YBI Global Forum, Monday: Strengthening our network - Performance measurement
-
Upload
youth-business-international -
Category
Education
-
view
231 -
download
0
description
Transcript of YBI Global Forum, Monday: Strengthening our network - Performance measurement
![Page 1: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/1.jpg)
Network Strategy – Working Group CPerformance measurement:“Measuring network impact and effectiveness”
![Page 2: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/2.jpg)
Working Group C – Team members
China Mde GuRick ZouYimei McCabe
CEO, Youth Business ChinaProject Director, Youth Business China
India Lakshmi Venkatesan
CEO, BYST
South Africa
Mzwabantu Ntlangeni
Director International Relations & Partnerships, National Youth Development Agency
Sri Lanka Harin Malwatte Youth Business Sri Lanka
![Page 3: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/3.jpg)
Our project hypothesis
• Being able to demonstrate the global impact of the network is one of the key mechanisms for adding network value to individual YBPs
• Historically, the quality of the data collected at network level has not been sufficient for two reasons:
1. Low visibility for YBPs that the data was used in a way that added value to them – providing data to YBI not a priority
2. The process for collecting and aggregating the data was not adequate
We decided to focus on how we measure network impact & effectiveness
![Page 4: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/4.jpg)
Requirements for effective global data capture
Do we have a consistent
understanding of what a YBP does and therefore of
the impact we are trying to measure?
Do we have consistent and
appropriate definitions and
metrics for impact and effectiveness?
Do we have a process in each
YBP that can reliably collect,
analyse and report the data?
1 2 3
• Our global data set must cover the impact of our programmes and also our effectiveness
• What is measured must be common, core and consistent
• Our project will use our Working Group as a sample test the following:
![Page 5: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/5.jpg)
KPI Definition Process for collection
Freq Usage Installation
status*Youth businesses supported
Number of qualifying business started or supported in period
• Standard format data request sent to regions week after quarter end
• Regions complete and return within 5 working data
• Data compiled by Ops Director in Excel spreadsheet of historical data
Quarterly
• Data used to report to Board (every 6 months)
• Data submitted to YBI Ops team quarterly
2
Jobs created
Number of people directly employed by YBP-supported businesses
• Questionnaire sent to all clients on our database asking them about their business
• Responses compiled by Ops director
Annually • Input to annual review and annual report
• Data also used in marketing materials
3
Etc...
Data evaluation template
We will capture the following data for each key KPIs we track today focussing on what we measure, how we collect the data and how we use the information
* see below
![Page 6: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/6.jpg)
6
Installation status score
Score Criteria
0 Not measured/tracked
1 Gathered if requested
2 Regularly gathered and recorded
3Routinely gathered with clear process, responsibilities, format and analysis
4Routinely gathered and used as standard input into programme management process
As well as identifying what KPIs are measured, we will also assess the robustness of the process that collects the data using the scoring system below:
![Page 7: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/7.jpg)
7
Project implementation
Agree project
objective and
approach
Conduct individual
assessments
& compare findings
Design common KPI framework
& pilot implementation
process
Conduct pilot implementation
s
• Do we track the same KPIs?• Do we track the right KPIs?• Are the processes we use to
generate our data robust?• What do we need to have in
place to efficiently produce reliable data?
• What KPI’s best allow us to demonstrate network impact?
• How are they defined?• How are they
measured?• How can data be
gathered?• How do we support pilot
implementation?
• Implement in pilot YBPS with focus on:― Data accuracy― Implementing for
sustainability― Fit with/development
of OMS• capture and feedback
learnings
*London School of Economics
Working Group
Working Group
YBI /LSE*
Working GroupYBI
![Page 8: YBI Global Forum, Monday: Strengthening our network - Performance measurement](https://reader036.fdocuments.us/reader036/viewer/2022082915/5458b1a8af79592b448b54a4/html5/thumbnails/8.jpg)
Learnings from this project (so far)
• Our team has struggled to create momentum in this project for lots of good reasons
• But we will always be able to find “good reasons” for not being able to work on this sort of project
• We need to change the current paradigm if we are to create more value for ourselves