Www.sitecontrols.com 1 1 “… focused on the part of the energy web that can be built out now, for...

16
www.sitecontrols.co 1 “… focused on the part of the energy web that can be built out now, for profit, with near-term ROI and a growth path that could eventually produce macro-level network effects.” Chris Hickman President, Energy Services [email protected] 512-636-1382

Transcript of Www.sitecontrols.com 1 1 “… focused on the part of the energy web that can be built out now, for...

www.sitecontrols.com 1

1

“… focused on the part of the energy web that can be built out now, for profit, with near-term ROI and a growth path that could

eventually produce macro-level network effects.”

Chris HickmanPresident, Energy Services

[email protected]

www.sitecontrols.com

• Founded in 2003• Headquarters: Austin, TX• Deployed in 2,000 client sites (US, Canada, Europe)• Intelligent Load Management (ILM) program controls 220MW of Peak

load with 135MW dispatchable load• Customers: Big Lots, Michaels, The Cheesecake Factory, FedEx Kinko’s,

Ethan Allen, Chipotle, LA Fitness• Market Participation: Bi-lateral agreements , Utility Specific ‘Market’

programs for aggregators, Efficiency Programs.• Pilot Programs: Capital Efficiency through ILM, Renewable Balancing,

Premium Power, Feeder Balancing.

2

Overview

Site Controls creates value in energy by providing web-based enterprise-wide energy management, business intelligence, and grid efficiency solutions to retail and energy management businesses worldwide.

www.sitecontrols.com

• Grid Efficiency– Energy efficiency– Load aggregation and control with no/low consequence– Individual controls for HVAC, lighting, refrigeration, etc.

• Energy and Capacity– Fully Automated– “Always On” resource (24x7x365) – No DR Fatigue– Power plant equivalent resource (with no line losses)– Reduced need for peaking capacity

• Environmental Stewardship and Sustainability– Measurable carbon reductions– Coincident peak load reductions – Reduced greenhouse gas emissions– Reduced energy consumption

3

Global Benefits

www.sitecontrols.com 4

EnergyWeb1

• Connects all suppliers & users

• Two-way, seamless network

• Real-time management & optimization

• Generation

• Transmission & Distribution

• Consumption (Device-by-Device)

• Match supply & demand

• Significantly reduce Carbon emissions

POWER SYSTEMProviders

CLIENTConsumers

Generation

Transmission

Distribution

Utility/ISO

Residential

Commercial

Industrial

1 Reference: Bonneville Power Administration Federal research initiative. www.bpa.gov/Energy/N/tech/energyweb/

The integration of the utility electrical system, telecommunications system, and the energy market to optimize loads on the electrical

network, reduce costs to consumers and utilities, facilitate the integration of renewable resources, increase electrical system reliability

and reduce environmental impacts of load growth. 1

www.sitecontrols.com 5

The Energy Dilemma “you can’t get there from here”

Sources: (1) International Energy Agency, (2) Pacific Northwest National Lab, (3) Electric Power Research Institute, (4) The Center for Smart Energy

Generation Gap Amount

Increase in U.S. Generation Required during the next 10 years (1) 19%

Increase in U.S. Generation Scheduled for the next 10 years (1) 6%

Transmission & Distribution Gap Amount

Increase in U.S. Electricity T&D Required from 1999 – 2009 (2) 20%

Increase in U.S. Electricity T&D Scheduled from 1999 – 2009 (2) 5%

Projected Infrastructure Implications Amount

U.S. & Canadian Infrastructure $$$ Required from 2003 and 2030 (1) $1.6 trillion

U.S. & Canadian Capacity Required from 2003 and 2030 (1) 758,000 MW

Demand Response Implications Amount

U.S. Demand Response Market (Annual) (3) $4.2 billion

U.S. & Canadian Capacity required to serve < 80 hours per year (4) 10%

www.sitecontrols.com

“Please don’t fix the communication problems, our country couldn’t survive the unemployment problem.”

• DR - What is it to you?– A panic button– Only available 4 times a year– Resource that exhibits fatigue with each additional call– Not worthy unless over 5 MW– Wholesale or Retail resource– M&V? Imagined? Somewhere in-between– Only if I have the button?– It’s too complex to manage in mass – Customers ? Oh yes, them, I forgot.– “They” won’t play– Everyone or no one!

What conversation are we having?

6

www.sitecontrols.com 7

Efficiency Savings

www.sitecontrols.com 8

0

20

40

60

80

100

120

140

0:15

1:15

2:15

3:15

4:15

5:15

6:15

7:15

8:15

9:15

10:1

5

11:1

5

12:1

5

13:1

5

14:1

5

15:1

5

16:1

5

17:1

5

18:1

5

19:1

5

20:1

5

21:1

5

22:1

5

23:1

5

Time

kW o

r d

egre

es F

0

200

400

600

800

1000

1200

1400

1600

1800

2000

Dai

ly k

WH

Temp on 28th(left axis)

Temp on 27th(left axis)

avg kW over 15 minutes on the 27th(left axis)

avg kW over 15 minutes on the 28th(left axis)

kWH on 27th(right axis)

kWH on 28th(right axis)

Michaels Austin StoreTemperature & Electricity UsageSeptember 27 vs September 28

Load Mgt.Window

20% Reduction during Load Management Period

Low (or NO) consequence DR

www.sitecontrols.com 9

2,000 Sites on Network

www.sitecontrols.com 10

Helping the Grid & Market

5% DR = Real 5% DR = Real Grid SolutionGrid Solution

www.sitecontrols.com 11

ERCOT Power Emergency

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

• 21% load reduction

• 3.5 hours

• no material negative consequences

www.sitecontrols.com 12

Disaggregated Data

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

0:00

0:45

1:30

2:15

3:00

3:45

4:30

5:15

6:00

6:45

7:30

8:15

9:00

9:45

10:3

0

11:1

5

12:0

0

12:4

5

13:3

0

14:1

5

15:0

0

15:4

5

16:3

0

17:1

5

18:0

0

18:4

5

19:3

0

20:1

5

21:0

0

21:4

5

22:3

0

23:1

5

www.sitecontrols.com

Evolution of ILM

13

www.sitecontrols.com14

Don’t lose sight of the big picture

All DR is good!However, all DR is not the same nor should it be created,

valued or utilized in the same fashion.

There is not a silver bullet to solve the problems that our energy based economy faces today. We must recognize a blended approach is the answer, not focusing on only one thing. However, we must also recognize the reality of the timing in which these solutions can be delivered.

–DR (Short-term: Months)–EE (Short-term: Months)–AMI (Mid-term: 1 to 15 years)–T&D Assets (Short, Mid and Long-term: Months to 15 years)–Generation (Mid and Long-Term: 3-20 years)

www.sitecontrols.com

• Consistency– How many different programs do we really need? (Don’t let this

turn into the next rate structure.)• Lower the barriers to entry

– MeteringRequirements by size (0-50kW, 50-500kW, >500kW)Requirements by use (Spinning reserve, capacity, energy)Short-term ability to participate (Wait 5 years while I do AMI?)

– Programmatic Paperwork - “National Certification”?– Pay for Performance – Like Accounting rules, you have to

demonstrate continued performance to be recognized as a dependable resource. Let proof be in delivery, not paperwork.

– ISO/LSE conflict resolution• Timing

– We won’t have this opportunity to structure the market again• What do you want? Quit assuming it can’t be done!

What conversation should we have?

15

www.sitecontrols.com

Thank you

Chris [email protected]

512-636-1382

16