openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view ·...

67
Page 1 of 67 ANNEX B.1 FY2016 BOTTOM-UP BUDGETING (BUB) LIST OF PROJECTS FOR RELEASE TO ELIGIBLE CITY / MUNICIPALITIES These are the projects of municipalities that were able to comply with the BuB Governance Conditions, such as: (i) Compliance to DILG Good Financial Housekeeping (as of June 30, 2016) (ii) Requirements of DBM Public Financial Management (as of July 2016, as reported by the DBM ROs) (iii) Previous BuB LGSF projects have been implemented (as of 2016 Q2 submitted report) No. of LGU: 273 LGUs Number of Projects: 930 Sub-Projects Total amount: 2,234,686,001.64 REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) CAR ABRA 1 LACUB 2 LAPAZ APAYAO 3 LUNA BENGUET 4 KIBUNGAN INSTALLATION OF WATER SUPPLY TO SCHOOLS IFUGAO 5 KIANGAN 6 LISTA 7 MAYOYAO 8 TINOC KALINGA 9 LUBUAGAN EQUIPPING OF RHU FLOOD CONTROL INTEGRATED COMMUNITY FOOD PRODUCTION PROVISION OF POTABLE WATER SUPPLY 10 PASIL 11 PINUKPUK 12 TABUK CITY FLOOD CONTROL MT. PROVINCE 13 SAGADA FLOOD CONTROL PROVISION OF POTABLE WATER SUPPLY RESCUE EQUIPMENT 14 TADIAN COMMUNAL IRRIGATION SYSTEM PROVISION OF POTABLE WATER SUPPLY CARAGA AGUSAN DEL NORTE 15 BUENAVISTA POTABLE WATER IN BRGY. 10 16 MAGALLANES EQUIPPING OF RURAL HEALTH UNIT 17 SANTIAGO CONSTRUCTION/CONCRETING OF LAPAZ ACCESS ROAD AGUSAN DEL SUR 18 BUNAWAN CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE RESTORATION / REPAIR / MAINTENANCE OF COMMUNAL IRRIGATION SYSTEM CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE CONSTRUCTION OF CONCRETE FOOT BRIDGE IN CALOC-AN CONSTRUCTION/CONCRETING OF POBLACION II ACCESS ROAD CONSTRUCTION/CONCRETING OF SAN ISIDRO ACCESS ROAD REHABILITATION/IMPROVEMENT OF CURVA POTABLE WATER SYSTEM LEVEL II REHABILITATION/IMPROVEMENT OF E. MORGADO POTABLE WATER SYSTEM LEVEL II REHABILITATION/IMPROVEMENT OF TAGBUYACAN POTABLE WATER SYSTEM LEVEL II CONCRETING OF NRJ TAIGYAN-CABAOHAN LOCAL CORE ROAD, PHASE 3

Transcript of openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view ·...

Page 1: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 1 of 34

ANNEX B.1 FY2016 BOTTOM-UP BUDGETING (BUB)LIST OF PROJECTS FOR RELEASE TO ELIGIBLE CITY / MUNICIPALITIES These are the projects of municipalities that were able to comply with the BuB Governance Conditions, such as:(i) Compliance to DILG Good Financial Housekeeping (as of June 30, 2016)(ii) Requirements of DBM Public Financial Management (as of July 2016, as reported by the DBM ROs)(iii) Previous BuB LGSF projects have been implemented (as of 2016 Q2 submitted report)

No. of LGU: 273 LGUsNumber of Projects: 930 Sub-ProjectsTotal amount: 2,234,686,001.64

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION CAR ABRA 1 LACUB 15,000,000.00

2 LAPAZ 13,038,080.00

APAYAO 3 LUNA 15,000,000.00

BENGUET 4 KIBUNGAN INSTALLATION OF WATER SUPPLY TO SCHOOLS 500,000.00 IFUGAO 5 KIANGAN 7,000,000.00

6 LISTA 4,700,000.00

7 MAYOYAO 13,000,000.00

8 TINOC 13,000,000.00

KALINGA 9 LUBUAGAN 1,000,000.00

EQUIPPING OF RHU 500,000.00 FLOOD CONTROL 2,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 3,000,000.00 PROVISION OF POTABLE WATER SUPPLY 4,000,000.00

10 PASIL 11,400,000.00

11 PINUKPUK 15,000,000.00

12 TABUK CITY 5,000,000.00

FLOOD CONTROL 10,000,000.00 MT. PROVINCE 13 SAGADA 4,800,000.00

FLOOD CONTROL 2,850,000.00 PROVISION OF POTABLE WATER SUPPLY 500,000.00 RESCUE EQUIPMENT 600,000.00

1,100,000.00

14 TADIAN COMMUNAL IRRIGATION SYSTEM 3,000,000.00 3,000,000.00

PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 CARAGA AGUSAN DEL NORTE 15 BUENAVISTA POTABLE WATER IN BRGY. 10 500,000.00

16 MAGALLANES 1,300,000.00

EQUIPPING OF RURAL HEALTH UNIT 1,500,000.00 17 SANTIAGO CONSTRUCTION/CONCRETING OF LAPAZ ACCESS ROAD 500,000.00

5,381,866.31

500,000.00

500,000.00

500,000.00

500,000.00

AGUSAN DEL SUR 18 BUNAWAN 4,680,000.00

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

RESTORATION / REPAIR / MAINTENANCE OF COMMUNAL IRRIGATION SYSTEM

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CONSTRUCTION OF CONCRETE FOOT BRIDGE IN CALOC-AN

CONSTRUCTION/CONCRETING OF POBLACION II ACCESS ROAD

CONSTRUCTION/CONCRETING OF SAN ISIDRO ACCESS ROAD

REHABILITATION/IMPROVEMENT OF CURVA POTABLE WATER SYSTEM LEVEL II

REHABILITATION/IMPROVEMENT OF E. MORGADO POTABLE WATER SYSTEM LEVEL II

REHABILITATION/IMPROVEMENT OF TAGBUYACAN POTABLE WATER SYSTEM LEVEL II

CONCRETING OF NRJ TAIGYAN-CABAOHAN LOCAL CORE ROAD, PHASE 3

Page 2: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 2 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 3,590,000.00

2,000,000.00

500,000.00

19 LORETO INTEGRATED FOOD COMMUNITY PRODUCTION 5,100,000.00 POTABLE WATER SYSTEM IN STO TOMAS AND JOHNSON 1,100,000.00

20 TALACOGON 500,000.00

1,000,000.00

PROVINCE OF DINAGAT IS 21 BASILISA 2,000,000.00

8,000,000.00

500,000.00

SURIGAO DEL NORTE 22 MALIMONO 1,950,000.00

1,275,000.00

1,275,000.00

23 TUBOD 500,000.00

500,000.00

500,000.00

500,000.00

500,000.00

FLOOD CONTROL - P-BOUGANVILLA, BRGY. SAN PABLO 1,000,000.00

1,000,000.00

FLOOD CONTROL IN P-5, BRGY. DEL ROSARIO 1,000,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00

880,000.00

800,000.00

SCHOOL FENCE 500,000.00 SURIGAO DEL SUR 24 TAGO 535,000.00

REGION I ILOCOS NORTE 25 ADAMS ESTABLISHMENT OF SCHOOL CLINIC (ACES/ANHS) 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY (ACES/ANHS) 1,200,000.00

FLOOD CONTROL (CONSTRUCTION) 600,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 4,220,000.00 LOCAL ROAD CONSTRUCTION- CONCRETE ROAD 1,000,000.00

2,515,000.00

RESCUE EQUIPMENT (DUMPTRUCK) 1,500,000.00 26 DUMALNEG 5,000,000.00

EXPANSION OF RHU 1,500,000.00 RESCUE EQUIPMENT 3,500,000.00

ILOCOS SUR 27 GALIMUYOD CONSTRUCTION OF NEW BHS 854,000.00 ESTABLISHMENT OF SCHOOL LIBRARY (BIDBIDAY) 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY (CALONGBUYAN) 1,200,000.00

ESTABLISHMENT OF SCHOOL LIBRARY (PATAC) 1,200,000.00 PROVISION OF POTABLE WATER SUPPLY LEVEL 1 1,950,000.00

CONCRETING OF POBLACION-MAMBALILI LOCAL CORE ROAD PHASE 5

CONSTRUCTION OF BARANGAY HEALTH STATION LIBERTAD

CONSTRUCTION/REHABILITATION/UPGRADING OF SAN TEODORO POTABLE WATER SYSTEM IN SAN TEODORO

PROVISION OF POTABLE WATER SUPPLY AT BARANGAY CULI RAM

PROVISION OF POTABLE WATER SYSTEM PROJECT AT SITIO TUBURAN, SAN MIGUEL AND STA. CRUZ

CONCRETING OF DIEGAS-RITAGLENDA CORE LOCAL ROAD (PHASE 2)

CONCRETING OF FERDINAND-GEOTINA CORE LOCAL ROAD (PHASE 1)

UPGRADING OF 2 BARANGAY HEALTH STATION (RIZAL, MELGAR)

CORE LOCAL ROAD CONSTRUCTION (CONCRETE ROAD) IN BINOCARAN

CORE LOCAL ROAD CONSTRUCTION (CONCRETE ROAD) IN HANAGDONG

CORE LOCAL ROAD CONSTRUCTION (CONCRETE ROAD) IN TINAGO

CONCRETING OF DRAINAGE CANAL - P-2, BRGY. TIMAMANA

CONCRETING OF DRAINAGE CANAL - P-4, BRGY. SAN ISIDRO (BAGJANG)

CONCRETING OF DRAINAGE CANAL IN P-7,BRGY. MARGA

CONCRETING OF DRAINAGE CANAL IN P-SIGA-SIGA - KASILAK, BRGY. POBLACION

CONCRETING OF IRRIGATION LINE CANAL PFIA IN BRGY. MOTORPOOL

FLOOD CONTROL - P-SIGA-SIGA, KASILAK - BRGY. POBLACION

ROAD CONCRETING WITH DRAINAGE CANAL IN P1 & P2, BRGY. CAPAYAHAN

ROAD CONCRETING WITH DRAINAGE CANAL IN P-MALIPAYON, BRGY. CAWILAN

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

LOCAL ROAD COSTRUCTION- SAND AND GRAVEL SINGLE LANE

CONSTRUCTION OF CONCRETE CORE LOCAL ROAD (DOUBLE LANE) GOING TOSITIO NAPPUD, NANGURATAO FALLS AND AG-AGAPANG FALLS

Page 3: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 3 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION PANGASINAN 28 DAGUPAN CITY 3,500,000.00

4,300,000.00

1,000,000.00

1,800,000.00

29 MAPANDAN 4,500,000.00

1,000,000.00

3,000,000.00

30 SISON CORE LOCAL ROAD CONSTRUCTION - CONCRETE ROAD 2,489,200.00

EQUIPPING OF RHU - MEDICAL EQUIPMENTS 1,200,000.00 2,893,800.00

INSTALLATION OF WATER SUPPLY TO SCHOOLS 525,000.00 2,000,000.00

REGION II CAGAYAN 31 AMULUNG 5,500,000.00

500,000.00

PROVISION OF POTABLE WATER SUPPLY: SALINTUBIG 1,000,000.00

32 APARRI 1,750,000.00

3,000,000.00

1,435,000.00

525,000.00

ISABELA 33 MALLIG INTEGRATED COMMUNITY FOOD PRODUCTION 1,800,000.00 34 SAN PABLO 1,000,000.00

ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 FLOOD CONTROL PROJECT: STONE MASONRY/GABION 4,000,000.00

1,200,000.00

35 TUMAUINI 3,973,480.00

CONSTRUCTION OF 5 NEW BARANGAY HEALTH STATIONS AT PUGARO, LOMBOY, CALMAY, BONUAN GUESET AND PANTAL

CONSTRUCTION/CONCRETING OF VARIOUS CORE LOCAL BARANGAY ROADS (POGO GRANDE, LASIP GRANDE, SALAPINGAO, AND HERRERO - PEREZ)

INTEGRATED COMMUNITY FOOD PRODUCTION ( CLUSTER 1: BACAYAO NORTE, BACAYAO SUR, MALUED, CARANGLAAN; CLUSTER 2:MANGIN, MAMALINGLING, TEBENG; CLUSTER 3: PUGARO, CARAEL, BONUAN BINLOC, BONUAN GUESET)

PURCHASE OF RESCUE EQUIPMENT - (I UNIT BRAND NEW RIGID-HULL INFLATABLE RUBBER BOAT (APPROX. 12-15 CAPACITY) WITH 30 HORSE POWER OUTBOARD MOTOR/THE FOLLOWING ACCESSORIES: 4 BOUY CANS, A 15 LIFE VESTS, 100M STATIC ROPE, 4 ALUMINUM PADDLE & 3 WATERPROOF LED RECHARGEABLESEARCH LIGHTS STATIONES AT THE CDRRMO FOR THE BENEFIT OF FLOOD PRONE BARANGAYS (MALUED, LASIP GRANDE, LASIP CHICO, BACAYAO SUR, BACAYAO NORTE AND POGO CHICO)

CONCRETING OF VARIOUS BRGY. ROADS AT BRGYS PIAS, LAMBAYAN, JEMENEZ, BALOLING, & TORRES, MAPANDAN, PANGASINAN

CONSTRUCTION OF CONCRETE LINE CANAL W/ COVER AT ROSE STREET MAPANDAN, PANGASINAN

PROCUREMENT OF RESCUE VEHICLE: 1 UNIT 10 WHEELER DUMP TRUCK

FLOOD CONTROL - CONSTRUCTION OF STONE MASONRY OR GABIONS

PROVISION OF POTABLE WATER SUPPLY (REHABILITATION/REPLACEMENT/UPGRADING SPRING DEVELOPMENT, LEVEL 2)

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: REGRAVELLING CORE LOCAL ROADS

PROVISION OF POTABLE WATER SUPPLY: LEVEL 1 WATER SUPPLY

CORE LOCAL ROAD CONSTRUCTION/MAINTENACE/REHABILITATION: ACCESS ROAD (OPENING): A. OPENING OF ACCESS ROAD WITH 2-BARREL BOX CULVERT

CORE LOCAL ROAD CONSTRUCTION/MAINTENACE/REHABILITATION: B. OPENING OF MAJOR ACCESS ROAD

CORE LOCAL ROAD CONSTRUCTION/MAINTENACE/REHABILITATION: C. UPGRADING OF ROAD

PROVISION OF SCHOOL FURNITURE (SEATS) : REPLACEMENT OF SEATS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: REHABILITATION OF ACCESS ROAD

RESCUE EQUIPMENT: MEDICAL RESCUE VEHICLE WITH COMPLETE ACCESSORIES

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: CONSTRUCTION OF LOCAL CORE ROADS

Page 4: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 4 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 3,825,900.00

NUEVA VIZCAYA 36 BAGABAG 2,000,000.00

2,210,000.00

600,000.00

970,000.00

PROVISION OF POTABLE WATER SUPPLY – LEVEL II 1,500,000.00 1,000,000.00

2,000,000.00

37 BAYOMBONG 3,000,000.00

2,000,000.00

3,000,000.00

38 DUPAX DEL NORTE 6,780,000.00

INSTALLATION OF WATER SUPPLY TO SCHOOLS 2,000,000.00 QUIRINO 39 DIFFUN 4,910,000.00

INSTALLATION OF WATER SUPPLY TO SCHOOLS 500,000.00 REGION III AURORA 40 MARIA AURORA FLOOD CONTROL 11,500,000.00

PROVISION OF POTABLE WATER SUPPLY 1,990,160.00 BULACAN 41 ANGAT CONSTRUCTION OF SCHOOL FENCE 700,000.00

CONTINUATION OF ROAD CONCRETING 3,200,000.00 2,500,000.00

REHABILITATION OF DRAINAGE CANAL 1,000,000.00 RESCUE VEHICLE 2 UNITS 4,000,000.00

42 BALIWAG CONCRETING OF ROAD 1,000,000.00 DRAINAGE IMPROVEMENT 2,000,000.00

43 BULAKAN CONSTRUCTION OF CONCRETE ROAD 1,200,000.00 CONSTRUCTION OF NEW BHS/ EQUIPPING OF BHS 2,310,930.00

1,400,000.00

ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 FLOOD CONTROL 620,070.00 SCHOOL CLINIC 1,200,000.00

44 CITY OF MEYCAUAYAN 2,540,000.00

1,451,300.00

2,000,000.00

1,000,000.00

PROVISION OF 310 SCHOOL FURNITURE SEATS 525,700.00 45 GUIGUINTO CONSTRUCTION OF SCHOOL FENCE 840,000.00

1,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 700,000.00 PROVISION OF WATER SUPPLY 2,000,000.00

46 HAGONOY INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 560,000.00 RAPID COMMUNITY BASED MONITORING SYSTEM 1,378,360.00

47 PAOMBONG HEALTH FACILITY ENHNCEMENT PROGRAM 1,500,000.00 RCBMS 1,409,750.00

EQUIPPING OF RHU: PROVISION OF BASIC EQUIPMENT- MATERNITY & NEWBORN CARE AND PRIMARY CARE BENEFITS

CORE LOCAL ROAD – SAND AND GRAVEL SINGLE LANE ROAD

ESTABLISHMENT OF GROUNDWATER PUMP IRRIGATION PROJECT (EGPIP)

FLOOD CONTROL - CONSTRUCTION OF U-TYPE DRAINAGE CANAL

FLOOD CONTROL (GROUTED RIP-RAP STONE MASONRY OR GABION)

RAPID COMMUNITY BASED MONITORING SYSTEM (RCBMS) FOR BENCHMARKING AND MONITORING

RESTORATION / REPAIR AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEMS – SITIO SARANAY, LANATP

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION-CORE LOCAL ROAD- UPGRADING OF EARTH/GRAVEL ROAD TO PCCP

PROVISION OF POTABLE WATER SUPPLY-REHABILITATION AND REPAIR OF SPRING WATER SOURCE SYSTEM

RESCUE EQUIPMENT-PURCHASE OF RESCUE VEHICLE (DUMP TRUCK)

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION- CONSTRUCTION/ REHABILITATION OF 6KMS CORE LOCAL ROADS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION

REHABILITATION OF BHS AND PURCHASE OF MEDICAL EQUIPMENT

CONSTRUCTION/REHABILITATION MAINTENANCE OF ASPHALT ROAD

EQUIPPING OF BARANGAY HEALTH STATIONS (BHS) BAGBAGUIN & CALVARIO

ESTABLISHMENT OF SCHOOL CLINIC & PROVISION OF WATER SYSTEM

FLOOD CONTROL - FULL DE-CLOGGING OF DRAINAGE & RIP-RAPPING OF SELECTED AREAS OF MEYCAUAYAN RIVER

FOOD PRODUCTION: INTEGRATED COMMUNITY FOOD PRODUCTION

CORE LOCAL ROADS REHABILITATION IN BRGYS. PRITIL AND MALIS (ASPHALT ROAD)

Page 5: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 5 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION RESCUE EQUIPMENT 2,200,000.00

NUEVA ECIJA 48 BONGABON CONSTRUCTION OF SCHOOL FENCE 510,000.00 5,950,000.00

RAPID COMMUNITY BASED MONITORING SYSTEM 850,000.00 49 CABANATUAN CITY INTEGRATED COMMUNITY FOOD PRODUCTION 732,000.00

PURCHASES OF EQUIPMENT FOR RHUS 720,000.00 50 PANTABANGAN EQUIPPING OF RHU 650,000.00

ESTABLISHMENT OF SCHOOL CLINIC 2,400,000.00 HEALTH FACILITIES ENHANCEMENT PROGRAM 1,800,000.00 INTEGRATED COMM FOOD PRODUCTION 3,000,000.00 RCBMS 700,000.00

1,520,055.08

51 PENARANDA ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 RCBMS 700,000.00 RESCUE EQUIPMENT 3,600,000.00 SMALL IRRIGATION PROJECTS 500,000.00

52 TALUGTUG 12,200,000.00

REPAIR AND HEALTH FACILITIES ENHANCEMET 800,000.00 2,000,000.00

PAMPANGA 53 ARAYAT CONSTRUCTION OF BRGY. HEALTH STATION 1,750,000.00 CONSTRUCTION OF SCHOOL LIBRARY 1,200,000.00 CONSTRUCTION OF THE TB-DOTS LABORATORY 900,000.00 FLOOD CONTROL 687,000.00

750,000.00

PROVISION OF TB-DOTS LABORATORY EQUIPMENT 873,000.00

54 CANDABA CONSTRUCTION OF NEW BHS 3,240,000.00 7,728,000.00

REHABILITATION OF BHS 4,032,000.00 55 CITY OF SAN FERNANDO 2,100,000.00

56 MASANTOL CONSTRUCTION OF COMMUNITY HEALTH CENTER 1,000,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00 ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00

500,000.00

FLOOD CONTROL 1,200,000.00 PROVISION OF SCHOOL FURNITURE 525,000.00

1,200,000.00

57 STA. ANA CONSTRUCTION OF SCHOOL FENCE 1,200,000.00 IMPROVEMENT OF BARANGAY HEALTH STATION 500,000.00 REHABILITATION OF BARANGAY HEALTH STATION (BHS) 560,000.00

RESQUE EQUIPMENT 2,448,000.00 RHU EQUIPMENT 1,000,000.00 SHALLOW TUBE WELLS 720,000.00

TARLAC 58 LA PAZ CORE LOCAL ROAD ( CONST. OF CONCRETE ROAD ) 5,000,000.00

SMALL FARM RESERVOIR 7,300,000.00 ZAMBALES 59 MASINLOC PROVISION OF POTABLE WATER SYSTEM 2,000,000.00

60 SAN NARCISO 748,000.00

REGION IV A BATANGAS 61 BALETE 4X4 PICK-UP / RESCUE OF EQUIPMENT (VEHICLE) 850,000.00 CONSTRUCTION OF NEW BRGY. HEALTH STATION (BHS) 1,000,000.00

CONSTRUCTION OF SCHOOL FENCE 1,000,000.00 2,000,000.00

ESTABLISHMENT OF TWO (2) SCHOOL LIBRARIES 2,400,000.00 PROVISION OF POTABLE WATER SUPPLY 500,000.00

EXTENSION/EXPANSION OF EXISTING COMMUNALIRRIGATION SYSTEMS

RESTORATION/ REPAIR AND MAINTENANCE OF COMMUNALIRRGIGATION SYSTEM

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION(CONCRETING OF FARM OF MARKET ROAD)

SALINTUBIG - CONSTRUCION OF LEVEL II POTABLE WATER SUPPLYSYSTEM

PROVISION OF EQUIPMENT IN THE BARANGAY HEALTH STATION

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

EXPANSION OF RURAL HEALTH II (CONSTRUCTION OF NURSERY WARD, PLACENTA PIT, WASTE DISPOSAL AREA)

RAPID COMMUNITY BASED MONITORING SYSTEM (RCBMS)

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/REHABILITATION

Page 6: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 6 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 62 LEMERY CONCRETING OF LOCAL ROAD 800,000.00

CONSTRCUTION OF FACULTY ROOM 1,200,000.00 CONSTRUCTION OF BRGY HEALTH STATIONS 3,000,000.00 CONSTRUCTION OF FENCE 600,000.00

1,160,000.00

900,000.00

INSTALLATION OF SHALLOW TUBE WELLS 1,100,000.00 560,000.00

RIPRAPPING / EMBANKMENT PROTECTION 4,000,000.00 63 MALVAR FLOOD CONTROL 7,000,000.00 64 PADRE GARCIA 500,000.00

65 SAN LUIS CONSTRUCTION OF SCHOOL FENCE 1,400,000.00 540,000.00

PROVISION OF SCHOOL FURNITURE 599,900.00 REHABILITATION OF ROADS 5,389,500.00

66 SAN NICOLAS CONSTRUCTION OF SCHOOL CLINIC 1,200,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00

3,600,000.00

REHABILITATION OF RHU 1,000,000.00 SALINTUBIG 1,000,000.00

67 SAN PASCUAL 4,800,000.00

CONSTRUCTION OF SCHOOL FENCE 500,000.00 2,500,000.00

ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 PROVISION OF POTABLE WATER SUPPLY 700,000.00 PROVISION OF SCHOOL FURNITURES 800,000.00

500,000.00

68 STO. TOMAS CONSTRUCTION OF FACULTY ROOM 2,400,000.00 1,800,000.00

ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00

CAVITE 69 CARMONA PROCUREMENT OF SCHOOL FURNITURE 1,000,000.00 70 CAVITE CITY CONSTRUCTION OF NEW BHS 750,000.00

EQUIPPING OF RHU (3 IN 1 EQUIPMENT) 2,070,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 980,000.00 RESCUE EQUIPMENT (DUMPTRUCK) 3,000,000.00

71 GEN. MARIANO ALVAREZ EQUIPPING OF RHU I AND RHU II 2,500,000.00 1,500,000.00

REHABILITATION OF RHU I AND RHU II 1,578,000.00 1,300,000.00

72 INDANG EXPANSION OF RURAL HEALTH UNIT 1,800,000.00 73 NOVELETA BAMBOO FOOTBRIDGE 500,000.00

ESTABLISHMENT OF SCHOOL CLINIC 2,400,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 567,700.00

74 TANZA 500,000.00

LAGUNA 75 BAY 1,200,000.00

INSTALLATION OF SCHOOL FENCE 800,000.00 76 LOS BANOS CONSTRUCTION OF FACULTY ROOMS 1,200,000.00

CONSTRUCTION OF SCHOOL FENCE 1,000,000.00 REHABILITATION OF RHU 1,800,000.00 REHABILITATION OF SCHOOL LIBRARY 1,200,000.00

77 LUISIANA CONSTRUCTION OF SCHOOL FENCE 900,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 3,600,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 500,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00 RESCUE EQUIPMENT 1,500,000.00

CONSTRUCTION/ REHABILITATION OF IRRIGATION SYSTEM AT MATINGAIN 1

IMPROVEMENT OF WATER SYSTEM FACILITIES AT SITIO BAGONG PARAISO

PROVISION OF FURNITURES/ SEATS FOR PUBLIC ELEM SCHOOL CHILDREN WITH BACKLOG

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

EXPANSION OF RHU I (CONSTRUCTION OF ANIMAL BITE CLINIC AND LABORATORY)

ESTABLISHMENT OF SCHOOL LIBRARY WITH LEARNING MATERIALS

CONSTRUCTION OF FLOOD CONTROL (DRAINAGE SYSTEM)

CONSTRUCTION/REHABILITATION OF CORE LOCAL ROADS

REPAIR AND IMPROVEMENT OF 5 IDENTIFIED BARANGAY HEALTH CENTERS

CONSTRUCTION/REHABILITATION OF BRGY. HEALTH CENTER

INTEGRATED COMMUNITY FOOD PRODUCTION (GULAYAN SA BAWAT BARANGAY AT BAGSAKAN CENTER IN 27 BARANGAYS

RESCUE EQUIPMENT FOR DISASTER MITIGATION *RESCUE VEHICLE

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

ESTABLISHMENT OF SCHOOL CLINIC & ESTABLISHMENT OF LIBRARY

Page 7: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 7 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 78 LUMBAN 2,100,000.00

SMALL WATER IMPOUNDING PROJECT 3,000,000.00 79 PANGIL 750,000.00

80 SINILOAN 2,000,000.00

900,000.00

EQUIPPING OF BHS 500,000.00 FLOOD CONTROL 1,100,000.00

2,000,000.00

81 STA. CRUZ 500,000.00

82 STA. MARIA 2,500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 RESCUE EQUIPMENT 1,500,000.00

QUEZON 83 ALABAT ACQUISITION OF RESCUE EQUIPMENT 1,000,000.00 CONSTRUCTION OF CONCRETE FENCE 1,000,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 800,000.00

84 BUENAVISTA 2,000,000.00

2,000,000.00

1,200,000.00

2,000,000.00

1,774,700.00

2,070,300.00

SCHOOL FENCE CONSTRUCTION 600,000.00 85 CALAUAG 8,145,000.00

REHABILITATION OF BRGY. HEALTH STATION 840,000.00 86 GUMACA CONCRETING OF CORE LOCAL ROAD 3,000,000.00

CONSTRUCTION OF FACULTY ROOM 1,200,000.00 CONSTRUCTION OF FLOOD CONTROL PROJECT 3,000,000.00 CONSTRUCTION OF POTABLE WATER SUPPLY SYSTEM 1,500,000.00

1,400,000.00

87 LOPEZ CONSTRUCTION OF NEW RHU 4,750,000.00 88 LUCENA CITY EQUIPPING BARANGAY HEALTH STATIONS 2,000,000.00

500,000.00

INSTALLATION OF WATER SYSTEM IN SCHOOL 750,000.00 SALINTUBIG 1,000,000.00

89 MACALELON 500,000.00

EQUIPPING OF BARANGAY HEALTH STAION 800,000.00 EQUIPPING OF RURAL HEALTH STAION 3,000,000.00 FLOOD CONTROL 500,000.00 ISTALLATION OF WATER SUPPLY FOR SCHOOL 750,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 700,000.00 REHABILITAION OF BARANGAY HEALTH STATION 1,000,000.00 RESCUE EQUIPMENT 500,000.00

90 MAUBAN CONSTRUCTION OF SCHOOL FENCE 1,800,000.00 6,500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION PROGRAM

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION / MAINTENANCE

RESTORATION/REPAIR AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEMS

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ RAHABILITATION

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION CONCRETING OF FARM TO MARKET ROAD

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION CONCRETING OF FARM TO MARKET ROAD

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION CONCRETING OF FARM TO MARKET ROAD (CRITICAL PORTION)

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION CONCRETING OF FARM TO MARKET ROAD (CRITICAL PORTION)

PROVISION OF POTABLE WATER SUPPLY CONSTRUCTION OF LEVEL II WATER SUPPLY SYSTEM

REHABILITATION OF RHU PURCHASE OF 3 N 1 EQUIPMENT

CORE LOCAL ROAD CONSTRUCTION, MAINTENANCE, REHABILITATION

PRIMARY HEALTH CARE DELIVERY - CONSTRUCTION OF HEALTH CENTER

HIGH VALUE CROPS PROGRAM - SMALL SCALE IRRIGATION SYSTEM

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CORE LOCAL ROAD-CONCRETE ROAD (SINGLE LANE) UPGRADING

Page 8: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 8 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION FLOOD CONTROL - CONSTRUCTION OF DRAINAGE 600,000.00

1,000,000.00

91 MULANAY 15,000,000.00

92 PADRE BURGOS CONST. OF SCHOOL FENCE 750,000.00 EQUIPPING OF BHS 1,200,000.00 EQUIPPING OF RHU 1,000,000.00 INSTALLATION OF WATER SUPPLY SYSTEM TO SCHOOL 650,000.00

IRRIGATION PROJECTS 3,650,000.00 REHAB./CONST OF LEVEL II WATER SYSTEM PROJECT 3,630,000.00

93 PANUKULAN CORE LOCAL ROAD 13,000,000.00 POTABLE WATER SUPPLY 500,000.00

94 PITOGO 1,000,000.00

PROCUREMENT OF RESCUE VEHICLE 1,200,000.00 REHABILITATION OF RURAL HEALTH UNIT 1,000,000.00

95 PLARIDEL FLOOD CONTROL 1,000,000.00 96 POLILLO CORE LOCAL ROAD REHABILITATION 12,500,000.00 97 REAL DRAINAGE IMPROVEMENT 2,500,000.00

6,500,000.00

1,500,000.00

SCHOOL CLINIC 1,200,000.00 98 SAN ANTONIO 2,000,000.00

FLOOD CONTROL 2,500,000.00 99 SAN NARCISO COMMUNITY BASED MONITORING SYSTEM (CBMS) 1,000,000.00

CORE LOCAL ROAD 4,400,000.00 ESTABLISHEMENT OF SCHOOL LIBRARY 1,200,000.00 EXTENSION & EXPANSION OF IRRIGATION SYSTEM 1,500,000.00 FOOT BRIDGE 1,500,000.00

100 SARIAYA ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 PURCHASE OF RESCUE EQUIPMENT 2,800,000.00

101 TAGKAWAYAN 1,000,000.00

CORE LOCAL ROAD CONSTRUCTION 3,020,869.26 EQUIPPING OF RHU 1,000,000.00 EXPANSION OF RHU 2,000,000.00 PROVISION OF SCHOOL FURNITURES 504,000.00 RESCUE EQUIPMENTS 700,000.00

102 UNISAN 612,000.00

CONSTRUCTION OF ONE (1) FACULTY ROOM 1,200,000.00 EXPANSION OF RHU 500,000.00 PROVISION OF FURNITURES 500,000.00 REHABILITATION OF BARANGAY HEALTH STATIONS 632,000.00

RESCUE EQUIPMENT 1,376,000.00 RIZAL 103 ANGONO FLOOD CONTROL PROJECTS 1,500,000.00

600,000.00

1,200,000.00

104 ANTIPOLO CITY CONSTRUCTION OF BHS 2,000,000.00 EQUIPPING BHS 800,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 3,000,000.00 IRRIGATION 1,000,000.00 REHABILITATION OF RHU/BHS 800,000.00

105 BARAS EQUIPPING OF RHU 1,179,300.00 EXPANSION OF RHU 1,002,375.00 PROVISION OF SCHOOL FURNITURES (SEATS) 1,500,000.00 SMALL SCALE IRRIGATION SYSTEM 600,000.00

106 BINANGONAN DUMP TRUCK / RESCUE VEHICLE AND EQUIPMENT 1,600,000.00 INSTALLATION OF WATER SUPPLY 1,100,000.00

107 CARDONA CORE LOCAL ROAD 1,900,000.00 ESTABLISHMENT OF SCHOOL CLINIC 1,200,000.00 RESCUE EQUIPMENT 1,900,000.00

INSTALLATION OF POTABLE WATER SUPPLY TO SCHOOLS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION

CONSTRUCTION/ INSTALLATION OF U-TYPE DRAINAGE CANAL

HEALTH FACILTIES ENHANCEMENT PROGRAM (CONSTRUCTION OF NEWRURAL HEALTH UNIT)

PROVISION OF POTABLE WATER SUPPLY IN BRGY. TAGUMPAY

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION

CONSTRUCTION/REHABILITATION OF SMALL SCALE IRRIGATION

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

PROVISION OF LACTATION STATIONS EQUIPMENT/FIXTURES AND FURNITURES

PROVISION OF SCHOOL CLINIC EQUIPMENT AND SUPPLIES

Page 9: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 9 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 108 MORONG PROVISION OF POTABLE WATER SUPPLY 2,000,000.00

EQUIPPING OF BARANGAY HEALTH STATION 500,000.00 EXPANSION OF RHU 1,000,000.00

109 RODRIGUEZ CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 1,200,000.00

ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 FLOOD CONTROL 1,000,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) 600,000.00

110 TANAY CONSTRUCTION OF SCHOOL FENCE 850,000.00 CONSTUCTION OF BARANGAY HEALTH CENTER 1,700,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 850,000.00 PROVISION OF MEDICAL EQUIPMENTS 500,000.00 SALINTUBIG 850,000.00

REGION IV B MARINDUQUE 111 MOGPOG 600,000.00

2,300,000.00

OR. MINDORO 112 POLA CONSTRUCTION OF BARANGAY HEALTH STATION 2,400,000.00 880,000.00

880,000.00

880,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 760,000.00

REHABILITATION OF POTABLE WATER SUPPLY SYSTEM 1,350,000.00

RESCUE EQUIPMENT (DUMP TRUCK) 2,950,000.00 113 ROXAS CONSTRUCTION OF DRAINAGE CANAL IN METRO ROXAS 8,000,000.00

2,500,000.00

PROVISION OF IRRIGATION FACILITY 700,000.00 114 VICTORIA ANTONINO SMALL IRRIGATION PROJECT 500,000.00

2,000,000.00

600,000.00

CONSTRUCTION OF SCHOOL CLINIC 1,200,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 750,000.00

PALAWAN 115 ABORLAN CONSTRUCTION OF SCHOOL FENCE 2,500,000.00 116 BATARAZA 1,000,000.00

1,000,000.00

1,500,000.00

117 CUYO 2,000,000.00

2,500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,900,000.00 4,000,000.00

118 KALAYAAN 2,000,000.00

119 MAGSAYSAY 4,000,000.00

CONSTRUCTION OF NEW BHS 1,500,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00 EQUIPPING OF RHU 500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,200,000.00

ROMBLON 120 CAJIDIOCAN ACQUISITION OF ONE (1) UNIT RESCUE VEHICLE 1,170,000.00

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

REPAIR/REHABILITATION OF BARANGAY HEALTH STATION

CONSTRUCTION OF ONE-STOREY EVACUATION CENTER IN BRGY. MALUANLUAN

CONSTRUCTION OF ONE-STOREY EVACUATION CENTER IN BRGY. PANIKIHAN

CONSTRUCTION OF ONE-STOREY EVACUATION CENTER IN BRGY. TIGUIHAN

REHABILITATION / REPAIR / EXTENSION / OF EMERGENCY ROOM (1 5 SQ. METERS), POSTPARTUM WARD AND LABOR ROOM OF THE MUNICIPAL HEALTH OFFICE

CONSTRUCTON OF SEA WALL ALONG THE COASTAL BRGYS OF ROXAS

CONSTRUCTION OF BARANGAY HEALTH STATION PHASE 2

CONSTRUCTION OF FLOOD CONTROL PROJECT (GROUTED RIPRAP) IN BRGY. BAGONG BUHAY

CONCRETING OF LOCAL ACCESS ROAD IN BRGY. MARANGAS

CONSTRUCTION OF FOOTBRIDGE IN BARANGAYS CULANDANUM AND MARANGAS

RESTORATION/REPAIR AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEMS

ACQUISITION OF ONE (1) UNIT RESCUE VEHICLE (LAND AMBULANCE)

CONCRETING OF ROAD FROM BRGY. LUNGSOD TO BRGY. BALAGUEN

UPGRADING OF LEVEL 2 TO LEVEL 3 WATER SUPPLY SYSTEM IN BRGYS. BANCAL, CATADMAN, CABIGSING AND TENGA-TENGA

INTEGRATED COMMUNITY FOOD PRODUCTION PROGRAM

CONCRETING OF LOCAL ACCESS ROADS IN BARANGAYS LUCBUAN AND IGABAS

Page 10: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 10 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 2,700,000.00

900,000.00

500,000.00

900,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 5,100,000.00 SMALL DIVERSION DAM 720,000.00

121 CONCEPCION 10,500,000.00

122 FERROL CONSTRUCTION OF SCHOOL FENCE 700,000.00 EQUIPPING OF BARANGAY HEALTH STATION (BHS) 556,100.00 ESTABLISHMENT OF SCHOOL LIBRARY - HIGH SCHOOL 1,200,000.00

2,400,000.00

ESTABLISHMENT OF SHALLOW TUBE WELL (STW) 859,500.00 500,000.00

123 LOOC CONSTRUCTION OF FOOTBRIDGE IN BRGY. PILI 2,500,000.00 2,000,000.00

1,800,000.00

1,000,000.00

2,200,000.00

2,000,000.00

REHABILITATION OF CORE LOCAL ROAD IN BRGY. PILI 3,000,000.00

124 SAN JOSE COMPLETION OF RHU/BHS 1,144,847.00 CONCRETING OF LANAS-BATYAY-LINDERO RD 1,800,000.00 CONSTRUCTION OF SEA WALL 3,600,000.00

REGION IX ZAMBOANGA DEL NORTE 125 DAPITAN CITY CONSTRUCTION OF SCHOOL FENCE 800,000.00 3,000,000.00

670,000.00

2,000,000.00

1,000,000.00

2,000,000.00

ESTABLISHMENT OF SCHOOL LIBRARY 2,400,000.00 PROVISION OF SCHOOL FURNITURE SEATS 560,000.00

126 GODOD CONCRETING OF CORE LOCAL ROAD 13,200,000.00 CONSTRUCTION OF FOOTBRIDGE 800,000.00 REHAB/IMPROVEMENT OF PWS SYSTEM 500,000.00

127 GUTALAC CONCRETING OF POBLACION - SALVADOR ROAD 16,000,000.00 128 KALAWIT CORE LOCAL ROAD 3,500,000.00

SMALL IRRIGATION PROJECT 8,000,000.00 129 KATIPUNAN CORE LOCAL ROAD 2,000,000.00

IRRIGATION SYSTEM (SMALL IRRIGATION PROJECT) 600,000.00

130 LABASON CONCRETING OF SIKATUNA STREET 5,375,000.00 CONSTRUCTION OF DRAINAGE SYSTEM 1,820,000.00 CONSTRUCTION OF LEVEL II WATER SYSTEM 1,000,000.00

1,000,000.00

UNDERTAKE FLOOD CONTROL PROJECTS 3,000,000.00

CONCRETING OF LOCAL ACCESS ROAD IN BRGYS. ALIBAGON, CAMBALO (CATMON), CAMBAJAO, CANTAGDA, DANAO (BAKILID), TAGUILOS AND POBLACION

CONSTRUCTION OF DRAINAGE CANAL IN BRGY. POBLACION

CONSTRUCTION OF SLOPE PROTECTION IN BRGY. SUGOD

IMPROVEMENT AND EXPANSION OF LEVEL II WATER SUPPLY SYSTEM IN BRGYS. TAGUILOS, LICO AND CAMBAJAO (SITIO KABUYLANAN)

IMPROVEMENT AND CONCRETING OF LOCAL ACCESS ROAD IN BRGYS. POBLACION, SAN PEDRO, CALABASAHAN, SAMPONG, AND BACHAWAN

ESTABLISHMENT OF SCHOOL LIBRARY- ELEMENTARY SCHOOL

PROVISION OF SCHOOL FURNITURES (SEATS) - ELEMENTARY SCHOOL

IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM IN BRGY. TUGUIS

IMPROVEMENT OF LEVEL II WATER SUPPLY SYSTEM IN BRGYS. UPPER AND LOWER STO. NINO

IMPROVEMENT OF LEVELL II WATER SUPPLY SYSTEM IN BRGY. AGOJO

REHABILITATION OF CORE LOCAL ROAD IN BRGY. CAMANDAG

REHABILITATION OF CORE LOCAL ROAD IN BRGY. LIMON SUR

CONSTRUCTION/MAINTENANCE/REHABILITATION OF ORO KAUSWAGAN BRGY ROAD

CORE LOCAL ROAD (MAINTENANCE/REHABILITATION OF FOOTBRIDGE OF VARIOUS BARANGAYS)

CORE LOCAL ROAD CONSTRUCTION OF BA-AO TO ILAYA BRGY ROAD

CORE LOCAL ROAD CONSTRUCTION OF MA. CRISTINA BRGY ROAD

CORE LOCAL ROAD CONSTRUCTION OF SIGAYAN BRGY ROAD

REHABILITATION & DEVT. OF 2 UNITS LEVEL III WATER SYSTEM

Page 11: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 11 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 131 LEON B. POSTIGO BHS EQUIPMENT 750,000.00

LOCAL CORE ROAD (CONCRETE PAVEMENT) 1,500,000.00 132 LILOY 1,000,000.00

CONCRETING OF LOCAL ROAD 2,000,000.00 CONSTRUCTION OF FLOOD CONTROL 3,493,000.00 CONSTRUCTION OF SCHOOL FENCE 800,000.00

133 MUTIA CONCRETING OF CORE LOCAL ROADS 14,000,000.00 134 SIBUCO CORE LOCAL ROAD 6,448,000.00

PROVISION OF SCHOOL FURNITURE (ARM CHAIR) 565,000.00 135 SIRAWAI 2,400,000.00

1,600,000.00

CONSTRUCTION OF TWO (2) UNIT SCHOOL LIBRARY 2,400,000.00

EQUIPPING OF RHU AND BHS 1,300,000.00 1,000,000.00

4,000,000.00

136 TAMPILISAN PURCHASE OF RESCUE VEHICLE 1,900,000.00 ZAMBOANGA DEL SUR 137 AURORA CAMPO UNO WATER SYSTEM REHAB/EXTENDED 1,000,000.00

CONCRETING OF 250 LM ALANG-ALANG ROAD 1,800,000.00 CONCRETING OF 325 LM ANONANG ROAD 2,500,000.00 CONCRETING OF 800 LM SAN JOSE 5,980,000.00

1,000,000.00

LA VICTORIA WATER SYSTEM REHAB/EXTENDED 1,000,000.00 LIVELIHOOD/ENHANCEMENT OF FLOWERS FARMERS 500,000.00

138 BAYOG CONSTRUCTION OF FOOTBRIDGE 7,500,000.00 7,500,000.00

139 JOSEFINA CONCRETING OF B. AQUINO CORE LOCAL ROAD 1,500,000.00 CONCRETING OF GOMEZ CORE LOCAL ROAD 7,200,000.00 CONCRETING OF RHU CORE LOCAL ROAD 500,000.00 CONCRETING OG EBALLE CORE LOCAL ROAD 1,500,000.00

140 LAKEWOOD CONSTRUCTION OF CORE LOCAL ROAD 2,610,000.00 CONSTRUCTION OF HEALTH STATION 950,000.00 CONSTRUCTION OF LEVEL II WATER SUPPLY 2,500,000.00

1,000,000.00

REPAIR OF RESERVOIR 500,000.00 141 LAPUYAN CONSTRUCTION OF FACULTY ROOM 1,200,000.00

CONSTRUCTION OF SCHOOL FENCE 2,400,000.00 CORE LOCAL ROAD CONCRETING 1,571,668.00 REHABILITATION OF BRGY TIPASAN WATER SYSTEM 500,000.00

REHABILITATION OF LUBOSAN WATER SYSTEM 500,000.00 142 MAHAYAG CONSTRUCTION OF DRAINAGE CANAL 3,000,000.00

3,000,000.00

PROCUREMENT OF RESCUE VEHICLE 1,000,000.00 143 MIDSALIP 8,000,000.00

144 MOLAVE CONCRETING OF LOCAL CORE ROAD 6,500,000.00 5,620,000.00

145 PITOGO CONSTRUCTION OF FLOOD CONTROL (OPEN CANAL) 5,000,000.00

CONSTRUCTION OF PITOGO SEA WALL (PHASE 2) 10,000,000.00 146 SAN PABLO IMPROVEMENT OF EXISTING LEVEL 2 WATER SYSTEM 2,350,000.00

IMPROVEMENT OF EXISTING LEVEL2 WATER SYSTEM 750,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,500,000.00 147 SOMINOT 5,000,000.00

ACQUISITION OF PUMP IRRIGATION SYSTEM FOR OPEN SOURCE

CONSTRUCTION OF TWO (2) UNIT ADMINISTRATIVE/FACULTY ROOM

CONSTRUCTION OF TWO (2) UNIT COMMUNAL/PUBLIC TOILET

PROCUREMENT OF SEABOAT/SEA AMBULANCE (RESCUE VEHICLE)

ROAD UPGRADING/ROAD CONCRETING ALONG SAINT MARY ROAD)

IMPROVEMENT/UPGRADING OF SAPA LUBOC WATER SUPPLY SYSTEM

IMPROVEMENT OF BAYOG CREEK (FLOOD CONTROL STRUCTURE)

REHABILITATION & UPGRADING LEVEL III WATER SUPPLY

CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECT

CONCRETING OF CRITICAL PORTIONS OF ROAD FROM BRGY. CANIPAY NORTE TO BRGY. GOLICTOP

CONSTRUCTION OF U-TYPE DRAINAGE CANAL AT THE POBLACION AREA

CORE LOCAL ROAD CONSTRUCTION ( CONCRETE PAVEMENT)

Page 12: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 12 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 10,000,000.00

148 TABINA CONSTRUCTION OF 2 - BARANGAY HEALTH STATION 1,720,000.00

CONSTRUCTION OF DRAINAGE CANAL 600,000.00 CONSTRUCTION OF FLOOD CONTROL 600,000.00 CONSTRUCTION OF SCHOOL FENCE 1,300,000.00 CONSTRUCTION OF SEA WALL 939,192.00 EXPANSION OF WATER SYSTEM LEVEL II (GRAVITY TYPE) 500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 3,360,000.00 SCHOOL WATER SUPPLY INSTALLATION 630,000.00

149 VINCENZO SAGUN INTEGRATED COMMUNITY FOOD PRODUCTION 650,000.00 ZAMBOANGA SIBUGAY 150 ALICIA CONCRETING OF BARANGAY LOCAL ROADS 4,620,000.00

CONSTRUCTION OF FLOOD CONTROL 1,200,000.00 CONSTRUCTION OF SCHOOL LIBRARY 1,200,000.00

151 DIPLAHAN 2,000,000.00

2,000,000.00

2,500,000.00

2,000,000.00

2,500,000.00

CONCRETING OF SONGCUYA-LOBING ROAD (PHASE II) 2,000,000.00

2,000,000.00

152 IPIL 2,100,000.00

INSTALLATION OF WATER SUPPLY FOR SCHOOLS 525,000.00 OPENING AND GRAVELING OF ROAD 1,500,000.00

664,000.00

REHABILITATION OF RURAL HEALTH UNIT OF IPIL 1,500,000.00 153 MALANGAS CONCRETING OF LOCAL ROAD 1,500,000.00

CONSTRUCTION OF FOOTBRIDGE 500,000.00 CONSTRUCTION OF CORE LOCAL ROAD 1,260,000.00 CONSTRUCTION OF WATER SYSTEM LEVEL 2 2,000,000.00

154 OLUTANGA CONCRETING OF MUNICIPAL ROAD 9,000,000.00 1,000,000.00

155 PAYAO 15,000,000.00

156 SIAY CONCRETING OF ONE (1) LANE LOCAL ROAD 9,600,000.00 CONSTRUCTION OF CONCRETE SCHOOL FENCE 1,000,000.00

500,000.00

500,000.00

157 TALUSAN CONCRETING OF CAWILAN CORE LOCAL ROAD 5,000,000.00 500,000.00

PROVISION OF POTABLE WATER SUPPLY LEVEL II 2,826,000.00 REHABILITATION OF BARANGAY HEALTH STATION 860,000.00

158 TITAY CONCRETING OF JOSE RIZAL AVENUE 3,300,000.00 CONCRETING OF JUAN LUNA ST. 1,200,000.00 CONCRETING OF LOCAL CORE ROAD 1,000,000.00 CONCRETING OF PUROK TALISAY STREET 1,300,000.00 COSTRUCTION OF LEVEL II POTABLE WATER SYSTEM 800,000.00

FLOOD CONTROL PHASE I 1,400,000.00 RAPID COMMUNITY BASE MONITORING SYSTEM 1,000,000.00

159 TUNGAWAN CONCRETING OF CORE LOCAL ROAD 7,150,000.00 CONSTRUCTION OF DRAINAGE CANAL 2,050,000.00 CONSTRUCTION OF SCHOOL FENCE 600,000.00 CONSTRUCTION OF SCHOOL WATER SYSTEM 525,000.00

PROVISION OF POTABLE WATER SUPPLY* CONSTRUCTIONS OF LEVEL II WATERWORKS PROJECTS

CONCRETING OF ACCESS ROAD TO GUINOMAN ELEMENTARY SCHOOL - SITIO SACAON

CONCRETING OF ACCESS ROAD TO LUOP ELEMENTARY SCHOOL

CONCRETING OF BARANGAY DITAY TO SITIO TINAGO ROAD

CONCRETING OF BARANGAY KAUSWAGAN TO SITIO SAN ISIDRO ROAD

CONCRETING OF KAUSWAGAN - POBLACION ROAD (BONIFACIO STREET)

CONSTRUCTION OF KAUSWAGAN WATER SUPPLY SYSTEM

COMMUNITY BASED FOOD PRODUCTION PROGRAM FOR MARGINAL HOUSEHOLDS

PROCUREMENT OF MEDICAL EQUIPMENT FOR THE 14 BARANGAY HEALTH STATIONS

FLOOD CONTROL PROJECT - CONSTRUCTION OF DRAINAGE CANAL

CORE LOCAL ROAD-SPOT CONCRETING OF THE VARIOUS LOCAL ROADS

UPGRADING/REHABILITATION OF 27.70 SQ. METER BATU BHS

UPGRADING/REHABILITATION OF 27.70 SQ. METER SALINDING BHS

PROCUREMENT OF WATER PUMPS AND ENGINES FOR SHALLOW TUBE WELL (STW)

Page 13: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 13 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION CONSTRUCTION OF WATERWORKS SYSTEM LEVEL II 700,000.00

500,000.00

REGION V ALBAY 160 PIODURAN CONSTRUCTION OF SCHOOL FENCE 500,000.00 10,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION (ICPF) 4,000,000.00

PROVISION OF SCHOOL FURNITURE 500,000.00 161 TIWI CORE LOCAL ROAD CONSTRUCTION 1,000,000.00

INSTALLATION OF WATER SUPPLY 500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICPF) 6,250,000.00

CAMARINES NORTE 162 MERCEDES CONRETING OF SINGLE LANE FEEDER ROAD 1,700,000.00 1,750,000.00

4,000,000.00

CAMARINES SUR 163 BALATAN CONSTRUCTION OF 1 UNIT FACULTY ROOM 1,200,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 5,100,000.00

164 NABUA 500,000.00

500,000.00

500,000.00

1,771,000.00

CORE LOCAL ROAD (ROAD OPENING) 500,000.00 EQUIPPING OF RHU 885,500.00

885,500.00

1,107,760.00

885,500.00

500,000.00

885,500.00

500,000.00

885,500.00

885,500.00

500,000.00

500,000.00

165 SAGNAY 500,000.00

166 SIRUMA CONCRETING OF CORE LOCAL ROAD 9,040,000.00 PROVISION OF WATER SUPPLY 1,000,000.00 SMALL DIVERSION DAM 600,000.00

CATANDUANES 167 BATO 500,000.00

168 PANDAN EXPANSION OF RURAL HEALTH UNIT 2,100,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,500,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 500,000.00

600,000.00

169 PANGANIBAN CONSTRUCTION OF DRAINAGE SYSTEM (PHASE II) 1,500,000.00 CONSTRUCTION OF INTERMEDIATE ROAD (PHASE II) 1,100,000.00

PURCHASE OF PUMP & ENGINE FOR SHALLOW TUBE WELL

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE REHABILITATION (ROAD OPENING WITH GRAVEL SURFACING FEEDER ROAD

PROVISION OF POTABLE WATER (CONSTRUCTION OF LEVEL II WATER SUPPLY INCLUDING APPROPRIATE WATER TREATMENT SYSTEM

ANGUSTIA ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

ANTIPOLO OLD ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

ANTIPOLO YOUNG ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

CORE LOCAL ROAD CONSTRUCTION OF CONCRETE FOOTBRIDGE

INAPATAN ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

LA OPINION ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

LOURDES OLD ROAD CONDRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

SAN ANTONIO OGBON ROA CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

SAN ESTEBAN ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

SAN JOSE ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

SAN ROQUE ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

SAN VICENTE GORONG GORONG ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

STA. CRUZ ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

STA. LUCIA ROAD CONCRETING LEADING TO HOSPITALS, SCHOOLS AND MARKET

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

REPAIR AND REHABILITATION OF BARANGAY HEALTH STATIONS

Page 14: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 14 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 3,000,000.00

MASBATE 170 CLAVERIA CONSTRUCTION/OPENING OF BARANGAY ROAD 4,000,000.00 EQUIPPING OF BHS 864,000.00

1,000,000.00

UPGRADING OF BARANGAY ROAD 1,933,700.00 171 MONREAL 5,500,000.00

2,000,000.00

172 PIO V. CORPUS 500,000.00

SORSOGON 173 MAGALLANES 500,000.00

174 SORSOGON CITY 1,500,000.00

CONSTRUCTION OF BARANGAY HEALTH STATION 3,000,000.00 CONSTRUCTION OF SAFE WATER SOURCE 1,500,000.00

REGION VI AKLAN 175 ALTAVAS 8,500,000.00

REHABILITATION OF RHU 500,000.00 176 IBAJAY 11,000,000.00

FLOOD CONTROL 3,000,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00

177 NUMANCIA CONSTRUCTION/REHABILITATION OF FOOTBRIDGES 800,000.00

4,000,000.00

RESCUE EQUIPMENT 4,600,000.00 ANTIQUE 178 BARBAZA CONSTRUCTION OF SCHOOL FENCE 700,000.00

4,000,000.00

IMPROVEMENT OF POTABLE WATER SUPPLY SYSTEM 1,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 REHABILITATION OF COMMUNAL IRRIGATION SYSTEM 1,000,000.00

179 BELISON 1,627,600.00

2,825,000.00

EQUIPPING OF BHS 1,223,100.00 EQUIPPING OF RHU 2,070,300.00

180 LIBERTAD CONSTRUCTION OF BHS 2,500,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 3,600,000.00 INSTALLATION OF WATER SUPPLY 600,000.00

900,000.00

181 SAN REMIGIO EXPANSION OF RHU 2,000,000.00 SPRING DEVELOPMENT PROJECT 1,000,000.00

182 TIBIAO 1,500,000.00

CAPIZ 183 DUMALAG FLOOD CONTROL 1,500,000.00 2,000,000.00

184 DUMARAO 12,156,000.00

2,844,000.00

185 PONTEVEDRA, CAPIZ FLOOD CONTROL 2,000,000.00 3,500,000.00

ILOILO 186 BADIANGAN 5,640,000.00

187 BAROTAC NUEVO CONSTRUCTION OF FACULTY ROOM 1,200,000.00 CONSTRUCTION OF SCHOOL LIBRARY 1,200,000.00

4,700,000.00

REAHABILITATION OF MABINI-SALVACION IRRIGATION SYSTEM (PANGANIBAN CIS)

EXPANSION AND UPGRADING OF WATER SUPPLY SYSTEM

CORE LOCAL ROAD CONSTRUCTION (CONCRETING OF FMR)

FLOOD CONTROL (CONSTRUCTION/INSTALLATION OF DRAINAGE CANAL)

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CONSTRUCTION OF SCHOOL FENCE & PROVISION OF SCHOOL FURNITURE WITH INSTALLATION OF WATER SUPPLY SYSTEM IN CENTRAL SCHOOL

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

INTEGRATED COMMUNITY FOOD PRODUCTION (ORGANIC FARMING)

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

RESCUE EQUIPMENT (PROCUREMENT OF FIBER GLASS BOAT/ RESCUE VEHICLE/ DUMP TRUCK)

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

Page 15: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 15 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION INTEGRATED COMMUNITY FOOD PRODUCTION 4,500,000.00 SCHOOL FENCING 2,000,000.00

188 BAROTAC VIEJO 15,000,000.00

189 BINGAWAN 15,000,000.00

190 CABATUAN 3,425,000.00

FLOOD CONTROL (GABION) 1,800,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 1,050,000.00 REHABILITATION OF BARANGAY HEALTH STATION 1,000,000.00

3,000,000.00

191 CALINOG 7,000,000.00

FLOOD CONTROL 2,000,000.00 HANGING FOOT BRIDGE 2,000,000.00

192 DINGLE 10,600,000.00

REHABILITATION OF BHS 800,000.00 UPGRADING OF HEALTH FACILITIES 1,500,000.00

193 DUENAS CONSTRUCTION OF BRIDGE SLOPE PROTECTION 1,500,000.00 11,100,000.00

700,000.00

194 DUMANGAS 3,890,000.00

FLOOD CONTROL 6,000,000.00 195 LEGANES CONSTRUCTION OF FACULTY ROOM 1,200,000.00

6,822,080.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 PROVISION OF POTABLE WATER SUPPLY 500,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) 539,000.00

196 MIAGAO 15,000,000.00

197 NEW LUCENA 9,262,700.00

EXTENSION/EXPANSION OF CIS 1,314,300.00 PROVISION OF POTABLE WATER SUPPLY 1,650,000.00

198 PASSI 6,500,000.00

PROVISION OF SCHOOL FURNITURES (SEATS) 500,000.00 199 SAN RAFAEL CONSTRUCTION OF FACULTY ROOM 1,200,000.00

EQUIPPING OF BHS 1,200,000.00 1,200,000.00

1,200,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,700,000.00 1,800,000.00

200 SANTA BARBARA 8,300,000.00

EQUIPPING OF RHU 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,500,000.00

NEGROS OCCIDENTAL 201 BINALBAGAN CONSTRUCTION OF NEW BHS BIRTHING FACILITY 1,600,000.00 2,500,000.00

FLOOD CONTROL OF ENCLARO SHORELINE 3,000,000.00 PROVISION OF SCHOOL FURNITURES 500,000.00

202 ENRIQUE B. MAGALONA CONSTRUCTION OF FACULTY ROOM 1,000,000.00 1,000,000.00

500,000.00

1,000,000.00

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

RESCUE EQUIPMENT (PROCUREMENT OF RESCUE VEHICLE)

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

ESTABLISHMENT OF GROUNDWATER PUMP IRRIGATION PROJECT - SHALLOW TUBE WELL

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

ESTABLISHMENT OF SCHOOL LIBRARY - JUNIOR HIGH SCHOOL

ESTABLISHMENT OF SCHOOL LIBRARY - SENIOR HIGH SCHOOL

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CONSTRUCTION OF NEW BARANGAY HEALTH STATION(BHS) OF GIDA BARANGAY

EQUIPPING THE BARANGAY HEALTH STATION AS NON BIRTHING FACILITY

EQUIPPING THE BARANGAY HEALTH STATION FOR BIRTHING FACILITY 591,000 EACH BHS

Page 16: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 16 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 800,000.00

FLOOD CONTROL 600,000.00 203 ISABELA FLOOD CONTROL 600,000.00

RESCUE EQUIPMENT/VEHICLE 4,600,000.00 204 KABANKALAN CITY 2,000,000.00

CONSTRUCTION OF FACULTY ROOM 1,200,000.00 CONSTRUCTION OF FLOOD CONTROL 800,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 2,400,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 1,200,000.00

2,800,000.00

REHABILITATION OF BARANGAY HEALTH STATION 2,500,000.00 SMALL WATER IRRIGATION PROJECT 5,000,000.00

205 LA CASTELLANA FLOOD CONTROL PROJECT 2,000,000.00 IMPROVEMENT OF POTABLE WATER SUPPLY SYSTEM 1,200,000.00

ON-GRID SITIO ELECTRIFICATION PROGRAM (SEP) 800,000.00 206 MOISES PADILLA ACQUISITION OF PELLETIZING SYSTEM MACHINE 500,000.00

CONCRETING OF EARTH ROAD 3,060,000.00 CONSTRUCTION OF HANGING FOOTBRIDGE 5,400,000.00 EQUIPPING OF BHS 1,000,000.00

2,040,000.00

1,000,000.00

207 SALVADOR BENEDICTO 2,300,000.00

INSTALLATION OF WATER SUPPLY 750,000.00 RAPID COMMUNITY BASED MONITORING SYSTEM 676,680.00 REHABILITATION OF BHS WITH EQUIPMENTS 1,500,000.00 REHABILITATION OF RHU 1,500,000.00

208 SAN ENRIQUE, NEGROS OCC FLOOD CONTROL PROJECT 1,000,000.00 4,300,000.00

209 SIPALAY BARANGAY CANTURAY LEVEL II WATER SYSTEM SUPPLY 1,350,000.00

900,000.00

1,800,000.00

1,080,000.00

210 TOBOSO 800,000.00

7,370,000.00

REHABILITATION OF TOBOSO WATER SYSTEM 530,000.00 1,000,000.00

REGION VII BOHOL 211 ALBURQUERQUE CONSTRUCTION OF SCHOOL FENCE 500,000.00 2,175,000.00

500,000.00

600,000.00

212 ANDA 15,000,000.00

213 BALILIHAN 3,500,000.00

FLOOD CONTROL 2,000,000.00 RESCUE EQUIPMENT 1,500,000.00 SMALL SCALE IRRIGATION PROJECT 1,200,000.00

214 BUENAVISTA 2,360,000.00

8,080,000.00

215 CANDIJAY 4,000,000.00

EXPANSION OF BARANGAY HEALTH STATION(BHS) TO BIRTHING FACILITY, GIDA BARANGAY

CONSTRUCTION OF 2 UNITS BARANGAY HEALTH STATION

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

PROVISION OF SCHOOL FURNITURES TO VARIOUS SCHOOLS

CONSTRUCTION OF NEW BHS & PROVISION OF EQUIPMENT FOR BHS

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

BARANGAY CARTAGENA REHABILITATION OF WATER SUPPLY SYSTEM

EXPANSION AND RENOVATIONS OF BARANGAY HEALTH STATIONS INCLUDING DELIVERY ROOMS

IRRIGATION SYSTEM REHABILITATION (MAIN CANAL LINING)

CONSTRUCTION OF POTABLE WATER SYSTEM AT MASCOVADO (PHASE II)

CORE LOCAL ROAD CONSTRUCTION (UPGRADING OF ROAD FROM EARTH TO PCCP)

UPGRADING OF BARANGAY HEALTH STATIONS THROUGH ADEQUATE EQUIPPING

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

PROVISION OF POTABLE WATER SUPPLY (CONSTRUCTION OF WATER STORAGE TANK)

PROVISION OF SCHOOL FURNITURES (ARMCHAIRS AND SEATS)

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

Page 17: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 17 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION INTEGRATED COMMUNITY FOOD PRODUCTION 3,000,000.00

216 GARCIA HERNANDEZ CONSTRUCTION OF FACULTY ROOM 1,200,000.00 FLOOD CONTROL 6,250,000.00 RESCUE EQUIPMENT 2,250,000.00

217 SAN MIGUEL 5,500,000.00

PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 RESCUE EQUIPMENT 1,500,000.00

CEBU 218 BADIAN CONSTRUCTION OF NEW BHS 2,000,000.00 2,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 RAPID COMMUNITY BASED MONITORING SYSTEM 1,000,000.00

219 BARILI 1,000,000.00

6,000,000.00

CORE LOCAL ROAD REHABILITATION 1,000,000.00 HIGH VALUE CROPS SMALL SCALE IRRIGATION SYSTEM 1,500,000.00

220 BORBON 2,000,000.00

221 CATMON 15,000,000.00

222 CEBU CITY 7,000,000.00

223 CITY OF BOGO CONSTRUCTION OF NEW BHS 2,430,000.00 1,000,000.00

EXPANSION OF RHU 2,180,000.00 INTEGRATED COMMUNITY FOOD PROGRAM 600,000.00

224 CITY OF CARCAR 6,500,000.00

INSTALLATION OF WATER SUPPLIES TO SCHOOLS 500,000.00 REHABILITATION OF BARANGAY HEALTH STATIONS 2,000,000.00

225 DUMANJUG INTEGRATED COMMUNITY FOOD PRODUCTION 12,000,000.00 226 LILOAN 4,500,000.00

FLOOD CONTROL 5,000,000.00 227 MADRIDEJOS LOCAL ACCESS ROAD 1,000,000.00

RESCUE EQUIPMENT 1,500,000.00 228 OSLOB 10,000,000.00

229 SAN REMIGIO CONSTRUCTION OF BHS 2,000,000.00 LIVELIHOOD PROGRAM 2,150,000.00 RESCUE EQUIPMENT 2,300,000.00

230 SOGOD 12,000,000.00

231 TUBURAN 4,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 1,850,000.00 NEGROS ORIENTAL 232 BINDOY CONSTRUCTION OF BARANGAY HEALTH STATION 1,823,856.00

5,600,000.00

INSTALLATION OF WATER SUPPLY TO SCHOOLS 1,200,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 5,200,000.00

233 CITY OF TANJAY CONSTRUCTION OF IRRIGATION CANAL 500,000.00 800,000.00

FLOOD CONTROL 6,700,000.00 FLOOD CONTROL - GROUPED RIPRAP/MEGA DIKE 4,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,500,000.00

234 MABINAY CONSTRUCTION OF SCHOOL FENCE 1,000,000.00 8,600,000.00

FLOOD CONTROL 2,000,000.00

CORE LOCAL ROAD CONSTUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION: ROAD CONCRETING

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION & MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD/CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

Page 18: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 18 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION INTEGRATED COMMUNITY FOOD PRODUCTION 2,400,000.00

235 MANJUYOD 14,999,999.99

236 STA. CATALINA 10,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 6,000,000.00 237 VALLEHERMOSO CONSTRUCTION OF SCHOOL FENCES 846,000.00

2,700,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 5,550,000.00 RESCUE EQUIPMENTS 1,800,000.00

SIQUIJOR 238 LAZI CONSTRUCTION OF SCHOOL FENCE 1,900,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 5,800,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) 800,000.00 REHABILITATION OF RHU 1,200,000.00

239 SAN JUAN CONSTRUCTION OF SCHOOL FENCE 1,215,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 4,500,000.00 REHABILITATION OF RHU 1,000,000.00

REGION VIII EASTERN SAMAR 240 QUINAPONDAN 5,000,000.00

5,000,000.00

5,000,000.00

241 SULAT CORE LOCAL ROADS CONSTRUCTION/ MAINTENANCE 10,000,000.00

5,000,000.00

LEYTE 242 TUNGA CONSTRUCTION OF FLOOD CONTROL SYSTEM 2,400,000.00 CORE LOCAL ROAD CONSTRUCTION (FOOTBRIDGE) 2,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 4,000,000.00

NORTHERN SAMAR 243 LAOANG INTEGRATED COMMUNITY FOOD PRODUCTION 5,882,353.00 244 LOPE DE VEGA CONSTRUCTION OF NEW BHS 1,200,000.00

CONSTRUCTION OF SCHOOL FENCE 500,000.00 CONSTRUCTION OF SCHOOL LIBRARY 1,200,000.00 CORE LOCAL ROAD CONSTRUCTION 5,750,000.00 EQUIPING OF BHS 1,000,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 750,000.00

SAMAR 245 MOTIONG CONSTRUCTION OF NEW BHS 1,500,000.00 EQUIPPING OF RHU 1,300,000.00 RESCUE EQUIPMENT 3,000,000.00

246 STO. NINO CORE LOCAL ROADS (ROAD CONCRETING) 1,500,000.00 1,500,000.00

507,150.00

REGION X BUKIDNON 247 KADINGILAN 1,650,000.00

1,100,000.00

1,650,000.00

1,100,000.00

1,870,000.00

1,100,000.00

1,650,000.00

1,100,000.00

971,500.00

1,100,000.00

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

B) CONCRETING OF LOCAL ROAD FROM BRGY. SAN PEDRO TO MABINI

C) CONCRETING OF LOCAL ROAD FROM NATIONAL HIGHWAY TO STA. MARGARITA

CORE LOCAL ROAD CONSTRUCTION/ REHABILITATION /MAINTENANCEA) CONCRETING OF LOCAL ROAD FROM BARANGAY 7 TO ANISLAG

FLOOD CONTROL CONSTRUCTION/ INSTALLATION OF DRAINAGE

PROVISION OF POTABLE WATER SUPPLY (DEEP WELL, GROUND WATER DEOTH ABOVE 40M TO 60M)

PROVISION OF POTABLE WATER SUPPLY (DEEP WELL, GROUND WATER DEPTH ABOVE 40M TO 60M)

1. CONCRETING OF BRGY ROAD - 0.150 KM CROSSING PAY-AS TO PAYAO ROAD SECTION

10. CONCRETING OF BRGY ROAD - 0.100 KM HUSAYAN ROAD SECTION

2. CONCRETING OF BRGY ROAD - 0.150 KM CROSSING BAGOR TO PAYAO ROAD SECTION

3. CONCRETING OF BRGY ROAD - 0.100 KM MABUHAY TO BOLISONG ROAD SECTION

4. CONCRETING OF BRGY ROAD - 0.170 KM MACAO ROAD SECTION

5. CONCRETING OF BRGY ROAD - 0.100KM MATAMPAY ROAD SECTION

6. CONRETING OF BRGY ROAD - 0.150 CABADIANGAN ROAD JUNCTION KIBALANGON AND MATAMPAY ROAD

7. CONCRETING OF BRGY ROAD - 0.100 KM KIBALOGAN ROAD SECTION

8. CONCRETING OF BRGY ROAD - 0.100 KM POBLACION TO SALVACION ROAD SECTION

9.CONCRETING OF BRGY ROAD - 0.100 KM BAROY TO SIBONGA ROAD SECTION

Page 19: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 19 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 600,000.00

248 KIBAWE CONSTRUCTION/EXPANSION OF WATER SYSTEM 1,905,000.00 FOOTBRIDGE 500,000.00 ROAD REHABILITATION 5,000,000.00

500,000.00

249 PANGANTUCAN CONCRETING OF ROAD CONCEPTION 1,200,000.00 CONCRETING OF ROAD PIGTAURANAN 2,400,000.00 CONCRETING OF ROAD PORTULIN 3,600,000.00 FLOOD CONTROL 600,000.00 REHABILITATION OF WATER SYSTEM 7,000,000.00

500,000.00

LANAO DEL NORTE 250 LALA CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 251 MUNAI CONSTRUCTION OF BHS - LININDING 1,000,000.00

CONSTRUCTION OF BHS - PANGGAO 1,000,000.00 CONSTRUCTION OF BHS - RAMAIN 1,000,000.00 LOCAL ROAD CONCRETING 10,500,000.00

252 PANTAO-RAGAT 8,000,000.00

POTABLE WATER SUPPLY 2,000,000.00 253 SULTAN NAGA DIMAPORO 2,289,500.00

CONSTRUCTION OF SCHOOL FENCE 500,700.00 5,000,000.00

MISAMIS OCCIDENTAL 254 BONIFACIO 500,000.00

CONSTRUCTION OF POTABLE WATER SYSTEM 1,000,000.00 255 LOPEZ JAENA FLOOD CONTROL 500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 REHABILITATION OF RHU (TB DOTS / LABORATORY) 500,000.00

256 OZAMIZ CITY CORE LOCAL ROAD PROGRAM 13,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00

257 PANAON REHABILITATION OF LEVEL II WATER SYSTEM 1,400,000.00 ROAD CONCRETING 1,200,000.00 SHALLOW TUBE WELL (STW) 900,000.00

MISAMIS ORIENTAL 258 BALINGASAG ACQUISITION OF RESCUE VEHICLE 1,500,000.00 CONCRETING OF CALA-CALA COGON ROAD 1,500,000.00 CONCRETING OF SAN ISIDRO - TANGIS ROAD 7,500,000.00 CONCRETING OF TUGAS-TUGASON LINABU-JUAN ROAD 13,500,000.00

259 BALINGOAN 10,000,000.00

260 CAGAYAN DE ORO CITY CAPACITY DEVELOPMENT FOR LPRAT - CSO 3,500,000.00 2,500,000.00

800,000.00

800,000.00

2,000,000.00

500,000.00

800,000.00

500,000.00

3,200,000.00

261 INITAO INTEGRATED COMMUNITY FOOD PRODUCTION 900,000.00 REGION XI DAVAO DEL NORTE 262 CARMEN CONSTRUCTION OF BARANGAY HEALTH STATIONS 2,000,000.00

2,000,000.00

PROVISION OF POTABLE WATER SUPPLY - SALINTUBIG DEEPWELL LEVEL III

SPECIAL PROGRAMS FOR THE EMPLOYMENT OF STUDENTS

SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS (SPES)

CONCRETING OF FARM TO MARKET ROAD OF BRGY. DILIMBAYAN ROAD

CONSTRUCTION OF NEW BARANGAY HEALTH STATION (BHS) AND EQUIPPING OF BHA THROUGH PROVISION OF BHS EQUIPMENT

FLOOD CONTROL (CONSTRUCTION OF DRAINANGE CANAL)

BARANGAY WATER SYSTEM ASSOCIATION CAPACITY BUILDING

CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE REHABILITATION

CONSTRUCTION OF SEA WALL GROUTED RIP-RAP FOR ZONE 8, CUGMAN, CDOC

ENHANCED COMMUNITY BASED WATER SYSTEM FOR SITIO TIPOLOHON, BRGY. CAMAMAN-AN, CDOC

IMPROVEMENT OF WATER SYSTEM FOR BRGY. TUMPAGON WATER SYSTEM

LEVEL 1 AND LEVEL 2 WATER SYSTEM FOR SITIO PALALAN, BRGY. LUMBIA CDO

LEVEL II REHABILITATION AND IMPROVEMENT OF WATER SYSTEM FOR SITIO BULAHAN, DANSOLIHON, CDOC

REHABILITATION AND IMPROVEMENT OF THE TAGLIMAO WATER SYSTEM

REPAIR AND IMPROVEMENT OF WATER SYSTEM FOR ZONE 8, BRGY. CUGMAN, CDOC

SPECIAL PROGRAM FOR THE EMPLOYMENT OF STUDENTS

CONSTRUCTION OF PUROK 1 TO PUROK 3 ASUNCION CORE LOCAL ROAD

Page 20: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 20 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 4,650,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 5,850,000.00 263 SANTO TOMAS CONSTRUCTION OF CONCRETE DRAINAGE CANAL 2,000,000.00

DAVAO DEL SUR 264 CITY OF DIGOS CONSTRUCTION OF FENCE 800,000.00 INSTALLATION OF WATER SUPPLY 525,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 800,000.00

2,000,000.00

265 MALITA CONSTRUCTION OF BARANGAY HEALTH STATION 1,000,000.00 2,400,000.00

CONSTRUCTION OF COVERED DRAINAGE 1,875,000.00 CONSTRUCTION OF KILALAG LEVEL II PWS 2,000,000.00 CONSTRUCTION OF NEW ARGAO LEVEL II PWSS 2,000,000.00 CONSTRUCTION OF PANGIAN LEVEL II PWSS 2,000,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00

600,000.00

ESTABLISHMENT OF FACULTY ROOMS 6,000,000.00 EXPANSION OF MATERNAL CARE AND CHILD UNIT 750,000.00 INSTALLATION OF WATER SUPPLY IN SCHOOLS 500,000.00 SMALL DIVERSION DAM 500,000.00 UPGRADING OF LAGUMIT LEVEL II PWSS 1,000,000.00

266 SANTA CRUZ ESTABLISHMENT OF SCHOOL LIBRARY/READING CENTER 1,200,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 2,400,000.00

PROVISION OF POTABLE WATER SUPPLY 2,500,000.00 DAVAO ORIENTAL 267 BAGANGA CONSTRUCTION OF SCHOOL FENCE 2,000,000.00

268 CARAGA CONSTRUCTION OF SCHOOL FENCE 1,000,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 IMPROVEMENT OF BHS WITH BIRTHING FACILITY 1,500,120.00

269 MANAY CONSTRUCTION OF NEW BHS 2,000,000.00 FOOTBRIDGE 1,500,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOL 525,000.00

REGION XII NORTH COTABATO 270 ARAKAN CONSTRUCTION OF NEW BRGY HEALTH CENTER 1,000,000.00 CORE LOCAL ROAD CONCRETINBG 4,200,000.00 CORE LOCAL ROAD REHABILITATION 3,000,000.00 INSTALATION OF POTABLE WATER SUPPLY TO SCHOOLS 500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,500,000.00

SARANGANI 271 ALABEL 3,600,000.00

CONSTRUCTION OF FLOOD CONTROL/RIPRAP 500,000.00 EXPANSION OF LEVEL III WATER SYSTEM 2,700,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 800,000.00 PURCHASE OF RESCUE VEHICLE 1,300,000.00

500,000.00

SMALL SCALE IRRIGATION PROJECT 500,000.00 272 MAASIM 1,000,000.00

FLOOD CONTROL (DRAINAGE) 3,360,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 430,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 910,000.00

273 MALAPATAN 825,000.00

1,900,000.00

FLOOD CONTROL PROJECT 2,400,000.00 1,200,000.00

PROCUREMENT OF RESCUE VEHICLE ("SADDAM") 1,500,000.00 2,000,000.00

1,000,000.00

CONSTRUCTION OF PUROK 3 ISING TO PUROK 4A TUGANAY CORE LOCAL ROAD

RESTORATION/ REHABILITATION & MAINTENANCE OF CIS

CONSTRUCTION OF CLUSTER BASED LIBRARY FOR MALITA NORTH AND SOUTH DISTRICT

EQUIPPING OF MATERNITY AND NEW BORN NEW BORN CARE

CONSTRUCTION OF ADDITIONAL WATER SOURCE WITH 20 CU.M. ELEVATED WATER TANK

REHABILITATION OF FOOTBRIDGE WITH SLOPE PROTECTION STRUCTURE AND FLOOD CONTROL

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION

COMMUNITY-BASED FOOD PRODUCTION (GOAT DISPERSAL, VEGETABLE PRODUCTION, ORGANIC FARMING SYSTEM- VERMICULTURE)

CONCRETING OF ROAD AT SITIO UPPER LASANG, SAPU MASLA

PROCUREMENT OF EQUIPMENTS FOR RURAL HEALTH UNIT

UPGRADING/REHABILITATION OF WATER SYSTEM AT POBLACION

UPGRADING/REHABILITATION OF WATER SYSTEM AT UPPER LASANG, SAPU MASLA

Page 21: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 21 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION

TOTAL 2,234,686,001.64

Prepared by:

NORMAN M. APARENTEAsst. Senior Technical Staff, BuB PMO

Reviewed by:

RICHARD L. VILLACORTEProgram Manager, BuB PMO

Page 22: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 22 of 34

ANNEX B.2FY2016 BOTTOM-UP BUDGETING (BUB)LIST OF PROJECTS FOR RELEASE TO ELIGIBLE PROVINCESThese are the projects of provinces that are:(i) covering the municipalities and cities that were not able to comply with the BuB Governance Condition (as of June 30, 2016); and(ii) are able to comply with DILG Good Financial Housekeeping and met the requirements of DBM Public Financial Management at the provincial level assessment (as of July 2016, as reported by the DBM ROs)

No. of PLGU: 43 ProvincesNumber of Projects: 529 Sub-ProjectsTotal amount: 1,323,335,121.38

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION CAR 1 ABRA BOLINEY 12,000,000.00

LAGAYAN 4,000,000.00

LANGIDEN 15,000,000.00

SAN ISIDRO 14,000,000.00

CARAGA 2 SURIGAO DEL NORTE GENERAL LUNA CORE LOCAL ROAD IN BRGY. CONSUELO 1,400,000.00 CORE LOCAL ROAD IN BRGY. TAWINTAWIN 500,000.00 EQUIPPING OF BHS IN BRGY. STA. CRUZ 1,500,000.00 FLOOD CONTROL IN BRGY. CATANGNAN 1,000,000.00 FLOOD CONTROL IN POBLACION 2,400,000.00 PROVISION OF POTABLE WATER SUPPLY IN BRGY. MALINAO 500,000.00

SISON HANGING BRIDGE AT BRGY. SAN PABLO 3,500,000.00 RESCUE EQUIPMENT 1,500,000.00 TINOGPAHAN WATER SYSTEM LEVEL 2 500,000.00 WATER SYSTEM LEVEL 3 AT BRGY. MABUHAY 800,000.00

REGION I 3 ILOCOS SUR G. DEL PILAR 1,000,000.00

750,000.00

PROCUREMENT OF DUMP TRUCK 1,500,000.00 REHABILITATION OF MAGMAGA TO TANGGAOAN ROAD 9,218,073.00

4 PANGASINAN MALASIQUI 1,000,000.00

700,000.00

700,000.00

2,000,000.00

2,000,000.00

700,000.00

STA. BARBARA 4,000,000.00

5,000,000.00

RESCUE EQUIPMENT - PURCHASE OF FORWARD TRUCK 1,000,000.00 REGION II 5 ISABELA PALANAN 3,400,000.00

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION / REHABILITATION / MAINTENANCE

CONSTRUCTION OF SCHOOL FENCES AT: A. BUSSOT PRIMARY SCHOOL, B. CONCEPCION ELEMENTARY SCHOOL, C. DAPDAPPIG PRIMARY SCHOOL, D. UL-OLING PRIMARY SCHOOL, E. G. DEL PILAR CENTRAL SCHOOL, F. G. DEL PILAR NATIONAL HIGHSCHOOL, H. BUTARAG PRIMARY SCHOOL, I. ALFONSO ELEMENTARY SCHOOL, J. TUBALINA PRIMARY SCHOOL

INSTALLATION OF WATER SUPPLIES AT: A. BUSSOT PRIMARY SCHOOL, B. CONCEPCION ELEMENTARY SCHOOL, C. DAPDAPPIG PRIMARY SCHOOL, D. UL-OLING PRIMARY SCHOOL, E. G. DEL PILAR CENTRAL SCHOOL, F. G. DEL PILAR NATIONAL HIGHSCHOOL, H. BUTARAG PRIMARY SCHOOL, I. ALFONSO ELEMENTARY SCHOOL, J. TUBALINA PRIMARY SCHOOL

REHABILITATION OF CORE LOCAL ROADS AT BRGY. ALACAN (PART OF SITIO BENEG)

REHABILITATION OF CORE LOCAL ROADS AT BRGY. CANAN SUR (PART OF SITIO LOOBAN)

REHABILITATION OF CORE LOCAL ROADS AT BRGY. LASIP (PART OF SITIO SOLOMON ECHAORE)

REHABILITATION OF CORE LOCAL ROADS AT BRGY. LOKEB ESTE (PART OF SITIO BIROS)

REHABILITATION OF CORE LOCAL ROADS AT BRGY. NANCAPIAN(PART OF SITIO MARON)

REHABILITATION OF CORE LOCAL ROADS AT BRGY. TALOY ( PART OF SITIO DINACUAN)

FLOOD CONTROL - CONSTRUCTION OF GROUTED RIP RAP ALONG SINUCALAN RIVER (TULIAO, VENTINILLA SECTION)

FLOOD CONTROL - CONSTRUCTION OF GROUTED RIP RAP ALONG SINUCALAN RIVER (VENTINILLA, PRIMICIAS & BANAOANG SECTION)

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: CONCRETING OF MUNICIPAL ROADS

Page 23: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 23 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 4,284,600.00

SAN ISIDRO 7,100,605.38

1,000,000.00

STA. MARIA CONSTRUCTION OF SCHOOL FENCE 700,000.00 CONSTRUCTION OF SCHOOL LIBRARY 3,600,000.00 IMPROVEMENT OF EXISTING HEALTH SERVICES 3,760,000.00 PROVISION OF POTABLE WATER SUPPLY 525,000.00 PROVISION OF SCHOOL CHAIRS 825,000.00

STO. TOMAS CONSTRUCTION OF SCHOOL FENCE 810,000.00 EXPANSION OF RURAL HEALTH UNIT 3,270,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 575,000.00

REGION III 6 BULACAN NORZAGRAY 1. PURCHASE OF ONE (1) UNIT OF RESCUE BOAT 1,000,000.00 2. PURCHASE OF ONE (1) UNIT OF AMBULANCE 1,000,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 1,000,300.00

SANTA MARIA CONCRETING OF ROAD 933,000.00 CONSTRUCTION OF GROUTED RIPRAP 1,570,000.00 CONSTRUCTION OF U-TYPE DRAINAGE CANALS 1,800,000.00 PUMPING IRRIGATION SYSTEM FOR OPEN SOURCE 540,000.00

7 NUEVA ECIJA SAN ISIDRO RESCUE EQUIPMENT 3,500,000.00 1,300,000.00

8 PAMPANGA SASMUAN CONSTRUCTION OF FACULTY ROOM 1,200,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00

500,000.00

REGION IV A 9 BATANGAS TAYSAN CONCRETING OF CORE LOCAL ROAD 600,000.00 CONCRETING OF CORE LOCAL ROADS 9,400,000.00 IMPROVEMENT OF DRAINAGE CANAL 5,000,000.00

10 LAGUNA CALAUAN CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 6,764,200.00

EQUIPPING OF RHU 1,500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00

700,000.00

MAJAYJAY CONSTRUCTION OF BHS 1,800,000.00 CONSTRUCTION OF SCHOOL FENCE 600,000.00

567,000.00

EQUIPPING BHS 500,000.00 5,120,000.00

PAETE BRGY. HEALTH STATION(CONSTRUCTION & EQUIPPING) 800,000.00

FLOOD CONTROL PROJECT 500,000.00 PURCHASE OF RESCUE VEHICLES 1,500,000.00 RCBMS (RAPID COMMUNITY-BASED MONITORING SYSTEM) 700,000.00

SMALL IRRIGATION PROJECT (SIP) 1,000,000.00 11 QUEZON BURDEOS CORE LOCAL ROADS 5,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 DOLORES CORE LOCAL ROAD 3,500,000.00

1,500,000.00

500,000.00

RURAL COMMUNITY BASE MONITORING SYSTEM 1,500,000.00 GEN. LUNA CONCRETING OF CORE LOCAL ROAD 13,000,000.00

FLOOD CONTROL 600,000.00 JOMALIG CONSTRUCTION OF BRGY. ROAD 2,900,000.00

CONSTRUCTION OF SPILLWAY 500,000.00 CONSTRUCTION OF SPILLWAYS 1,100,000.00 CORE LOCAL ROAD 3,100,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 WATER PUMP (DEEPWELL) 500,000.00

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: CONSTRUCTION OF BISAG-DIDIAN MUNICIPAL ROADS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION: CORE LOCAL ROAD

INTEGRATED FARMING: HYBRID CHICKEN PRODUCTION, VERMICULTURE, ORGANIC FERTILIZER PRODUCTION AND VEGETABLE PRODUCTION

RESTORATION / REPAIR AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEMS

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/ MAINTENANCE/ REHABILITATION

PROVISION OF SCHOOL FURNITURE (SEATS) (1,000 X 700/UNIT)

CORE LOCAL ROAD 1.2 CABLE SUSPENDED STEEL FOOT BRIDGE

EXTENSION/EXPANSION OF EXISTING COMMUNAL IRRIGATION SYSTEM

CORE LOCAL ROAD (CONC. OF SALIW-MANGAHAN & SAN MATEO FMR)

INTEGRATED FOOD PRODUCTION: INSTITUTIONALIZATION OF FOOD ALWAYS IN THE HOME (FAITH) PROGRAM

Page 24: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 24 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION PATNANUNGAN CORE LOCAL ROAD - FOOTBRIDGE CONSTRUCTION 4,500,000.00

FMR 8,500,000.00 PEREZ CONSTRUCTION OF TWO FACULTY ROOMS 2,400,000.00

ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 SAMPALOC CONSTRUCTION OF CORE LOCAL ROAD 2,615,900.00

CONSTRUCTION OF ONE-LANE CORE LOCAL ROAD 9,851,000.00 CONSTRUCTION OF SCHOOL FENCE 1,000,000.00 CONSTRUCTION/REPAIR OF CONCRETE FENCE 500,000.00 PROVISION OF DRAINAGE SYSTEM 533,100.00

SAN ANDRES 6,000,000.00

CONSTRUCTION OF NEW BHS 700,000.00 EQUIPPING BHS 800,000.00 EQUIPPING OF RHU 500,000.00 INSTALLATION OF WATER SUPPLY 600,000.00

SAN FRANCISCO CORE LOCAL ROAD CONSTRUCTION 6,149,700.00 FLOOD CONTROL 6,080,000.00 REHABILITATION OF RHU 1,770,300.00

12 RIZAL PILILLA CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 CONSTRUCTION OF SCHOOL FENCE 1,400,000.00 EQUIPPING OF BHS 500,000.00 EQUIPPING OF RHU 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 PROVISION OF SCHOOL FURNITURE 500,000.00 RESCUE EQUIPMENT 1,210,000.00

REGION IV B 13 OCC. MINDORO MAMBURAO 2,830,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,500,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 1,120,000.00

1,800,000.00

14 OR. MINDORO CALAPAN ACQUISITION OF 23 UNITS OF RESCUE BOATS 3,750,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 PROVISION OF SCHOOL FURNITURE 1,200,000.00 RURAL HEALTH UNIT EQUIPMENT 2,070,000.00

15 PALAWAN ARACELI 2,250,000.00

CONCRETING OF ROADS 3,235,000.00 CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00 EQUIPPING OF RHU 1,200,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 525,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 REHABILITATION OF BHS 500,000.00

BALABAC 1,800,000.00

CONCRETING OF CORE LOCAL ROAD IN POBLACION 3 700,000.00 3,000,000.00

CAGAYANCILLO 2,250,000.00

BARANGAY HEALTH STATION KIT 500,000.00 ICFP 3,630,000.00

CULION CONSTRUCTION OF BHS 3,050,000.00 CONSTRUCTION OF SCHOOL FENCE 900,000.00 EQUIPPING OF BHS 1,200,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 900,000.00 PROVISION OF POTABLE WATER SUPPLY 1,849,125.00

DUMARAN CORE LOCAL ROAD- CONSTRUCTION 5,000,000.00 INTERGRATED COMMUNITY FOOD PRODUCTION 4,800,000.00 SCHOOL LIBRARY 2,400,000.00

LINAPACAN 5,000,000.00

EXPANSION OF RHU 800,000.00 FLOOD CONTROL PROGRAM 3,500,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 REHABILITATION OF RHU 1,000,000.00

RIZAL CONSTRUCTION OF IRRIGATION CANAL 925,000.00 CONSTRUCTION OF LOCAL ACCESS ROAD 1,000,000.00

CONCRETING OF FMR AND PROVISION OF CONCRETE CANALAS ON BOTH SIDES

CONSTRUCTION OF SEA WALL ALONG THE COASTAL BARANGAYS IN POBLACION (BRGYS. 7,4,5 AND 2)

REHABILITATION OF LEVEL III WATER SUPPLY SYSTEM IN SITIO AROMA, BARANGAY TAYAMAAN

ACQUISITION OF 1 UNIT RESCUE VEHICLE AND RESCUE EQUIPMENTS

ACQUISITION OF ONE (1) UNIT SEA AMBULANCE AND FIVE (5) UNITS SMALL RESCUE BOAT

CONSTRUCTION OF 1 UNIT SMALL WATER IMPOUNDING (SWIP)

ACQUISITION OF ONE (1) UNIT RESCUE MOTOR BOAT (BANCA WITH MOTOR)

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

Page 25: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 25 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION CONSTRUCTION OF SMALL WATER IMPOUNDING PROJECTS 1,000,000.00

ESTABLISHMENT OF SHALLOW TUBE WELL (STW) 625,000.00 INSTALLATION OF WATER SUPPLY TO ELEMENTARY SCHOOLS 825,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,700,000.00 REHABILITATION OF SMALL DIVERSION DAM 800,000.00

16 ROMBLON CALATRAVA 3,500,000.00

REGION IX 17 ZAMBOANGA DEL NORTE BALIGUIAN CONSTRUCTION OF DIANGAS WATER SYSTEM LEVEL II 2,000,000.00 CONSTRUCTION OF LUMAY WATER SYSTEM LEVEL II 2,000,000.00 CONSTRUCTION OF RIVER CONTROL (GABION TYPE) 5,000,000.00

LA LIBERTAD CONCRETING OF 0.150 KM BRGY. MERCEDES ROAD 1,250,000.00 CONCRETING OF 0.150 KM BRGY. SINGARAN ROAD 1,250,000.00 CONCRETING OF 0.400 KM BRGY. STA.CRUZ ROAD 4,000,000.00

2,000,000.00

1,000,000.00

1,399,500.00

CONSTRUCTION OF SCHOOL FENCE 1,100,000.00 ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 500,500.00

800,000.00

18 ZAMBOANGA DEL SUR DINAS INTEGRATED COMMUNITY FOOD PRODUCTION 740,000.00 PROCUREMENT OF RESCUE VEHICLE 1,500,000.00 ROAD CONCRETING 4,500,000.00

DUMINGAG CONSTRUCTION OF SCHOOL FENCING 2,800,000.00 LABANGAN CONSTRUCTION OF BARANGAT HEALTH STATION 3,000,000.00

CONSTRUCTION OF FLOOD CONTROL 1,200,000.00 CONSTRUCTION OF POTABLE WATER SYSTEM 1,500,000.00 CORE LOCAL ROAD 3,000,000.00 RENO/REHAB OF BHS 500,000.00

TAMBULIG ACCESS LOCAL ROAD 7,908,300.00 CONSTRUCTION OF DRAINAGE CANAL 1,269,787.00 CONSTRUCTION OF FOOTBRIDGE 2,037,500.00 FURNITURE AND FIXTURES 978,000.00 POTABLE WATER SYSTEM 607,500.00

REGION V 19 CAMARINES SUR BOMBON CORE LOCAL ROAD 2,298,000.00 LAGONOY 14,290,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 510,000.00 TIGAON CORE LOCAL ROAD 12,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 20 CATANDUANES VIGA INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 5,875,000.00

1,000,000.00

21 MASBATE AROROY CONSTRUCTION OF NEW BHS 5,086,638.00 CONSTRUCTION OF SCHOOL FENCE 1,077,199.00

5,565,530.00

1,319,569.00

EQUIPPING OF BHS 1,277,280.00 INSTALLATION OF WATER SUPPLY TO SCHOOLS 807,899.00 INTEGRATED COMMUNITY FOOD PRODUCTION 673,250.00 REPAIR AND RENOVATION OF BHS 1,077,199.00

ESPERANZA (FROM GRAVEL ROAD TO PCCP) - SINGLE LANE UPGRADING 11,062,650.00

EXPANSION OF WATER SUPPLY - LEVEL 2 2,223,070.00 642,800.00

USON 2,400,000.00

FLOOD CONTROL 1,800,000.00 22 SORSOGON BULAN INSTALLATION OF SHALLOW TUBE WELLS (STWS) 500,000.00

NEW OPENING OF LOCAL ACCESS ROAD IN BRGY. LINAO TO BRGY. TALISAY

CONSTRUCTION OF 0.250 LN.M. POBLACION DRAINAGE SYSTEM

CONSTRUCTION OF 150.00 LN.M. POBLACION LINE DITCH CANAL

CONSTRUCTION OF 50 LN.M. POBLACION - STA. CRUZ HANGING FOOTBRIDGE

PURCHASE OF 2 UNIT MUNICIPAL EMERGENCY RESCUE VEHICLE

CORE LOCAL ROAD CONSTRUCTION/REHAB.-CONCRETING OF ACCESS ROAD

RESTORATION/REPAIR AND MAINTENANCE OF COMMUNAL IRRIGATION SYSTEM (OCO CIS)

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION - CONCRETE ROAD (SINGLE LANE) UPGRADING (FROM GRAVEL TO PCCP)

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION FOOTBRIDGE

FLOOD CONTROL ( CONSTRUCTION/ INSTALLATION OF U-TYPE DRAINAGE CANAL)

CORE LOCAL ROAD CONSTRUCTION/MAINTAINANCE/REHABILITATION

Page 26: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 26 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 2,500,000.00

6,000,000.00

BULUSAN CONSTRUCTION OF SEA WALL 3,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 PURCHASE OF RESCUE VEHICLES 1,500,000.00

CASIGURAN INTEGRATED COMMUNITY FOOD PRODUCTION 2,000,000.00 1,200,000.00

2,000,000.00

CASTILLA CONSTRUCTION OF LOCAL ACCESS ROAD 4,300,000.00 DONSOL CONSTRUCTION OF 10 UNITS SHALLOW TUBEWELLS 825,000.00

CONSTRUCTION OF 3 UNITS BARANGAY HEALTH STATION 3,750,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 825,000.00 REGION VI 23 AKLAN LEZO 4,470,000.00

PROCUREMENT OF RESCUE VEHICLE 5,400,000.00 LIBACAO 10,000,000.00

REHABILITATION/RECONSTRUCTION OF MAGUGBA BRIDGE 5,000,000.00

MALINAO 15,000,000.00

24 ANTIQUE VALDERRAMA CONSTRUCTION OF SCHOOL FENCE 637,500.00 REHABILITATION OF IRRIGATION SYSTEM 1,500,000.00

25 CAPIZ TAPAZ 15,000,000.00

26 GUIMARAS NUEVA VALENCIA CONSTRUCTION OF BHS 1,500,000.00 2,500,000.00

SIBUNAG CONSTRUCTION OF SCHOOL FENCE 500,000.00 3,000,000.00

PROVISION OF POTABLE WATER SUPPLY SYSTEM 500,000.00 RESCUE EQUIPMENT 3,000,000.00

27 ILOILO CARLES 1,500,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 5,400,000.00 2,620,000.00

PROVISION OF POTABLE WATER SUPPLY SYSTEM 1,500,000.00 GUIMBAL CONSTRUCTION OF DRAINAGE CANAL 2,900,000.00

CONSTRUCTION OF LIBRARY 1,200,000.00 CONSTRUCTION OF SEAWALL 3,000,000.00 CONSTRUCTION OF SPURDIKE 2,500,000.00

2,500,000.00

JANIUAY CONSTRUCTION OF SCHOOL FENCE 1,112,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 PROVISION OF POTABLE WATER SUPPLY 1,000,000.00 RAPID COMMUNITY BASED MONITORING SYSTEM 1,888,000.00 RESCUE EQUIPMENT 1,500,000.00

LAMBUNAO CONSTRUCTION OF SCHOOL FENCE 800,000.00 INSTALLATION OF WATER SUPPLY IN SCHOOLS 900,000.00

LEMERY CONSTRUCTION OF BOX CULVERT 1,224,163.00 CONSTRUCTION OF BOX CULVERT 684,000.00 FLOOD CONTROL 1,800,000.00

1,871,737.00

1,722,600.00

PROVISION OF POTABLE WATER SUPPLY SYSTE - LEVEL I 500,000.00 PROVISION OF POTABLE WATER SUPPLY SYSTEM - LEVEL II 1,947,500.00

LEON CONSTRUCTION OF HANGING FOOT BRIDGE 4,500,000.00

REHABILITATION OF SMALL WATER IMPOUNDING PROJECT (SWIP)

ROAD CONSTRUCTION OF SOUTH COASTAL BARANGAY MARINAB-AGUINALDO ROAD SECTION

REHABILITATION/REPAIR OF BURGOS COMMUNAL IRRIGATION SYSTEM

RHU EQUIPMENT (3 IN 1) MATERNITY AND NEWBORN CARE, TB DOTS/LABORATORY PACKAGE AND PRIMARY CARE BENEFITS

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CONSTRUCTION OF WATER SUPPLY SYSTEM AND INSTALLATION OF POWER SUPPLY

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE WITH LINE DITCH

Page 27: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 27 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 7,960,000.00

PROVISION OF POTABLE WATER SUPPLY SYSTEM 500,000.00 PAVIA 5,000,000.00

4,900,000.00

PROVISION OF POTABLE WATER SUPPLY SYSTEM 1,800,000.00 PROVISION OF SCHOOL FURNITURES 1,000,000.00 REPAIR/REHAB OF HEALTH CENTERS 500,000.00

28 NEGROS OCCIDENTAL CANDONI CONSTRUCTION OF SCHOOL FENCE 600,000.00 CONSTRUCTION OF SCHOOL LIBRARY 2,200,000.00

1,500,000.00

PROVISION OF POTABLE WATER SUPPLY 2,000,000.00 REGION VII 29 BOHOL CORTES FLOOD CONTROL 1,200,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 4,200,000.00 RESCUE EQUIPMENT 4,600,000.00

DANAO 1,260,000.00

RESCUE EQUIPMENT 4,140,000.00 30 CEBU ALCOY 5,000,000.00

FLOOD CONTROL 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00

CORDOVA CONSTRUCTION OF FACULTY ROOMS 1,200,000.00 CONSTRUCTION OF SCHOOL FENCE 585,000.00

5,000,000.00

EQUIPPING OF RHU 5,000,000.00 MANDAUE CITY 4,000,000.00

FLOOD CONTROL 3,300,000.00 FLOOD CONTROL (GROUTED RIP-RAP) 3,000,000.00 RESCUE EQUIPMENT 1,200,000.00

PILAR CONSTRUCTION OF SCHOOL FENCE 500,000.00 2,820,250.00

ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00 RESCUE EQUIPMENT 4,600,000.00

SAN FRANCISCO 12,250,000.00

EQUIPPING OF BHS 500,000.00 TOLEDO CITY INTEGRATED COMMUNITY FOOD PRODUCTION 1,400,000.00 TUDELA ESTABLISHMENT OF SCHOOL LIBRARY 1,200,000.00

PROVISION OF POTABLE WATER SUPPLY: LEVEL 1 550,000.00 REHABILITATION OF RHU 1,200,000.00 RESCUE EQUIPMENT 4,600,000.00

31 NEGROS ORIENTAL BASAY CONSTRUCTION OF SCHOOL FENCE 884,000.00 4,000,000.00

3,000,000.00

INSTALLATION OF WATER TO SCHOOLS 116,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 1,500,000.00

CITY OF GUIHULNGAN 8,000,000.00

FLOOD CONTROL 3,145,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 10,000,000.00 PROVISION OF SCHOOL FURNITURES (SEATS) 2,555,000.00

PAMPLONA 15,000,000.00

REGION VIII 32 EASTERN SAMAR GIPORLOS 8,372,900.00

2. SCHOOL CLINIC 1,200,000.00 3. INTEGRATED HEM PROJECT 944,100.00 4. RESCUE TRANSPORT EQUIPMENT 1,800,000.00 SCHOOL CONCRETE FENCE 1,000,000.00

LOCAL CORE ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

FLOOD CONTROL - CONSTRUCTION OF CANAL AND DRAINAGE

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD/CONSTRUCTION/REHABILITATION/MAINTENANCE

CORE LOCAL ROAD/CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

EXTENSION/EXPANSION OF EXISTING COMMUNAL IRRIGATION SYSTEM

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

7. REHABILITATION OF CORE LOCAL ROAD

Page 28: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 28 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION HERNANI 3,900,000.00

RESCUE EQUIPMENT 1,560,000.00 SCHOOL LIBRARY 1,200,000.00

MASLOG CONSTRUCTION OF SCHOOL FENCE 1,300,000.00 CORE LOCAL ROAD CONSTRUCTION 500,000.00

1,800,000.00

ICFP 3,000,000.00 SALINTUBIG 2,000,000.00

TAFT BIRHTING FACILITIES 1,000,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00 CONSTRUCTION OF WATER SUPPLY 500,000.00 CORE LOCAL ROAD 2,782,500.00 INTEGRATED COMMODITY FOOD PROGRAM PRODUCTION 500,000.00

PROVISION OF SCHOOL FURNITURES 500,000.00 33 LEYTE ABUYOG INTEGRATED COMMUNITY FOOD PRODUCTION 1,900,000.00

ISABEL ACQUISITION OF RESCUE EQUIPMENT 1,400,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00

4,600,000.00

EQUIPPING OF RHU 1,000,000.00 FLOOD CONTROL 5,000,000.00

JULITA FLOOD CONTROL 3,000,000.00 REHABILITATION OF IRRIGATION 1,000,000.00

KANANGA CONSTRUCTION OF CONCRETE MASONRY RIPRAP 920,000.00 CONSTRUCTION OF DRAINAGE CANAL 800,000.00 CONSTRUCTION OF FOOTBRIDGE AT SITIO BALIMBING 1,840,000.00 DRAINAGE CANAL 520,000.00 EXPANSION OF WATER SYSTEM 600,000.00 IMPROVEMENT OF WATER SYSTEM 800,000.00

LA PAZ CONSTRUCTION OF CONCRETE BRIDGE 3,108,350.00 CONSTRUCTION OF CONCRETE CORE LOCAL ROAD 1,776,200.00

1,154,530.00

EXPANSION OF THE LAPAZ WATER SYSTEM (LAPWAS) 1,154,530.00 FLOOD CONTROL 1,367,674.00

MACARTHUR ACQUISITION OF RESCUE VEHICLE 1,000,000.00 CONSTRUCTION OF FLOOD CONTROL PROJECT 500,000.00

MAYORGA 2,070,300.00

CONSTRUCTION OF SCHOOL FENCE 1,300,000.00 5,070,000.00

EQUIPPING OF BHS: MATERNITY AND NEWBORN CARE 591,000.00 EQUIPPING OF BHS: TB DOTS LABORATORY PACKAGES 500,000.00

PASTRANA RESCUE EQUIPMENT 4,000,000.00 1,500,000.00

STA. FE 5,000,000.00

REPAIR OF FENCE IN ELEMENTARY SCHOOLS 2,000,000.00 RESCUE EQUIPMENT (PROCUREMENT OF DUMP TRUCK) 1,300,000.00

TANAUAN 1,600,000.00

RESCUE EQUIPMENT 1,000,000.00 TOLOSA CONSTRUCTION OF FACUTY ROOM 1,200,000.00

CONSTRUCTION OF FENCE 500,000.00 500,000.00

PROVISION 0F SCHOOL FURNITURES (DESKS/CHAIRS) 500,000.00 VILLABA EQUIPPING OF BHS 500,000.00

EQUIPPING OF RHU 500,000.00 ESTABLISHMENT OF CLINIC IN SCHOOL 2,400,000.00 FLOOD CONTROL 2,118,500.00 INSTALLATION OF WATER SUPPLY SYSTEM TO SCHOOLS 840,000.00 PURCHASE OF RESCUE EQUIPMENT 2,625,500.00

CORE BARANGAY ROADS CONSTRUCTION, REHABILITATION & MAINTENANCE

EXTENSION/EXPANSION OF EXISTING COMMUNAL IRRIGATION SYSTEMS

CORE LOCAL ROAD CONSTRUCTION/MAINTENANCE/REHABILITATION

CONTRUCTION OF A NETWORK OF "U" TYPE DRAINAGE CANAL WITHOUT COVER

EQUIPPING OF BHS: 3 IN 1 EQUIPMENT FOR RURAL HEALTH UNIT MATERNAL CENTER

CORE LOCAL ROAD CONSTRUCTION-CONSTRUCTION OF 3 KILOMETERS CONCRETE ROAD IN BARANGAYS UNION TO ORMOCAY AND ORMOCAY TO WILSON

SCHOOL FENCING (MANAYBANAY NHS, PASTRANA CENTRAL SCHOOL, JUAN VILLABLANCA MEMORIAL HS, MACALPIAY NHS)

INTEGRATED COMMUNITY FOOD PRODUCTION (VEG. CEREALS AND ROOTCROPS, FRUIT TREES (CACAO, CITRUS)

CONSTRUCTION OF SCHOOL FENCE OF TNHS, TANAUAN DISTRICT I AND II

INTEGRATED COMMUNITY FOOD PRODUCTION (POULTRY RAISING/HOG AND SWINE RAISING)

Page 29: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 29 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 34 NORTHERN SAMAR SAN JOSE CONCRETING OF BRGY ROAD IN BRGY GENGAROG 3,000,000.00

650,000.00

ENVIRONMENTAL PROTECTION 500,000.00 EQUIPPING OF BARANGAY HEALTH STATION 814,000.00 FLOOD CONTROL 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 750,000.00 REHABILITATION OF BARANGAY HEALTH STATION 500,000.00

SAN VICENTE FLOOD CONTROL 1,000,000.00 REHABILITATION OF RHU (MAIN RHU) 500,000.00

SILVINO LUBOS 15,000,000.00

35 SAMAR DARAM 7,000,000.00

HINABANGAN CONSTRUCTION OF NEW BARANGAY HEALTH STATION (BHS) 1,512,573.00

10,000,000.00

PROVISION OF SCHOOL FURNITURES (SEATS) 500,500.00 JIABONG ACQUISITION OF SHALLOW TUBE WELLL (STW) 500,000.00

500,000.00

500,000.00

CORE ROAD CONCRETING IN BRGY. KARUNUNGAN 2,000,000.00 EXPANSION OF RURAL HEALTH UNIT (RHU) 500,000.00

2,000,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 PROCUREMENT OF RESCUE VEHICLE 1,500,000.00

1,000,000.00

500,000.00

MARABUT RESCUE EQUIPMENT 1,000,000.00 MATUGUINAO 5,000,000.00

5,000,140.00

SAN JORGE PROCUREMENT OF RESCUE VEHICLE 1,500,000.00 PROVISION OF SCHOOL FURNITURES 700,000.00 RAPID CBMS 500,000.00

SAN JOSE ACCESS ROAD TO EVACUATION CENTER 1,000,000.00 EMERGENCY/RESCUE VEHICLE 1,500,000.00 FLOOD CONTROL PROJECT 4,400,000.00 LOCAL CORE ROAD PROJECT 3,200,000.00

STA. RITA CONSTRUCTION OF 2 UNITS BHS 1,500,000.00 EQUIPPING 2 UNITS BHS 500,000.00 RESCUE VEHICLE 3,000,000.00 SCHOOL FENCING 500,000.00

TAGAPUL-AN 7,575,000.00

INSTALLATION OF WATER SUPPLY TO SCHOOLS 1,125,000.00 TALALORA WATER SYSTEM 1,000,000.00 ZUMARRAGA 500,000.00

CONSTRUCTION OF NEW BIRTHING FACILITY 1,800,000.00 CORE LOCAL ROAD CONSTRUCTION 3,000,000.00 EXPANSION OF RHU 1,800,000.00 FLOOD CONTROL 600,000.00 POTABLE WATER SUPLY SYSTEM 2,000,000.00 RAPID CBMS FOR BENCH MARKING & MONITORING 500,000.00 SCHOOL CLINIC PROJECT 1,200,000.00

REGION X 36 BUKIDNON BAUNGON 6,600,000.00

EXPANSION OF RHU BUILDING 1,025,000.00 3,000,000.00

CABANGLASAN 4,000,000.00

CONSTRUCTION OF CONCRETE PERIMETER FENCE AND INSTALLATION OF SCHOOL WATER SYSTEM

CORE LOCAL ROAD: CONSTRUCTION OF CIRCUMFERENTIAL ROAD

REHABILITATION OF LOCAL CORE ROAD CONCRETING (REAL-CABAC SECTION)

CORE LOCAL ROAD CONSTRUCTION / MAINTENANCE / REHABILITATION

CONSTRUCTION OF REINFORCED CONCRETE HANGING . FOOTBRIDGE OF BRGY. NAGBAC

CONTRUCTION IF REINFORCED CONCRETE HANGING / FOOTBRIDGE OF BRGY. SAN FERNANDO

IMPROVEMENT OF DRAINAGE CANAL FROM BRGY. MASAGANA TO MASBAG RIVER

REHABILITATION OF BARANGAY MALINO WATER SUPPLY SYSTEM - PHASE 2

REHABILITATION OF BRGY. MALOBAGO WATER SUPPLY SYSTEM - PHASE 2

CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF FOOTBRIDGE

CORE LOCAL ROAD CONSTRUCTION - CONSTRUCTION OF SAND AND GRAVEL 'SINGLE LANE' ROAD

CONSTRUCTION OF LOCAL CORE ROAD WITH SHORE-LINE PROTECTION

LOCAL GOVERNMENT SUPPORT FOR LOCAL INFRASTRUCTURE PROJECTS

CONCRETING OF BARANGAY ACCESS ROAD (ICES JUNCTION TO BNHS, 550M.)

INTEGRATED COMMUNITY FOOD PRODUCTION -ORGANIC HOG RAISING, ORGANIC GARDENING (OKRA; CHINESE KANGKONG), BAGUIO BEANS

ROAD CONCRETING FROM TOWNSITE PROPER TO OLD POBLACION

Page 30: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 30 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION DANGCAGAN CORE LOCAL ROAD REHABILITATION 6,060,000.00

500,000.00

RCBMS 650,000.00 DON CARLOS 1,000,000.00

700,000.00

PROCUREMENT OF 4.6 MTS. SMALL FIBERGLASS BOAT 1,000,000.00 RESCUE EQUIPMENT 10 WHEELER DUMP (4 WHEEL DRIVE) 3,200,000.00

IMPASUGONG HABIOGAN FOOTBRIDGE 1,500,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 1,000,000.00 IRRIGATION - SWIP 2,000,000.00

KALILANGAN CONSTRUCTION OF FOOTBRIDGE 500,000.00 CORE LOCAL ROAD CONSTRUCTION (INFRASTRUCTURE) 6,550,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00 IRRIGATION SYSTEM 500,000.00 POTABLE WATER SYSTEM 500,000.00 RAPID COMMUNITY BASED MONITORING SYSTEM 800,000.00

1,000,000.00

KITAOTAO CORE LOCAL ROAD CONCRETING 3,500,000.00 MALAYBALAY CITY 2,000,000.00

QUEZON BRGY. HEALTH STATION 2,550,000.00 CORE LOCAL ROAD 850,000.00 CORE LOCAL ROADS 14,855,000.00 FLOOD CONTROL 2,125,000.00 IRRIGATION SUPPORT SERVICES 500,000.00 SPES 850,000.00

SUMILAO INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 500,000.00 37 CAMIGUIN GUINSILIBAN 2,000,000.00

CORE LOCAL ROAD TO NURSERY 3,000,000.00 RESCUE VEHICLE WITH COMPLETE RESCUE EQUIPMENT 1,550,000.00 RIVER CONTROL (BRGYS. NORTH & SOUTH POBLACION) 2,000,000.00

38 LANAO DEL NORTE BALO-I 500,000.00

CONCRETING CORMATAN TO SIGAYAN FMR 1,000,000.00 CONCRETING OF DORO STREET TO LAP-LAP STREET 500,000.00 CONCRETING OF PILOMBAYAN TO GOMAMPONG STREET 500,000.00

500,000.00

CONSTRUCTION OF DEEP WELL (BRGY. BANGKO) 500,000.00 CONSTRUCTION OF DEEP WELL (BRGY. BULAO) 500,000.00

750,000.00

ROAD REHABILITATION OF CORMATAN TO SARIP ALAWI 500,000.00

ROAD REHABILITATION OF SARIP ALAWI TO LANDA FMR 500,000.00

KAUSWAGAN INTEGRATED COMMUNITY FOOD PRODUCTION (ICFP) 1,000,000.00 RESCUE EQUIPMENT 4,600,000.00

MAGSAYSAY 8,200,000.00

500,000.00

NUNUNGAN 3,000,000.00

3,000,000.00

3,000,000.00

3,000,000.00

PROCUREMENT OF POLYETHYLENE PIPES FOR BUGWAK IRRIGATION PROJECT

CONSTRUCTION OF 1 UNIT NEW BARANGAY HEALTH STATION

INDIGENOUS PEOPLE (IP) COMMUNAL FARM FOR INTEGRATED COMMUNITY FOOD PRODUCTION

WATER SUPPLY INSTALLATION AND TOILETS REPAIR FOR SCHOOLS

COMPREHENSIVE HEALTH PROGRAMS: BARANGAY 9 HEALTH STATION RENOVATION

CONTINUATION OF BRGY BUTAY WATER SYSTEM UNDER SALINTUBIG PROGRAM

CONCETING OF BALOI NATIONAL HIGH SCHOOL TO NATIONAL HIGHWAY ROAD

CONSTRUCTIN OF PERIMETER FENCE OF LININDING ELEMENTARY SCHOOL

CONSTRUCTION OF U-TYPE DARAINAGE CANAL (BRGY. WEST)

CONCRETING OF 900 LINEAR METERS FARM TO MARKET ROAD BARANGAY SOMIORANG

PROVISION OF SCHOOL FURNITURE (SEATS) FOR THE INCREASING ENROLLEES OF MAGSAYSAY ELEMENTARY SCHOOL DISTRICT

CONCRETING OF LOCAL ACCESS ROAD ( BRGY. PARIDI TO MASIBAY)

CONCRETING OF LOCAL ACCESS ROAD ( BRGY. POBLACION TO PUTADON)

CONCRETING OF LOCAL ACCESS ROAD ( BRGY. PUTADON TO KATUBUAN)

CONCRETING OF LOCAL ACCESS ROAD (BRGY. ABAGA TO PARIDI)

Page 31: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 31 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION 3,000,000.00

TAGOLOAN 10,400,000.00

TANGKAL 1,200 L.M CONCRETING OF BUBONG ACCESS ROAD 12,000,000.00 300 L.M CONCRETING OF POBLACION STREET ACCESS ROAD 3,000,000.00

39 MISAMIS OCCIDENTAL CALAMBA CONCRETING OF FAUSTINO CALES STREET 1,200,000.00 CONCRETING OF PANGILINAN AND REBOSURA STREET 1,100,000.00 CONCRETING OF PORFERIO BRANZUELA STREET 1,000,000.00 CONCRETING OF SEMION CLAPANO STREET 1,000,000.00

800,000.00

CONCRETING OF SOLINOG CORE LOCAL ROAD 1,000,000.00 CLARIN CONSTRUCTION OF CORE LOCAL ROADS 4,000,000.00

CONSTRUCTION OF FOOT BRIDGES 1,000,000.00 CONCEPCION CONCRETING OF MUNICIPAL ACCESS ROAD 15,000,000.00 DON VICTORIANO CONCRETING OF ROAD LAMPASAN - LALUD ROAD 10,909,000.00

CONSTRUCTION OF FOOT BRIDGE - DIMOROK RIVER 1,000,000.00 CONSTRUCTION OF FOOT BRIDGE - NAPANGAN CREEK 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 500,000.00

OROQUIETA CITY INTEGRATED COMMUNITY FOOD PRODUCTION 1,000,000.00 40 MISAMIS ORIENTAL CLAVERIA 2,000,000.00

CONCRETING OF PUROK 1, 2 BARANGAY ROAD 2,000,000.00 2,500,000.00

EL SALVADOR CITY 15,000,000.00

GINGOOG CITY DRAINAGE CANAL 3,405,400.00 FLOOD CONTROL REHAB OF EXISTING 2,905,400.00

1,200,000.00

RAPID COMMUNITY BASED MONITORING SYSTEM (RCBMS) 2,000,000.00

LAGONGLONG CONCRETING OF MANAOL CIRCUMFERENTIAL ROAD 5,000,000.00 CONCRETING OF HIGHWAY -KABULAWAN FMR 3,000,000.00 CONCRETING OF TABOK-SAPONG FMR 5,000,000.00 CONCRETING OF UMAGOS-ROAROA FMR 2,000,000.00

LAGUINDINGAN 2,500,000.00

2,500,000.00

2,500,000.00

2,500,000.00

2,500,000.00

2,500,000.00

LUGAIT CONCRETING OF KALUKNAYAN RAOD 3,000,000.00 CONCRETING OF KUYANAPAN ROAD 2,000,000.00 CONCRETING OF MARKET TO BLISS ROAD 2,000,000.00 CONCRETING OF TANGISON ROAD 3,000,000.00 CONSTRUCTION OF FLOOD CONTROL 4,000,000.00

MEDINA PROPOSED CONCRETE PAVEMENT OF ACCESS ROAD 9,000,000.00 PROPOSED CONSTRUCTION/REHAB OF DRAINAGE SYSTEM 2,000,000.00

SALAY CONCRETING OF ACCESS ROAD 15,000,000.00 TALISAYAN CORE LOCAL ROAD CONSTRUCTION 5,102,000.00 VILLANUEVA NANGKA-TAGBALOGO- DAYAWAN ROAD 15,000,000.00

REGION XI 41 DAVAO DEL SUR DON MARCELINO CONSTRUCTION OF BARANGAY HEALTH STATION 2,000,000.00 CONSTRUCTION OF FOOTBRIDGE 1,500,000.00

CONCRETING OF LOCAL ACCESS ROAD (BRGY. KATUBUAN TO ABAGA)

CONCRETING OF CABSARAN TO DARIMBANG PANALAWAN LOCAL ROAD

CONCRETING OF SILOY CORE LOCAL ROAD TO MAN MADE LAKE

CONCRETING OF JUNCTION PROVINCIAL ROAD SITIO LIMBUSAN

CONCRETING OF SITIO MIGBANDAY - BARANGAY LUNA ROAD

CONCRETING OF KALABAYLABAY TO SAN FRANCISCO DE ASIS ROAD

ICFP (GOAT PRODUCTION, COW DISPERSAL AND ORGANIC PRODUCTION)

IMPROVEMENT / REHABILITATION / CONCRETING OF JUNCTION AROMAHON PROVINCIAL ROAD BOUND TO TIANO PROPERTY, PUROK 4, AROMAHON, BRGY. ROAD

IMPROVEMENT / REHABILITATION / CONCRETING OF MAUSWAGON ELEMENTARY SCHOOL BRGY. ROAD LEADING TO PUROK 4, MAUSWAGON BRGY. ROAD

IMPROVEMENT / REHABILITATION / CONCRETING OF PORTION JUNCTION AROMAHON ACCESS ROAD LEADING TO GK DIAMOND RELOCATION SITE, KIBAGHOT, LAGUINGINGAN MIS. OR.

IMPROVEMENT / REHABILITATION / CONCRETING OF PUROK 4, SAMBULAWAN DIVERSION ROAD ALONG BLESSED VIRGIN FATIMA LOCATED AT SAMBULAWAN, LAGUINGINGAN MIS. OR.

IMPROVEMENT / REHABILITATION / CONCRETING OF PUROK 5 BRGY. ROAD LOCATED AT POBLACION, LAGUINDINGAN MIS. OR.

IMPROVEMENT / REHABILITATION / CONCRETING OF PUROK 5, LAPAD BRGY. ROAD

Page 32: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 32 of 34

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION CONSTRUCTION OF L2 PWS 1,000,000.00 CONSTRUCTION OF PWS 500,000.00 CORE LOCAL ROAD CONCRETING 3,500,000.00 EXPANSION OF L3 PWS TO SITIO 1,000,000.00 PROVISION OF BHS EQUIPMENTS 1,117,500.00

MATANAO CONCRETING OF ROAD 2,717,100.00 CONSTRUCTION OF PWS LEVEL II 1,000,000.00 IMPROVEMENT OF PWS LEVEL II 500,000.00 PROVISION OF SCHOOL FURNITURE (SEATS) 1,500,000.00 REHABILITATION OF PWS II 500,000.00

REGION XII 42 NORTH COTABATO BANISILAN FLOOD CONTROL 850,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION* 2,150,000.00 RESCUE EQUIPMENT 1,250,000.00

CARMEN CONSTRUCTION OF NEW BHS 1,500,000.00 CONSTRUCTION OF SCHOOL FENCE 500,000.00 EQUIPPING OF RHU 1,000,000.00

43 SULTAN KUDARAT Palimbang CONSTRUCTION OF NEW BHS 2,210,000.00 CONSTRUCTION OF SCHOOL FENCE 825,000.00 CORE LOCAL LOAD 9,900,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 850,000.00 PROVISION OF SCHOOL FURNITURE( SEATS) 558,600.00

TOTAL 1,323,335,121.38

Prepared by:

NORMAN M. APARENTEAsst. Senior Technical Staff, BuB PMO

Reviewed by:

RICHARD L. VILLACORTEProgram Manager, BuB PMO

Page 33: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 33 of 34

ANNEX B.3FY2016 BOTTOM-UP BUDGETING (BUB)LIST OF PROJECTS THAT WILL BE DROPPED (FUNDS WILL NO LONGER BE RELEASED)These are the projects of Highly Urnbanized Cities and Chartered Cities that were not able to comply with the BuB Governanc Standards

No. of LGU: 9 LGUsNumber of Projects: 27 Sub-ProjectsTotal amount: 49,688,075.00

REGION PROVINCE CITY/ MUNICIPALITY NAME OF PROJECT (PER LPRAP) BUDGET ALLOCATION NCR METRO MANILA CALOOCAN ESTABLISHMENT OF SCHOOL CLINICS 2,400,000.00

ESTABLISHMENT OF SCHOOL LIBRARY ROOMS 2,400,000.00 ESTABLISHMENT OF FACULTY ROOMS 2,400,000.00 PROVISION OF SCHOOL FURNITURE 504,000.00 EQUIPPING OF LYING IN CLINIC 2,661,300.00 CONSTRUCTION OF NEW BARANGAY HEALTH STATION 540,000.00

1,120,000.00

INTEGRATED COMMUNITY FOOD PRODUCTION 2,400,000.00 LAS PIÑAS 700,814.00

2,200,000.00

636,471.00

MAKATI 12,500,000.00

MALABON EQUIPPING BARANGAY HEALTH CENTER WITH LYING-IN 1,000,000.00 INTEGRATED COMMUNITY FOOD PRODUCTION 510,000.00

PASAY INTEGRATED COMMUNITY FOOD PRODUCTION 600,000.00 PATEROS 600,000.00

CONSTRUCTION/MAINTENANCE/REHABILITATION OF ROADS 600,000.00

1,800,000.00

CONSTRUCTION/MAINTENANCE/REHABILITATION OF ROADS 1,200,000.00

CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM 1,200,000.00 QUEZON CITY 3,500,000.00

TAGUIG INSTALLATION OF WATER SUPPLY TO SCHOOLS 660,000.00 REGION IX ISABELA CITY ISABELA CITY LEVEL II REHABILITATION OF WATER SUPPLY 1,000,000.00

CONSTRUCTION OF DEEP WELL LEVEL I 550,000.00 CONSTRUCTION OF CONCRETE ROAD AT BINUANGAN BARANGAY 781,490.00

2,200,000.00

3,024,000.00

TOTAL 49,688,075.00

Prepared by:

NORMAN M. APARENTEAsst. Senior Technical Staff, BuB PMO

Reviewed by:

RICHARD L. VILLACORTE

REHABILITATION / EXPANSION OF BARANGAY HEALTH CENTERS (BHS)

CONSTRUCTION OF GRILL PERIMETER FENCE FOR PUBLIC SCHOOLS IN LAS PIÑAS CITY

ACQUISITION OF ONE (1) UNIT RESCUE VEHICLE FOR EMERGENCY RESPONSE AND DISASTER RELIEF OPERATIONS

ACQUISITION OF TWO (2) UNITS 4.6 SMALL FIBERGLASS RESCUE BOATS FOR DISASTER RELIEF AND RESCUE BOATS FOR DISASTER RELIEF OPERATIONS

RAPID COMMUNITY BASED MONITORING SYSTEM (RCBMS) FOR BENCHMARKING AND MONITORING

CONSTRUCTION/INSTALLATION OF 24'0 REINFORCED CONCRETE CULVERT PIPE DRAINAGE CANAL

CONSTRUCTION/MAINTENANCE/REHABILITATION OF ROADS AND DRAINAGE SYSTEM

INSTALLATION OF WATER SANITATION AND WATER FACILITIES IN PUBLIC SCHOOLS IN ACCORDANCE WITH SAFETY STANDARDS

CONSTRUCTION OF CONCRETE ROAD AT BUSAY BARANGAY (GOING PANUNSULAN)

CONSTRUCTION OF 3 UNITS NEW BARANGAY HEALTH STATION (BHS)

Page 34: openbub2.gov.phopenbub2.gov.ph/sites/default/files/fy2016 … · XLS file · Web view · 2017-02-1925 1 15000000 7192016. 35 2 13038080 7192016. 136 3 13800000 7192016. 137 4 1200000

Page 34 of 34

Program Manager, BuB PMO