Wtw process
-
Upload
drexelmetals -
Category
Business
-
view
436 -
download
3
description
Transcript of Wtw process
WTW Warranty Process
Technical DepartmentAugust 2011
What you need to know
• Forms and Files:– WTW Submittal Package– Step by Step Process Flow– WTW Fee Schedule and Types• Type 1, 2, 3 and 4
– Curb Specification – WTW Log – Status of projects
TWO PROCESSESTO BE QUOTED WTW
PLANS AND SPEC
QUOTE TO CUSTOMER WON/LOSS
SOLD WTW
PLAN, SPECS AND QUOTE
REVIEW
REVIEWING SUBMITTAL PACKAGE
NOTICE OF INTENT ISSUED
Quoting at WTW
PLANS AND SPEC
WTW QUOTE TO CUSTOMER
(*)WON/LOSS
• Plans and Spec: Sent to Tony Spaw or Jeff Hock for review.• WTW Quote to Customer: Salesperson or Technical Department
• (*) Drexel Metals technical department will provide a roof take-off at no charge to our customer. This would include a panel cut-list, 2-D drawing and all accessories required for the project.
• Win/Loss – Sales will follow up with quote in STRATIX and Salesforce.com
What’s Reviewed for a SOLD WTW
• PLANS:– Architectural and Structural Plans Preferred – Minimum requirement:
– Roof Plans– Elevations– Section Details
• SPECS + ADDENDUMS:• Division 7
• QUOTE REVIEW:– Hard Copy of the quote provided to the customer
• Includes: – STRATIX Material (Coil, Flats, Clips and Accessories)– WTW price provided to our customer (WTW Fee Schedule)– If Applicable:
» Shop Drawings and Job Specific Engineering price provided to our customer.
PLAN, SPECS AND QUOTE
REVIEW
SUBMITTAL PACKAGE
• Providing the Submittal Package to Jason Shumate for review:– Submittal Package: insert WIKI hyperlink instead– Shop Drawing review or created. • If Drexel Metals creates shop drawings:
– $ 250.00 per page ($ 500 minimum) per WTW Fee Schedule
REVIEWING SUBMITTAL PACKAGE
Notice of Intent and Schedule
• Jason Shumate will issue the Notice of Intent to Warrant directly to Installer with a Cc: to Regional Sales Manager and Salesperson.
• Jason Shumate will assign an inspector to the project and create a preliminary schedule for the project. Once, inspector is assigned the RSM and Salesperson will be notified.
NOTICE OF INTENT ISSUED
Please inquire to Technical Department for projects:
• including Wall Panels• outside of the Lower 48 states (Hawaii etc.)• International projects (Korea, Caribbean)• Job Specific Engineering Required
Inspections
Lower 48 Inspector MapFrank Oswald – Green Jeff Hock – Purple
Technical Department
• At its discretion: – Will use specific Drexel Metals Regional Sales
Managers or Sales to conduct inspections on a per needed basis.
– No WTW inspections shall be scheduled without notification to the Technical Department.
Invoicing our WTW’s
Invoicing the WTW
• After final inspection and all corrective measures have been made; – the technical department will notify corporate accounting to issue
the invoice for the WTW. – All WTW invoices will be issued through STRATIX which will include
the project name. – All WTW invoices will be issued with zero profit and will be
reallocated to deferred revenue over the life of the warranty. – The technical department and regional manager will be emailed a
copy of the invoice. – Once payment is received, Drexel Metals accounting will notify
technical department to issue the final signed and executed warranty.