WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS: Lqars Cemagref Tratolixo PERIOD: 1 – 24...

43
WORK PACKAGE 5 WORK PACKAGE 5 BIOLOGICAL TREATMENT BIOLOGICAL TREATMENT

Transcript of WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS: Lqars Cemagref Tratolixo PERIOD: 1 – 24...

Page 1: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

WORK PACKAGE 5WORK PACKAGE 5

BIOLOGICAL TREATMENTBIOLOGICAL TREATMENT

Page 2: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

PARTICIPANTS: PARTICIPANTS: Lqars Lqars Cemagref Cemagref Tratolixo Tratolixo

PERIOD:PERIOD: 1 – 24 (Months) 1 – 24 (Months)

Page 3: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

OBJECTIVES (1/4):OBJECTIVES (1/4):

Development of a general procedure Development of a general procedure of data collection for evaluating the of data collection for evaluating the efficiency of biological treatment efficiency of biological treatment plants – BTP – (composting, anaerobic plants – BTP – (composting, anaerobic digestion - AD)digestion - AD)

Page 4: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

OBJECTIVES (2/4):OBJECTIVES (2/4):

Data collection for several BTPs, Data collection for several BTPs, following the developed procedure following the developed procedure

Page 5: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

OBJECTIVES (3/4):OBJECTIVES (3/4):

Modelling and simulation analyses Modelling and simulation analyses with the aim of improving the with the aim of improving the efficiency of the BTPs under studyefficiency of the BTPs under study

Page 6: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

OBJECTIVES (4/4):OBJECTIVES (4/4):

If feasible, implementation and If feasible, implementation and assessment of some of the assessment of some of the improvement measures proposedimprovement measures proposed

Page 7: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

METHODOLOGY /METHODOLOGY /

WORK DESCRIPTIONWORK DESCRIPTION

7 TASKS7 TASKS

Page 8: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 1 (month 1 – 24)Task 1 (month 1 – 24)

Inventory of legislation on Inventory of legislation on biological treatment operations biological treatment operations and compost and digestate use and compost and digestate use in each participating countryin each participating country

Page 9: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 1 (1/3)TASK 1 (1/3)

1. Standards on compost and digestate use on 1. Standards on compost and digestate use on agriculture and other activitiesagriculture and other activities

  IMPOSITION OF CONSTRAINTS ON:IMPOSITION OF CONSTRAINTS ON:Inorganic and organic contaminantsInorganic and organic contaminants: heavy metals, PCBs, PAHs, : heavy metals, PCBs, PAHs,

dioxins, man made inert materialsdioxins, man made inert materialsSanitizationSanitization: pathogenic microorganisms, germinating weed seeds, : pathogenic microorganisms, germinating weed seeds,

process controlprocess controlMaturation degreeMaturation degree (degree of Rotting) (degree of Rotting)Application ratesApplication rates: amounts, periodicity, restrictions for application: amounts, periodicity, restrictions for applicationOthersOthers: minimum organic matter content, maximum water content, etc: minimum organic matter content, maximum water content, etc

Page 10: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 1 (2/3)TASK 1 (2/3)

2. Standards on biological treatment 2. Standards on biological treatment operationsoperations

  

Concrete restrictions, e.g.:Concrete restrictions, e.g.:

Reduction in odour of exhaust air to less Reduction in odour of exhaust air to less

than 300 OU/mthan 300 OU/m33

Page 11: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 1 (3/3)TASK 1 (3/3)

Compost Directive ProposalCompost Directive Proposal

Page 12: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 2 (month 1 – 24)Task 2 (month 1 – 24)

Inventory on existing methods Inventory on existing methods of characterisation for of characterisation for

evaluating process efficiency evaluating process efficiency and compost quality in each and compost quality in each

participating country participating country

Page 13: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 2 (1/3)TASK 2 (1/3)

1. Methodology for evaluating 1. Methodology for evaluating process efficiency process efficiency

  

Page 14: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 2 (2/3)TASK 2 (2/3)

2. Methods of characterisation for 2. Methods of characterisation for evaluating compost qualityevaluating compost quality

Standards with the imposition of constraints on compost Standards with the imposition of constraints on compost quality normally refer to standard methods of analysis for quality normally refer to standard methods of analysis for evaluating that quality, e.g.: evaluating that quality, e.g.:

- sampling- sampling- heavy metals- heavy metals- pathogenic microorganisms- pathogenic microorganisms- maturation degree- maturation degree

etc. etc. 

Page 15: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 2 (3/3)TASK 2 (3/3)

Compost Directive ProposalCompost Directive Proposal

Page 16: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASKS 1 AND 2TASKS 1 AND 2

Participation of other partnersParticipation of other partners

Page 17: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 3 (month Task 3 (month 22 – – 99))

Development of a Development of a characterisation and modelling characterisation and modelling

procedure for efficiency procedure for efficiency evaluation in the BTPsevaluation in the BTPs

Page 18: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (1/13)TASK 3 (1/13)

1.1. Technical description Technical description

2.2. Pre-BT efficiency evaluation Pre-BT efficiency evaluation

3.3. BT efficiency evaluationBT efficiency evaluation

4.4. Post-BT efficiency evaluationPost-BT efficiency evaluation

5.5. Quantification of energy spent in process Quantification of energy spent in process (WP2)(WP2)

6.6. Economic aspects (WP3)Economic aspects (WP3)

Page 19: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (2/13)TASK 3 (2/13)

1. Technical description 1. Technical description   

System typeSystem type Operating conditionsOperating conditions

Page 20: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (3/13)TASK 3 (3/13)

1.1. Technical description Technical description

2.2. Pre-BT efficiency evaluation Pre-BT efficiency evaluation

3.3. BT efficiency evaluationBT efficiency evaluation

4.4. Post-BT efficiency evaluationPost-BT efficiency evaluation

5.5. Quantification of energy spent in process Quantification of energy spent in process (WP2)(WP2)

6.6. Economic aspects (WP3)Economic aspects (WP3)

Page 21: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (4/13)TASK 3 (4/13)Definition ofDefinition of::

ii) parameters to be assessed in:) parameters to be assessed in:

starting material starting material material undergoing the process (BT)material undergoing the process (BT) final materialsfinal materials

ii) analytical methodsii) analytical methods (CEN methods)(CEN methods)

iii) sampling procedureiii) sampling procedure

Page 22: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (5/13)TASK 3 (5/13)

2. Pre-BT efficiency evaluation2. Pre-BT efficiency evaluation

Mechanical and / or manual separation systemsMechanical and / or manual separation systems

Starting material:Starting material: - MSW - MSW

- selective - selective collection collection MSWMSW

Final Materials: Final Materials: - biodegradable fraction- biodegradable fraction

- inerts fraction- inerts fraction

Page 23: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (6/13)TASK 3 (6/13)

2. Pre-BT efficiency evaluation (cont)2. Pre-BT efficiency evaluation (cont)

a)a) o.m. recovery efficiency o.m. recovery efficiency- biodegradable materials- biodegradable materials

b) inert materials extraction efficiencyb) inert materials extraction efficiency- man made inert materials- man made inert materials

Page 24: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (7/13)TASK 3 (7/13)

3. BT efficiency evaluation3. BT efficiency evaluation

Composting, AD systemsComposting, AD systems

Starting material:Starting material: - SSOW- SSOW

- selective collection MSW- selective collection MSW- biodegradable fraction MSW- biodegradable fraction MSW

Material undergoing the processMaterial undergoing the process

Final Material:Final Material: - compost- compost

- digestate- digestate

Page 25: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (8/13)TASK 3 (8/13)

3. BT efficiency evaluation (cont)3. BT efficiency evaluation (cont)

a) Biological stabilisationa) Biological stabilisation- volatile solids- volatile solids- synthetic and non-synthetic o.m.- synthetic and non-synthetic o.m.- Sour test- Sour test- self-heating test- self-heating test- water content- water content- pH- pH- C/N- C/N- air capacity (porosity) ??- air capacity (porosity) ??- oxygen and carbon dioxide ??- oxygen and carbon dioxide ??

Page 26: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (9/13)TASK 3 (9/13)

3. BT efficiency evaluation (cont)3. BT efficiency evaluation (cont)

bb) Contamination) Contamination- heavy metals- heavy metals- man made inert materials- man made inert materials- organic micropollutants will not be - organic micropollutants will not be

determineddetermined

Page 27: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (10/13)TASK 3 (10/13)

3. BT efficiency evaluation (cont)3. BT efficiency evaluation (cont)

c) Compost characterisationc) Compost characterisation

- previous parameters- previous parameters

- phytotocixity (germination test)- phytotocixity (germination test)

- pathogenic microorganisms (Salmonella, - pathogenic microorganisms (Salmonella, E. E. colicoli))

- N, P, K, Ca, Mg, Na, Cl, humic compounds, - N, P, K, Ca, Mg, Na, Cl, humic compounds, electric electric conductivityconductivity

Page 28: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (11/13)TASK 3 (11/13)

4. Post-BT efficiency evaluation4. Post-BT efficiency evaluation

Mechanical separation systemsMechanical separation systems

Starting material:Starting material: - - compostcompost

- digestate- digestate

Final Final mmaterials: aterials: - - “clean” compost“clean” compost

- inerts fraction- inerts fraction

Page 29: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (12/13)TASK 3 (12/13)

4. Post-BT efficiency evaluation4. Post-BT efficiency evaluation (cont) (cont)

a) o.m. recovery efficiencya) o.m. recovery efficiency- - volatile solidsvolatile solids

- - synthetic and non-synthetic o.m.synthetic and non-synthetic o.m.

b) inert materials extraction efficiencyb) inert materials extraction efficiency- man made inert materials- man made inert materials

Page 30: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 3 (13/13)TASK 3 (13/13)

1.1. Technical description Technical description

2.2. Pre-BT efficiency evaluation Pre-BT efficiency evaluation

3.3. BT efficiency evaluationBT efficiency evaluation

4.4. Post-BT efficiency evaluationPost-BT efficiency evaluation

5.5. Quantification of energy spent in process Quantification of energy spent in process (WP2)(WP2)

6.6. Economic aspects (WP3)Economic aspects (WP3)

Page 31: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 4 (month 7– 16)Task 4 (month 7– 16)

Data collection Data collection

Page 32: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 4 (1/2)TASK 4 (1/2)

Cover a wide range of BTPs, namely:Cover a wide range of BTPs, namely:

BTBT: composting, AD and mixed plants: composting, AD and mixed plants

Different systems for:Different systems for: - composting- composting

- AD- AD

Input materials:Input materials: - MSW- MSW

- SSOW- SSOW- selective collection MSW- selective collection MSW

Page 33: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

TASK 4 (2/2)TASK 4 (2/2)

Separation systems for the biodegradable Separation systems for the biodegradable fraction of MSWfraction of MSW

Separation Separation systems systems fforor man made inert man made inert materialsmaterials

PORTUGAL, FRANCE, GERMANYPORTUGAL, FRANCE, GERMANY

Page 34: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 5 (month 10 – 18)Task 5 (month 10 – 18)

Data treatment and models Data treatment and models definition definition

Page 35: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 6 (month 14 – 23)Task 6 (month 14 – 23)

Calibration of the models with Calibration of the models with the treated data (task 5) and the treated data (task 5) and

simulation of several scenarios simulation of several scenarios in relation with WP7 in relation with WP7

Page 36: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

Task 7 (month 23 – 24)Task 7 (month 23 – 24)

Proposals for improving the Proposals for improving the overall efficiency of the BTPs overall efficiency of the BTPs

studied, and possible studied, and possible implementation of some of the implementation of some of the measures proposed followed measures proposed followed

by process efficiency by process efficiency assessmentsassessments

Page 37: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (1/6):DELIVERABLES (1/6):

Legislation survey on biological Legislation survey on biological treatment operations, compost use and treatment operations, compost use and methods for evaluation of process methods for evaluation of process efficiency and compost quality in the efficiency and compost quality in the participating countriesparticipating countries

Page 38: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (2/6):DELIVERABLES (2/6):

New sets of biological treatment data New sets of biological treatment data

Page 39: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (3/6):DELIVERABLES (3/6):

Methodology for evaluating the overall Methodology for evaluating the overall efficiency of BTP efficiency of BTP

Page 40: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (4/6):DELIVERABLES (4/6):

Unit operation model for the biological Unit operation model for the biological treatment channel treatment channel

Page 41: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (5/6):DELIVERABLES (5/6):

Suggestions for improving process Suggestions for improving process efficiency in the BTPs under study efficiency in the BTPs under study

Page 42: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)

DELIVERABLES (6/6):DELIVERABLES (6/6):

Implementation and assessment of Implementation and assessment of improvement measures of the previous improvement measures of the previous point point

Page 43: WORK PACKAGE 5 BIOLOGICAL TREATMENT. PARTICIPANTS:  Lqars  Cemagref  Tratolixo PERIOD: 1 – 24 (Months)