Week 10 Tutorial Activity Oval Pavillion During the week 10 tutorial, we went on a final site visit to the oval pavilion. Notes on the feature of pavilion:
• Retaining wall stopping overflow – 800mm deep o Any moisture finds its way to drainage cell, then removed through
storm water drainage pipes • Cables
o Orange: electrical o White: columns o Grey: water
• Welding used to join steel members • Bolting and screws used to fasten to timber and steel members • Horizontal purlins
o Levels of roof § Noise insulation followed by moisture barrier, heat
insulation and upper roof • Roof supported by four main columns – window self supporting • Tongue and groove timber – can only be used for wall cladding due to
larger groove • Hidden fixing – don’t see nails/screws • Window – cover plate (sliding) • ‘Z’ purlin
o Can cross over member • ‘C’ purlin
o Sits on top of member • Timber sound proof flooring • CFC sheets – compressive • Brick veneer • Timber wall • Over-‐flashing • Internal floor higher than external floor to eliminate the risk of flooding
o 300mm floor thickness • Thicker concrete due to the weight of the brick wall • Yellow termite proofing on floor
Images
Retaining Wall Wall cladding – tongue and groove
Termite proofing Timber