, Cr, Cl, V, D, X,L,W (ALL) Min NR R Ps Go to an area of the field where there are not as many people There are bins where the litter should be dropped so there should not be any litter. Also tell people that you will be taking pictures here and nicely ask for them to stay away from there. Make sure the area is clean and there is no rubbish on the floor before taking photographs.

Transcript of Zoheb risk assessment 2 for grm

Page 1: Zoheb risk assessment 2 for grm

STUDENT RISK ASSESSMENT

Date 18th January 2016

Location: Assembly hall/ studio Task being assessed: Students taking photos in college

General Risk assessment

Student Name: Zoheb Ashraf

HAZARDS DEGREE OF RISK CONTROL MEASURES ACTION PLANHazard

Regardless of control measuresPersons at risk

*1

Worst outcome

*2

Probability

*3

Risk Rating

A-E

Existing control measures taken against the risk

What further control measures are required when

and by whomOvercrowding

Litter on the floor

Sf, St, Cr, Cl, V, D, X,L,W

(ALL)

Min

NR

R

Ps

Go to an area of the field where there are not as many people

There are bins where the litter should be dropped so there should not be any litter.

Also tell people that you will be taking pictures here and nicely ask for them to stay away from there.

Make sure the area is clean and there is no rubbish on the floor before taking photographs.

*1Sf = staffSt = studentsCr = contractorsCl = cleanersV = visitors

D = people with disabilitiesX = young/inexperiencedL = lone workersW = women of child-bearing age

*2 This is without control measuresF = fatalMaj = major injury or permanent disabilityMin = minor injuryNR = non-reportable

*3 This is with control measures in placeFr = frequent/likely/could occur repeatedly/expectedPr = probable/not surprised/might occur oftenPs = possible/could occur sometimeR = remote/unlikely but conceivableU = unlikely/improbable such that likelihood is almost zero