WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio...
-
Upload
jerome-hopkins -
Category
Documents
-
view
213 -
download
0
Transcript of WP5 Pilot implementations targeting clean vehicle usage Martino Soragni – Province of Reggio...
WP5WP5Pilot implementations targeting clean vehicle usagePilot implementations targeting clean vehicle usage
Martino Soragni – Province of Reggio EmiliaMartino Soragni – Province of Reggio Emilia
5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots
• 5.1.1 Local implementation / operating models (March 2011) – Preparation of a template for distribution to partners that will
develop local pilots for the collection of data and information in order to define their operating model (25p each)
Contents:• Detailed description of the demonstration site (technical
specifications)
• Implementation timeline (status quo and next operative steps)
• Decisional procedure (legal aspects, security provisions)
• Encountered obstacles and problems
• Expected results in terms of environmental, economic and social benefits
5.1 - Detailed Specification of the local Pilots5.1 - Detailed Specification of the local Pilots
• 5.1.2 Prepare Procurement / Leasing document (April 2011)
– Definition of the EV type (in terms of performance, battery, safety, comfort…)
– Definition of the formula for the acquisition of the ZEVs: leasing contract or procurement
– Definition of contractual provisions that guarantee the full functionality and usage of the vehicle for the duration of the project: support and maintenance, courtesy vehicle, option to buy the leased vehicle at the end of the contract
5.2 - Preparing the roll out –User/Staff Training5.2 - Preparing the roll out –User/Staff Training
• 5.2.1 Training Materials (June 2011)
– Training materials for users: handbook for the correct use of the EV (warnings, how to behave in case of failure, recharging methods, streets and traffic rules)
– Training materials for fleet/depot managers: organization of the fleet (active and reserve vehicles), vehicle maintenance and efficiency (periodic testing of electrical and mechanical components)
5.2 - Preparing the roll out – User/Staff Training5.2 - Preparing the roll out – User/Staff Training
• 5.2.2/.3/.4 Test vehicles (May 2011)Status quo:– Reggio Emilia: leasing of 5 EVs necessary to run the pilots (ecorenting
model); public tender to select the service provider that will also be responsible for the local investment implementation (PV charging station)
– Klagenfurt– Bolzano
• 5.2.6/.7 Demonstration (May 2011)Status quo:– Ljubljana– Györ
• 5.2.5/.8/.9 Solar Rally Upper Austria (November 2010, 2011, 2012)Status quo
5.3 Demonstration phase5.3 Demonstration phase
• 5.3.1 Demonstration log (March 2013)
• 5.3.2 Producer briefing cars&heavy vehicles (October 2011)
• 5.3.3 Producer briefing ultralight vehicle (December 2011)