MOVING BAHRAIN FORWARD
Tahleeq: Graduate Training ProgramPresented by: Husain Baqer
Placement Department (Or Contractor): Hill Int. , DG Jones, and ADPi
Bahrain22nd Feb 2015
“Tell me and I forget. Teach me and I remember. Involve me and I learn”
-Benjamine Frankline
Presentation Layout
1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop
2) DG Jones (2 weeks)BOQContracts
3) ADPi (2 weeks)Master PlanningEnabling Works Package 1-A
100% DD Submission
• Reviewing of the Detailed Design reports and drawings (100% submission).
• Identifying some of the missing details in the drawings.• Reviewing the comments on the 50% submission• Questions and answers regarding some of the HVAC
systems.• Working on the 100% DD submission comments.
HVAC Drawing
Example from 50% Submission Comments
Item No.
Title / Reference No. of Document Reviewed
Hill Design Review Team Comments
Review Status
Designer’s Response
85
PD-D3000-M-RPT-001-0Clause-6 (Maintenance considerations)
AHU plant rooms to be provided with treated water facility/drain facility and filter drying facility to carry out periodic maintenance.
B
To be implemented in 100% submission
Value Engineering Workshop
• Why is it important?Reducing the capital cost while improving quality.Team building as every participant has to work in a team-
oriented environment. Improved qualities and values. Problem solving and more effective use of resources.
Pre-Design Workshop Session
Presentation Layout
1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop
2) DG Jones (2 weeks)BOQContracts
3) ADPi (2 weeks)Master PlanningEnabling Works Package 1-A
Bill of Quantity (BOQ)
• What is BOQ? Is a document used in tendering. Materials, parts, and labor (and their costs) are
itemized.Shows the terms and conditions of the construction
contracts.• Why is it important?Without BOQ the client will not be able to estimate the
cost of the construction.To finish the project on time and within budget.
Presentation Layout
1) Hill Int. (4 weeks)100% DD SubmissionValue Engineering Workshop
2) DG Jones (2 weeks)BOQContracts
3) ADPi (2 weeks)Master PlanningDesign (Enabling Works Package 1-A)
ADPi (Design)
• Reviewing the scope of Mechanical Enabling Works at phase 1-A.
• Reviewing of the contractor’s queries.• Attending the Site Kick-off Meeting.
Contractor’s Query Example
Query No.
Queries Response
1
Vol. 2 Bill of Quantities- in the page Bill 4/1 under the provision Sums, the amounts have not been given. Please clarify.
Please include BD 10,000 for each of the 2 provisional sums.
Site Visit with Contractor
Learning Outcomes
• Developing a good understanding of the role and function of PMC.
• Building a professional network.• Identifying the purpose of BOQ.• Witnessing the importance of Value Engineering
Workshop.• Team working and coordination are keys for success.• Get exposed to the other disciplinary design aspects.
Inspiring Activities
• Starting the Enabling Works Package 1-A.• Attending the Value Engineering Workshop.• Attending the meeting for BHS and PLB.• Commenting on the 100% DD submission.• Sitting with the Lead Mechanical Engineer at the VE
Workshop.
Questions and Answers
?