R educing dis ruption to the R oad Network through the cloud

R oland Major IM – E nterprise Architect Transport for L ondon

Page 2: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud
Page 3: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

G rowing brings C hallenges

Page 4: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

What is needed

• T he ability to unders tand the real time demand for time and space

• T he intelligence to make sure the needs of all c us tomers drives what happens on our roads

• New think ing and better information, enabled by tec hnolog y

Page 5: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

T fL O nline

Workbenches + Tools

L ondonWorks II

Incident Management

J unction O ptimisation

Integration S ervices

IoT and S ensors

Page 6: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

L ondonWorks II

Network Impac t

A s s es s ment

•T he team engages with promoters of major developments , projects and events on T L R N and S R N through appropriate planning and collaboration, coordinate activities in order to minimis e dis ruptions to all road us ers .

Work s C oordination & P ermitting

•R es pons ible for minimis ing dis ruption on the T L R N through mitigation, coordination and permitting of works

R oadwork s Intellig enc e & E nforc ement

•Undertaking s pecialis t R oadworks ins pections and validating 3rd party intelligence to as certain compliance with s afety, permit conditions , lane rental and overrunning works

P erformanc e, T ec hnolog y &

C harg es

•R es pons ible for monitoring promoters performance taking enforcement action or apply fines for non-compliance when required. T he team als o provides s upport for P I technology s ys tems

Wo

rkflow

Presenter
Presentation Notes
FY2015/16 (projected from P1-P10) Over 86,000 Permit Applications Over 6,370 days of disruption saved 58,600 Roadworks Inspections 30% Safety Non-Compliance 35% Permit Condition Breaches £12m Charges & Fines Recovered Increased workload - £4bn Roads Modernisation Programme Lane Rental Scheme Mayor’s Roadworks Pledge Mayor’s Code of Conduct for Roadworks Automatic Road Network Monitoring LondonWorks & Other Supporting Systems (Part of SITS) Operational Efficiencies Restructure Operational Analysis Team in order to better service Technology requirements Centralise the assessment of standalone works Ensure current Lane Rental outputs provide optimum returns
Page 7: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

C oordinating acces s to road s pace – Traffic O rders

• 500,000 per annum borough works

• alongs ide events , licenses & other activities

Presenter
Presentation Notes
Deliverables: Each month: Over 7,000 permit applications assessed each month of which 78% must be responded to within two days Average response time 1.36 days 170 utility Traffic management assessments and 150 TfL works assessments each month Over 6,730 days of disruption saved in 2015-16
Page 8: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud
Page 9: WSO2Con EU 2016: Reducing Disruption to the Road Network Through the Cloud

T hank You!

#WS O 2C onE U

S hare your feedback for this sess ion ws o2con.com/app