Prepared and Presented by: Husain Baqer
Tahleeq: Graduate Training Program
3RD WORK PLACEMENT PRESENTATIONMay 2015
1
Work Placement Duration
BAC FM
15th Mar 2015
23rd Apr 2015
Week 4
ADPi Design – D&T
6 weeks
2
3
Outline
ADPI-DSC
Reviewing the design drawings and tender documents
Attending the progress meetings
Monitoring the condition on site (Package 1A )
Preparation of cooling system presentation
BAC FM
Monitoring the progress of AC installation project at level 2.8 arrivals
Performing Planned Preventive Maintenance (PPM) and corrective maintenance
Research
ADPI - DSC
4
Drawings Meetings Site Presentation
BAC FM
2.8 level Arrivals Project
PPMCM
Research
5
Types of Compressors
Start & Run Capacitor
Pumping Stations
Cooling Load
Escalators
Runway Shot Down
6
Learning Outcomes
Gaining on-hand experience
Enhancing technical knowledge
Extending professional network
Interacting with colleague from different backgrounds
7
8
Questions and Answers
?