Xavier Fernando’s fernando/ele800.

12
EDP DESIGN PROJECTS Xavier Fernando’s http://www.ee.ryerson.ca/~fernando /ele800

Transcript of Xavier Fernando’s fernando/ele800.

Page 1: Xavier Fernando’s fernando/ele800.

EDP DESIGN PROJECTSXavier Fernando’s

http://www.ee.ryerson.ca/~fernando/ele800

Page 2: Xavier Fernando’s fernando/ele800.

RADIO FREQUENCY IDENTIFICATION

RFID – the emerging battery free sensor that find numerous applications

RFID will fully replace bar codes in WALMART stores by 2010

Active/Passive Tags Read only/writable tags Used in smart cards, smart homes etc.

http://www.youtube.com/watch?v=qMjukYHibzM

Page 3: Xavier Fernando’s fernando/ele800.

RFID CATEGORIES

Band Unlicensed Frequency Wavelength Classical Use

LF 125-134.2KHz 2400 meters Animal tagging

and keyless entry.HF 13.56MHz 22 meters

UHF 865.5-867.6MHz ()

915MHz ( )

950-956MHz()

32.8 centimeters Smart cards, logistics, and item management

ISM 2.4GHz 12.5 centimeters Item management

[1] Table taken from RFID Applications, Security, and Privacy, Simson Garfinkel and Beth Rosenberg.

Page 4: Xavier Fernando’s fernando/ele800.

RFID APPLICATIONS

Design of an RFID system RFID based metro-pass RFID augmented photo album RFID based exam hall supervision RFID based smart-home for elderly care

Page 5: Xavier Fernando’s fernando/ele800.

WI-FI COVERAGE IN TORONTO Toronto down-town gets Wi-Fi

coverage How to make use of this for

revenue generation? Parking control using Wi-Fi Traffic info-management using Wi-Fi Inexpensive VOIP phone using Wi-Fi Energy meters using Wi-Fi Special purpose opportunistic

networks

Page 6: Xavier Fernando’s fernando/ele800.

LOW-COST AD-HOC WIRELESS NETWORKS

eZ430-RF2500 Development Kit ($49)

Page 7: Xavier Fernando’s fernando/ele800.

WIRELESS PULSE RATE MONITOR FOR TREADMILL

Page 8: Xavier Fernando’s fernando/ele800.

SMART WIRELESS UTILITY METER

The Ontario Energy Board (OEB) is calling for:§ 800,000 smart meters to be installed by December 31, 2007 and

§ The installation of smart meters for all Ontario customers by December 31, 2010.

Ontario will be the first, full-scale smart meter system in North America. There are several smart meter pilots running in Ontario now. Hydro Ottawa has started conducting its pilots last spring.

Past students who worked on this are now with Hydro One

Page 9: Xavier Fernando’s fernando/ele800.

WIRELESS POWER SYSTEM CONTROL

Distributed power generation and micro grids have drastically transformed the electric power grid management and control

Communications play major role in power system management

Design of a wireless communication scheme for power system control

Page 10: Xavier Fernando’s fernando/ele800.

WIRELESS HOME ALARM SYSTEM

A thief will first cut the telephone line before attempting a burglary

Most current systems will fail in this case

What about a system that uses wireless network for emergency contact when dead telephone line is detected

Brainstorm

Page 11: Xavier Fernando’s fernando/ele800.

RFID BASED BABY MONITORING

Page 12: Xavier Fernando’s fernando/ele800.

WIRELESS INFOPAD FOR MUSEUMS

Award Winner in 2006