APFP Regulation 5(2)(j)
Planning Act 2008 Infrastructure Planning (Applications: Prescribed
Forms and Procedure) Regulations 2009
Volume 2 August 2019
A1 Birtley to Coal House
Scheme Number: TR010031
2.3 Works Plan
A1 Birtley to Coal House Works Plan
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.3
Infrastructure Planning
Planning Act 2008
The Infrastructure Planning (Applications: Prescribed Forms and Procedure - APFP) Regulations 2009
The A1 Birtley to Coal House Development Consent Order 20[xx]
WORKS PLAN
Regulation Reference: APFP Regulation 5(2)(j)
Planning Inspectorate Scheme Reference
TR010031
Application Document Reference TR010031/APP/2.3
Author: A1 Birtley to Coal House Project Team, Highways England
Version Date Status of Version Rev 0 14/08/2019 Application Issue
A1 Birtley to Coal House Works Plan
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.3
CONTENTS
1 Introduction ............................................................................................................. 1
1.1 Purpose of this Document ......................................................................................... 1
2 Schedule of Plans included in this Application Document ................................. 2
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.3
Page 1
A1 Birtley to Coal House Works Plan
1 INTRODUCTION
1.1 Purpose of this Document
1.1.1 This Works Plan (this “Plan”) relate to an application made by Highways England(the "Applicant") to the Planning Inspectorate (the “Inspectorate”) under thePlanning Act 2008 (the "2008 Act") for a Development Consent Order (DCO). Ifmade, the DCO would grant consent for the Applicant to undertake the A1 Birtleyto Coal House (the "Scheme"). A detailed description of the Scheme can be foundin Chapter 2 of the Environmental Statement (ES) (Application DocumentReference: TR010031/APP/6.1).
1.1.2 This Plan comprises part of the suite of Application documentation and is includedin the Application in compliance with Regulation 5(2)(j) of the InfrastructurePlanning (Applications: Prescribed Forms and Procedure) Regulations 2009,which requires:
“5(2)(j) a works plan showing, in relation to existing features:-
(i) the proposed location or (for a linear scheme) the proposed route andalignment of the development and works; and
(ii) the limits within which the development and works may be carried outand any limits of deviation provided for in the draft order.”
1.1.3 This Plan is also being submitted under Regulation 5(4) of the 2009 Regulationswhich states:
"Where a plan comprises three or more separate sheets a key plan must beprovided showing the relationship between the different sheets."
1.1.4 As this Plan is part of the Application documentation, it should be read alongsideand is informed by the other Application documents. In particular, the Plan shouldbe read alongside Schedule 1 of the draft DCO (Application DocumentReference: TR010031/APP/3.1).
Planning Inspectorate Scheme Ref: TR010031 Application Document Ref: TR010031/APP/2.3
Page 2
A1 Birtley to Coal House Works Plan
2 SCHEDULE OF PLANS INCLUDED IN THIS APPLICATION DOCUMENT
Document Title Document Number Revision
Works Plan – Regulation 5(2)(j) & 5(4) - Key Plan
TR010031/APP/2.3(A) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 1 of 7
TR010031/APP/2.3(B) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 2 of 7
TR010031/APP/2.3(C) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 3 of 7
TR010031/APP/2.3(D) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 4 of 7
TR010031/APP/2.3(E) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 5 of 7
TR010031/APP/2.3(F) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 6 of 7
TR010031/APP/2.3(G) Rev 0
Works Plan – Regulation 5(2)(j) – Sheet 7 of 7
TR010031/APP/2.3(H) Rev 0
S
H
E
E
T
1
S
H
E
E
T
1
SH
EE
T 3
S
H
E
E
T
4
S
H
E
E
T
5
S
H
E
E
T
6
S
H
E
E
T
7
RETAIL WORLD
TEAM VALLEY
LAMESLEY
BIRTLEY
JUNCTION 65
BIRTLEY
JUNCTION 66
EIGHTON LODGE
JUNCTION 67
COAL HOUSE
A1
A
1
A
1
A
1
A
1
A
1
GATESHEAD
BOROUGH
SUNDERLAND
BOROUGH
JUNCTION 68
LOBLEY HILL
COUNTY DURHAM
UNITARY AUTHORITY
SH
EE
T 2
KEY
ORDER LIMIITS
LOCAL AUTHORITY BOUNDARY
THE SCHEME (SHOWN FOR ILLUSTRATIVE PURPOSES ONLY)
Project Title
Suitability Status
TR010031/APP/2.3(A)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
Con
fidential
HE551462-WSP-LSI-ZZ-DR-ZL-43000
---PGPGMBFirst Revision17/10/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:10000
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43000ZLDRZZ
LSIWSPHE551462
KEY PLAN
REGULATION 5(4)
WORKS PLAN
A1 BIRTLEY TO COAL HOUSE
0m 200m
SCALE 1:10000
1000m100m 500m
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
24
D
W
3
4
P
la
y
in
g
F
ie
ld
B
e
b
e
H
o
u
s
e
4
0
1
2
Dip
lom
at H
ouse
F
a
rn
a
c
re
s
D
W
12
E
l S
u
b
S
ta
2
6
D
W
C
o
tta
g
e
s
2
D
W
S
u
b
w
a
y
M
illg
re
e
n
C
o
tta
g
e
D
W
D
W
C
o
tta
g
e
R
o
s
e
A
llo
tm
e
n
t G
a
rd
e
n
s
E
l
S
ta
S
u
b
251a
353b
257a
250a
252d
355b
250d
257d
252a
E
l S
u
b
S
ta
s
354b
354a
249d
355a
356b
251d
E
l S
u
b
S
ta
E
l S
u
b
S
ta
356c
356a
353a
249a
356d
CU
TLIN
E
C
O
A
C
H
R
O
A
D
A1 N
B
A1 S
B
D
W
D
W
8
1
E
l S
u
b
S
ta
E
l S
u
b
S
ta
E
S
S
's
13
G
a
s
G
o
v
D
W
T
e
a
m
V
a
lle
y
T
ra
d
in
g
E
s
ta
te
S
o
u
th
L
o
d
g
e
E
l S
u
b
S
ta
M
a
s
t (T
e
le
c
o
m
m
u
n
ic
a
tio
n
)
362c
G
a
s
G
o
v
E
l S
u
b
S
ta
362a
C
O
A
C
H
R
O
A
D
C
O
AC
H
R
O
AD
A
1
N
B
A
1
S
B
A1 NB
A1 SB
C
O
N
T
I
N
U
E
S
O
N
S
H
E
E
T
2
CU
TLIN
E
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
uuuuuyuuyuyuyuy
Suitability Status
TR010031/APP/2.3(B)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S1_X-DR-ZL-43001
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43001ZLDRXS1
LSIWSPHE551462
SHEET 1 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
El P
s
El
El P
1
El P
s
L T
wr
6
El P
s
Sub
DW
Shelter
El P
s
L T
wr
8
1
Lady P
ark
El P
s
El P
El P
Car
Park
T
a
n
k
1
7
T
a
n
k
El S
ub S
ta
El P
The B
ungalo
w
El P
s
1
3
Reta
il
L T
wr
1
4
4
2
TC
B
Lady P
ark
El P
s
W
orld
Lady P
ark
Farm
Cottage
W
hite C
ottage
El P
s
Sta
El P
El P
s
2
0
1
El P
L T
wr
El P
El S
ub S
ta
3
8
1
A
3
8
2
A
Supers
tore
FB
3
8
1
E
3
8
2
B
C
U
T
L
IN
E
B
C
O
N
T
IN
U
E
S
O
N
S
H
E
E
T
1
CO
NT
IN
UE
S O
N S
HE
ET
3
A1 NB
A1 SB
K
I
N
G
S
W
A
Y
S
O
U
T
H
R
I
V
E
R
T
E
A
M
C
H
O
W
D
E
N
E
B
A
N
K
L
A
M
E
S
L
E
Y
R
O
A
D
SAINSBURY'S
CO
AC
H R
OA
D
B
A
N
E
S
L
E
Y
L
A
N
E
A1 NB
A1 SB
BA
NE
SLE
Y L
AN
E
RETAIL WORLD
TEAM VALLEY
RETAIL WORLD
TEAM VALLEY
JUNCTION 67 - COAL HOUSE
11
12
13
9
WORK No. 1b
WORK No. 2
WORK No. 3a
WORK No. 3c
WORK No. 3d
WORK No. 3b
LIMITS OF DEVIATION FOR
WORK No.1a & 3a
WORK No. 1a
LIMITS OF DEVIATION FOR
WORK No.1b & 3d
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(C)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S2_X-DR-ZL-43002
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43002ZLDRXS2
LSIWSPHE551462
SHEET 2 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1
1
3
9
1
1
7
1
T
h
e
C
o
u
r
t
y
a
r
d
5
9
6
8
6
1
1
1
5
2
S
a
lc
o
m
b
e
G
a
r
d
e
n
s
2
0
3
5
4
6
2
0
1
3
Supers
tore
5
8
7
9
1
0
1
1
5
2
0
5
1
1
4
1
9
3
Gain
ford
4
2
9
7
5
8
6
3
1
0
2
6
9
7
1
El S
ub S
ta
Shelter
6
8
3
9
1
6
2
3
7
0
1
1
2
4
4
Gas
3
1
2
9
9
5
103
Kin
gsw
ay Inte
rchange
9
1
6
1
2
4
5
9
4
1
2
1
5
9
8
2
5
3
El S
ub S
ta
7
4
3
2
El S
ub S
ta
6
0
7
6
2
8
1
8
7
1
Gard
ens
9
7
Salc
om
be
7
7
5
8
2
2
90
ALLE
RD
EN
E
6
7
4
8
7
1
7
3
SL
6
6
9
6
8
4
9
0
8
1
5
3
6
3
1
0
9
1
0
5
7
1
0
3
Shelter
4
8
4
4
1
0
1
8
2
3
9
9
9
1
0
6
9
6
7
5
3
3
9
9
8
0
1
5
6
4
6
9
Pum
pin
g S
tation
2
5
Farm
Filling
Tank
5
6
7
0
7
2
1
0
0
4
6
1
2
2
6
4
7
7
0
Nort
h
7
3
6
4
4
7
7
8
3
7
6
1
1
1
8
5
2
8
3
0
8
3
1
7
5
2
1
0
3
5
0
1
0
7
1
1
1
Sta
tion
5
5
1
0
5
1
1
7
1
87
5
4
3
1
1
1
8
5
8
9
9
3
8
3
6
7
CO
NT
IN
UE
S O
N S
HE
ET
2
C
O
N
T
IN
U
E
S
O
N
S
H
E
E
T
4
8
6
GANTRY - TYPE 1
GANTRY - TYPE 1
GANTRY - TYPE 1
GANTRY - TYPE 2
WORK No. 13
WORK No. 20
WORK No. 6a
LIMITS OF DEVIATION FOR
WORKS No. 9, 13, 14, 15 and 16
WORK No. 4a
WORK No. 5a
WORK No. 3b
WORK No. 1a
WORK No.21
WORK No. 17
WORK No. 14
WORK No. 16
LIMITS OF DEVIATION
FOR WORK No.22
LIMITS OF DEVIATION
FOR WORK No.23
WORK No. 23
WORK No. 10
WORK No.12
LIMITS OF DEVIATION
FOR WORK No.12
WORK No. 11
WORK No. 15
WORK No. 9
LIMITS OF DEVIATION
FOR WORK No.10
AREA EXCLUDED FROM
DCO BOUNDARY
LIMITS OF DEVIATION
FOR WORK No.11
WORK No. 1b
WORK No. 4b
WORK No. 6b
WORK No.22
WORK No. 3c
LIMITS OF DEVIATION FOR
WORK No.1b, 3c, 4b, 5a & 20
LIMITS OF DEVIATION FOR
WORK No.1a, 3b, 4a, 5b & 20
WORK No. 5b
A
1
N
B
A
1
S
B
C
H
O
W
D
E
N
E
B
A
N
K
S
M
IT
H
Y
L
A
N
E
SAINSBURY'S
E
A
S
T
C
O
A
S
T
M
A
I
N
L
I
N
E
A
1
N
B
A
1
S
B
S
M
I
T
H
Y
L
A
N
E
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(D)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S2_X-DR-ZL-43003
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43003ZLDRXS2
LSIWSPHE551462
SHEET 3 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
uuuuuyuuyuyuyuy
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
3
8
A
s
h
f
o
r
d
3
2
7
7
8
0
7
9
7
2
7
8
L
o
n
g
a
c
r
e
W
o
o
d
L
T
w
r
C
o
m
m
u
n
i
t
y
C
e
n
t
r
e
9
8
1
3
2
6
2
3
2
0
A
l
l
e
r
d
e
n
e
1
9
1
2
7
5
22
3
0
1
7
T
C
B
7
3
6
1
6
6
5
E
l
S
u
b
S
t
a
s
L
o
n
g
a
c
r
e
W
o
o
d
F
B
B
o
w
l
i
n
g
G
r
e
e
n
2
P
l
a
y
i
n
g
F
i
e
l
d
s
C
a
r
P
a
r
k
1
S
h
e
l
t
e
r
7
7A
GANTRY - TYPE 1
GANTRY - TYPE 1
GANTRY - TYPE 2
WORK No. 6a
WORK No. 7a
WORK No. 7d
WORK No. 22
LIMITS OF DEVIATION
FOR WORK No. 22
AREA EXCLUDED FROM
DCO BOUNDARY
WORK No. 6b
LIMITS OF DEVIATION
FOR WORK No. 6a & 7a
A
1 N
B
A
1 S
B
S
M
IT
H
Y
L
A
N
E
ANGEL OF THE NORTH
A1 NB
A1 SB
A
1
C
O
N
T
IN
U
E
S
O
N
S
H
E
E
T
3
CO
NT
IN
UE
S O
N S
HE
ET
5
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(E)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S3_X-DR-ZL-43004
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43004ZLDRXS3
LSIWSPHE551462
SHEET 4 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
W
e
s
t
V
i
e
w
E
i
g
h
t
o
n
F
a
r
m
C
o
t
t
a
g
e
E
l
S
u
b
S
t
a
s
I
n
n
D
e
n
e
H
o
u
s
e
39
7
O
u
t
f
a
l
l
1
5
1
0
S
h
e
l
t
e
r
1
2
T
h
e
A
n
g
e
l
V
i
e
w
5
7
33
52
3
5
C
o
t
t
a
g
e
4
3
1
2
9
L
o
n
g
a
c
r
e
C
o
t
t
a
g
e
C
o
t
t
a
g
e
E
d
r
o
s
e
2
5
(
P
H
)
8
4
7
L
o
n
g
B
a
n
k
V
i
e
w
E
i
g
h
t
o
n
L
o
d
g
e
6
3
L
o
w
E
i
g
h
t
o
n
2
0
2
5
111
4
4
1
3
1
3
9
105
3
2
1
8
5
GANTRY - TYPE 2
GANTRY - TYPE 2
WORK No. 6b
WORK No. 7b
WORK No. 7c
WORK No. 7d
WORK No. 19
WORK No. 19
AREA EXCLUDED FROM
DCO BOUNDARY
WORK No. 6a
GANTRY - TYPE 2
LIMITS OF DEVIATION FOR
WORK No. 6a& 7b
LIMITS OF DEVIATION FOR
WORK No. 6a, 7b & 19
A
1
N
B
A
1
S
BA
167 D
U
R
H
A
M
R
O
A
D
B
1
2
9
6
L
O
N
G
B
A
N
K
A
1
6
7
N
E
W
C
A
S
T
L
E
B
A
N
K
L
O
N
G
B
A
N
K
JUNCTION 66 - EIGHTON LODGE
CO
NT
IN
UE
S O
N S
HE
ET
4
CO
NT
IN
UE
S O
N S
HE
ET
6
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(F)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S3_X-DR-ZL-43005
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43005ZLDRXS3
LSIWSPHE551462
SHEET 5 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
0m
SCALE 1:1250
100m 150m25m 50m
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
1
9
B
o
w
e
s
M
a
n
o
r
2
5
69
2
2
50
83
E
q
u
e
s
t
r
i
a
n
C
e
n
t
r
e
33
2
4
5
1
0
(
P
H
)
1
1
1
62
70
3
5
13
4
4
1
3
8
45
37
2
9
60
3
5
2
74
21
3
6
D
u
n
k
i
r
k
F
a
r
m
C
o
t
t
a
g
e
B
e
r
g
50
1
4
4
9
2
1
a
F
a
r
m
K
i
r
s
c
h
85
16
31
1
64
B
a
s
s
e
t
t
s
1
1
3
15
94
103
6
7
2
7
93
3
2
3
0
Cra
thie
93
39
C
rathie
2
6
1
7
2
5
1
3
9
27
E
l
1
3
B
o
w
e
s
I
n
c
l
i
n
e
H
i
g
h
f
i
e
l
d
N
o
r
t
h
s
i
d
e
105
2
2
13
S
u
b
S
t
a
51
1
2
8
1
9
3
2
2
2
92
106
1
8
20
42
1
5
82
24
23
1
6
1
0
4
5
44
8
4
2
3
3
a
1
6
1
1
2
6
P
r
i
m
a
r
y
S
c
h
o
o
l
4
4
1
9
B
o
w
e
s
V
i
e
w
4
7
1
6
1
1
9
1
4
3
3
4
0
C
rathie
1
3
E
l
S
u
b
S
t
a
8
8
9
17
1
56
2
5
2
8
2
3
4
2
2
7
a
H
i
g
h
f
e
l
l
1
6
1
8
11
4
9
1
1
T
C
B
1
1
1
0
1
1
45
25
3
1
1
5
2
9
3
1
7
9
2
0
6
H
o
u
s
e
2
7
H
i
g
h
f
i
e
l
d
2
9
a
3
5
a
8
1
2
1
4
B
i
r
t
l
e
y
E
a
s
t
3
7
4
0
1
9
6a
2
3
7
8
5a
2
6
6
1
2
28
1
5
3
1
a
1
P
i
p
e
l
i
n
e
2
0
B
o
w
e
s
V
i
e
w
5
2
1
2
1
0
5
8
C
o
m
m
u
n
i
t
y
7
4
4
4
3
6
1
1
4
1
1
7
1
5
11
3
7
5
3
1
2
6
3
2
7
1
1
1
4
1
4
15
35
1
1
2
1
1
3
3
3
1
3
5
2
8
1
7
1
8
3
26
6
1
5
5
9
1
1
3
3
1
6
2
5
P
o
s
t
s
1
5
3
0
1
1
1
7
3
3
7
CO
NT
IN
UE
S O
N S
HE
ET
7
CO
NT
IN
UE
S O
N S
HE
ET
5
2
4
GANTRY - TYPE 1
GANTRY - TYPE 1
GANTRY - TYPE 2
GANTRY - TYPE 2
WORK No. 6b
WORK No. 18
WORK No. 19
WORK No. 6a
WORK No. 8a
LIMITS OF DEVIATION
FOR WORK No. 6b
LIMITS OF DEVIATION
FOR WORK No. 6b
LIMITS OF DEVIATION FOR
WORK No. 6a
LIMITS OF DEVIATION FOR
WORK No. 6a, 7b & 19
NO
RT
H D
EN
E
L
O
N
G
B
A
N
K
CR
AT
HIE
A1 N
B
A1 S
B
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(G)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S3_X-DR-ZL-43006
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43006ZLDRXS3
LSIWSPHE551462
SHEET 6 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUEAW IA
0
Application Issue
A.Wallace
IANGR
B
a
s
s
e
t
t
s
2
1
7
8
T
a
r
a
v
a
l
e
W
illo
w
C
ro
ft
7
b
8
5
4
3
3
2
4
3
5
3
1
1
2
9
5
8
2
1
2
1
a
8
4
4
7
2
3
0
3
7
2
4
1
1
2
4
4
4
2
2
2
1
7
a
1
2
25
2
6
1
P
l
a
y
g
r
o
u
n
d
5
1
9
1
5
4
6
9
2
7
1
2
2
3
3
7
2
7
1
8
8
1
1
R
o
s
e
d
a
l
e
5
1
5
E
l
S
u
b
S
t
a
2
1
7
1
7
5
3
3
6
1
2
1
5
2
E
l
S
u
b
S
t
a
1
0
2
2
a
2
3
2
0
1
3
1
2
1
6
1
T
e
n
n
i
s
C
o
u
r
t
7
3
9
5
2
E
l
1
8
2
8
4
5
0
2
6
1
6
G
a
s
2
1
3
2
40
Tank
S
u
b
S
t
a
1
6
3
2
2
1
1
2
a
T
a
n
k
s
2
7
3
4
2
5
1
El S
ub S
ta
1
5
E
l
S
u
b
S
t
a
Filt
er
9
W
h
i
n
f
i
e
l
d
H
o
u
s
e
2
6
4
2
3
G
o
v
41
2
4
1
5
3
1
1
4
C
h
i
m
n
e
y
2
1
1
7
E
l
S
u
b
S
t
a
1
2
7
3
9
1
1
1
GANTRY - TYPE 2
WORK No. 6a
WORK No. 8a
WORK No. 8b
WORK No. 6b
LIMITS OF DEVIATION
FOR WORK No. 8a & 6a
LIMITS OF DEVIATION
FOR WORK No. 6a
LIMITS OF DEVIATION
FOR WORK No. 6b & 8b
CO
NT
IN
UE
S O
N S
HE
ET
6
A
1
9
4
(
M
)
N
B
A
1
2
3
1
N
B
A
1
2
3
1
S
B
A
1
2
3
1
A
1
(
M
)
N
B
A
1
(
M
)
S
B
A
1
2
3
1
A
1
2
3
1
JUNCTION 65 - BIRTLEY
A1 N
B
A1 (
M)
SB
A1
GATESHEAD BOROUGH SUNDERLAND BOROUGH
NOTES
1. ALL DIMENSIONS ARE IN METRES UNLESS STATED OTHERWISE.
2. WORKS ARE DESCRIBED IN SCHEDULE 1 (AUTHORISED DEVELOPMENT) OF
THE A1 (BIRTLEY TO COAL HOUSE) DEVELOPMENT CONSENT ORDER
(DOCUMENT REFERENCE TR010031/APP/3.1).
KEY
ORDER LIMITS
LOCAL AUTHORITY BOUNDARY
WORK CENTRELINE (APPROX)
HIGHWAY WORK LIMIT OF DEVIATION
CONSTRUCTION COMPOUND
NON LINEAR WORKS
UTILITY DIVERSION CENTRELINE (APPROX)
NON HIGHWAY WORKS LIMIT OF DEVIATION (APPROX)
DIFFERENT COLOURS ARE PROVIDED ONLY TO
DIFFERENTIATE BETWEEN OVERLAPPING LIMITS
COMMENCEMENT OF WORK (APPROX)
TERMINATION OF WORK (APPROX)
TRANSITION BETWEEN WORK (APPROX)
PROPOSED NEW GANTRY AREA
CANTILEVER GANTRY
SUPER-SPAN GANTRY
PROPOSED DISCHARGE POINT
EXISTING DISCHARGE POINT
GANTRY - TYPE 1
GANTRY - TYPE 2
Suitability Status
TR010031/APP/2.3(H)
Client
WSP Project Number:
PINS Reference Number
Rev. DateDescription By
Eng'
Ch'k
App'd
Disc'
Ch'k
Date
DrawnScale
Drawing Title
Project Title
Date Date Date
Eng. Check Approved Authorised
Original Size
Drawing Number Revision
HE PIN Originator Volume
Section Type Role NumberType ID Direction
PW Stage Code
A3Published - Preliminary Design
70041947
In
te
rna
l
HE551462-WSP-LSI-S4_X-DR-ZL-43007
---PGPGMBFirst Revision13/07/18P01
---PGPGAW
Following legal workshop comments
18/01/19P02
---PGPGAW
Following legal workshop comments
25/01/19P03
NRIAIAAW
Design Update
22/07/19C01
3
A1
1:1250
22/07/19
n.rawcliffe
22/07/19
i.akram
22/07/19
i.akram
22/07/19
A.Wallace
C01
43007ZLDRXS4
LSIWSPHE551462
SHEET 7 OF 7
REGULATION 5(2)(j)
WORKS PLANS
A1 BIRTLEY TO COAL HOUSE
© Crown Copyright and Database Rights 2019 Ordnance Survey 100030649
0m
SCALE 1:1250
100m 150m25m 50m
0 22/07/19 APPLICATION ISSUE IA IA
0
Application Issue
AWNGR