LLCAgenda
• Status update of the project• Overview of Radiation Monitoring on siteg• Financial update and economic impact of the project• Regulatory design criteria for the Fuel Storage Facility
2
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC2012 Safety Statistics
2012 Statistics
• 9 OSHA Recordable Injuries (all9 OSHA Recordable Injuries (all categorized as Strain/Sprain/Pain)- Focus is being placed on Human Performance tools andFocus is being placed on Human Performance tools and
training
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCSafety
• Focus 2012 on Sprains/Strains/Pains– Outside of RCA for management attention– Added senior management team observation program
modeled after Ford Motor Company, is in addition to formal daily management observationsdaily management observations
– Stretching, limbering, getting mechanical advantage for work– Proper equipment and proper use of equipment– Human Performance tools: attention span, work planning
involvement of craft (weekly safety meetings focus)– Murphy’s Alley Trainingu p y s ey a g
4
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRegulatory, NRC
• Actions– License amendment for fuel building crane upgrade and
heavy loads in the fuel building to support cask handling– ISFSI Security Plan review and approval– Post-Fuel Tech Spec changes to support staff reductions– Post-Fuel Tech Spec changes to support staff reductions
• Region III inspections: no cited violations• Copy of inspection reportpy p p• NRC Public Meeting• Visit by the Chairman• Visit by NRC executives
5
Z NOI S ITULO ONSAn EnergySoluitons Company
LLC2012 Major Work Remaining
• ISFSI construction• Heavy haul path constructiony p• U-1 reactor vessel prep work• U-2 reactor internals segmentation• Asbestos remediation in the aux building• VCC construction
F l b ildi d• Fuel building crane upgrade• Continue MARSAME characterization of the turbine
buildingbuilding• Rail shipments for disposal
6
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCISFSI Construction
• Contractor is mobilizing• Late start
7
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCHeavy Haul Path Construction
Started in AugustComplete in November
8
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCU-2 Reactor Vessel Internals
Behind scheduleBehind schedule
Bolt MillingBolt MillingTool, issues
9
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCU-1 Large Steam Generator Segmentation
Cutting the first of 8 SGs
10
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCAsbestos Abatement
Work completed in Turbine Building, crews moving into Aux Building
11
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCVCC Construction
Approx 50% complete
12
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCFuel Building Crane Upgrade
13
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCMARSAME Characterization of Turbine Building
14
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRail Shipments
First cars to ship to Clive, UT in Nov/Dec 2012
15
Z NOI S ITULO ONSAn EnergySoluitons Company
LLCRadioactive Effluent Monitoring
16