WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio...

6
WP5 WP5 Pilot implementations targeting clean vehicle Pilot implementations targeting clean vehicle usage usage Martino Soragni – Province of Reggio Martino Soragni – Province of Reggio Emilia Emilia

Transcript of WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio...

Page 1: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

WP5WP5Pilot implementations targeting clean vehicle usagePilot implementations targeting clean vehicle usage

Martino Soragni – Province of Reggio EmiliaMartino Soragni – Province of Reggio Emilia

Page 2: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots

• 5.1.1 Local implementation / operating models (March 2011) – Preparation of a template for distribution to partners that will

develop local pilots for the collection of data and information in order to define their operating model (25p each)

Contents:• Detailed description of the demonstration site (technical

specifications)

• Implementation timeline (status quo and next operative steps)

• Decisional procedure (legal aspects, security provisions)

• Encountered obstacles and problems

• Expected results in terms of environmental, economic and social benefits

Page 3: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots

• 5.1.2 Prepare Procurement / Leasing document (April 2011)

– Definition of the EV type (in terms of performance, battery, safety, comfort…)

– Definition of the formula for the acquisition of the ZEVs: leasing contract or procurement

– Definition of contractual provisions that guarantee the full functionality and usage of the vehicle for the duration of the project: support and maintenance, courtesy vehicle, option to buy the leased vehicle at the end of the contract

Page 4: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

5.2 - Preparing the roll out –User/Staff Training5.2 - Preparing the roll out –User/Staff Training

• 5.2.1 Training Materials (June 2011)

– Training materials for users: handbook for the correct use of the EV (warnings, how to behave in case of failure, recharging methods, streets and traffic rules)

– Training materials for fleet/depot managers: organization of the fleet (active and reserve vehicles), vehicle maintenance and efficiency (periodic testing of electrical and mechanical components)

Page 5: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

5.2 - Preparing the roll out – User/Staff Training5.2 - Preparing the roll out – User/Staff Training

• 5.2.2/.3/.4 Test vehicles (May 2011)Status quo:– Reggio Emilia: leasing of 5 EVs necessary to run the pilots (ecorenting

model); public tender to select the service provider that will also be responsible for the local investment implementation (PV charging station)

– Klagenfurt– Bolzano

• 5.2.6/.7 Demonstration (May 2011)Status quo:– Ljubljana– Györ

• 5.2.5/.8/.9 Solar Rally Upper Austria (November 2010, 2011, 2012)Status quo

Page 6: WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio Emilia.

5.3 Demonstration phase5.3 Demonstration phase

• 5.3.1 Demonstration log (March 2013)

• 5.3.2 Producer briefing cars&heavy vehicles (October 2011)

• 5.3.3 Producer briefing ultralight vehicle (December 2011)