Page | 1 With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction Practices & Technical Data for Distribution Works 12 th October 2012 Rev. 0

Transcript of With Standard Construction Practices & Technical Data for ... · With Standard Construction...

Page 1: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 1

With Standard Construction Practices & TechnicalData for Distribution Works

With Standard ConstructionPractices & Technical Datafor Distribution Works

12th October 2012Rev. 0

Page 2: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 2

ContentsCHAPTER-1

An Account of Growth of Power Sector in J&K State.

1.1 Chronology of important events in J&K State………………………….....................................................6-13

CHAPTER-2Organizational Structure, Profile and Details of Manpower2.1 Organizational Structure…………………………………………………………………………………………….142.2 Profile of Various Wings of Power Development Department…………………………………………………..15-162.3 Organizational Structure of M&RE Wing, Kashmir…………………………...................................................172.4 Organizational Structure of M&RE Wing, Jammu………………...………………………………………. …….182.5 Organizational Structure of S&O Wing, Kashmir…………………………………………………………..……..192.6 Organizational Structure of S&O Wing, Jammu …………………………………………………………..……...202.7 Organizational Structure of Planning & Design Wing……………………………………………………………..202.8 Organizational Structure of Procurement & Material Management Wing……………………………………….212.9 Organizational Structure of Commercial & Survey Wing …………………………………………….…………..212.10 Organizational Structure of Director TTIC………………………………………………………………………….222.11 Year Wise Statement of No. of Employees………………………………………………................................... 232.12 Category Wise Sanctioned/Existing Strength of PDD Employees..………………….…………….…………….24-26

CHAPTER-3

Infrastructure Available3.1 Abstract of Transformation Capacity & Line Length in J&K State………………………………………… 273.2 Details of 220/132kV Transformation Capacity in Jammu & Kashmir Regions…………………………. 283.3 Details of 132/33kV Transformation Capacity in Kashmir Region………………………………………… 29-303.4 Details of 132/33kV Transformation Capacity in Jammu Region…………………………………………..31-323.5 Details of Transmission Lines at 220kV Level in Jammu & Kashmir Regions……………………………33

Page 3: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 3

3.6 Details of Transmission Lines at 132kV Level in Kashmir Region…………..………….………………….…343.7 Details of Transmission Lines at 132kV Level in Jammu Region………………………………………….…..353.8 Assets of Power Grid Corporation of India under Operation in J&K …………………………………………..36-383.9 HT/LT Ratio at Distribution Level ………………….……………...................................................................393.10 Capacity Wise list of 66/ 33/11/6.6 KV R/Stations of Jammu Province……………………………………….40-473.11 Capacity Wise list of 33/11 KV Sub Stations in EM&RE Wing, Kashmir……………………………………….48-58

CHAPTER-4

Electric Power- Installed Capacity, Its Availability & Consumption

4.1 Electric Power-Installed Generating Capacity & Hydel Projects in Operation underState & Central Sector........................ …………………………………………………………………………..59-60

4.2 Upcoming Power Plants under State and Central Sector………………………………………………………61-624.3 Generation in Ladakh Region (Owned by JKPDD)………………………………………………………………634.4 List of the DG Sets with Installed Capacities in Leh District………………………………………. …………..64-654.5 List of the DG Sets with Installed Capacities in Kargil District………………………………………………….666-674.6 List of the DG Sets with Installed Capacities in Keran,Gurez & Machil……………………………………….684.7 Entitlement from CPSUs and Other External Sources………………………… ……………………………....69-704.8 Demand and Availability Scenario (POWER)………………………………... ……………………………….. 714.9 Demand and Availability Scenario (ENERGY)……………………………….................................................724.10 Seasonal Power Deficit…………………………………………………………………………….......................734.11 Year-wise Statement of Energy Consumption…………………………………………………………………...744.12 Year-wise Statement of Energy Purchased from Northern Grid …………………………………………….…754.13 Year-wise Statement of Self Generated Energy of State available to PDD……………………………… …..764.14 Gross Per Capita Power Consumption of J&K…………………………………………………………………....774.15 Average Cost of Supply (ACS), Average Revenue Realized (ARR) and AT&C Losses ……………………78-794.16 Bifurcation of Transmission and Distribution Losses for 2010-11………………………………………………80

Page 4: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 4

CHAPTER-5

Electricity Consumers, Connected Load and Revenue Realization and Arrears

5.1 Category wise Number of Consumers as on 31-3-2012.………………………………………………………...815.2 Category wise Consumption for 2010-12…………………………………………………………………………..825.3 Category wise Connected Load (in MWs) ………………….……………………………………………………. 835.4 Metering Status upto 31-3-2012.…………………………………………………………………………………....845.5 Year wise Revenue Realization……………………………………………………………………………………...855.6 Category wise Revenue Realized for the period 2009-10 to 2011-12 in J&K..………………………………...865.7 Category wise Revenue Realized for 2009-10 to 2011-12 in respect of EM&RE wing Jammu ……………. 875.8 Category wise Revenue Realized for 2009-10 to 2011-12 in respect of EM&RE wing Kashmir …………….885.9 Category wise Subsidy Component 2011-12........................................................................ ………………895.10 Arrears of Non Govt. and Govt. Consumers from 2002-03 to 11-12 ……………………………….………….90.

CHAPTER-6

Schemes under Implementation

6.1 RGGY Schemes……………………………………………………………………………………………………….916.2 Physical Progress report ending 3/2012 under RGGVY ………………………………………………………….926.3 Districts wise REC Sanctioned/Approved Cost, Amount Released By REC, Expenditure under RGGVY…..936.4 Restructured Accelerated Power Development and Reforms Programme (RAPDRP)……………………… ..946.5 List of towns approved under RAPDRP ………………………………....…………….………………….……… 95-966.6 Progress report of RAPDRP ending 03/2012………………………………………………………..………..…. 97-986.7 Hon’ble Prime Ministers Reconstruction Programme…………………………………………………..……..… 996.8 New / Augmentation of Grid Stations under PMRP……….. …………….…………………………….………...1006.9 PMRP Achievement Ending 03/2012………………………………………………………………………………101-102

Page 5: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 5

CHAPTER-7

Power Sector Reforms7.1 Benchmarks Under Ist Tripartite MOU …………………………………..…………………………..……………1037.2 Benchmarks Under IInd Tripartite MOU……………………………………………………………………….….1047. 3 Benchmarks Under IIIrd Tripartite MOU………………………………………………….……………….……....105-1077. 4 Targets and Achievements under Ist & IInd Tripartite MOUs…………………………………………….……..1087. 5 Progress of IIIrd Tripartite MoU……………………………….…………………………………………….……..109-114

CHAPTER-8

STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR SUB-TRANSMISSION &DISTRIBUTION WORK 115

8.1 Recommended Type & Size of Multi core Cables/Single Core Cables ……………………………………...116-1178.2 Current Rating of Distribution & Power transformers………………………………………………..…….…….1188.3 Fuse ratings…………………………………………………………………………………………….……………1198.4 CT Ratios applicable for HT/LT Metering…………………………………………………………………………1208.5 Economic Design for Pre stressed Concrete Poles……………………………………………………….……...1218.6 Specification of Swaged Type Steel Tubular Poles(IS 2713)……………………………………...…………...122-1238.7 Weight per meter for various types of steel…………………………………………………………...................124

8.8 Rating of Capacitors for KVAR Compensation…………………………………………………………………….1258.9 Extract from Record Note of meetings of KEECC………………………………………….. ……………………126-1298.10 General Guidelines for Execution of Electric Works……………………………………………………………….130-1428.11 Construction Drawings for X arms, Substation-frame etc……………………………………….………………...143-157

Page 6: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 6

Chapter-1

An Account of Growth of Power Sector in J&K State.The State of Jammu & Kashmir is located in the Extreme North of India and is bound on the North by China and on the

South by Himachal Pradesh and Punjab and on the west by Pakistan. The State has a Population of 1,25,48,926 with20,15,088 households (14,97,920 rural and 5,17,168 urban) as per 2011 Census.

The state is traversed by three main rivers i.e. Indus, Jhelum and Chenab. The Indus traverses through Ladakh, whilethe Jehlum flows through Kashmir and Chenab drains Jammu.

The average rainfall is about 100 Cms.

There are huge Glaciers in the state and the existence of high mountains with glaciers and rainfall makes it haven forhydel generation.

As per preliminary survey an estimated potential of 16400 MWs of power has already been identified while the actualpotential is much more.

The state of Jammu and Kashmir was the second, next only to the state of Mysore State in having Hydro Power, as farback as the 1st decade of this Century.

P o we r Deve lo p m e n t Dep a r t m en t

Page 7: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 7

1.1 CHRONOLOGY OF IMPORTANT EVENTS IN J&K POWER SYSTEM

1905 4×1 MVA,2.3KV, 25 Hz Mohra Power Project commissioned

Head 430 feet (131 mtrs.), Pelton Wheel Turbine.

2nd in India after Mysore

Constructed by General Electric (GE), America

Commissioned in 1905, Mohra Power Station served to light thousands of Kashmiri homes besides a small number ofsmall industrial units comprising rice huskers, flour and oil grinders, bandsaws, silk reeling, weaving, spinning and the like. Theonly available route to Kashmir Valley those days was Jhelum Valley road ( Muzzafarabad road) along the banks of riverJhelum. Heavy equipments could be easily transported to Mohra on this road. No formal transport was available other thansome horse driven carts and the only navigable area at that time was from Khannabal to Khadinyar.

25 Hz, AC power generated at 2300 Volts was stepped upto 30 kV for its transmission to Sopore, Braramulla and Srinagar.30/2.3 kV Receiving Sub Stations were in operation at Silk Factory and Narwara in Srinagar, at Amargarh in Sopore and inBaramulla. 2.3 kV Supply was also available at Pampore, Pattan, Tangmarg and Gulmarg.

Mohra was the only source of power supply in Kashmir Valley till the year 1955. In June,1955, 2x3 MW Ganderbal HydelProject was Commissioned. The Mohra however continued generating till July 1959 when it was struck by the unprecedentedfloods in Jhelum. The flood waters hit the Power plant, shearing its building longitudinally into two halves.

1948 Work started for construction of Ganderbal Power plant

The Sindh Valley Multipurpose Project with its power plant at Ganderbal had been investigated in the forties. Civil works wereentrusted to the Irrigation Department while its electric works were to be done by the then Electrical and MechanicalDepartment. Construction of Civil Works had been taken in hand in 1948. The electro-mechanical plant of 2x3 MW Capacitywas ordered from M/s Associated Electrical Industries Calcutta who supplied the Electrical Equipment of M/s MetropolitanVickers and matching Hydro Equipment made by Escherwyss, Switzerland.

Page 8: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 8

1954 Electrification in Anantnag, Khanabal, Bijbehara and Awantipora town started.

Extension of 33 kV transmission line from Srinagar to Anantnag.

66 kV line (on wooden poles) from Pathankote (Punjab) Grid station to Canal (Jammu) sub station was commissioned.

A real boost to power availability in the state.

1955 Ganderbal Project commissioned by the then President of India, Dr Rajendra Prasad.

Srinagar city was divided into two Zones , Zone 1 receiving 25 Hz, 230 V, 3Ø supply from Mohra and zone 2 receiving 50Hz, 400-230 V, 3Ø supply from Ganderbal .

1957 A project report for adding 9 MW to Ganderbal Project was approved.

Mohra Power project was revived and its frequency was changed from 25 Hz to 50 Hz in order to meet the problem ofsevere over loading .

1961 Additional 9 MW Units of Ganderbal project commissioned.

Old Mohra closed and abandoned.

Ganderbal was the lone source of power

1962 New Mohra (9MW) commissioned and synchronized through 66 kV over head line (on wooden poles) with Ganderbal.

Local Grid to which two sources were connected came into existence for the first time in the state. (It was an extremelyexciting event for the Engineers).

New 66kV transmission line from Sarna (Punjab) to Canal Sub Station (Jammu) on steel poles was commissioned.

New transmission line from Samba to Gladni

Page 9: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 9

1964 Mini Hydel project (2× 350 kW) at Rajouri commissioned

1965 Mini Hydel project (2× 350 kW) at Bhaderwah commissioned

1967-68 132 kV Transmission line between Kalakote – Janipur (Jammu) and Chenani was constructed by Electric Department

along with 22.5MVA, 132 / 66 kV Grid station at Janipora.

1969-70 Three units (3×7.5 MW ) of Kalakote commissioned.

Grid operation became a reality in Jammu region

1971-75 Chenani power plant ( 3×5 MW ) commissioned.

Parallel operation or synchronization with Punjab Grid between two generating station of state in Jammu on one sideand Punjab on the other was established.

Jammu became surplus while Kashmir had shortage.

Constitution of Jammu and Kashmir Electricity Board in pursuance of J&K Electricity Supply Act 1971.

Upper Sindh–I (2×11.3 MW) commissioned.

1976-80 A major event in the 1970s was interconnection of Kashmir and Jammu through 132 kV Udhampur Srinagar Double

Circuit Line (CSTL). At Banihal Tunnel, one circuit was laid overhead crossing Pir Panchal Top and 2nd throughBanihal Tunnel as Gas Filled Cables.

Page 10: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 10

Advantages resulting from this interconnection:• Boosted generation Capability.• Stabilized the supply frequency .• Reliable Power Supply.• Increased efficiency of the system.• Faults reduced to a large extent.

Formation of POWER DEVELOPMENT DEPARTMENT headed by the Commissioner and Secretary to Govt.

1981-84 2X120 MVA, 220/132kV Grid Sub Station at Udhampur Commissioned.

1985-1990 120MVA, 220/132kV and 2X20 MVA, 132/33kV Grid Sub Station at Gladni (Jammu) commissioned on energization of

single circuit Sarna – Gladni Transmission Line.

Salal HEP (Phase-I) of 345 MW commissioned in 1987.

Stakna (4 MW) at Leh commissioned.

Salal - Gladni 220 kV Single Circuit Transmission line no. 1 and line no. 2 energized.

Gladni - Miran Sahib 132 kV Double Circuit line and Grid Sub Station at Bari Brahamna and Miran Sahebcommissioned.

35 MVAR Shunt at Pampore (supplied by Crompton & Greaves).

Series Capacitor Bank at Wanpoh (supplied by BHEL). These measures were taken to increase the transmissioncapacity of 132 kV CSTL from 60 MW to 155 MW.

With the Commissioning of Salal ( HEP) which was thought to make up for the power deficit of the Kashmir Valley also,department felt handicapped because in spite of surplus power in Jammu region there was no adequate transmissionfacilities to Kashmir Valley in addition to Udhampur-Bemina 132-KV line, which could not carry more than 70 MW , whileas deficit in the valley was around 300 MW.

Page 11: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 11

To overcome this problem, various options were considered like

Reactive compensation (installation of 33 kV shunt capacitors at various Grid Stations and Series compensation(Installation of Series Capacitor bank) of the line.

Changing this Double Circuit line to HVDC link, a study was undertaken by the Department and the choice fell onCompensation.

To manage the peak load by reviving Bemina Diesel or Gas Turbine.

Lower Jhelum Hydel Project (105 MW ) was commissioned.

1990-2000 Karnah HEP (2 MW) commissioned in 1991.

220kV Double Circuit Kishenpore – Pampore Transmission Line (KPTL) commissioned in 1996 to overcomeconstraints in power transmission to Kashmir Valley.

345 MW Salal-II, commissioned in 1998.

220 kV Double Circuit Kishenpore – Pampore Transmission Line (KPTL) commissioned in 1996 to overcomeconstraints in Power Transmission to Kashmir Valley. 220/132 kV Pampore Grid Station Commissioned in 1996.

220/132/33 kV Grid station at Zainakote commissioned in 1998.

480 MW, Uri-I alongwith its transmission system viz. 630MVA, 400/220 kV Wagoora Grid Sub Station and 400kV Uri-Wagoora line commissioned in 1997.

2001-2011 USHP-II, 105 MW Power Project commissioned at Kangan

400 kV Inter-regional Transmission Line between Kishenpur and Srinagar commissioned by PGCIL

First ever Tariff Order for electricity determined and issued by JKSERC in March 2007.

J&K PDD launched its website under URL: www.jkpdd.gov.in in 2007.

Page 12: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 12

390 MW Dulhasti Power Plant commissioned in 2007.

450 MW Baglihar HEP commissioned in October, 2008.

Computerized billing of consumers of Jammu & Srinagar city completed in 2007-08.

160 MVA,220/132 kV Barn Grid Sub Station commissioned in 2008.

100MVA 132/33KV Grid station Bari-Brahmana-II Commissioned in 2008

20 MVA , 132/33 kV Draba Grid Station commissioned in 2008.

50MVA132/33 kV Grid Station Khanmoh Commissioned in April-2009

50 MVA 132/33 kV Gangyal Grid Station Commissioned in March-2009

50MVA132/33 kV Grid Station Tethar Commissioned in Oct -2009

50MVA132/33 kV Grid Station Mahanpur Commissioned in Aug -2009

Second Tariff Order for electricity issued by JKSERC in Sep.2009.

Third Tariff Order issued by SERC in April 2010

Electricity Act 2010 notified by GoJ&K in April 2010

120 MWs HEP SEWA II on Ravi Basin commissioned in September 2010.

2011-12 320 MVA,220/132 Grid station Mirbazzar commissioned in 12/2011

320 MVA+100MVA,220/132/33 Grid station Budgam commissioned in 12/2011

320 MVA+100MVA,220/132/33 Grid station Bishnah commissioned in 2011

120 MVA+20MVA,220/132/33 Grid station Ramban commissioned in 2011

50MVA 132/33 Grid station Lissar commissioned in 5/12/-2011

50MVA 132/33 Grid station Vilgam commissioned in 02/2011

50MVA 132/33 Grid station Magam commissioned in 02/2012

Page 13: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 13

50MVA 132/33 Grid station Katra commissioned in 2011

20MVA 132/33 Grid station Chandak commissioned in 2/2012

50MVA 132/33 Grid station Pounichak commissioned in 2/2012

1.26 MW HEP Sanjak on Indus Basin commissioned in September 2011.

4thTariff Order issued by SERC in April 2012

Page 14: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 14

Chapter-2

Organizational Structure, profile and Details of Manpower

2.1 - Organizational Structure

ChiefEngineerM&REWingKashmir

ChiefEngineerM&REWingJammu

ChiefEngineerS&OWingKashmir

ChiefEngineerP&MMWing(Moving)

ChiefEngineerC&SWing(Moving)

ChiefEngineerS&OWingJammu

ChiefEngineerP&DWing(Moving)

DirectorTraining, Testing,

Inspection andCommissioning Wing

(Moving)

DevelopmentCommissioner

(Power)

Page 15: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 15

2.2 - PROFILE OF VARIOUS WINGS OF POWER DEVLOPEMENT DEPARTMENT

Maintenance & RE Wings Overall distribution at 66 & 33 kV level and below.

Setting up, maintenance and operations of 66-33/11-6.6 kV Sub-transmission systems

Setting up, maintenance and operations of 11kV/433V distribution system

The billing of energy to consumers and collections

The face of PDD in dealings with individual consumers.

System and Operation Wings Overall transmission above 66 / 33 kV level.

Setting up, maintenance and operations of 220/132/33 kV Grid stations

Setting up, maintenance and operations of 220KV and 132 kV transmission lines.

Planning & Design Wing Technical study and approval of Projects

Setting up standards of quality control for projects

Procurement process of equipment for Grid stations and transmission lines above 66/33 KV.

Procurement and Material Management Wing Procurement of line material and equipment for the Sub-transmission level and below.

Maintaining inventory of material for M&RE wings in its stores

Page 16: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 16

Commercial and Survey Wing Power Purchases

Scheduling at merit order

Power arrangements under exchange with other states and agencies.

Setting up, maintenance and operations of Communication network between different Grids and power Plants

Enforcement of power curtailments as per schedule for strict grid discipline

Managing operations of the SLDC and Sub LDC

Testing of Electric Protection for all electric installations

Training, Testing, Inspection and Commissioning Wing Arranging training for the staff

Technical Inspection of all new electric installations before their commissioning

Setting Standards for Electric Contractors and issuing licenses after assessing their abilities

Technical Investigation of all electric accidents

Electrical testing and commissioning .

Page 17: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 17

2.3 - Organizational Structure, EM&RE Wing, Kashmir

Circle-IstSrinagar

Circle-IIndSrinagar

Circle-NorthSopore

ED-Ist Srinagar

ED-IV Srinagar

STD-IstSrinagar

CentralWorkshopPampore

ED-II Srinagar

ED-III Srinagar

ED-Budgam

STD-II,Srinagar

ED-Baramulla

Circle-SouthAnantnagag

ED-Handwara

ED-Sopore

STD -Ganderbal

STD-Sopore

ED-Anantnag

ED-Kulgam

ED-Bijbehara

STD-Bijbehara

Circle-Leh

ED-Leh

ED-Kargil

Direction Office, Srinagar

Circle-Shopian

ED-Pulwama

STD-Pulwama

ED-Shopian

ED-Awantiporaa

Circle-Gander-bal

ED-Bandipora

ED-Ganderbal

ED-Sumbal

ED-Kupwara

Spl. Sub Div.Tangmarg

Page 18: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 18

2.4 - Organizational Structure, EM&RE Wing, Jammu

Circle-Jammu

Circle-Rajouri

Circle-Batote

ED-Ist Jammu

ED-II Jammu

ED-III Jammu

STD-Ist Jammu

ED-Rajouri

ED-Poonch

ED-Batote

ED-Udhampur

STD-Udhampur

STD-II Jammu

STD-IVKalakote

Direction Office, Jammu

Circle-Kuthua

ED-Vijaypur

STD-III,Kathua

ED-Kathua

Circle-Kishtwar

ED-Doda

STD-Doda

ED-Kishtwar

ED-Reasi

CentralWorkshopJammu

Page 19: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 19

2.5 - Organizational Structure, S&O Wing, Kashmir

Circle-Ist.Srinagar

Circle-IISrinagar

TLMD-I, Srinagar

TLMD-II,Pampore

TLMD-III,Sopore

TLCD-I, Srinagar

TLCD-II, Srinagar

GCD, Srinagar

TLMD-IV,Pampore

Direction Office, Srinagar

Page 20: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 20

2.6 - Organizational Structure, S&O Wing, Jammu

2.7- Organizational Structure, Planning & Design Wing

Circle-Ist.Jammu

Circle-IIJammu

TLMD-I, Jammu

TLMD-II, Jammu

TLMD-III, Udhampur

TLCD-I, Jammu

TLCD-II,Jammu

GCD,Jammu

P&D Circle, Srinagar P&D Circle, Jammu

Direction Office, Jammu

Direction Office, Moving

Page 21: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 21

2.8 - Organizational Structure, Procurement & Material Management Wing

2.9- Organizational Structure, Commercial & Survey Wing, Jammu

Purchase Circle, Srinagar Purchase Circle, Jammu

Elect. Central StorePampore

Elect. Central StoreJammu

Survey Division, Srinagar

Commercial Division,Srinagar

LDM&T Division ,Srinagar

Survey Division, Jammu

Commercial Division,Jammu

LDM&T Division, Jammu

Direction Office, Moving

Direction Office, Jammu

Circle Office-Srinagar

Page 22: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 22

2.10- Organizational Structure, Training, Testing, Inspection and Commissioning Wing

Inspection Division,Srinagar

Inspection Division,Jammu

DirectorTTIC Wing Moving

Page 23: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 23

2.11 - Year Wise Statement of No. of Employees

S.No. Year No. of Employees

1 1998-99 20500

2 1999-2000 20700

3 2000-01 20925

4 2001-02 21010

5 2002-03 21300

6 2003-04 21500

7 2004-05 22600

8 2005-06 22600

*9 2006-07 23274

*10 2007-08 23816

*11 2008-09 23285

*12 2009-10 23112

*13 2010-11 31010

14 2011-12 27053

* This includes 13325 No daily wagers as well

Page 24: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 24

2.12 STATEMENT SHOWING CATEGORYWISE SANCTIONED/EXISTING STRENGTH (GAZETTED /NON-GAZETTED) OF VARIOUS WINGS OF J&K PDD AS ON 30-06-2012

S# Category of Post DCPOffice

M&REWing Kmr.

M&REWing

Jammu

S&OWingKmr.

S&Owing

Jammu

P&MMWing

Jammu

C/SwingJ&K

P&DWing

Jammu

DirectorTTICWing

JammuTotal Total

S E S E S E S E S E S E S E S E S E S E

1 DevelopmentCommissioner Power J&K 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0

2 Chief Engineer 0 0 1 1 1 1 1 1 1 1 1 1 1 1 1 0 0 0 7 63 Superintending Engineer 0 0 7 7 5 5 2 2 2 2 2 2 1 1 2 1 1 1 22 214 Executive Engineer 2 2 28 25 20 16 8 7 7 7 8 6 6 4 7 6 2 2 88 755 Special Mobile Magistrate 0 0 3 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 6 3

6 Asstt. Ex. Engineer(E/C/M) 2 0 119 75 100 67 29 19 28 17 25 21 25 11 15 8 7 6 350 217

7 Asstt. Engineer (E/C/M) 12 6 214 122 88 88 20 19 40 41 1 1 17 15 0 0 4 5 396 297

8 Jr. Engineer includingcontractual. 3 2 401 407 328 310 138 132 132 95 35 32 91 75 25 19 4 5 1157 1077

9 Jr. Engineer Civil 1 0 7 3 8 4 0 0 7 4 0 0 0 0 0 0 0 0 23 1110 Senior Foreman 0 0 31 12 24 15 12 8 6 1 0 0 0 0 0 0 0 0 73 3611 Tech-I 0 0 114 41 82 82 28 18 29 4 0 0 11 4 0 0 4 0 268 14912 Tech-II 0 0 223 89 122 122 26 17 28 13 0 0 11 1 0 0 6 1 416 24313 Tech-III 0 0 1971 1537 1272 993 222 194 265 151 0 0 44 31 0 0 38 26 3812 293214 Tracer 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 2 0

15

Tech-IV/Helper/Lineman/SBA/Bill

Distributor/Tech-V/GateKeeper/Store Attendant

0 0 3296 1530 1893 160 419 228 440 365 0 0 71 40 0 0 0 0 6119 2323

16 Attendant 0 0 164 101 1469 1071 0 0 0 0 0 0 6 5 0 0 0 0 1475 107617 Meter Reader 0 0 497 361 158 124 1 1 1 0 0 0 0 0 0 0 0 0 657 48618 works supervisor 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 1 119 Sr. Surveyour 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 2 220 Survey Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 6 1 0 0 0 0 6 121 Jr. Survey Supervisor 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0 2 122 Survey Asstt. 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 0 0 0 2 223 Electric Ministry 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0

24 Centrifuge Driver 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0 2 1

Page 25: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 25

S# Category ofPost

DCPOffice

M&REWingKmr.

M&REWing

Jammu

S&OWingKmr.

S&Owing

Jammu

P&MMWing

Jammu

C/SwingJ&K

P&DWing

Jammu

DirectorTTICWing

JammuTotal Total

S E S E S E S E S E S E S E S E S E S E

25 Diesel EngineDriver 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 2 0

26 EngineMechanic 0 0 0 0 0 0 0 0 0 0 0 0 2 1 0 0 0 0 2 1

27 GeologicalAsstt. 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 1 1

28 Chief AccountsOfficer 0 0 1 1 1 1 0 0 1 1 1 1 0 0 0 0 0 0 4 4

29

Sr. LawOfficer/Law

Officer/LegalAsstt.

0 0 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 2 2

30 Adm. Officer 1 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3 1

31 Accounts Officer/Rev. Officer 1 1 3 2 3 2 1 1 0 0 3 3 2 2 1 1 0 0 14 12

32 Head Computer 1 0 1 1 1 1 1 0 1 1 1 0 0 0 1 1 1 1 8 533 Dy. Director 1 0 1 1 1 0 0 0 1 1 0 0 0 0 0 0 0 0 4 234 Asstt. Director 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 035 Pvt. Secretary 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0

36 Asstt. AccountsOfficer 1 0 28 25 20 18 8 7 7 6 7 5 3 2 1 0 0 0 75 63

37 Section Officer 1 1 4 2 4 2 1 1 1 1 1 1 2 2 1 0 0 0 15 10

38 Sr.Stenographer 1 1 1 1 1 1 1 0 1 1 1 1 0 0 0 0 0 0 6 5

39 StatisticalOfficer 1 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 0 0 4 4

40 Jr.Stenographer 1 0 7 1 6 4 3 2 2 1 4 2 1 0 3 1 1 1 28 12

41 Head Asstt. 3 3 27 12 26 26 11 7 10 8 7 4 14 6 3 1 3 3 104 70

42 Rev.Superintendent 0 0 21 12 16 16 0 0 0 0 0 0 0 0 0 0 0 0 37 28

43 Sr. Asstt. 7 5 212 162 95 95 36 25 32 32 31 30 34 22 24 14 6 6 477 39144 St. Asstt. 1 0 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 0 5 2

Page 26: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 26

S# Category ofPost

DCPOffice

M&REWingKmr.

M&REWing

Jammu

S&OWingKmr.

S&Owing

Jammu

P&MMWing

Jammu

C/SwingJ&K

P&DWing

Jammu

DirectorTTICWing

JammuTotal Total

S E S E S E S E S E S E S E S E S E S E

45 AccountsAsstt. 1 0 23 3 17 12 7 3 7 6 12 6 1 0 1 0 0 0 69 30

46 Jr. Asstt. 15 6 431 319 288 260 53 30 45 31 52 29 62 29 34 19 11 7 991 73047 Rev. Examiner 0 0 0 0 45 45 0 0 0 0 0 0 0 0 0 0 0 0 45 45

48 HeadDraftsman 1 1 3 1 20 20 2 2 7 7 3 3 1 0 1 0 1 1 39 35

49 Draftsman 0 0 33 12 23 2 10 3 9 9 17 8 8 2 9 4 3 2 112 42

50 Driver /Chauffer 2 2 67 40 60 60 25 20 26 21 9 6 16 7 3 3 3 1 211 160

51

Orderlies /Chowkidar /

Jamadar / DakRunner

16 15 519 267 340 340 61 29 73 60 77 53 54 22 38 20 12 9 1190 815

52 ComputerOperator 0 0 5 4 9 9 0 0 1 2 1 1 30 8 0 0 0 0 46 24

53 ComputerAssistants 0 0 0 0 0 0 0 0 0 0 0 0 35 1 0 0 0 0 35 1

54 Cleaner 0 0 53 25 0 0 6 3 5 2 4 0 1 1 0 0 0 0 69 31

55 LinemanGrade I 0 0 398 349 0 0 21 21 0 0 0 0 0 0 0 0 0 0 419 370

56 LinemanGrade II 0 0 2837 1871 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2837 1871

57 Land Collector 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 1 1

58 Naib Tehsildar 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0

59 Patwari 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 2 0

60 DRW/CL/Needbasis 0 0 0 7571 0 4254 0 1227 0 257 0 9 0 7 0 0 0 0 0 13325

Total 21748 27053

Page 27: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 27

Chapter-3Infrastructure Available as on 31-03-2012

3.1-Abstract of Transformation capacity in J&K State

Description Jammu Kashmir TotalNo MVA No MVA No /MVA

220/132 kV Grid Sub Stations 6 2030.00 4 1540 10 3570.00132/66-33 kV Grid Sub Stations 27 1699.00 24 2146.64 51 3845.64

a) 66/33 kV Sub Station 2 60.00 ….. ….. 2 60.0

b) 66/11 kV Sub Station 27 359.059 ….. ….. 27 359.059c) 66/6.6 kV Sub Station 2 20.0 ….. ….. 2 20.0

a) 33/11 kV Sub Stations 204 1659.65 208 2363.05 412 4022.70b) 33/6.6 kV Sub Stations 5 32.90 7 68.15 12 101.05c)33/0.4 kV Sub Stations 1 5 7 62.55 8 67.55d)11/0.43 kV Sub Stations 19685 2185.79 19306 2833.57 38991 5019.36e)6.6/0.43 KV Sub-Stations 91 9.39 509 79.00 600 88.39f)No of 11/6.6 KV feeders 851 728 1579

Abstract of Line Length of Transmission lines in J&K stateDescription Jammu Kashmir Total

Ckt.Km Ckt. Km Ckt.Km

220 kV Line Length (Km) 512.96 200.00 712.96132 kV Line Length (Km) 902.80 801.52 1704.32

66 kV Line Length (Km) 227.80 ….. 227.833 kV Line Length (Km) 2241.430 1799.93 4041.36

11 kV Line Length (Km) 16640.309 12939.0 29579.309

6.6 kV Line Length 158.570 175.00 333.570LT Line Length(Km) 36370.502 27584.37 63954.872

Page 28: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 28

3.2 - Details of 220/132kV Transformation Capacity in Jammu & Kashmira) Kashmir Region

b) Jammu Region

SNo.

Name of the220/132 KV Grid

sub station

Capacity Date ofcommissioning of

Grid Station

Name of the scheme underwhich sub station

constructed

No. ofoutgoing132 KVfeeders

Remarks

No. MVA / X-MVA Total MVA

1 Gladni3+1 spare 133.33 400 1985 State Sector 7

#2 160+150 310 2008

2 Udhampur 6+1 spare 40 240 1981 State Sector 5

3 Hira Nagar3+1 spare 66.67 200 2001

State Sector 43+1 spare 40 120 1996

4 Barn 2(3Ph) 160 320 2008 PMRP 2

5 Bishnah 2(3ph) 160 320 2011 PMRP 1

6 Ramban 3+1 spare 40 120 2011 PMRP 2

Total MVA 2030

S.No.

Name of theGrid SubStation

Transformation Capacity Date ofCommissioning

Name of the schemeunder which Sub Station

Constructed

No.ofoutgoing

132 kVfeeders

RemarksNo MVA /

Tfm. Total (MVA)

1 Pampore 9 +1 50 450 +50 (spare Jully-1996 220 kV Kishanpur-PamporeTransmission Line Project 4

2 Zainakote 9+1 50 450 +50 (spare) Dec.1998300 MVA 220/132 kV Grid Station atZainkote with 220 kV D/C Wagoora-

Zainkote Transmission Line6 The Sub Station is

having 33kV level also

3 Mir Bazzar 6+1 53.33 320+53.33 Dec,2011 PMRP 8

4 Budgam 6+1 53.33 320+53.33 Dec,2011 PMRP 0 The Sub Station ishaving 33kV level also

Total MVA 1540

Page 29: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 29

3.3 - Details of 132/33 kV Transformation Capacity in Kashmir Region

S.No Name of theGrid Sub Station

Transformation Capacity TOTAL(MVA)

Date of Commissioning / Nameof the scheme under which Sub

Station Constructed

No.of33 kV

feedersRemarks

No MVA / Tfm. Total (MVA)

1 Bemina3 50 150

185.64 1973 66+1 5.94 35.64+5.94

2 Wanpoh

1 50 50

120 1973 62 20 40

2 15 30

3 Amargarh

1 50 50

95 1977 61 20 20

2 12.5 25

4 Habak2 50 100

120 1981 61 20 20

5 Pampore9+1 16.66 150+16.66

200 1982 10 50MVA capacity addedduring 2007-081 50 50

6 Pattan 3 2x50+1x20 100+20 120 1987 4 60MVA added during2011-12 RE sector

7 Cheshmashahi

1 50 50

105 1987 42 20 40

1 15 15

8 Rawalpora1 50 50

110 1993 63 20 60

9 Arampora 21

2050

4050 90

199550MVA added in

2009-103

Page 30: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 30

S.No Name of theGrid Sub Station

Transformation Capacity TOTAL(MVA)

Date of Commissioning / Nameof the scheme under which Sub

Station Constructed

No.of33 kV

feedersRemarks

No MVA / Tfm. Total (MVA)

10 Wanganpora 6+1 25 150+25 150 1996 5

11 Zainkote 3 +1 25 75 +25 75 Dec.1998/Const.of 300 MVA220/132kV Grid Stn Zainkote 3

12 Awantipora 3+11

2550

75+2550 125 1999/Const.of 75 MVA

50MVAadded in 2009 6 Added by virtue of Depositcontribution.

13 Lassipora 3+1 25 75+25 7505.04.2003 /Const.of 75

MVA 132/33 kVG/Stn.Lassipora

4

14 Badampora1 50 50

66 16.10.2004/Const.of 36 MVA132/33kV G/Stn.Badampora 1

Augmented to 66MVAreplacing 20MVA

transformer by 50MVAtransformer during 2007-081 16 16

15 Kangan 1 20 20 20 29.04.2006/Const. of 20 MVA132/33kV G/ Stn.Kangan 3

16 Sheree 1 50 50 50 06.05.2006/Const.of 50 MVA132/33 kV G/ Stn. Sheree 3

17 Mattan 1 50 50 50 23.09.2006/Const. of 50 MVA132/33 kV G/Stn. Mattan 2

18 Kulgam 2 20 40 40 02.12.2006/Const. of 40 MVA132/33 kV G/Stn. Kulgam 1

19 Khonmoh 1 50 50 50 2-10-2009 3 Under PMRP

20 Tethar 1 50 50 50 28-05-2009 3 Under PMRP

21 Budgam 2 50 100 100 PMRP- 12/2011 4 Under PMRP

22 Lissar 1 50 50 50 PMRP- 5/12/2011 3 Under PMRP

23 Vilgam 1 50 50 50 PMRP- 22/12/2011 3 Under PMRP

24 Magam 1 50 50 50 PMRP- 21/12/2011 4 Under PMRP

Total MVA 2146.64

Page 31: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 31

3.4 Details of 132/33 kV Transformation Capacity in Jammu Region

Name of the 132/66/33 KVGrid sub station

CapacityDate of commi. Of

G/StnName of the scheme

under which sub stationconstructed

No. ofoutgoing66/33 KVfeeders

RemarksNo. MVA / X-

MVA Total

132/66 KV

Kathua 2 50 100 1994 State sector 3 (66 KV)

Hira Nagar1 50

72.5 1990 State sector 3 (66 KV)3 7.5

Samba 2 50 100 2001 State sector 2 (66 KV)

132/33 KV

Gladni 2 50 100 1985 State sector 5

Bari Brahmana2 50

131.50 1988 State sector6

(132/33 KV) 50(132/11) 31.5

1 31.5 1

Miran Sahib1 50

90 1989 State sector 42 20

Janipur 2 50 100 1967 State sector 71 no. 50 MVA Xmer is under outage &replaced b 31.5 MVA Xmer.of Jhajjar

Kotli G/Stn.

Canal 2 50 100 1993 State sector 6

Akhnoor 1+1 20+20 40 1979 State sector 6

Jhajjar Kotli 2 31.50 63 1977 State sector 7 1 no. 31.5 MVA Xmer replaced by 15MVA Xmer & shifted to Janipur G/Stn.

Udhampur 1 5070 1981 State sector 4

1 20

Batote 1+1 15+20 35 1978 State sector 4

Page 32: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 32

Name of the 132/66/33 KVGrid sub station

Capacity Date of commi. OfG/Stn

Name of the scheme underwhich sub station

constructed

No. ofoutgoing66/33 KVfeeders

RemarksNo. MVA / X-

MVA Total

Khellani 2 20 40 1995-96 State sector 2

NHPC (Kishtwar) 1 20 20 - NHPC 1

Sidhra 1 20 20 1995 State sector 3

Barn 2 20 40 2005 PMRP 2

Rajouri 3 20 60 1994-95 State sector 5

Kalakote 1 20 20 1987 State sector 1

Bari-Brahmana-II 2 50 100 2008 PMRP 2

Draba (Poonch) 1 20 20 2008 State sector 1

Gangyal 1 50 50 2009 PMRP 3

Mahanpur 1 50 50 2009 State sector

Bishnah 2 50 100 2011 PMRP 2

Ramban 1 20 20 2011 PMRP 3

Katra 1 50 50 2011 PMRP 3

Chandak 1 20 20 2011 PMRP 2

Pounichak 1 50 50 2011 PMRP 1

Total MVA 1662.00

Page 33: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 33

3.5 - Details of Transmission Lines at 220kV level Jammu & Kashmir :

a) Kashmir Region

b) Jammu Region

S # Name of the Double / Singleckt line

TotalCircuit kms.

Date ofCommissioning

Name of the scheme underwhich Line Constructed Remarks

1Kishenpur-Pampore(Pampore-Tethar Section)D/C Line

144 July.1996 220 kV Kishanpur-PamporeTransmission Line Project

2 Wagoora-ZainkoteD/C Line 56 Dec.1998

300 MVA 220/132 kV GridStation at Zainkote with 220 kV D/CWagoora-Zainkote Trans. Line

Total Ckt. Kms 200

S # Name of the Double /Single ckt line

LineLengthKms.

Total ckt.Kms.

Date ofcommissioning

Name of the scheme underwhich line constructed

1 220 KV D/C KPTL upto Tather 102.00 204.00 1996 State sector

2 220 KV S/C Udhampur - Sarna 124.00 124.00 1983 State sector

3 220 kV D/C Kishenpur-Barn 37.40 74.80 2008 PMRP

4 220KV D/C Miran-Sahib Bishnah 9.73 19.46 2010 PMRP

5 220KV D/C Hiranagar- Bishnah 44.80 89.6 2011 PMRP

6 220KV LILO Ramban 1.10 1.1 2011 PMRP

Total 319.03 512.96

Page 34: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 34

3.6 - Details of Transmission Lines at 132kV level in Kashmir Region

S.No. Name of the Double/SingleCircuit Transmission Line

TotalCircuitkms.

Date ofCommissioning

Name of the scheme underwhich Line Constructed Remarks

1 D/C CSTL

1973 Construction of 132 kVChenani-Srinagar Transmission Line

i Bemina-Rawalpora-Pampore 50.40

ii Pampore-Awantipora-Wanpoh 80.74

iii a. Wanpoh-Tether (D/C) 76.00

b. Wanpoh-Tether (S/C over Pir top) 4.00

2 Single Circuit USHP-I – Habak 50.00 1975 21.6 MW USHP Sumbal

3 D/C LJHP -Amargarh-Pattan- Zainakote 153.60 1977 105 MW LJHP Gantmulla

4 D/C Pampore – Chesmashahi 27.70 1987

5 D/C Chesmashahi – Habak 30.00 1987

6 D/C Amargarh - Arampora (Kupwara) 68.00 19957 D/C Bemina -Wanganpora- Habak 20.60 19968 D/C Bemina – Zainakote 19.00 Jan.19989 D/C Zainakote – Wanganpora 21.70 Dec.1998

10 D/C USHP-II – Habak 49.40 June.2002 105 MW USS-II Kangan

11 S/C Awantipora - Lassipora 24.70 05.04.2003 132 kV ALTL S/C line on D/C towers

12 D/C Ganderbal –Badampora 17.00 16.10.2004 132 kV GBTL

13 LILO of LJTL at Sheree 1.50 06.05.2006 Const.of 50 MVA 132/33 kV G/Stn. Sheree

14 D/C Wanpoh-Mattan 19.20 23.09.2006 Const. of 50 MVA 132/33 kVG/Stn. Mattan

Conductor on II circuit laidfor 7Kms upto Lissartapping point.

15 S/C Wanpoh-Kulgam 11.30 02.12.2006 Const. of 40 MVA 132/33 kVG/Stn. Kulgam S/C line on D/C towers

16 LILO of Pampore-C/Shshi Line forKhammoh Grid station 7.4 28-05-2010 PMRP .

17 LILO of CSTL at Tethar 0.9 02-10-2010 PMRP18 132kVD/C Lisser Line 26.00 2011 PMRP19 132kV S/C Arampora-Vilgam Line 18.40 2011 PMRP

20 132kV D/C Pattan-Magam Line 14.12 2011 PMRP

Total Kms 791.86

Page 35: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 35

3.7 - Details of Transmission Lines at 132kV level in Jammu Region

S.No. Name of the Double / Single ckt line Total ckt. Kms. Date ofcommissioning

Name of the scheme under whichline constructed

1 132 KV D/C Ring Main around Jammu city 136.56 2000 State sector

2 132 KV D/C Udhampur - Bemina upto Thather (CSTL) 166.00 1974 State sector

3 132 KV S/C Janipur – Kalakote 77.00 1968 State sector

4 132 KV S/C Chenani-Udhampur-J. Kotli 52.50 1967 State sector

5 132 KV S/C Janipur – Gladni 7.70 1985 State sector

6 132 KV D/C Gladni - Hira Nagar 84.46 1987 State sector

7 132 KV D/C Hira Nagar – Kathua 76.00 1990-91 State sector

8 132 KV D/C Gladni - Bari Brahmana 30.12 1987 State sector

9 132 KV D/C Bari Brahmana - Miran Sahib 27.76 1988 State sector

10 132 KV D/C Miran Sahib – Canal 32.18 1988 State sector

11 132 KV D/C Barn – Janipur 29.58 2005 State sector

12 132 KV D/C Kalakote – Rajouri 57.00 1994 State sector

13 132 KV D/C Tap line for Samba 3.62 2001 State sector

14 132 KV D/C Tap line for Grid Stn B.B-II 5.40 2007 PMRP

15 132 KV D/C Rajouri –Draba Line 70.24 2008 PMRP

16 LILO 132 kV for Gangyal 2.00 2009 PMRP

17 132KV Barn-Siot alongwith LILO(Akhnoor Section) 19.102 38.204 PMRP

18 LILO Pounichak 3.58 2012 State sector

19 132kV S/C Draba-Chandak 23.00 2011 State Sector

Total 903.8

Page 36: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 36

3.8 Assets of Power Grid Corporation of India under operation in J&K.

1 400/220KV KISHENPUR SUBSTATION

ICTs MVA

KISHENPUR, 315MVA ICT-I (3 x 105MVA) 315

KISHENPUR, 315MVA ICT-II (3 x 105MVA) 315

BUS REACTORs MVAR

1X 63 MVAR BUS REACTOR 63

1X 80 MVAR BUS REACTOR 80

2 400/220KV WAGOORA SUBSTATION

0ICTs MVA

WAGOORA, 315MVA ICT-I (3 x 105MVA) 315

WAGOORA, 315MVA ICT-II (3 x 105MVA) 315

WAGOORA, 315MVA ICT-III (3 x 105MVA) 315

WAGOORA, 315MVA ICT-III (3 x 105MVA) 315

BUS REACTORs MVAR

1X 50 MVAR BUS REACTOR 50

Page 37: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 37

3.8 (B) POWERGRID LINES UNDER O&M IN J&K.

S.No Name of The LineLine

Length (InKms)

Hilly (InKms)

Plain (In Kms)

400 KV TRANSMISSION LINES

1 400KV DULHASTI-KISHENPUR S/C 119.72 119.72 0.00

2 400kV Kishenpur - Wagoora I&II D/C 182.57 182.57 0.00

3 400KV URI-WAGOORA I&II D/C 94.99 58.00 36.99

4 800KV KISHENPUR-MOGA-I S/C (Charged at400kV

275.38 152.31 123.07

5800KV KISHENPUR-MOGA-II S/C (Charged at

400kV)287.12 145.96 141.16

6 400kV Uri-II - Wagoora S/C 105.00 84.00 21.00

7 400kV Uri-I - Uri-II S/C 10.45 10.45 0.00

220 KV TRANSMISSION LINES

1 220KV HIRANAGAR-SARNA S/C 45.29 0.00 45.29

2 220KV JAMMU-HIRANAGAR S/C 45.93 25.93 20.00

3 220KV KISHENPUR-SARNA I&II D/C 103.64 83.64 20.00

Page 38: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 38

S.No Name of The LineLine

Length (InKms)

Hilly (InKms) Plain (In Kms)

4220KV KISHENPUR-UDHAMPUR I&IID/C

22.04 22.04 0.00

5 220KV SALAL-JAMMU-I S/C 56.33 56.33 0.00

6 220KV SALAL-JAMMU-II S/C 62.42 62.42 0.00

7 220KV SALAL-KISHENPUR-I&II D/C 56.80 56.80 0.00

8 220KV SALAL-KISHENPUR-III& IV D/C 58.70 58.70 0.00

9 220KV WAGOORA-PAMPORE-I&II D/C 10.29 0.00 10.29

132 KV TRANSMISSION LINES

1 132 KV Sewa-II - Hiranagar I&II D/C 78.48 78.48 0.00

2 132 KV Sewa-II - Mahanpur S/C 31.25 31.25 0.00

3 132kV Mahanpur - Kathua S/C 21.50 21.50 0.00

4 132kV Sewa -II - Kathua S/C 53.00 53.00 0.00

TOTAL FOR T/LS 1720.90 1303.10 417.79

Page 39: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 39

3.9 Circle-wise HT/LT Ratio at Distribution Level(as on 31-3-2012 )

S.No. Name of Circle HT/LT Ratio

1 Circle-Ist, Jammu 1 : 2.20

2 Circle – 2nd Kuthua 1 : 2.00

3 Circle Rajouri 1 : 1.90

4 Circle Batote 1 : 1.74

5 Circle Kishtwar 1 : 1.31

6 Circle-I, Srinagar 1 : 1.9

7 Circle-2, srinagar 1 : 2.46

8 Circle-Ganderbal 1 : 2.44

9 Circle-South Bijbehara 1: 2.28

10 Circle-South Pulwama 1: 2.21

11 Circle-North,Sopore 1: 1.54

12 Crcle-Leh, Ladakh 1 : 1.59

Page 40: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 40

3.10 Capacity -wise List of 66/33/11/6.6 KVA Sub-Station of Elect. Maintt. & RE Wing, Jammu.

S.No. Name of ReceivingStation

VoltageLevel of

ReceivingStation

Capacity MVA TotalMVA

No. ofFeeder

s1.3 1.6 1.87 2.5 3.0 3.15 4.00 5.00 6.00 6.3 10.00 15.00 20.00 31.50

STD-I, Jammu1 . New Sectrait 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 9

2 . Residency 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 6

3 . Wazarat 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3

4 . Medical 33/11 KV 0 0 0 0 0 0 0 0 0 1 2 0 0 0 26.30 8

5 . Parade 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2

6 . Canal 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 6

7 . Company Bagh 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 4

8 . Sheetli 33/11 KV 0 0 0 0 0 0 0 0 0 3 2 0 0 0 38.90 79 . Nagrota 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

10 . Dhounthaly 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 611 . Jindhrah 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 612 . Jajjar Kotli 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

13 . Dansal 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 214 . Janipur 33/11 KV 0 0 0 0 0 0 0 0 0 0 3 0 0 0 30.00 1415 . Denis gate 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2

16 . Purkhoo 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 417 . Shamachak 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 118 . Akhnoor 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 8

19 . Jourian 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 320 . Pahariwala 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 221 . Khour 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

22 . Barmal 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 223 . Sohal Bhalwal 33/11 KV 0 0 0 0 0 1 0 0 0 0 1 0 0 0 13.15 324 . Sarote 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Page 41: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 41

25 . Tanda 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 326 . Maira Mandrian 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

27 . Chowki Choura 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 228 . Pargwal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 329 . Balli Gulaba 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

30 . Subash Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 431 . Roop Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 332 . Bantalab 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 8

33 . Thather 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 334 . Bhalwal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 335 . Marh 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

36 . Gajansoo 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 237 . Toph Sherkhania 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 738 . Muthi 33/11 KV 0 0 0 0 0 0 0 0 0 0 3 0 0 0 30.00 5

39 . Talab Tillo 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 240 . Udhwywala 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 341 . Kanachak 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

42 . Batera 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 243 . Machillian 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 244 . Gharata 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 2

45 . Bohri 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 246 . Nagrota-II (jagti) 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 447 . Superspeciality Hospital 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 148 . Ranjan 33/6.6 KV 0 0 0 2 0 0 0 0 0 0 0 0 0 0 5.00 249 . Trilokpur 33/6.6 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 150 . Gho Manhasan 33/6.6 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 2

Total 0 0 0 2 0 10 3 1 0 26 32 0 0 0 537.3 183

STD-II, Jammu 0

51 . Samba-I 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3

52 . Samba-II 66/11 KV 0 0 0 0 0 0 1 1 0 0 0 0 0 0 9.00 453 . IGC Samba-I 66/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 854 . IGC Samba-II 66/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 7

55 . Bainglad 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00

Page 42: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 42

56 . Chatha 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 557 . Parladpur 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

58 . Gadigarh 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 359 . Satwari 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 660 . Miltary Cantt 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

61 . Sunderpur 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 562 . Badyal Brahmana 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 263 . Rangpur Mulana 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

64 . Chakroi 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 265 . Bishnah 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 366 . Chak Hasla 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

67 . Salehar 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 568 . Miran Sahib 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 669 . Shatraiyan 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 2

70 . Kullian 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 271 . Chak Shera 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 472 . Suhagpur 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

73 . Biaspur 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 374 . Nandpur 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 575 . Seora 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 4

76 . Ashok Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 277 . JDA Complex 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 678 . Railway Complex 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 6

79 . Nanak Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 780 . Gangyal 33/11 KV 0 0 0 0 0 0 0 0 0 0 3 0 0 0 30.00 781 . Trikuta Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3

82 . Channi Himmat 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 783 . Transport Nagar 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 484 . Bathindi 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

85 . Babliana 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 586 . Sainik Colony 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 387 . Sidhra 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

88 . Malhori Jagir 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 1

Page 43: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 43

89 . Greater Kailash 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 490 . BB-II 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 5

91 . BB-I 33/11 KV 0 0 0 0 0 0 0 0 0 0 3 0 0 1 61.50 1592 . Raya 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 393 . Birpur Complex 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3

94 . Smailpur 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 395 . Ramgarh 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 496 . Vijaypur 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 3

97 . Gurha 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 398 . Mandal 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 299 . Kartholi 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

100 . Rangoor 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3101 . Jakh 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3102 . Sarore 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

103 . RatnuChak 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2104 . Bahu Fort 33/6.6 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 5

Total 0 0 0 0 0 2 3 3 0 32 34 0 0 1 606.4 214

STD-III, Kathua 0

105 . Hatli Village 66/33/11KV

0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 2

106 . Hiranagar 66/33/11KV

0 0 0 0 0 0 0 0 0 0 2 0 1 0 40.00 3

107 . Hiranagar-II 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3108 . Hatlimore 66/11 KV 0 0 0 0 0 1 0 0 0 0 1 0 1 0 33.15 11109 . Keerian Gandyal 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2

110 . Lakhanpur 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3111 . Basantpur 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2112 . C.T.M 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 1 0 0 25.00 1

113 . Knit Fab 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1114 . Industry 66/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 2

115 . Nagri 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 5

116 . Palli 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

117 . Nanan 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 2

Page 44: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 44

118 . Changran 66/11 KV 0 0 0 0 0 0 0 1 0 0 1 0 0 0 15.00 3119 . Taraf Pajwal 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

120 . Ghagwal 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3121 . Chann Arorian 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2122 . Marheen 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

123 . Nichila 66/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3124 . Rajpura 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3125 . Sherpur 66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 1

126 . Pharpur 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 3127 . Hatlimore-II (Khrote

More)66/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

128 . Barnoti 66/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 2129 . Lift Irrigation, Lakhanpur

(RTIC)66/6.6 KV 0 0 0 0 0 0 0 2 0 0 0 0 0 0 10.00 1

130 . Lift Irrigation, Basantpur(RTIC)

66/6.6 KV 0 0 0 0 0 0 0 2 0 0 0 0 0 0 10.00 1

131 . Challan Prajali 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2132 . Phinter 33/11 KV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 6133 . Ramkot 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

134 . Kalyal 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4135 . Mahanpur 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2136 . Basohli 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4

137 . Bhoond 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3138 . Bani 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3139 . Bagan 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

140 . Machaddi 33/11 KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2141 . Martha Nagrota 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

Total 0 1 0 1 0 7 0 13 0 4 19 1 2 0 361.35 106

STD-IV, Kalakote 0

142 . Kalakote 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3143 . Siot 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

144 . Sunderbani 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 5145 . Phall 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2

Page 45: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 45

146 . Sunderbani-II (Phall) 33/11 KV 2 0 0 0 0 0 0 0 0 0 0 0 0 0 2.50 2147 . Nowshera 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 9

148 . Chowki-Hundan 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2149 . Kangri 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3150 . Marchola 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

151 . Mogla 33/11 KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2152 . Kheora 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 7153 . Thudi 33/11 KV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 11

154 . Darhal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2155 . Manjakote 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4156 . Thannamandi 33/11 KV 0 0 0 0 0 0 0 0 0 0 1 0 0 0 10.00 4

157 . Dhanwan 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3158 . Dhangri 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1159 . Kotranka 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3

160 . Darhali Bridge 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2161 . Palma 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3162 . Sial Sui 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

163 . Kamsar 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 5164 . Haveli 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 3165 . Gulpur 33/11 KV 0 2 0 0 0 0 0 0 0 0 0 0 0 0 3.20 3

166 . Jhallas 33/11 KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 4167 . Chandak 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2168 . Mandi 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 4

169 . Lassana 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2170 . Surankote 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4171 . J.W.G 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 2

172 . Draba 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 2173 . B.G 33/11 KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 3174 . Mendhar 33/11 KV 0 0 0 0 0 2 0 0 0 0 0 0 0 0 6.30 3

175 . Mankote 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2176 . Jhallas-II 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2177 . Budhal 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

178 . Bandi Chechian 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

Page 46: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 46

179 . Solki 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3180 . Loran 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

181 . Chatral 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2182 . Rajal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 1183 . Qila Dharal 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

184 . Lift Irr. Rajal 33/6.6 KV 0 0 0 2 0 0 0 0 0 0 0 0 0 0 5.00 1185 . Jhulla (LC Fence) 33/11 KV 0 2 0 0 0 0 0 0 0 0 0 0 0 0 3.20 1186 . MES Rajouri 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 1

187 . Baba Ghulam Shah(University)

33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 1

188 . Kalakote-II 33/6.6 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 2

Total 2 7 0 6 0 17 0 3 0 16 3 0 0 0 228.05 136

STD- Udhampur 0

189 . Dairy farm 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 11

190 . Devik 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 7191 . Dhar Road 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 6192 . Ramnagar 33/11 KV 0 0 0 1 0 0 0 0 0 1 0 0 0 0 8.80 6

193 . Phalatta 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 6194 . Jakhani 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3195 . Battal Ballian 33/11 KV 0 0 0 0 0 0 0 0 0 1 1 0 0 0 16.30 6

196 . Staney 33/11 KV 0 0 0 0 0 1 1 0 0 1 0 0 0 0 13.45 5197 . Chenani 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 5198 . Pathi 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

199 . Battal 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4200 . Dhuna 33/11 KV 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1.60 2201 . Jib 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

202 . Katra 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 9203 . Tarakote 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 4204 . Reasi 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 7

205 . Pouni 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 3206 . Panthal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 6207 . Dharmari 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4

208 . SMVD University 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

Page 47: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 47

209 . Dharmound 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4210 . Meetra (Ramban) 33/11 KV 0 0 0 0 0 1 0 0 0 1 0 0 0 0 9.45 7

211 . Ramsoo 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3212 . Banihal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 8213 . Assar 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

214 . Patnitop 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3215 . Tethar 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 3216 . Sangaldan 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4

217 . Sarhbaga 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3218 . Johnu 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3219 . Chowki 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4

220 . Basantgarh 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4221 . Gool 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 2

Total 0 1 0 3 0 13 2 2 0 19 4 0 0 0 227.75 154

STD- Doda222 . Doda 33/11 KV 0 0 0 0 0 0 0 0 0 2 0 0 0 0 12.60 8223 . Thathri 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4

224 . Prem Nagar 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 4225 . Bhalla 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3226 . Gandoh 33/11 KV 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5.00 4

227 . Bhaderwah 33/11 KV 0 0 0 0 0 0 0 1 0 1 0 0 0 0 11.30 6228 . Ganika 33/11 KV 0 0 0 1 0 0 0 0 0 0 0 0 0 0 2.50 3229 . Changa 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 2

230 . Bhatyas 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3231 . Dallian (Bhaderwah) 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 3232 . Sappa (Army) 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 1

233 . Kishtwar 33/11 KV 0 0 0 0 0 0 0 0 0 0 2 0 0 0 20.00 6234 . Mandal 33/11 KV 0 0 0 0 0 0 0 0 0 1 0 0 0 0 6.30 4235 . Dedpeth 33/11 KV 0 0 0 0 0 1 0 0 0 0 0 0 0 0 3.15 3

236 . Doda-II (Behli Ghat) 33/11 KV 0 0 0 0 0 0 1 0 0 0 0 0 0 0 4.00 4

Total 0 0 0 1 0 6 2 2 0 5 2 0 0 0 90.9 58

Page 48: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 48

3.12 Capacity wise List of 33/11 kV Sub-Stations of Elect. Maintt. & RE Wing, Srinagar.

STD - Ist Srinagar

S # Sub StationCapacity (MVA)

Total MVA No. of Out-going feeders2.5 3.15 4 5 6.3 10

1 Ahmad Nagar 0 0 0 0 1 0 6.3 2

2 Awanta Bhawan 0 0 0 0 2 0 12.6 2

3 B.A.M. Khan 0 0 0 0 3 0 18.9 44 Bagwanpora 0 0 0 0 0 2 20 25 Balhama 0 0 0 0 1 0 6.3 4

6 Barbarshah 0 0 0 0 0 2 20 2

7 Brane 0 0 0 0 0 2 20 38 Buchwara 0 0 0 0 0 2 20 29 Centaur 0 0 0 0 2 0 12.6 4

10 Fateh kadal 0 0 0 0 0 2 20 411 Habak 0 0 0 0 3 0 18.9 312 Harwan 0 0 0 0 2 0 12.6 213 Illahi Bagh 0 0 0 0 2 0 12.6 214 Kathidarwaza 0 0 0 0 3 0 18.9 415 Kawdara 0 0 0 0 0 2 20 316 Khanyar 0 0 0 0 1 2 26.3 5

17 Khayam 0 0 0 0 0 2 20 4

Page 49: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 49

S # Sub Station

Capacity (MVA)

Total MVA No. of Out-going feeders2.5 3.15 4 5 6.3 10

18 Lal Bazar 0 0 0 1 0 1 15 319 Mughal Masjid 0 0 0 0 0 2 20 11

20 Nedous 0 0 0 0 2 0 12.6 2

21 Nishat 0 0 0 0 0 2 20 4

22 Basantbagh 0 0 0 0 0 2 20 3

23 Omer Hair 0 0 0 0 2 0 12.6 224 Rainawari 0 0 0 0 0 2 20 425 Shalimar 0 0 0 0 2 0 12.6 3

26 SIDCO Food Park 0 0 0 1 0 0 5 2

27 Sonwar 0 0 0 0 0 2 20 4

28 Soura 0 0 0 0 1 2 26.3 5

29 T.R.C. 0 0 0 0 0 2 20 6

30 Tailbal (Burzahama) 0 0 0 1 1 0 11.3 1

31 Zakoora 0 0 0 1 0 1 15 3

32 Zoonimar 0 0 0 0 1 0 6.3 1

33 Hazratbal 0 0 0 0 2 0 12.6 3

Total (STD Ist) 0 0 0 4 31 32 535.3 109

Page 50: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 50

STD - IInd Srinagar

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 10

1 B.K.Pora 0 0 0 0 2 0 12.6 32 Baghi-Mehtab 0 0 0 0 2 0 12.6 43 Batmalloo 0 0 0 0 0 2 20 24 Beerwah 0 0 0 1 1 0 11.3 65 Bemina-IInd 0 0 0 0 1 2 26.3 46 Bemina-Ist 0 0 0 0 2 0 12.6 57 Bone & Joint Hospital 0 0 0 0 2 0 12.6 48 Brenwar 0 0 0 0 1 0 6.3 29 Budgam 0 0 1 0 0 2 24 7

10 Chadoora 0 0 0 0 2 1 22.6 511 Chanapora 0 0 0 0 0 2 20 512 Chari Shareef 0 0 0 0 2 0 12.6 613 Danderkhah 0 0 0 0 2 0 12.6 314 Exhibition 0 0 0 0 0 2 20 415 Ichgam 0 0 0 0 1 0 6.3 216 J V C (Bemina III) 0 0 0 0 1 0 6.3 217 Jawaharnagar 0 0 0 0 0 2 20 218 K.P.Bagh 0 0 0 0 2 0 12.6 419 Karan Nagar 0 0 0 0 0 2 20 720 Khag 0 0 0 0 1 0 6.3 321 Khan Sahib 0 0 0 0 1 0 6.3 422 Khanda 0 0 0 0 1 0 6.3 123 Kremshore 0 0 0 1 0 1 15 4

Page 51: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 51

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 10

24 M.R.Gunj 0 0 0 0 2 0 12.6 525 Magam 0 0 0 1 1 0 11.3 326 Nagam 0 0 1 1 0 0 9 227 Narbal 0 1 0 0 2 0 15.75 528 Peerbagh 0 0 0 0 2 0 12.6 329 Rajbagh 0 0 0 0 0 2 20 430 Rangreth 0 0 0 0 0 2 20 431 Rawalpora 0 0 0 0 0 2 20 432 Rakhi Arth 0 0 0 0 0 2 20 033 Safa Kadal 0 0 0 0 0 2 20 434 Shalistore 0 0 0 0 0 2 20 335 Shalteng 0 0 0 0 2 0 12.6 536 Shariefabad 0 0 0 0 1 0 6.3 137 Shreen bagh 0 0 0 0 2 0 12.6 438 Silk Factory 0 0 0 0 3 0 18.9 539 Syed Hamid pora 0 0 0 0 2 0 12.6 340 Wadwan 0 0 0 0 1 0 6.3 241 Wanganpora 0 0 0 0 1 0 6.3 142 Zainakoot 0 0 0 0 1 1 16.3 843 Narkara 0 0 0 0 0 1 10 144 Bakshipora 0 0 0 0 1 0 6.3 145 PC Depot 0 0 0 0 2 0 12.6

Total (STD IInd) 0 1 2 4 47 30 627.3 157

Page 52: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 52

STD - Sopore

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 101 Arampora 0 0 0 0 2 0 12.6 22 Audoora 0 0 0 0 1 0 6.3 43 Baramulla-II 0 0 0 0 1 1 16.3 34 Baramulla-Ist 0 0 0 0 0 2 20 75 Chandoosa 0 0 0 0 1 0 6.3 26 Chakloo Rafiabad 0 0 0 0 1 0 6.3 37 Chogul 0 0 0 0 1 0 6.3 28 Delina 0 0 0 0 2 0 12.6 39 Dooru Sopore 0 0 0 0 1 0 6.3 3

10 Dhobiwan 0 1 0 0 0 0 3.15 211 Drugmulla 0 0 0 0 1 0 6.3 312 Drungbal 0 0 0 0 1 0 6.3 213 Ganapora 0 0 0 0 1 0 6.3 314 Gulmarg 0 0 1 0 0 0 4 415 Hamray 0 1 1 0 0 0 7.15 316 Handwara 0 0 0 1 1 0 11.3 617 HardIchloo 0 0 0 0 1 0 6.3 318 Kangamdar (Pattan) 0 0 0 0 1 0 6.3 219 Kanilbagh 0 0 0 0 1 0 6.3 320 Khumriyal 0 0 0 0 1 0 6.3 321 Kralpora 0 0 0 0 0 1 10 422 Krusan 0 0 0 0 0 1 10 423 Kunzar 0 0 1 0 1 0 10.3 324 Ladoora 0 2 0 0 0 0 6.3 4

Page 53: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 53

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 10

25 Malpora Narwah 0 0 0 0 1 0 6.3 226 Nowpora 0 0 0 0 1 0 6.3 327 Nowshera 0 0 1 0 0 0 4 228 Panzipora Tarzoo, Sopore 0 1 0 0 0 0 3.15 229 Pattan 0 0 0 0 0 2 20 630 Rohama 0 0 0 0 1 0 6.3 331 Rampora Uri 0 0 0 0 1 0 6.3 332 Sangrama 0 0 0 0 1 0 6.3 333 Seeloo 0 0 0 0 0 1 10 534 Sheeri 0 0 0 1 0 0 5 335 Singhpora 0 0 0 0 1 0 6.3 236 Sopore- 2nd 0 0 0 0 1 1 16.3 537 Sopore-1st 0 0 0 0 0 2 20 638 Tangdar 0 0 0 0 1 0 6.3 439 Tangmarg 0 1 0 0 0 1 13.15 440 Tikker Kupwara 0 0 0 0 0 2 20 841 Trehgam 0 0 0 0 1 0 6.3 242 Uri Salamabad 0 0 0 0 0 1 10 543 Wagoora 0 1 0 1 0 0 8.15 444 Watlab 0 0 0 0 1 0 6.3 345 Watrigam 0 1 0 0 1 0 9.45 546 Willgam (Doolipora) 0 0 1 0 1 0 10.3 347 Zachaldara 0 2 0 0 0 0 6.3 3

Total (STD Sopore) 0 10 5 3 31 15 411.8 164

Page 54: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 54

STD - Ganderbal

S # Sub StationCapacity (MVA) Total

MVANo. of Out-

going feeders2.5 3.15 4 5 6.3 101 Ajas 0 0 0 1 0 0 5 32 Aloosa 0 0 0 0 1 0 6.3 23 Ajar Bandipora 0 0 0 0 2 1 22.6 64 Panzigam Bandipora 0 0 0 0 1 0 6.3 35 Mansbal 0 0 0 0 1 0 6.3 36 Markundal 0 0 0 0 2 0 12.6 57 Nadihal 0 1 1 0 0 0 7.15 28 Naidkhah 0 0 0 0 1 0 6.3 39 Shadipora 0 0 1 0 1 0 10.3 3

10 Hajin 0 3 0 0 0 0 9.45 411 Ganderbal 1 0 0 0 2 0 15.1 512 Manigam 0 0 0 0 1 0 6.3 413 Nagbal 0 0 0 0 1 0 6.3 114 Alesteng 0 0 0 0 1 0 6.3 215 Tulla Bagh 0 0 0 0 1 0 6.3 316 Ganda Singh 0 1 0 0 0 0 3.15 217 Lar 0 0 0 1 1 0 11.3 418 Kheer Bhawani 0 1 0 0 0 0 3.15 219 Doderhama 0 0 0 0 3 0 18.9 520 Khurhama 0 0 0 0 2 0 12.6 421 Kangan 0 0 0 0 0 1 10 422 Wussan 0 0 0 0 0 1 10 323 Surfraw 0 0 0 1 0 0 5 224 Gagangeer 0 1 0 0 0 0 3.15 1

Total (STD Ganderbal) 1 7 2 3 21 3 209.9 76

Page 55: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 55

STD PulwamaS# Name

Capacity (MVA) TotalMVA

No. of Out-going feeders

2.5 3.15 4 5 6.3 101 Lassipora 0 0 0 0 0 1 10 32 Pulwama 0 0 0 0 0 2 20 73 Keegam 0 0 0 0 1 0 6.3 24 Shadimargh 0 0 0 1 1 0 11.3 45 Mitrigam 0 1 0 0 1 0 9.45 36 Reshipora 0 0 0 0 2 0 12.6 47 Landoora 0 0 0 0 1 0 6.3 48 Shopian(Gagren) 0 0 0 0 2 0 12.6 49 Pinjoora 0 0 1 0 0 0 4 2

10 Batpora 0 0 0 0 1 0 6.3 311 Chowdrigund 0 0 0 0 1 0 6.3 312 Konibal 0 0 1 0 1 0 10.3 413 Lethpora 0 0 1 1 0 0 9 314 Kakapora 0 0 0 0 1 0 6.3 215 Newa 0 0 1 0 1 0 10.3 316 Tral 0 0 0 0 0 2 20 517 Lurgam 0 1 0 0 1 0 9.45 318 Lalgam 1 1 0 0 0 0 5.65 219 Chewa 0 0 0 0 1 0 6.3 320 Awantipora 0 0 0 0 2 0 12.6 721 Naroo 0 1 0 0 1 0 9.45 322 KachachKoot 0 1 1 0 0 0 7.15 323 Nowgam Panzgam 0 2 0 0 0 0 6.3 3

Total (STD Pulwama) 1 7 5 2 18 5 217.95 80

Page 56: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 56

STD - Bijbehara

S # Sub StationCapacity (MVA)

TotalMVA

No. of Out-going feeders2.5 3.15 4 5 6.3 10

1 Achabal 0 0 0 0 2 0 12.60 42 Aishmuqam 0 0 0 0 1 0 6.30 43 Akura 0 0 0 0 1 0 6.30 34 Arwani 0 0 0 0 1 0 6.30 35 Ashajipora 0 0 0 0 0 2 20.00 46 D.H.pora 0 0 0 0 0 1 10.00 47 Dialgam 0 0 0 0 1 0 6.30 38 Dooru 0 0 0 1 0 1 15.00 39 Harnag 0 0 0 0 2 0 12.60 3

10 Hiller 0 0 0 0 1 0 6.30 311 Hiller Dooru 0 0 0 0 1 0 6.30 312 Hutmurah 0 0 0 0 2 0 12.60 313 Janglat Mandi 0 1 0 0 1 0 9.45 314 Khiram 0 0 0 0 1 0 6.30 215 Kokernag 0 0 0 0 1 1 16.30 316 Kulgam 0 0 0 0 0 2 20.00 417 Kund 0 1 0 0 0 0 3.15 218 Malaknag 0 0 0 0 1 0 6.30 319 Mattan, Gopalpora 0 0 0 0 1 0 6.30 3

Page 57: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 57

S # Sub StationCapacity (MVA)

TotalMVA

No. of Out-going feeders2.5 3.15 4 5 6.3 10

20 Mir Bazar 0 0 0 0 2 0 12.60 621 Nai Basti, Anantnag 0 0 0 0 1 0 6.30 322 Nillow 0 0 0 0 2 0 12.60 323 Nowgam (Chowgund) 0 1 0 0 0 0 3.15 224 Nowgam (Shangus) 0 0 0 0 1 1 16.30 325 Pahalgam 0 0 0 0 1 0 6.30 526 Qaimoh 0 0 1 0 0 1 14.00 327 Qazigund 0 0 0 0 0 1 10.00 428 Salia 0 0 0 0 1 0 6.30 229 Saller 0 0 0 0 1 0 6.30 330 Sangam 0 0 0 0 0 2 20.00 431 Sarnal 0 0 0 0 0 2 20.00 732 Shankerpora 0 0 0 0 1 0 6.30 333 Sicop Bijbehara 0 0 0 0 1 0 6.30 334 Veeri, Bijbehara 0 0 0 0 1 0 6.30 335 Yaripora 0 0 0 0 2 0 12.60 336 Zirpora 0 0 1 0 0 0 4.00 2

Total (STD Bijbehara) 0 3 2 1 31 14 357.8 119

Page 58: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 58

Capacity wise List of 33/6.6 kV Sub-Stations of Elect. Maintt. & RE Wing, Kashmir.

STD-Ist, Srinagar

S.No Sub StationCapacity MVA

TotalMVA

No. ofOut-going

feeders3.15 3.75 4 5 6.3

1 Badami Bagh 0 0 0 0 2 12.6 42 Khonmoh 1 0 0 0 1 9.45 43 Pantha Chowk 0 0 0 1 0 5 2

Total 1 0 0 1 3 27.1 10

STD-Pulwama

S.No Sub Station Capacity (MVA) TotalMVA

No. ofOut-going

feeders3.15 3.75 4 5 6.31 Pampore -I 0 1 1 0 2 20.4 62 Pampore -II 0 0 0 1 1 11.3 33 Khrew 0 0 0 0 1 6.3 24 Wuyan 0 0 0 0 1 6.3 2

Total 0 1 1 1 5 44.3 13

Page 59: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 59

CHAPTER 44.1 ELECTRIC POWER-INSTALLED CAPACITY

STATE SECTOR

UNDER POWER DEVELOPMENT CORPORATIONHYDRO 759.96 MW

TOTAL NO. OF HYDEL PROJECTS 20THERMAL 175MW

TOTAL NO. OF THERMAL PROJECTS(Operated only in case of emergency inview of high per unit generation cost) 2

UNDER POWER DEVELOPMENT DEPARTMENTDIESEL 33.146 MW

CENTRAL SECTOR

HYDRO 1680 MW

TOTAL NO. OF HYDEL PROJECTS 4

INDEPENDENT POWER PRODUCERS

Hydro 17.5Total No of Hydel Projects 2

POWER HOUSES UNDER OPERATION IN THE STATE

Name of Power House Configuration Installed Capacity in MWSTATE SECTORJhelum River Basin

Lower Jhelum 3 x 35 105Upper Sindh-I 2x11.3 22.6

Ganderbal 2x3+2x4.5 15

Page 60: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 60

Upper Sindh-II 3x35 105Pahalgam 2 x 1.5 3

Karnah 2x1 2Chenab Basin

Chenani-I 5x4.66 23.3Chennai-II 2x1 2Chenani-III 3x2.5 7.5Bhaderwah 2 x 0.5 1

Baglihar 3x150 450Ravi Basin

Sewa-III 3x3 9Indus Basin

Iqbal 3x1.25 3.75

Hunder 2x0.20 0.4Sumoor 2x0.05 0.1

Igo-Mercellong 2x1.50 3Haftal 2x0.50 1

Marpachoo 3x0.25 0.75Bazgo 2x0.15 0.3

Stakna (with J&KPDD) 2x2 4Sanjak 1.26 1.26TOTAL 759.96

Independent Power Producers(IPP)Athwatoo 2X5 10Branwar 3X2.5 7.5TOTAL 17.50

CENTRAL SECTORSalal HEP 6x115 690

Uri –I 4x120 480Dul-Hasti 3x130 390Sewa-II 2X60 120

Total 1680Note: Out of 450 MW Bhagliar project only 225 MW power is available to J&K PDD

Page 61: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 61

Name of the Project Capacity( MWs)

Location Status

A) STATESECTOR (JKSPDC)

Sawalkote1856 Ramban

DPR clearance by CEA under process.Award likely in Nov-2013

Baglihar Stage-II

450Chanderkoot,

RambanUnder construction likely to be

commissioned in Aug-2015

Kirrthai-I 390 Thatri KishtwarTendered out in Sep. 2012.

Kirrthai-II 990 Thatri Kishtwar Tender being floated in Oct-2012.

New Ganderbal 93 GanderbalTendered out- expected commissioning

2017

Lower Kalnai 48 Thatri KishtwarTendered out, likely to be awarded in

Dec-2012Parnai 37.5 Poonch

To be awarded by Oct-2012

Pahalgam (3rd Unit) 1.5 PhalgamTo be commissioned in March, 2013

Matchil 0.35Being tendered in October, 2012

Total 3866.35 MW

B) Chenab Valley Power Projects Joint Venture (NHPC-49%, JKSPDC-49%, PTC-2%)

PakulDul 1020 Kishtwar Tendered out

Kiru 660 Kishtwar Tender under preparation

Kawar 560 Kishtwar Tender under preparation

Total 2240

4.2 UP-COMING GPOWER PLANTS UNDER STATE AND CENTRAL SECTOR

Page 62: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 62

Central Sector(NHPC)

Kishenganaga 330 Commissioning, 2016

Uri-II 240 Commissioning, 2013

Nimo Bazgo 45 Commissioning, 2012

Chutak 44 Commissioning, 2012

Total 669C) IPP Mode

Ratle 850Allotted to IPP GVK. Scheduled

commissioning 2017Small Projects under

execution 93Total 8 Nos

Bids opened for smallprojects in 09/2012 131

Total 5 Nos

RFP for small projectsto be received on

15/10/2012114

Total 13 nos

1188

Grand Total 7963.35 MW

Page 63: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 63

4.3 - GENRATION IN LADAKH,GUREZ,MACHIL & KERAN (Owned by JKPDD)

Installed Capacity in MWEnergy Generated in MU

S.No PowerStation

2009-10(A) 2010-11 (A) 2011-12 (A) 2012-13(E)

InstalledCapacity

EnergyGenerated

InstalledCapacity

EnergyGenerated

InstalledCapacity

EnergyGenerated

InstalledCapacity

EnergyGenerated

I. THERMAL

a Diesel 25.745 19.90 28.769 19.60 33.15 23.76 33.60 27.0

Total (T) 25.745 19.90 28.769 19.60 33.15 23.76 33.60 27.0

II. HYDEL

a. Stakna 4.00 4.88 4.00 3.98The P/H has been transferred to JKSPDC in

the month of January 2011.Total (H) 4.00 4.88 4.00 3.98

GRAND TOTAL(T+H) 29.745 24.78 32.77 23.58 33.15 23.76 33.6 27.0

Page 64: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 64

4.4 LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN LEH DISTRICT AS ON 31-03-2012

S # Name of the D.Gstation/Location No. of Units (Nos.) Capacity of each

Unit (KVA)Total InstalledCapacity (KVA)

1 4.5 MVA Choglamsar 3 1500 4500

2 4 MW Choglamsar 5 750 37503 1500 4500

3 1 MW Leh 2 750 15004 Nyoma 1 160 1605 Tangtse 1 250 2506 Chumathang 1 160 1607 Kungiam 1 160 1608 Hemis 1 75 759 Anlay 1 160 16010 Rongo 1 75 7511 Tsaga 1 75 7512 Korzok 1 82.5 82.513 Kharu 1 750 75014 Puga 1 10 1015 Chushul 1 160 16016 Saspol 1 160 16017 Temisgam 1 160 16018 Tia 1 160 16019 Khalsi 1 250 25020 Lamayuru 1 160 16021 Domkhar 1 160 16022 Skurbuchan 1 250 25023 Hemisshukpachan 1 160 16024 Alchi 1 160 16025 Wanla 1 320 32026 Mangue 1 100 10027 Sku Kaya 1 30 30

Page 65: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 65

S # Name of the D.Gstation/Location No. of Units (Nos.)

Capacity ofeach Unit

(KVA)Total Installed Capacity

(KVA)28 Rumbak 1 10 1029 Hanu 1 125 12530 Bema 1 75 7531 Nemo 1 750 75032 Deskit-I 1 250 25033 Deskit-II 1 160 16034 Turtuk 1 125 12535 Bogdang 1 75 7536 Panamik 1 160 16037 Chamshain 1 75 7538 Tigger 1 320 32039 Tyakshi 1 160 16040 Charasa 1 30 3041 Kuri 1 30 3042 Murgi 1 15 1543 Tongsted 1 30 3044 Khemi 1 15 1545 Burma 1 15 1546 Achinathang 1 200 20047 Hundri 1 35 3548 Chulungkha 1 35 3549 Udmaroo 1 30 3050 Nungsted 1 15 1551 Gonbo 1 12.5 12.552 Tangyar 1 35 3553 Khalsar 1 25 2554 Khardong 1 125 12555 Waris 1 15 15

Total 65 21385

Page 66: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 66

4.5 LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN KARGIL DISTRICT AS ON 31-03-2012

S.No. Name of the Power House No.of Units(Nos.) Capacity of each Unit(KVA)

Total InstalledCapacity (KVA)

1 2 MW Kargil Town 9 250 2250

2New DG Stn. Khurbathang 2 750 1500New DG Stn. Khurbathang 3 1500 4500Auxillary 1 40 40

3 Mulbeck 1 250 2504 Shargole 1 250 2505 Khangral 1 320 3206 Haniskot 1 75 757 Chiktan 1 160 1608 Hagnis 1 160 1609 Shakar 1 320 320

10 Y-Kharboo 1 75 7511 Shakar Rong 1 30 3012 Sanjak 1 75 75

13 Batalik1 160 1601 75 75

14 Silmoo 1 160 16015 Garkone 1 75 75

16 Padum1 250 2501 160 160

17 Junkhore 1 160 16018 Sani 1 160 16019 Karsha 1 320 32020 Parkachik 1 75 75

Page 67: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 67

S.No. Name of the Power House No.of Units(Nos.) Capacity of each Unit (KVA) Total Installed Capacity(KVA)

21 Panikhar 1 250 25022 Nam-Suru 1 250 25023 Sangrah 1 160 160

24 Sankoo1 320 3201 160 160

25 Lankarchey 1 160 16026 Stakpa 1 125 12527 Saliskote 1 250 250

28 Trespone1 250 2501 250 250

29 Thasgam 1 160 160

30 Drass1 250 2501 320 3201 160 160

31 Pandrass 1 75 7532 Purtikchey 1 160 16033 Matayeen 1 75 7534 Barsoo 1 160 16035 Phey 1 320 32036 Tanbis 1 320 32037 Kharboo 1 200 20038 Choskore 1 250 25039 Khar chey Khar 1 200 200

Total 58 16425

Page 68: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 68

4.6 - LIST OF THE DG SETS WITH INSTALLED CAPACITIES IN GUREZ, MACHIL AND KERAN

S.No. Name of the D.Gstation/Location

No. ofUnits(Nos.)

Capacity of each Unit(kVA) Total Installed Capacity (kVA)

A Gurez1 Kanzalwan 1 320 3202 Dawar 1+1 250+320 5703 Wanpora 1 250 2504 Tarbal 1 100 1005 Bagtoor 1 75 1006 Nayal 1 75 757 Achoora 1 75 758 Churwan 1 200 2009 Burnai 1 75 75

10 Bodugam 1 200 20011 Gujran 1 75 7512 Zedgay 1 250 2013 Koragbal 1 62.5 62.514 Khprihaijin 1 20 2015 Hassangam 1 100 10016 Purana Tulal/Sheikhpora 1 320 32017 Buglender 1 320 32018 Neeru 1 100 100

Total 2982.5B

Machil 1 320 320C

Keran 1 320 320Grand Total 3622.5

Page 69: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 69

4.7 Entitlement from CPSUs and Other External SourcesJammu and Kashmir Share in CPSUs and Joint Ventures (JVs) as on 31-03-2012

S.No. Name of Power HouseInstalled Capacity

(MW)%age share for

J&KShare in MWs

%age Share inMWs

Share inMWs

1 2 3 Firm Non-FirmNTPC

1 Anta 419 6.92 13 2.03 92 Auraiya 663 6.64 44 1.51 103 Dadri (G) 830 6.75 56 1.01 84 Dadri stage-II 980 0 0 2.07 265 Unchahar-1 420 3.33 14 0.66 36 Unchahar-2 420 7.14 30 2.07 97 Unchahar-3 210 6.19 13 2.03 48 Rihand-1 1000 7.00 70 2.05 229 Rihand-2 1000 9.40 94 2.07 2110 Singrouli 2000 0.00 00 2.07 4111 Jhajjar 500 0.00 00 1.1 512 Tlchr 1000 00 00 00 0013 Khlgn I 840 00 00 00 0014 Khlgn II 1000 00 00 00 00

Sub-Total 11282 334 158NPC

1 NAPP 440 7.50 33 2.11 92 RAPP-B3-B4 440 7.95 35 0.00 03 RAPP-C 440 0.00 0 11.48 51

1320 68 60NHPC

3 Salal 690 34.39 237 0 04 Tanakpur 94 7.68 7 0 01 Chamera I 540 3.9 21 0 02 Chamera II 300 6.33 19 2.61 85 Uri 480 33.96 163 0 07 Dul hasti 390 21.15 82 2.16 86 Dhaulinganga 280 6.07 17 2.16 67 Sewa-2 120 19.17 23 2.61 3

Sub-Total 2894 569 25

Page 70: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 70

S.No. Name of Power HouseInstalled Capacity

(MW)%age share for

J&KShare in MWs

%age Share inMWs

Share inMWs

D- Eastern Region1 FAKKA 1600 0.65 14 0 02 KHLGN-I 840 3.69 31 0 03 KHLGN-II 1500 2.87 43 2.69 404 MEHA-6 250 7.08 18 0 0

Sub-total 4190 106 40TEHRI 1000 4.80 48 1.42 14Tala 1020 0.00 0 1.77 18SJVN(JV)N-

1500 7.00 105 1.43 22Sub total 3520 153 54

G.Total 23206 1230 337

Page 71: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 71

4.8 - Demand And Availability Scenario Peak (POWER)MW

Year 2004-05(A)

2005-06(A)

2006-07(A)

2007 -08(A)

2008-09(A)

2009-10(A)

20010-11(A)

20011-12(A)

2012-13(RE)

Peak Demand 1706 1800 1925 2020 2120 2290 2369 2500 2600

Peak Met 1350 1242 1306 1350 1340 1407 1492 1788.9 1900

Peak Deficit 356 558 619 670 780 883 877 711.1 700

Peak Deficit (%) 20.87% 31.00% 32.16% 33.17% 36.79% 38.56% 37.02% 28.44% 26.92%

Page 72: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 72

4.9 - Demand And Availability Scenario (ENERGY)

MU

YEAR 2004-05(A)

2005-06(A) 2006-07 (A) 2007-08

(A)2008-09

(A)2009-10

(A)2010-11

(A)2011-12

(A)2012-13

(E)

Energy Requirement 9640.00 10503.00 11343.00 14037.00 14750.00 15656.00 16544.00 17323.00 17842.69Restricted Energy

Availability 7306.00 7916.38 8236.53 8743.96 9147.21 10370.00 10667.00 11115.41 11560.03

Energy Deficit 2334.00 2586.62 3106.47 5293.04 5602.79 5286.00 5877.00 6207.59 6282.6636

Energy Deficit (%) 24.21% 24.63% 27.39% 37.71% 37.99% 33.76% 35.52% 35.83% 35.21%

Page 73: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 73

4.10 Seasonal Power Deficit (Minimum-Maximum)(MW)

S. No. ParticularsYear 2011-12 (A) Year 2012-13 (E)

Summer Winter Summer Winter

I. Unrestricted Demand 2200 2500 2450 2600

II. Restricted Demand 1560 1789 1712 1900

III.

Power Availability

(i) Self Generated300-450 150-250 300-450 170-250

(ii) CPSUs700-1250 650-1100

700-1350 700-1250Total (i+ii)

1000-1700 800-13501000-1800 870-1500

IV Deficit(-) +140 to -560 -439 to -989 +88 to -712 -400 to-1030

*Summer = 6 hours curtailmentWinter = 10 hours curtailment

Page 74: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 74

4.11 - Year Wise Statement of Energy Consumption

S.No YearEnergy

Purchased(MU)

1 1998-99 5429.57

2 1999-2000 4978.65

3 2000-01 5374.65

4 2001-02 5606.04

5 2002-03 6280.38

6 2003-04 7148.29

7 2004-05 7306.36

8 2005-06 7916.38

9 2006-07 8236.53

10 2007-08 8743.96

11 2008-09 9147.21

12 2009-10 10370.65

13 2010-11 10667.23

14 2011-12 11115.41

15 2012-13(E) 11560.03

Page 75: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 75

4.12 - Year Wise Statement of Energy Purchased from Northern Grid

S.No Year Energy Purchased(MU)

1 1997-98 3966.53

2 1998-99 4723.38

3 1999-2000 2637.69

4 2000-01 4808.30

5 2001-02 4989.48

6 2002-03 5778.65

7 2003-04 6232.70

8 2004-05 6560.71

9 2005-06 7045.91

10 2006-07 7265.19

11 2007-08 7873.40

12 2008-09 7488.62

13 2009-10 8269.424

14 2010-11 8356.41

15 2011-12 8534.57

16 2012-13(E) 8740.00

Page 76: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 76

4.13 - Year Wise Statement of Self-Generated Energy of State Available to PDD

S.No Year Energy (MU)

1 1997-98 951.36

2 1998-99 713.32

3 1999-2000 638.34

4 2000-01 572.07

5 2001-02 622.78

6 2002-03 506.80

7 2003-04 924.84

8 2004-05 745.66

9 2005-06 870.47

10 2006-07 971.34

11 2007-08 879.34

12 2008-09 1658.58

13 2009-10 2101.23

14 2010-11 2310.82

15 2011-12 2580.838

16 2012-13(E) 2670.00

Page 77: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 77

4.14 - Gross Per Capita Power Consumption of Jammu & Kashmir State.

S.No Year Consumption(MU)

Population(Million)

Per CapitaConsumption

(kWHr)

1 1998-99 5429.57 9.24 587.62

2 1999-2000 4978.65 9.50 524.07

3 2000-01 5374.65 9.78 549.56

4 2001-02 5606.04 10.14 552.66

5 2002-03 6280.38 10.41 603.22

6 2003-04 7148.29 10.68 669.37

7 2004-05 7306.36 10.95 667.44

8 2005-06 7916.38 11.25 703.80

9 2006-07 8236.53 11.52 715.24

10 2007-08 8752.75 11.78 742.80

11 2008-09 9147.217 12.05 759.03

12 2009-10 10370.65 12.32 841.85

13 2010-11 10667.229 12.55 849.98

14 2011-12 11115.41 12.59 882.88

15 2012-13(E) 11671.5 12.82 910.58

*Population source: www.censusindia.gov.in

Page 78: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 78

4.15 Calculation of Gap between Average Cost of Supply(ACS) and Average Revenue Realized (ARR) andAT&C Losses

S# ITEM Unit 2002-03 2003-04

2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

1 Self-Generation in State MU 506.8 924.84 745.66 870.47 971.34 870.56 1649.07 2101.23 2310.8 2580.838

2 Import from CPSUs MU 5778.65 6232.7 6560.7 7045.91 7265.19 7873.4 7776.5 8269.424 8356.4 8534.570

3 Total Energy (1+2) MU 6285.45 7157.5 7306.4 7916.38 8236.53 8743.96 9425.57 10370.65 10667.2 11115.408

4 Billed Energy MU 3326 3718.8 3856 4188.55 4030.84 3331.6 3478 3833 4041.1 4267.000

5Billing Efficiency(4/3x100)

52.92 51.96 52.78 52.91 48.94 38.10 36.90 36.96 37.88 38.39

6 Energy Costs

7i. Power Purchased fromCPSUs incl U.I &RE Cr.

1267.85 1343.2 1339.6 1671.51 1415.45 1744.34 1459.5 1996.71 2157.6 3051.022

8ii. Power Purchased fromState Cr.

103.99 107.72 103.88 124.76 129.86 81.43 324.18 546.697 639.53 710.75

9Total Power PurchaseCost (6+7) Cr.

1371.84 1450.9 1443.5 1796.27 1545.31 1825.77 1783.68 2543.41 2797.2 3761.772

10 I. O&M Cr. 18.12 26.27 32.43 28.28 28.78 41.27 43.34 55.35 48.72 58.96

11 ii. Establishment Cr. 105.8 115.07 155.59 123.93 211.52 288.95 237.58 339.04 410.82 536.385

12 iii. Depreciation Cr. 48.07 49.1 55.1 57.15 58.52 62.58 68.94 82.73 87.85 105.14

13 iv. Interest Cr. 32.87 22 32.89 22.67 21.46 16.97 14.37 14.97 11.2 15.76

14Total Cost ofSupply(9+10+11+12+13) Cr.

1576.7 1663.3 1719.5 2028.3 1865.59 2235.53 2147.91 3035.5 3355.8 4478.012

15Cost of Supply* (After

losses I,e on billed energy)

(14/4)Paisa/Unit

474.05 447.27 445.93 484.25 462.83 671.01 606.97 791.94 830.41 1049.45

Page 79: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 79

S# ITEM Unit 2002-03 2003-04

2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

16Average Cost of Supply**

(Before Losses i,e on inputenergy) ACS (14/3) *100

Paisa/Unit 250.85 232.39 235.34 256.22 226.5 255.67 235.06 292.70 314.59 402.87

17Pure Revenue Billed orAssessed (Gross)

Cr. 446.44 549 543.70 590.59 592.53 816.24 829.50 928.00 1180.65 1192.53

18Average RevenueRealized (ARR) (17/3)

Paisa/Unit

71 77 74 74 72 971 90.99 89.48 110.68 107.29

19Gap between ACS and

ARR (ACS-ARR) (16-18)Paisa/Unit

179.82 155.68 161.1 181.79 154.44 158.59 144.07 148.65 148.65 148.65

20Revenue Realized(without ED)

Cr. 293.65 308.67 341.47 371.54 393.41 591.97 628 702.30 802.82 1014.16

21 Average TariffRs./Unit 1.34 1.41 1.41 1.41 1.47 2.45 2.385 2.42 2.53 2.79

22 Energy Realized (20/21) MU 2191.42 2189.2 2421.8 2635.04 2676.26 2416.20 2633.12 2902.07 3173.20 3634.98

23Collection Efficiency(20/17*100)

% 65.78 56.22 62.95 63.06 66.28 69.74 75.71 75.68 68.00 85.04

24 T&D Losses ((3-4)/3*100) % 47.08 48.04 47.22 47.09 51.06 61.90 63.10 63.04 62.12 61.61

25AT&C Losses(3-22)/3*100)

% 65.14 69.41 66.85 66.71 67.51 72.37 72.06 72.02 70.25 67.30

Page 80: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 80

4.16 BIFURFCATION OF T&D LOSSES FOR 2011-12 (Tentative)

Energy Figures in MUs

ENERGY PURCHASED FROM CPSUs ( A) 8534.67

SELF GENERATION OF THE STATE (B) 2580.73

TOTAL ENERGY INPUT(C=A+B) 11115.41

INTER STATE TRANSMISSION LOSSES i.e. POOL LOSSES (D= 4.87 % OF A) 415.63

NET ENERGY INPUT TO THE STATE (E=C-D) 10699.77

INTRA STATE TRANSMISSION LOSSES i.e. LOSSES AT 220/132 kV LEVEL ( F) 674.69

ENERGY AVAILABLE FOR DISTRIBUTION AT 33 kV LEVEL (G=E-F) 10025.08

ENERGY BILLED (H) 4267.00

DISTRIBUTION LOSSES i.e. (I= G-H) AT 33/11/6.6/.4 kV LEVEL 5758.08

DISTRIBUTION LOSSES (J= I/Cx100) 51.80%

Note: Since J&K PDD is looking after both Transmission & Distribution Sectors the T&D losses for both thesesectors are of the order of 61.61%. Out of which distribution losses are of the order of 51.80 %

Page 81: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 81

Chapter 5

Electricity Consumers, Connected Load and Revenue Realization

5.1 - Category Wise Number of Consumers as on 31-03-2012

S# Category Jammu(No.)

Kashmir(with

Ladakh)(No.)

Total (No.)

1 Domestic 497811 633140 1130951

2 Non- Domestic/Commercial 79815 74757 154572

3 LT Industrial 8889 10091 18980

4 HT Industrial 516 134 650

5 HT Power IntensiveIntensity 14 0 14

6 Irrigation/ Agriculture 14724 425 15149

7 Public Lighting 179 75 254

8 LT Public WaterWorks 1190 527 1717

9 HT Public WaterWorks 33 85 118

10 State/ Central Deptt. 5147 4353 9500

11 General PurposeBulk Supply 89 42 131

Total 608407 723629 1332036

Page 82: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 82

5.2 - Category-wise Consumption for 2011-12

S# Category Jammu(MU)

Kashmir(MU)

Total(MUs) %age

1 Domestic 609.76 822.23 1431.9833.56

2 Non- Domestic/Commercial 182.23 151.03 333.26 7.81

3 Industrial 664.11 185.42 849.53 19.91

4 Irrigation/Agriculture 137.16 3.51 140.67 3.30

5 Public Lighting 30.35 5.31 35.66 0.84

6 Public WaterWorks 341.65 294.49 636.14 14.91

7 State/ CentralDeptt. 259.87 435.78 695.65 16.30

8GeneralPurpose BulkSupply

124.86 19.24 144.10 2.68

Total 2350.00 1917.00 4267.00

Page 83: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 83

5.3 - Statement Showing Category Wise Connected Load (in MWs) as on 31-03-2012

S.No Category Jammu Kashmir Total

1 Domestic337.063 376.71 713.773

2 Non- Domestic/Commercial 95.166 96.34 191.506

3 LT Industrial140.064 88.82 228.884

4 HT Industrial185.586 52.04 237.626

5 HT Power IntensiveIndustry 33.371 0 33.371

6 Irrigation/ Agriculture79.986 37.66 117.646

7 Public Lighting6.813 2.33 9.143

8 LT Public WaterWorks 50.144 13.33 63.474

9 HT Public WaterWorks 7.839 8.04 15.879

10 State/ Central Deptt.97.742 70.23 167.972

11 General PurposeBulk Supply 30.263 12.79 43.053

Total 1064.037 758.29 1822.327

Page 84: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 84

5.4 Metering Status as on 31-03-2012

Description Jammu Kashmir Total

Total Consumers 608407 723629 1332036

Electronic Meters 303157 285537 588694

Percentage Electronic Metering 49.83 39.46 44.20

Electromechanical Meters 125970 0 130669

Percentage Electromechanical Metering 20.70 0 10.5

Total meters 429127 285537 719363

Total Percentage Metering 70.53 39.46 54.00

Page 85: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 85

5.5 - Statement showing Year-wise Revenue Realization

S.# Year

TotalRevenue

Realization(Rs in

Crores)

ED(Crs)

Rev.Pure(Crs)+Misc

1 2010-11 267.39 27.54 239.85

2 2002-03 323.19 29.14294.05

3 2003-04 342.62 33.1 309.52

4 2004-05 398.77 54.75 344.02

5 2005-06 436.20 64.46 371.74

6 2006-07 455.47 60.21 395.26

7 2007-08 693.24 99.31 593.93

8 2008-09 737.51 108.00 629.51

9 2009-10 823.53 120.32 703.21

9 2010-11 950.40 147.58802.82

10 2011-12 1200.14 183.7 1016.45

267.39323.19342.62

398.77436.2 455.47

693.24737.51

823.53

950.4

1200.14

0

200

400

600

800

1000

1200

1400

Rev

enue

Rea

lizat

ion

(Rs

in C

r)

Year

Page 86: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 86

5.6 Category-wise Revenue Realized for the year 2009-10 to 2011-12 J&K

(Rs. in Crores)

S# Category of Consumers

2009-10 2010-11 2011-12

PureRevenue ED Total Pure

Revenue ED Total PureRevenue ED Total

1 Domestic 136.56 29.95 166.51 170.52 38.48 209.00 245.21 52.56 297.38

2 Non Domestic/ Commercial 58.27 12.50 70.77 80.07 18.25 98.32 104.75 22.61 128.15

3 Irri/Agriculture 31.18 6.84 38.02 31.47 7.24 38.71 35.24 7.89 42.97

4 State/Central 202.67 11.16 213.83 208.38 11.82 220.20 237.9 14.13 232.8

5 Public Lighting 0.02 0.01 0.03 0.11 0.03 0.14 0.06 0.01 0.07

6 L.T Industrial 29.44 6.44 35.88 39.00 9.02 48.02 45.04 9.71 54.73

7 H.T Industrial 112.36 24.98 137.34 132.60 30.61 163.21 167.02 27.42 205.85

8 Power Intensive Industries 32.11 6.95 39.06 24.17 7.70 31.87 30.18 9.73 36.87

9 L. T Public Water Works 64.72 14.12 78.84 68.18 16.67 84.85 92.36 19.05 113.31

10 H. T Public Water Works 17.28 3.95 21.23 15.82 2.19 18.01 19.93 12.53 23.63

11 Gen. Purpose Bulk Supply 17.26 3.42 20.68 30.59 5.57 36.16 36.53 8.07 62.09

Total:- 701.87 120.32 822.19 800.91 147.58 948.49 1014.22 183.71 1197.85

Rev. Miscl. 2.29

Grand Total 1200.14

Page 87: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 87

5.7 Category-wise Revenue Realized for the year 2009 -10 to 2011-12 in respect of Elect. Maintt. & REWing, Jammu

(Rs. in Crores)

S# Category of Consumers

2009-10 2010-11 2011-12

PureRevenue ED Total Pure

Revenue ED Total PureRevenue ED Total

1 Domestic 51.65 11.25 62.90 67.41 15.80 83.21 92.71 20.54 113.25

2 Non Domestic/ Commercial 32.88 7.16 40.04 43.45 10.19 53.64 53.42 11.83 65.25

3 Irri/Agriculture 21.93 4.78 26.71 21.90 5.14 27.04 22.18 4.91 27.09

4 State/Central 122.68 4.97 127.65 122.97 5.01 127.98 147.46 5.06 152.52

5 Public Lighting 0.02 0.01 0.03 0.06 0.02 0.08 0.06 0.01 0.07

6 L.T Industrial 20.35 4.44 24.79 29.98 7.03 37.01 31.47 6.97 38.44

7 H.T Industrial 80.62 17.58 98.20 98.65 23.14 121.79 123.83 27.42 151.25

8 Power Intensive Industries 32.11 6.95 39.06 24.17 5.67 29.84 30.18 6.69 36.87

9 L. T Public Water Works 57.11 12.45 69.56 58.95 13.83 72.78 77.89 17.25 95.14

10 H. T Public Water Works 5.31 1.16 6.47 2.91 0.68 3.59 11.77 2.61 14.38

11 Gen. Purpose Bulk Supply 9.70 2.10 11.80 23.75 5.57 29.32 21.44 4.75 26.19

Total:- 434.36 72.85 507.21 494.20 92.08 586.28 612.41 108.04 720.45

Page 88: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 88

5.8 Category-wise Revenue Realized for the year 2009 -10 to 2011-12 in respect of Elect. Maintt. & REWing, Kashmir

(Rs. in Crores)

S# Category ofConsumres

2009-10 2010-11 2011-12

PureRevenue ED Total Pure

Revenue ED Total PureRevenue ED Total

1 Domestic 84.91 18.70 103.61 103.11 22.68 125.79 152.50 32.02 184.52

2 N. Domestic/ Commercial 25.39 5.34 30.73 36.62 8.06 44.68 51.33 10.78 62.11

3 Irri/Agriculture 9.25 2.06 11.31 9.57 2.10 11.67 13.06 2.74 15.80

4 State/Central 79.99 6.19 86.18 85.41 6.81 92.22 90.44 9.92 100.36

5 Public Lighting 0.0006 0.0001 0.0007 0.05 0.01 0.06 0.00 0.00 0.00

6 L.T Industrial 9.09 2.00 11.09 9.02 1.99 11.01 13.57 2.98 16.55

7 H.T Industrial 31.74 7.40 39.14 33.95 7.47 41.42 43.19 9.07 52.26

8 Power Intensive Industries 0.00 0.00 0 0.00 2.03 2.03 0.00 0.00 0.00

9 L. T Public Water Works 7.61 1.67 9.28 9.23 2.84 12.07 14.47 3.04 17.51

10 H. T Public Water Works 11.97 2.79 14.76 12.91 1.51 14.42 8.16 1.80 9.96

11 Gen. Purpose Bulk Supply 7.56 1.32 8.88 6.84 0.00 6.84 15.09 3.32 18.41

Total:- 267.511 47.4701 314.981 306.71 55.50 362.21 401.81 75.67 477.48

Page 89: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 89

5.9 CATEGORYWISE SUBSIDY COMPONENT FOR 2011-12

S# Category

Billed EnergyPerunitCost

ofsupply

(Rs)

Cost of supply

Tarrif

Revenue Billed (Crs) Subsidy (Crs)

Jammu KashmirTotal(MU)

Jammu KashmirTotal(Crs)

Jammu KashmirTotal(Crs)

Jammu KashmirTotal(Crs)

1 Domestic 609.76 822.23 1431.98 10.49 639.91 862.89 1502.80 1.66 101.22 136.49 237.71 538.69 726.40 1265.09

2 Commercial 182.23 151.03 333.26 10.49 191.24 158.50 349.74 3.22 58.68 48.63 107.31 132.56 109.87 242.43

3 LT Industrial 184.12 111.02 295.14 10.49 193.22 116.51 309.73 2.85 52.47 31.64 84.11 140.75 84.87 225.62

4 HT Industrial 384.74 74.39 459.13 10.49 403.77 78.07 481.83 3.33 128.12 24.77 152.89 275.65 53.30 328.94

5HT PowerIntensive

95.25 0.00 95.25 10.49 99.96 0.00 99.96 3.39 32.29 0.00 32.29 67.67 0.00 67.67

6 Irrigation/Agr. 137.16 3.51 140.67 10.49 143.95 3.68 147.63 1.60 21.95 0.56 22.51 122.00 3.12 125.12

7 Public lighting 30.35 5.31 35.66 10.49 31.85 5.57 37.42 4.76 14.45 2.53 16.97 17.41 3.04 20.45

8LT Public WaterWorks

293.82 40.72 334.54 10.49 308.34 42.73 351.08 5.11 150.14 20.81 170.95 158.21 21.93 180.13

9HT Public WaterWorks

47.84 253.77 301.61 10.49 50.20 266.32 316.52 4.38 20.95 111.15 132.10 29.25 155.17 184.42

10 State Central Deptt 259.87 435.78 695.65 10.49 272.72 457.33 730.05 5.78 150.20 251.88 402.08 122.51 205.45 327.96

11General PurposeBulk

124.86 19.25 144.11 10.49 131.03 20.20 151.24 4.84 60.43 9.32 69.75 70.60 10.88 81.49

Total 2350 1917.00 4267.00 10.49 2466.20 2011.80 4478.00 790.90 637.78 1428.68 1675.30 1374.02 3049.32

Page 90: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 90

5.10- Arrears of Non Govt. and Govt. Consumers From 2002-03 to 2011-12 (Rs. In Crores)

S.NoYear

Jammu (A) Kashmir (B) TotalGrandTotal

Non Govt. Govt.Deptts. Total (A) Non

Govt.Govt.

Deptts. Total (B) NonGovt.

Govt.Deptts.

1 2 3 4=2+3 5 6 7=5+6 8=2+5 9=3+6 10=8+9

1 2002-03 18.54 239.76 258.3 128.05 113.47 241.52 146.59 353.23 499.82

2 2003-04 37.39 282.3 319.69 156.27 127.35 283.62 193.66 409.65 603.313 2004-05 81.21 311.51 392.72 170.14 188.17 358.31 251.35 499.68 751.034 2005-06 101.70 377.31 479.01 158.96 194.82 353.78 260.66 572.13 832.79

5 2006-07 101.72 424.46 526.18 165.69 207.83 373.52 267.41 632.29 899.76 2007-08 74.84 443.65 518.49 189.11 218.7 407.81 263.95 662.35 926.37 2008-09 95.12 448.74 543.86 205.58 223.08 428.66 300.7 671.82 972.52

8 2009-10 121.59 445.01 566.60 191.97 228.83 420.8 313.56 673.84 987.4

9 2010-11 149.36 505.86 655.22 197.5 233.53 431.03 346.86 739.39 1086.25

10 2011-12 151.60 572.150 723.75 197.5 233.53 431.03 349.10 805.68 1154.78

Page 91: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 91

Chapter-6Schemes under implementation

6.1 - RGGVY:• RGGVY is basically a scheme for 100% Rural Electrification.

• 14 Schemes covering whole of J&K State were submitted to REC at a total estimated DPR (Detailed ProjectReport) cost of Rs. 1051.73 crores. All these schemes have been sanctioned by REC at a cost of Rs.917.02crores and Rs 741.36 crores have been released ending 3/2012, against which an amount of Rs 568.57has been spent ending 3/2012.

• Above RGGVY Schemes envisages electrification of 365 no. virgin villages, un-electrified villages and de-electrified villages, which are financially viable for electrification within the Grid System.

• 303682 no. Rural Household connections are proposed to be provided under these RGGVY schemes.

• 110337 no. BPL households are earmarked to be electrified free of cost and 5889 no. already electrified villagesto be covered for intensive electrification under the scheme.

• As per guidelines of RGGVY, the execution of work for 7 districts each has been ensured to NHPC andJ&KSPDC as under:

NHPC: Udhampur, Kathua, Jammu, Srinagar, Budgam, Leh and Kargil.

J&KSPDC: Kupwara, Anantnag, Doda, Baramullah, Pulwama, Rajouri and Poonch.

.

Page 92: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 92

6.2 Physical progress Report 3/2012 under RGGVYS.

No N

ame

of D

istr

ict

Cod

e N

o

Impl

e-m

entin

g A

genc

y

Targ

et N

o. o

f un-

elec

trifi

ed/d

e-el

ectr

ified

villa

ges.

Cum

.Ach

. Of

un-

elec

trifi

ed/

de-e

lect

rifie

d vi

llage

s.

No.

of e

lect

rifie

d vi

llage

sco

vere

d fo

r HH

sel

ectr

ictr

if-ic

atio

n.

Cum

.Ach

. On

acco

unt O

fel

ectr

ified

vill

ages

cove

red

for H

Hs

elec

tric

trif-

icat

ion.

.

Tota

l vill

ages

cov

ered

for

HH

s co

nnec

t-ion

s

Targ

et N

o. o

f un-

elec

trifi

ed/d

e-el

ectr

ified

ham

lets

Cum

.Ahi

evem

ents

of u

n-el

ectr

ified

/de-

elec

trifi

edha

mle

ts

No.

of e

lect

rifie

dha

bita

tions

cov

ered

for

HH

s el

ect-r

ifica

tion.

Cum

.Ach

. On

acco

unt O

fel

ectr

ified

hab

itatio

nsco

vere

d fo

r HH

sel

ectr

ictr

if-ic

atio

n..

Tota

l ham

lets

cov

ered

for e

lect

rific

atio

n.

Tota

l No.

of h

ouse

hold

sto

be

elec

trifi

ed in

the

sche

me

( inc

ludi

ng B

PLho

useh

olds

) asp

ersc

hme

No.

of B

PL c

onne

c-tio

nsin

RH

H

Cum

.Ach

. Of h

ouse

hold

elec

trifi

red

in th

e sc

hem

ein

cl. B

PL H

HS

1 Srinagar 900040 NHPC 7 5 161 66 168 304 0 550 49 854 9212 3748 2049

2 Baramulla 900034 SPDC 22 7 576 60 598 172 0 0 0 172 15994 5625 1730

3 Pulwama 900036 SDPC 19 5 509 42 528 333 0 0 0 33 20606 8331 11734 Budgam 900039 NHPC 9 7 461 10 470 1418 71 130 1 1548 10135 1519 6455 Kupwara 900001 SPDC 33 22 332 50 373 196 373 0 74 196 8099 5308 27006 Anantnag 900002 SPDC 5 5 600 337 605 596 0 0 0 596 27016 13821 211497 Leh 900043 NHPC 35 20 77 5 112 136 0 147 1965 283 6909 3755 23208 Kargil 900042 NHPC 27 16 101 0 128 118 0 458 585 576 1614 1038 10129 Jammu 900035 NHPC 0 0 1019 847 1019 1375 78 4511 289 5886 36697 6314 691410 Kathua 900005 NHPC 44 44 534 504 578 604 0 1110 1061 1714 31632 6461 646111 Rajouri 900037 SPDC 98 1 368 41 248 864 0 0 0 687 41092 5127 13512 Poonch 900049 SPDC 26 1 148 75 105 250 17 0 0 250 7288 1328 55013 Udhampur 900005 NHPC 18 18 578 346 596 1345 0 1367 440 2712 59357 47962 1155214 Doda 900033 SPDC 22 5 586 55 154 253 0 0 0 253 28031 0 2163

Total: 365 156 6050 2438 5682 7964 539 8273 4464 15760 303682 110337 60553

Page 93: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 93

6.3 - Districts wise REC Sanctioned/Approved Cost, Amount Released By REC, Expenditureunder RGGVY.

S.No. District Actual DPR(Rs in Lacs)

REC Sanctioned/Approvedrevised cost

(Rs in Lacs)

Amount Released byREC

(Rs in Lacs)

Expenditure ending 03/2012(Rs in Lacs)

Sanctioned Schemes.(A) JAMMU1 Rajouri 6910.41 7996.87 4694.96 2170.002 Udhampur 5602.00 5034.66 4531.19 2521.003 Kathua 5477.07 3776.26 3398.61 2304.004 Jammu 5174.05 3546.21 3104.33 2197.005 Doda 7251.65 5739.87 3456.22 2152.006 Poonch 5476.32 2659.67 2381.35 1592.00

Sub-Total 35891.5 28753.54 21566.66 12936(B) KASHMIR1 Kupwara 2426.35 3366.30 2986.74 1567.002 Anantnag 5830.00 6387.81 5798.74 5577.003 Baramullah 3392.40 1976.28 1173.35 802.004 Pulwama 4057.83 2413.25 1429.62 882.005 Budgam 917.00 1603.30 941.38 467.006 Srinagar 1389.00 1697.68 877.77 797.00

Sub-Total 18012.58 17444.62 13207.6 10092(C) LADAKH1 Leh 26645.27 28807.00 25637.11 21966.002 Kargil 24623.46 16697.19 13725.51 11863.00

Sub-Total 51268.73 45504.19 39362.62 33829Grand Total 105172.8 91702.35 74136.88 56857

Page 94: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 94

6.4- Restructured- Accelerated Power Development and Reforms Programme (R-APDRP)IntroductionThe Govt. of India has proposed to continue R-APDRP during the XI Plan with revised terms and conditions as a Central Sector

Scheme. The focus of the programme shall be on actual, demonstrable performance in terms of sustained loss reduction.

Establishment of reliable and automated systems for sustained collection of accurate base line data, and the adoption of Information

Technology in the areas of energy accounting will be essential before taking up the regular distribution strengthening projects

• R- APDRP is a scheme to bring down T&D looses to 15% within project period of 5 years with minimum target 0f 3% p.a.

• The scheme is divided in two parts, PART-A and PART-B. Part-A is to cover Ring Fencing, Feeder Metering, DT Metering,

application of Information Technology and Supervisory Control and Data Acquisition / DMS in Distribution Sub Sector. Part-B

is aimed to strengthen Distribution System in the identified project areas.

• For Part-A of the scheme : M/s CMC Ltd, New Delhi has been appointed as IT consultant, M/s Prominent Engineers & Traders,

Haryana awarded the contract for Boundary Metering / Ring Fencing, M/s Wipro Ltd appointed as Information Technology

Implementation Agency ( ITIA ) and M/s NDPL New Delhi appointed as SCADA consultant.

• The Power Finance Corporation ( PFC ) will be the Nodal Agency for the operationalisation and implementation of the R-

APDRP programme under the overall guidance of the Ministry of Power ( MoP ).

• GoI will provide 100% loan for part A of the R-APDRP schemes and 90% loan for part B of the R-APDRP.

• Under R-APDRP, 30 towns have been identified as project areas in J&K state with population of above 10,000 as per 2001

census. GoI has sanctioned Rs 191.25 crores for part-A and Rs 1665.27 crores for part-B of R-APDRP scheme. The DPR for

SCADA / DMS for Jammu and Srinagar cities has been approved by GoI at an estimated cost of Rs. 52.89 crores.

Page 95: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 95

6.5 List of towns approved for R-APDRP.

S.No Name of town Revised sanctioned cost of Part-A.( In Rs. Crores)

Appraised cost for part-B

( In Rs. Crores)

A. Kashmir Province

1 Srinagar 85.31 669.36

2 Anantnag 1.23 31.54

3 Bandipore 0.50 8.40

4 Baramulla 1.19 32.80

5 Bijbehara 0.53 8.62

6 Budgam 0.63 10.15

7 Dooru-Verinag 0.55 4.54

8 Ganderbal 0.56 15.96

9 Handwara 0.49 7.39

10 Kargil 0.61 7.90

11 Kulgam 0.62 6.16

12 Kupwara 0.58 7.39

13 Leh 0.74 9.30

14 Pattan 0.45 4.57

15 Pulwama 0.68 11.79

16 Shopian 0.46 6.65

17 Sopore 1.33 36.38

Page 96: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 96

18 Sumbal 0.55 4.70

19 Tral. 0.43 5.96

Total Kashmir 97.44 889.56

B- Jammu Province

1 Jammu 45.16 610.48

2 Akhnoor 0.33 13.64

3 Baderwah 0.56 6.75

4 Doda 0.70 7.28

5 Kathua 1.66 62.41

6 Kishtwar 0.56 7.42

7 Poonch 0.88 7.74

8 Rajouri 1.82 11.72

9 Ranbir Singh Pora 0.76 12.36

10 Samba 0.56 10.08

11 Udhampur 1.56 25.83

Total Jammu 54.55 775.71

Total J&K PDD 151.99* 1665.27

* Civil cost component of Rs 10.50 crores and FMS charges of Rs 28.76 crores to be born by the State Government for Part-Aafter the Ist year of the commissioning of IT software in the State.

Page 97: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 97

6.6 Progress report of R-APDRP as on March 2012

S#

Name of theWork/Activity

Agency Physical Financial ExpenditureCompletion Status Rs in Crores

Status Anticipated Estimated Expenditure

1 Appointment of ITConsultant

CMC Completed Closed 0.69 0.154*

2 Appointment of ITIA Wipro Completed Closed 159.85 13.69

3 Appointment ofSCADA/DMS consultant.

NDPL Completed Closed 0.904 0.1809

4 Appointment ofSCADA/DMSimplementation agency.

-- RFP received from NDPL. Under review. Mar-12 Included initem (15)

0.00

5 Procurement of Hardware Wipro Revised BoM received from Wipro indicatingchange in certain end of life items. Forwardedto CMC (ITC) for comments.

Mar-12

Included initem (2)

6

GIS Survey Wipro Under Progress Aug-12

Procurement of satelliteimagery

Wipro/ NRSC 29 images procured from NRSC, 1 awaited. Apr-12

Asset Mapping Wipro 4 towns-Pattan, Ganderbal, Kulgam, RS Puracompleted. 6 under progress-Srinagar, Jammu,Budgam, Samba, Poonch, Akhnoor.

Aug-12

Consumer indexing Wipro

7 Software development Wipro 40 % completed Jun-12

8 Web portal Wipro 35% completed Jun-12

9 Integration of towns Wipro Under Progress Jun-12

10 Ring Fencing Prominent 12 towns/ 40% completed. Mar-12 21.21 0.2613

11 Feeder Metering Prominent Under Progress Jun-12 0.00

12 DT metering on LT -- Tendering stage Jun-12 0.00

Page 98: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 98

13 Base line Data Submissionto TPIEA-EA

DRS 5 towns inspected by TPIEA, 7 towns ready forTPIEA inspection.

Mar-12

14 Part-B,DPRsubmission/sanction

JKPDD 30 DPRs sanctioned Closed 1665.27 0.00

15 SCADA DPR submission NDPL 2 DPRs sanctioned Closed 52.89 0.0

16 Incentive Scheme JKPDD Under Progress Mar-12

17 Capacity Building /Training

Wipro Not initiated. Jul-12

18 Data Centre cumCustomer Care Center,Srinagar

JKPCC 2nd floor slab completed. Column work on finallift under progress. Finishing work in groundfloor under progress.

Jun-12 3.99 3.000

19 Diaster RecoveryCentre,Jammu

JKPCC Finishing work under progress Jun-12 1.99 0.498

*out of Rs 15.50 lacs paid to M/S CMC, Rs 6.79 lacs have been debited to T&D (2009-10) and Rs 8.61 to R-APDRP

Page 99: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 99

6.7- Hon’ble Prime Ministers Reconstruction Programme.

The Hon`ble Prime Minster during his visit of J&K in November, 2004 announced a Re-construction Plan

infrastructure for J&K and the objective of Schemes under the Re-Construction program is develop infrastructure at 220KV

and 132KV level by way of construction/ Augmentation of Grid Stations, construction of New lines and thickning of

Conductor of Existing lines. Originally the project was estimated to cost of Rs. 707.00 Crores based on cost data 2003. the

project was scrutinized by CEA and on their observations , the project was revised to the cost of Rs. 1006.51 crores The

CEA subsequently advised to revise the Project Report necessitated due to further cost escalation during the intervening

period. Accordingly, the revised project amounting to Rs. 1351.00 Crores was furnished to CEA for approval and finally the

Project Report was approved for 1350.00 Crores. Out of this cost, an amount of Rs. 1048.56 Crores has been spent

ending 03/2011( to be updated)

The Scheme envisages construction/ augmentation of following transformation and Transmission capacities.o Construction of 7 No. new 220/132 KVA, Grid sub Stations of 1880 MVA capacity.o Augmentation of 1 No. , 220/132 KVA, Grid Sub Station of 150 MVA Capacity.o Construction of 22 No., 132/33 Grid Sub Stations of 1180 MVA Capacity.o Augmentation of 4 No. 132/66-33 Grid Sub Stations of 160 MVA Capacity.o Laying of 373.5 Km of 220KV, D/C, Transmission Lines.o Laying of 446.35 Km of 132KV, D/C, S/C transmission Lines.

Besides, the Scheme includes other works like Stringing of II Circuit of existing 220KV, D/C TransmissionLines (40.40 Km), Stringing of II Circuit of 132 KV, D/C, Transmission lines (21.00 Km), thickening of conductor etc.

Page 100: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 100

6.8 - New / Augmentation of Grid Stations under PMRP.

Kashmir Division:

• B u d g a m ( 3 2 0 / 1 0 0 M V A )• M i r b a z a r ( A n a n t n a g )• A m a r g a r h ( 3 2 0 M V A )• A l u e s t a n g h ( 3 2 0 / 1 0 0 M V A )• S h o p i a n ( 5 0 M V A )• B a n d i p o r ( 5 0 M V A )• L i s s a r ( 5 0 M V A )• K h a n m o h ( 5 0 M V A• B a n i h a l ( T e t h e r ) ( 5 0 M V A )• V i l g a m• M a g a m ( 5 0 M V A ) a n d• A u g m e n t a t i o n o f Z a n a k o t e / P a m p o r e G r i d S t a t i o n s .

Jammu Division:

• 2 N o . i n B i s h n a ( 2 X 1 6 0 M V A a n d 1 0 0 M V A )• 2 N o . i n R a m b a n ( 3 X 4 0 M V A a n d 2 0 M V A )• K i s h t w a r ( 2 x 1 6 0 M V A )• K a t t r a ( 1 x 5 0 M V A )• B h a l e s s a ( 2 0 M V A• P o o n i c h e c k ( 5 0 M V A )• B a t t a l m a n w a l ( 5 0 M V A )• C h a n d a k , S i o t ( 2 0 M V A )• B a r i b r a h m n a - I I ( 2 x 5 0 M V A )• G a n g y a l ( 1 x 5 0 M V A )• S i o t ( ( 5 0 M V A )• A u g m e n t a t i o n o f K a t h u a , S a m b a a n d H i r a n a g a r G r i d S t a t i o n s .

The first ever State owned 132 KV Transmission Line from Ramban to Kishtwar and Rajouri-Poonch, ring aroundJammu cities are included in the package which are based on Technical requirement and survey done by CEA. Thepower requirements under the Plan for Industries have been given due focus and priority.

Page 101: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 101

6.9 – PMRP Achievements ending 03/2012

Jammu• 220/132 kV, 320MVA Barn Grid Sub Station Commissioned alongwith allied 132/33kV, 40 MVA

transformer.• 220/132 kV,320 MVA Bishnah Grid Sub Station Commissioned.• 220/132 kV,120 MVA Ramban Grid Sub Station Commissioned.• 132/33kV, 100 MVA Bari Brahamana-II Grid Sub Station Commissioned.• 132/33kV, 50 MVA Gangyal Grid Sub Station Commissioned.• 132/33kV, 50 MVA Katra Grid Sub Station Commissioned.• 132/33kV, 100 MVA Bishnah Grid Sub Station Commissioned.• 132/33kV, 50 MVA Pounichak Grid Sub Station Commissioned.• Augmentation of 132/66 KV Grid Sub Station Kathua from 70 MVA to 100 MVA completed• Augmentation of 132/66 KV Grid Sub Station Samba from 50 MVA to 100 MVA• Augmentation of 132/33 KV Grid Sub Station Hira Nagar from 42.5 MVA to 72.5 MVA• 220 kV D/C Burn-Kishenpur Transmission Line completed.• 220 kV D/C Miran Sahab-Bishnah.Transmission Line commissioned .• LILO of 220 kV KPTL for Ramban Grid commissioned.• 220 kV D/C Bishnah-Hiranagar Transmission Line completed.• 132kV D/C Rajouri-Draba Line Commissioned• LILO of 132 kV, Gladni-Miran Sahib Transmission Line for Grid Station Gangyal• 132 kV Barn-Siot-kalakote Transmission Line commissioned• LILO of 132 KV D/C , Gladni-Hiranagar Transmission Line for Grid Station Bari Brahmana-II

completed.• 132 KV D/C Barn-Katra Transmission line completed.• 132 kV S/C Draba- Chandak Transmission line commissioned.• LILO of 132 kV S/C of Ring Main to Pounichak commissioned.• LILO of CSTL-I for Ramban Grid Sub Station commissioned.• Stringing of conductor on II circuit of 132KV Burn-Reasi Transmission line completed.

Page 102: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 102

• LILO of 132 KV D/C, CSTL-I for G/Stn Ramban completed.• Reconductoring and stabilization of 132KV S/C Gladni-Janipur transmission line completed• Reconductoring of 132KV D/C Ring main around Jammu city completed

Kashmir• 220/132 kV,320 MVA Mirbazar Grid Sub Station Commissioned.• 220/132/33 kV,320 MVA+100MVA Budgam Grid Sub Station Commissioned.• 132/33kV, 50 MVA Lissar Grid Sub Station Commissioned.• 132/33kV, 50 MVA Vilgam Grid Sub Station Commissioned.• 132/33kV, 50 MVA Magam Grid Sub Station Commissioned.• Augmentation of 220/132KV Grid Sub Station Zainakote from 300 MVA to 450 MVA• Augmentation of 132/33KV Grid Sub Station Pampore from 150 MVA to 200 MVA• Construction of 50MVA,132/33KV Grid station Tethar completed & Commissioned in 10/09• Construction of 50MVA,132/33KV Grid station Khonmoh completed & Commissioned in 5/09• LILO of Pampore-Cheshmashahi line for Khonmoh Grid station.• LILO of CSTL at Tethar for Grid station Tethar.• 132 kV D/C Mirbazar–Lissar line completed.• 132 kV S/C Arampora- Vilgam line completed.• 132 kV Pattan-Magam line completed

Page 103: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 103

Chapter- 7Power Sector Reforms

With a view to reform power sector, three tripartite MOUs have been signed so far between J&K PDD, PlanningCommission, GOI and Ministry of Finance GOI. Bench marks were fixed under these MOUs in a phased manner fromthe date of signing. In respect of Ist and 2nd tripartite MOUs, benchmarks have been achieved by and large as has beenduly certified by the Independent Auditor, M/S Batliboi Consultants. The details of these benchmarks are as under:

7.1 Bench Marks under 1st Tripartite MoU:Phase-I

1. Independent Auditor approved by Planning Commission to be appointed upon signing of MOU.

2. SERC to give tariff order.

3. All 11 kV feeders metered using electronic meters.

4. Energy Accounting for each 11kV feeder to be instituted with responsibility assigned to specific JE.

5. Formation of Distinct distribution profit centers with responsibilities of energy flow accounting.

6. Filing of ARR before the SERC by J&K PDD.

Phase-II

1. Total revenue for the preceding 12 months period must at least equal to 40% of the bulk power purchasecost for the same period. (This may be achieved by a combination of improved billing, collection and tariffhikes.).

2. Specific Proposal of PDD for reduction of Est. and O&M Cost by Rs. 15.00 Crores.

3. Computerized billing covering at least 40%of the billed energy.

4. Consumer metering to be 50%

Page 104: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 104

7.2 Bench Marks under 2nd Tripartite MoU:1. Certification of Benchmarks established under the MoU by an independent auditor.

2. Filing of ARR for the year 2008-09 before JKSERC.

3. SERC to issue Tariff Order for 2008-09

4. Full energy flow audit for the preceding twelve months covering all major consumers with a load of25kVA or more. Audit should cover energy (kWh) supplied, energy billed and cash collected to suchconsumers.

5. Capacitor banks to be added at sub-station/feeders that feed energy to at least 65 % of the consumerscovered under paragraph 4 above at 33 kV and below.

6. Total cash collected from the large consumers under para 4 above should be at least 70 % of theamount billed.

7. Total cash collected for the preceding 12 months period must at least equal 50 % of the bulk powerpurchase cost for the same period. In case this milestone is achieved, the milestones under para 4 and6 will be subsumed in this milestone.

8. Computerized billing covering at least 65 % of the billed energy.

9. Sixty five percent consumer metering in place.

10. Specific proposal for reduction of establishment and O & M cost for the period of the second MOU toRs 20 Crs inclusive of Rs 15 Crs saved under the first MOU.

11. JKPDD to submit a blue print for turn around of the power sector in J&K within 6 months from the dateof this MOU.

Page 105: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 105

7.3 Bench Marks under 3rd Tripartite MoU:

A. Basic Premise of Reforms Roadmap

a GOJK will take steps to reduce T&D losses by at least 3% considering the guidelines of Restructured APDRPissued by Ministry of Power.

b Detailed Terms of Reference (TORS) for carrying out system and commercial studies for strategizing action onthe basis of a SWOT analysis of the transmission and distribution sector so as to reduce AT&C losses shall beframed by GOJK in consultation with the Ministry of Power (Central Electricity Authority).

c While framing the TORs, GOJK shall make use of available reports such as the Blue Print on PDD beingprepared by TERI.

B. Independent Auditors.

a Certification of the conditions (benchmarks) established under this MOU shall be done by an independentAuditor,

b The auditor, so appointed, will be used by GOJK effectively.

C. Corporate governancea GOJK shall take steps to restructure the T&D sector.

b GOJK shall take steps to unbundle the transmission functions being carried out by the Government asdepartmental activity.

c GOJK shall take steps to establish a transmission company (TRANSCO) under the companies Act. 1956.

dThe relations between company’s management, its board of directors, its shareholders and the other involvedstakeholder bodies in the Corporation shall be defined in the Memorandum/Articles of Association of theTRANSCO for clearly delineating parameters of corporate governance in the transmission sector.

e Reforms in the Distribution Sector shall be continued.

Page 106: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 106

f A road map for addressing consumer grievances shall be laid out considering the emphasis given in theguidelines of R_APDRP.

g Steps shall be taken to make the State Load Dispatch Centre (SLDC) function without the control of the T&Dutility, under the direct control of GOJK, as on interim measure, before autonomous SLDC comes into being.

D. Energy Accounting.

a GOJK will issue detailed guidelines for Energy Accounting in case of 11 KV feeders and above for effectivemonitoring through regular inspections at different levels.

b GOJK will fix responsibility at different levels of supervisory engineers for inspection of installations for demandvis-à-vis load as per agreement with the utility (department).

c

GOJK will carry out quick studies to pin point high loss areas in the coming six months. Based on the studies,the high loss areas and installations shall be addressed through a range of specific measures such aselectronic metering, adherence to publicized curtailment schedule, timely billing and monitoring of revenuerecovery.

dA web based Management Information System (MIS) shall be put in place by dovetailing APDRP or R-APDRPor other funds to monitor and take corrective steps on progress in reducing AT&C loss parameters. The MISshall be put in place within 12 months.

eFull energy flow audit for the preceding twelve months covering all major consumers with a load of 25 KVA ormore. Audit should cover energy (kWh) supplied to such consumers, energy billed to such consumers and cashcollected from such consumers.

f Capacitor banks to be added at sub stations/feeders that feed energy to at least 75% of the consumers coveredunder paragraph “e” above at 33 KV and below.

g

Considering the fact that due to law and order disturbances in the summer of 2008, electronic meters weredamaged by miscreants in Jammu division and that a large number of meters earlier installed in KashmirDivision have become non functional, 100% of the meters installed under earlier two MOU will be madefunctional.

a

Considering the fact that J&K is integrated with the rest of the country in respect of the flow of electrical energy,and also, considering the fact that power sector of the country is managed under the overall provisionscontained in the Central Electricity Act, 2003 which is not yet applicable to the State of J&K, GOJK will placebefore its legislature, within next six months, for consideration and adoption an Electricity Act on the lines of theCentral Electricity Act, 2003.

Page 107: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 107

bConsidering the importance of energy conservation, GOJK will place before its legislature, within next twelvemonths, for consideration and adoption energy Conservation Act on the lines of the Central EnergyConservation Act, 2001.

c.GOJK will take steps to bring in legislation for adoption by Regulator (SERC),of tariff determined throughcompetitive bidding, so as to reduce regulatory risk in projects and also to align the power sector of J&K withthe rest of the country.

F Regulatory Related Issues

a GOJK will file ARR for the year 2009-10 before the J&K State Electricity Regulatory Commission.

G. Commercial Issues

a Total cash collected from the larger consumers under paragraph “D-(e)” above should be at least 85% of theamount billed.

b Total cash collected for the preceding 12 months period must be at least equal to 60% of the bulk powerpurchase cost.

c Computerized billing covering at least 75% of the billed energy.

H. Dovetailing of Schemes.

aGOJK will establish a Single Nodal Agency in the Power Development Department for dovetailing variousschemes being implemented in the State in the power sector such as RGGVY, APDRP, R-APDRP, PMRP(T&D sector) etc. with the power Reform Grant for deriving optimum benefits from the investments.

b Various reports on Power Sector including the Blue Print for Turn Around of the power sector being preparedby TERI and outcome of studies mentioned in this MOU shall be referred to while dovetailing the schemes.

c System strengthening and up-gradation will be carried out as per the Detailed Project Reports prepared underRGGVY, PMRP, APDRP (X Plan) and R-APDRP.

d Dovetailing of schemes will also consider felt needs to people expressed by public representatives.

Page 108: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 108

7.4 Targets and achievement of benchmarks under Ist, 2nd & 3rd Tripartite MoU

S.No Description of Benchmark

Ist Tripartite MoUsigned on August 24, 2006

(for period September 2006to August 2007)

2nd Tripartite MoUsigned on February

29, 2008(for period September2007 to August 2008)

3rd Tripartite MoU

Target Achievement Target Achievement Target Achievement1. Appoint of Independent Auditor 100% 100% 100% 100% 100% 100%2. Feeder metering 100% 100% Nil - Nil -3. Energy Accounting of Feeders,

Designation of JEs as feeder managers100% 100%

Nil-

Nil-

4. Establishment of distribution profitcenters with responsibility of energyflow accounting

100% 100% Nil - Nil -

5. Filing of ARR/ Issuance of Tariff Orderby JKSERC

100% 100% 100% 100%

6. Revenue Collection as %age of PowerPurchase Cost

40% 40.06% 50% 35.92% 44.57 28.70%

7. Proposal of PDD for reduction of Est. &O&M cost by 15 Crores in Ist TripartiteMoU and by 20 Crores in 2nd TripartiteMoU

100% 100% 100% 100%

8. Computerization of billed energy40% 40% 65%

64.38% ending9/ 2008

66.42

9. Consumer metering50% 49.54% 65%

48.95% ending9/2008

50.13

10. Energy flow audit of 25kVA and aboveconnections

Nil - 100% 100%

11. Capacitor banks to be added at S/Stnsand Feeders of 25kVA and aboveconnections

Nil - 65% 59.36%

12. Cash Collected from Consumers withload 25kVA and above

Nil - 70% 75.29%

Page 109: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 109

7.5 .Progress of 3rd Tripartite MoU.

S.No Description of Benchmark ProgressA. Basic Premise of reforms Roadmap.a. GoJK will take steps to reduce T&D losses by

at least 3% considering the guidelines ofRestructured-APDRP issued by MoP.

With a view to reduce T&D losses to acceptable limits, R-APDRPschemes for 30 major towns with population of 10,000 and above gotapproved under Part-A of the Scheme by Government of India, Ministry ofPower on 8th December 2010 at a cost of Rs. 191.25 crore comprisingRs.151.99 crore as PFC loan and Rs.39.26 crore as State share.Part B Schemes of these towns stand sanctioned at an estimated cost of Rs.1665.27 Crores. This includes conversion of Low Voltage Distributionsystem in High Voltage Distribution System, Aerial Bunched Cabling andother distribution strengthening works. The engagement of implementingagencies under progress.In addition to above SCADA for Srinagar and Jammu cities standssanctioned at an estimated cost of Rs. 52.89 Crores. The DPRs for the samewere prepared by M/S NDPL. The engagement of implementing agencytendered out.

Progress made so far under R-APDRP :-

Work on part- A of the scheme under progress by the implementingagency M/S Wipro. GIS survey under progress. Out of 30 satelliteimageries, 29 procured.

Asset mapping and consumer indexing completed in 4 towns and 6under progress.

Software development 40% completed. Webportal 35% completed. Ring fencing 40% completed. Feeder metering under progress. Base line data submission to TPIEA. 5 towns inspected by TPIEA,

7 towns ready for inspection. Data Centre cum Customer Care Centre Srinagar 2nd floor slab

completed. Column work on final lift under progress. Disaster Recovery Centre Jammu finishing work under progress.

Page 110: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 110

b Detailed Terms of Reference (TORS) forcarrying out system and commercial studiesfor strategizing action on the basis of aSWOT analysis of the transmission anddistribution sector so as to reduce AT&Closses shall be framed by GOJK inconsultation with the Ministry of Power(Central Electricity Authority).

With a view to segregat the losses into technical and commercial losses,and identify high loss areas and work out realistic category-wise energyconsumption, the Power Development Department is conducting loss andcommercial studies of the system. ToR with reference to guidelines fromSERC and CEA have been finalized and Expression of Interest floated.Due to poor response, the date of submission of offers was extendedseveral times. However only two offers have been received which areunder evaluation.In meanwhile, Perspective transmission plan has been prepared for creationof additional infrastructure in the state in view of additional generation anddemand forecast for next decade.

c While framing the TORs, GOJK shall makeuse of available reports such as the Blue Printon PDD being prepared by TERI.

This has been done.

B Independent Auditors.a Certification of the conditions (benchmarks)

established under this MOU shall be done byan independent Auditor,

This has been done.

b The auditor, so appointed, will be used byGoJK effectively.

The auditor, M/S SR Batliboi Consultants Ltd is being used effectively.

C Corporate Governance.a GoJK shall take steps to restructure the T&D

sectorIn J&K the generation entity stands already unbundled and corporatized.The transmission and distribution utility is vertically integrated and islooked after by the Government. As a second step towards corporatization,the State Cabinet has approved creation of State Transmission Utility andDistribution Utility. The orders to this effect stands issued in April, 2012and May, 2012.

b GoJK shall take steps to unbundle thetransmission functions being carried out bythe Government as departmental activity.

Please refer to a above

c GoJK shall take steps to establish atransmission company (TRANSCO) underthe companies Act. 1956.

Please refer to a above

d The relations between company’smanagement, its board of directors, itsshareholders and the other involved

Please refer to a above.

Page 111: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 111

stakeholder bodies in the Corporation shall bedefined in the Memorandum/Articles ofAssociation of the TRANSCO for clearlydelineating parameters of corporategovernance in the transmission sector.

e Reforms in the Distribution Sector shall becontinued.

Reforms in the distribution sector are continuing with the launching of R-APDRP scheme in the state.

f A road map for addressing consumergrievances shall be laid out considering theemphasis given in the guidelines ofR_APDRP.

The road map for addressing consumer grievances in an effective manner isbeing developed under R-APDRP guidelines.In meanwhile Bijli Adalats have been established in all distribution circlesof the state to redress consumer grievances. Wide publicity has been givenin local news papers regarding Bijli Adalats.

g Steps shall be taken to make the State LoadDispatch Centre (SLDC) function without thecontrol of the T&D utility, under the directcontrol of GoJK, as an interim measure,before autonomous SLDC comes into being.

This has been done.

D. Energy Accounting.a GoJK will issue detailed guidelines for

Energy Accounting in case of 11 KV feedersand above for effective monitoring throughregular inspections at different levels.

Month-wise loss reduction targets for field staff have been fixed vide govt.order no. 121 PDD of 2012, dated 20-04-2012. It has been made clear inthe order that failure to meet the targets shall attract disciplinary actionslike making an adverse entry in APRs, stopping of annual increments andpremature retirement.

b GoJK will fix responsibility at different levelsof supervisory engineers for inspection ofinstallations for demand vis-à-vis load as peragreement with the utility (department).

The responsibility at different levels of supervisory engineers forinspection of installations for demand vis-à-vis load as per agreement withthe utility (department) stands assigned with the issuance of circular issuedunder no. PDD/II/AC/03/2008 dated 09-06-2009.

c GoJK will carry out quick studies to pin pointhigh loss areas in the coming six months.Based on the studies, the high loss areas andinstallations shall be addressed through arange of specific measures such as electronicmetering, adherence to publicized curtailmentschedule, timely billing and monitoring ofrevenue recovery.

Please refer to A(b) above

d A web based Management Information This will be taken up along with the implementation of R-APDRP schemes

Page 112: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 112

System (MIS) shall be put in place bydovetailing APDRP or R-APDRP or otherfunds to monitor and take corrective steps onprogress in reducing AT&C loss parameters.The MIS shall be put in place within 12months.

e Full energy flow audit for the precedingtwelve months covering all major consumerswith a load of 25 KVA or more. Audit shouldcover energy (kWh) supplied to suchconsumers, energy billed to such consumersand cash collected from such consumers.

Energy auditing of 25 KVA and above connections stands implemented asa part of 2nd and 3rd tripartite MoU.

f Capacitor banks to be added at sub stations /feeders that feed energy to at least 75% of theconsumers covered under paragraph “e”above at 33 kV and below.

The target stands achieved with installation of capacitor banks at 33kVlevel in grid substations of the state under NRPC assisted scheme for Rs.22 crores.

g Considering the fact that due to law and orderdisturbances in the summer of 2008,electronic meters were damaged bymiscreants in Jammu division and that a largenumber of meters earlier installed in Kashmirdivision have become non functional, 100%of the meters installed under earlier two MoUwill be made functional.

The replacement of defective and damaged meters is an ongoing process.During 2011-12, 37470 defective meters were replaced.

h GoJK will take steps, by dovetailing fundsunder APDRP and R-APDRP and undernormal Plan/Non-Plan (2009-10) to achieve75% consumer metering.

1.04 lac new meters installed during 2011-12. 7.44 lac consumers meteredso far against 13.32 lac consumers in the State. 100% metering in the townstaken up under R-APDRP to be achieved during 2012-13 to establish baseline data.

E. Legislative Framework for Reforms.a Considering the fact that J&K is integrated

with the rest of the country in respect of theflow of electrical energy, and also,

The J&K State Electricity Act 2010 prepared on the lines of CentralElectricity Act 2003 stands passed by the State Legislature and notified inApril, 2010.

Page 113: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 113

considering the fact that power sector of thecountry is managed under the overallprovisions contained in the Central ElectricityAct, 2003 which is not yet applicable to theState of J&K, GOJK will place before itslegislature, within next six months, forconsideration and adoption an Electricity Acton the lines of the Central Electricity Act,2003.

b Considering the importance of energyconservation, GOJK will place before itslegislature, within next twelve months, forconsideration and adoption energyConservation Act on the lines of the CentralEnergy Conservation Act, 2001.

The J&K Energy Conservation Act 2011 prepared on the lines of CentralEnergy Conservation Act 2001 stands passed by the State Legislature andnotified in April, 2011.

c. GOJK will take steps to bring in legislationfor adoption by Regulator (SERC),of tariffdetermined through competitive bidding, soas to reduce regulatory risk in projects andalso to align the power sector of J&K with therest of the country.

The SERC Act 2000 (now repealed under J&K Elasticity Act, 2010) wasamended so that the SERC can adopt tariff determined after competitivebidding. The State has allotted 690 MW Rattle HEP, first project of itskind through transparent tariff bidding subsequent to amendment in theAct.

F Regulatory Related Issues.a GOJK will file ARR for the year 2009-10

before the J&K State Electricity RegulatoryCommission.

ARR for the years 2009-10 to 2012-13 stands filed and approved by theCommission. ARR/Tariff Order for 2012-13 also stands approved by theCommission.

G Commercial Issues.a Total cash collected from the larger

consumers under paragraph “D-(e)” aboveshould be at least 85% of the amount billed.

The present collections efficiency for connections having load 25kVA andabove is above 85%.

b Total cash collected for the preceding 12months period must be at least equal to 60%of the bulk power purchase cost.

The total power purchase cost for the year 2011-12 has been Rs. 3761.78Crores, against which cash collected for the year has been Rs. 1200.15Crores. So total cash collected for 12 months period of 2011-12 works outto 32% of the power purchase cost.

c Computerized billing covering at least 75% ofthe billed energy.

100% computerization of billed energy, barring two sub divisions one eachin Leh and Kargil Districts looking after far flung areas of the district,achieved. The sub divisions looking after Leh and Kargil Towns and

Page 114: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 114

adjoining areas also computerized.

H. Dovetailing of Schemes.a GoJK will establish a Single Nodal Agency in

the Power Development Department fordovetailing various schemes beingimplemented in the State in the power sectorsuch as RGGVY, APDRP, R-APDRP, PMRP(T&D sector) etc. with the power ReformGrant for deriving optimum benefits from theinvestments.

Development Commissioner Power has been nominated as the NodalAgency. He is being assisted by a committee of senior Engineers which hasbeen constituted for the purpose.

b Various reports on Power Sector includingthe Blue Print for Turn Around of the powersector being prepared by TERI and outcomeof studies mentioned in this MOU shall bereferred to while dovetailing the schemes.

M/S TERI has submitted the initial report for the Turn Around Plan ofT&D Sector of Jammu and Kashmir, which has been forwarded to Ministryof Power vide communication no. PD/PDD/156/2010 dated 01-06-2010 forsupporting the same to the Planning Commission. M/S TERI in its finalreport projected Rs. 7384.79 crore against Rs. 5851.00 Crore projected inits initial report. The revised report submitted to MoP vide no. PDD-VII/Plan/470/2009-10 dated 07-03-2011. Other studies will also be usedonce they are completed.

c System strengthening and up-gradation willbe carried out as per the Detailed ProjectReports prepared under RGGVY, PMRP,APDRP (X Plan) and R-APDRP.

System strengthening and up-gradation is being carried out as per theDetailed Project Reports prepared under RGGVY, PMRP and APDRP. Theproject reports for part-A works under R-APDRP have been approved byPFC/MoP. The project reports under part B of R-APDRP are underpreparation.

Page 115: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 115

Chapter 8STANDARD CONSTRUCTION PRACTICES & TECHNICAL DATA FOR TRANSMISSION &

DISTRIBUTION WORK

IMPORTANT NOTES:-

i. Since errors and omissions in this chapter cannot be ruled out, standard drawings, tables & other data in thissection are for guidelines only. Practicing Engineers are requested to refer to the original source of data.The DCP’s office does not bare any responsibility for any damage or loss which may occur as aconsequence of implementation of any erroneous drawing or data in this section.

ii. Any suggestions for rectification/improvement may please be emailed at [email protected]

Page 116: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 116

8.1 RECOMMENDED TYPE AND SIZE OF MULTI-CORE CABLES

REC CONSTRUCTION STANDARDF-8

DistributionTransformer

Capacity in kVAType Size (Nominal area of

Cross Section)

25 PVC insulated and sheathed un-armoured four core alumunium cable 16mm2.

63 PVC insulated and sheathed un-armoured four core alumunium cablewith reduced neutral conductor 70mm2.

OR

PVC insulated and sheathed alumunium armoured three core solidalumunium conductored cable 70mm2.

100 PVC insulated and sheathed un-armoured four core alumunium cablewith reduced neutral conductor 120mm2.

OR

PVC insulated and sheathed alumunium armoured three core solidalumunium conductored cable 120mm2.

Note:1 The cable would be laid in air.

2 In case of PVC armoured cables, aluminum amour shall serve as neutral for 63 and 100 KVA distributiontransformer centers.

3 Size of reduced neutral conductor shall comply with the main -neutral conductor combination as per IS:1554 (Part-I)-1976

4 Type and size of single core cables which can be used for the same purpose are given in REC constructionstandard F-18

Page 117: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 117

RECOMMENDED TYPE AND SIZE OF SINGLE CORE CABLESREC CONSTRUCTION STANDARD

F-18Distribution

Transformer Capacityin kVA

Type Size (Nominal area ofCross Section)

25 PVC insulated and sheathed un-armoured aluminiumconductor cable 10mm2

63 PVC insulated and sheathed un-armoured aluminiumconductor cable 50mm2.

100 PVC insulated and sheathed un-armoured aluminiumconductor cable 120mm2.

Note:1 The cable would be laid in air.2 The cables shall be as per IS:1554(part-1)-1976

3 Type and size of single core cables which can be used for the same purpose are given in REC constructionstandard F-8

Recommended cable dimensions for service lines

Max. loadCurrentmarked

on meter

Copperconductor- Cross

section

Aluminiumconductor--

Cross sectionType of cable Insulation peel off length

(mm). Remarks

≤ 10A 4.0mm2 N/A Single / multi core

≤ 20A 6.0mm2 N/A Single / multi coreAs recommended by metermanufacturer or measured

terminal hole depth +2.0mm

Reference standard:IS7098 (Part-1) and

IS:1554 (Part-1)

≤ 30A 10mm2 16mm2 Single / multi core≤60A 16mm2 25mm2 Single / multi core≤80A 25mm2 N/A Minimum -25mm2

≤100A 35mm2 N/A Minimum -35mm2

Notes: Always use multi-strands conductor instead of solid conductor Manufacturer’s instruction should be followed while using lugs for terminations Do not use any lugs for floating cage type terminals

Page 118: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 118

8.2 CURRENT RATING OF DISTRIBUTION & POWER TRANSFORMERS

Voltage Ratio: 11/.433 kVTransformer Capacity kVA 11 kV side LV Side

16 0.84 21.33

25 1.31 33.34

63 3.31 84.00

100 5.25 133.34

250 13.12 333.35

400 21.00 533.36

630 33.07 840.05

1000 52.49 1333.41

Voltage Ratio: 33/11 kVTransformer Capacity MVA 33 kV side 11 kV Side

1.0 17.50 52.49

3.2 55.11 165.34

5.0 87.48 262.44

6.3 110.22 330.67

10.0 174.96 524.88

Voltage Ratio: 132/33 kVTransformer Capacity MVA 132 kV side 33 kV Side

20.0 87.48 349.92

50.0 218.70 874.80

Voltage Ratio: 220/132 kVTransformer Capacity MVA 220 kV side 132 kV side

150.0 393.66 656.10

Page 119: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 119

8.3 FUSE RATING:

The size of tinned copper fuse wire for use on HV and LV side of the transformer should be as follows:

3 phase TransformerCapacity in KVA

Size of T. C. - Fuse11 KV LV

mm(SWG) mm (SWG)

25 0.160 (38) 0.800 (21)

50 0.224(34) 1.25 (18)

63 0.224(34) 2 of 1.25 (18)

75 0.224(34) 2 of 1.25 (18)

100 0.315(30) 2 of 1.40 (17)

The size of tinned copper fuse wire if used at 33 KV and 11 KV side of the transformer shall be as follows: -

3 phase Transformer Capacity kVASize of T.C. Fuse wire

33 KV/ mm (SWG) 11KV / mm(SWG)

5000 1.80 (15) -

3150 1.25 (18) -

1600 0.80 (21) -

630 0.63 (23) 0.90 (20)Source: RE Standards

Page 120: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 120

8.4 CT RATIOS APPLICABLE FOR HT METERING

Page 121: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 121

8.5

Page 122: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 122

8.6 SPECIFICATION OF SWAGED TYPE STEEL TUBULAR POLES AS PER IS2715WIDELY USED IN J&K POWER DEVELOPMENT DEPARTMENT

Des

ign

atio

n

Ove

r al

l len

gth

L

Pla

nti

ng

dep

th

Load

ap

plie

d f

rom

top

at

a d

ista

nce

ofH

gt.

ab

ove

gro

un

d H

Length

Outsidediameter andthickness of

sections

Ap

p.

Wt

of P

le

Bre

akin

g L

oad

Cri

pp

ing

Loa

d WorkingLoad

Load

fo

rp

erm

ann

ents

etn

ot e

xcee

din

g 1

3m

m

Load

fo

rte

mp

orar

yd

elec

tio

n o

f 1

57

.5m

m

Btmh3

Mdl

h2

Top

h1

Btmh3

Mdlh2

Toph1

Col14(2)

Col13

(2.5)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18(m) m m m m m m m mm mm mm kg (kg) N n N N N

(kg) (kg) (kg) (kg) (kg)

410SP7.5 1.25 0.3 6.25 4.5 1.5 1.5

139.7 114.3 88.9103

4630 3280 1650 1850 2250 1480-8 x x x -472 -335 -168 -189 -229 -151

4.85 3.65 3.25410SP

7.5 1.25 0.3 6.25 4.5 1.5 1.5139.7 114.3 88.9

1105100 3620 1810 2040 2480 1600

-9 x x x -520 -369 -185 -208 -253 -1635.4 3.65 3.25

410SP8 1.5 0.3 6.5 4.5 1.75 1.75

139.7 114.3 88.9111

4440 3160 1580 1770 2160 1280-14 x x x -453 -322 -161 -181 -220 -131

4.85 4.5 3.25410

8 1.5 0.3 6.5 4.5 1.75 1.75139.7 114.3 88.9

1194890 3470 1740 1960 2380 1380

SP-15 x x x -499 -354 -177 -200 -243 -1405.4 4.5 3.25

4109 1.5 0.3 7.5 5 2 2 165.1

x 4.50139.7x 4.50

114.3147 5070

(517)3600(367)

1800(184)

2030(207) 2460 (251) 1360 (139)SP-31 x

3.65410

9 1.5 0.3 7.5 5 2 2 165.1x 4.85

139.7x 4.50

114.3154 5430

(554)3850(393)

1930(197)

2180(222) 2640 (269) 1430 (146)SP-32 x

3.65410

9 1.5 0.3 7.5 5 2 2 165.1x 5.40

139.7x 4.50

114.3154 6000

(612)4270(435)

2130(217)

2410(245) 2910 (297) 1540 (157)SP-33 x

3.65410

11 1.8 0.6 9.2 5.6 2.7 2.7 193.7x 4.85

165.1x 4.50

139.7227 6370

(650)4530(462)

2260(231)

2550(260) 3100 (316) 1270 (130)SP-55 x

4.5410

11 1.8 0.6 9.2 5.6 2.7 2.7 193.7x 5.40

165.1x 4.50

139.7241 6990

(713)4820(502)

2480(253)

2790(285) 3400 (347) 1370 (140)SP-56 x

4.5

Page 123: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 123

41011 1.8 0.6 9.2 5.6 2.7 2.7 193.7

x 5.90165.1x 4.85

139.7256 7620

(777)5410(552)

2710(276)

3050(311) 3710 (378) 1470 (150)SP-57 x

4.5410

13 2 0.6 11 5.8 3.6 3.6 219.1x 5.60

193.7x 4.85

165.1333 7720

(787)5480(559)

2740(279)

3090(315) 3750 (382) 1160 (118)SP-71 x

4.5410

13 2 0.6 11 5.8 3.6 3.6 219.1x 5.90

193.7x 4.85

165.1343 8120

(828)5770(588)

2880(294)

3250(331) 3940 (402) 1190 (121)SP-72 x

4.5410

14.5 2 0.6 12.5 6.5 4 4 219.1

x 5.60193.7x 4.85

165.1370 6750

(688)4790(488)

2390(244)

2700(275) 3780 (334) 775 (79)SP-75 x

4.5410

14.5 2 0.6 12.5 6.5 4 4 219.1

x 5.90193.7x 4.85

165.1380 7100

(724)5040(514)

2520(257)

2840(290) 3450 (352) 794 (81)SP-76 x

4.5410

16 2.3 0.6 13.7 7 4.5 4.5 219.1x 5.60

193.7x 4.85

165.1405 6130

(625)4350(444)

2180(222)

2450(250) 2980 (304) 569 (58)SP-79 x

4.5410

16 2.3 0.6 13.7 7 4.5 4.5 219.1x 5.90

193.7x 4.85

165.1416 6440

(657)4570(466)

2280(233(

2580(263) 3130 (319) 568 (60)SP-80 x

4.5

RECOMMENDED SHADES FOR PAINTING ST POLES

1. Poles should be painted in Silver or orange only, as these colours are conspicuous and therefore safe for trafficand pedestrians.

2. Paint the poles with black and yellow strips upto the height of 180 CM, so as to protect themagainst the possible damage during the night by fast moving vehicles.

3. Green paint is not recommended, since it conveys safety and is used to identify earth conductors

Page 124: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 124

8.7

Page 125: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 125

8.8 RATING OF CAPACITORS FOR kVAR COMPENSATION

S# Rating of Individual Induction Motor kVAR rating of LT Capacitor

1 3BHP and above upto 5BHP 1

2 Above 5 BHP to 7.5 BHP 2

3 Above 7.5 BHP to 10 BHP 3

4 Above 10 BHP to 15 BHP 4

5 Above 15 BHP to 20 BHP 5

6 Above 20 BHP to 30 BHP 6

7 Above 30 BHP to 40 BHP 7

8 Above 40 BHP to 50 BHP 8

9 Above 50 BHP to 100 BHP 9

10 Above 100 HP As approved by the utility

Page 126: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 126

8.9 Extracts from Record note of meetings of Coordination Committee constituted videDevelopment Commissioner (Power) communication no. DC/PD/TO-I/51/1659-1667Dated 17-06-2005.

A) Pole Erection The planting depth of poles up to and including 9Mtr. Shall be 1500mm (REC Construction standards).

The planting depth of poles of 11Mtr. Length shall be 1.83 Mtr. (One – sixth of pole length) (CBIP publication no 58).

PCC Poles shall be provided with base plates as per REC construction drawing no. K-1.

Base Plates for steel tubular poles shall be provided with a hole and shall be welded to pole bottom.

Steel tubular poles shall be provided with steel pole cap.

Drilling of holes in steel tubular shall be avoided as far as possible. Back up clamps shall be used to fix cross arms/cross braces.

All HT/LT poles shall be earthed as per REC standard drawing no. J-1. (REC construction drawings, J&K PDDEarthing Booklet Page No. 12)

At tension points PCC poles shall be installed in Transverse/ Lateral Position.

The Steel Tubular poles shall be concrete bottomed.

Earthing spiral shall be kept outside concrete portion.

Two pole, Three pole and four pole structures shall be provided with cross bracings as per REC construction drawingno. A-21.

B) Guys for Overhead lines The 33kV, 11kV and LT poles at angle locations (greater than 50o ), dead ends, tap off and tension points shall be

provided with guys.

Various accessories of guys shall be as per REC construction drawing no. G-1.

Page 127: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 127

Accessories of guys shall be assembled as per REC construction drawing no. G-3.

The no. of guys for various angle locations shall be as per REC Construction Standard G-5 to G-9.

The guy angle shall be 30 o to 45 o as per REC construction drawing no. G-3.

Anchor plate (or guy stone) shall be provided as per REC construction drawing no. K-1 and K-4.

Turn buckle shall be mounted at the pole end of the guy and guy wire shall be so fixed that the turn buckle is halfway in the working position thus giving the maximum movement for tightening or loosening.

Minimum two no. Guys shall be provided to two-pole structure of each distribution sub station.

For two pole tension points minimum four guys along the line two in each direction shall be provided.

Storm guys shall be provided for each section of line because Kashmir Valley is in wind zone of 100 Kg/cm2(greater than 50 Kg/cm2). (CBIP Publication no. 88 Page 123)

Fixing of guys to trees, buildings, structures, poles, pipe lines etc. Shall not be allowed in any case whatsoever.

Guy strain insulators: These are used in the guys so that in case of any mishap if the live conductor comes intocontact with the guy wire and continues to be in contact and if the line does not trip then the bottom portion of theguy wire would have no voltage due to the insulation provided by the guy insulator. The insulator is fixed between theguy wire almost in middle. The bottom portion of the wire thus gets insulated. Any human being or animal if comingin contact with the bottom portion of the guy-wire will be provided safety. No guy insulator shall be installed less than2.6m from the ground. (CBIP Publication no. 88 Page 39,40 and 124)

Two types of insulators are standardized:

(i) A type for 415/240 V lines

(ii) C type for 11kV lines.

Two C-type insulators are used in series for 33kV lines.

The minimum failing load for A type insulator is 44kN and for C type insulator is 88 kN. If space for installation of normal guys is not available then fly guy, bow guy and strut shall be used as per REC

construction standard no. G-4.

Page 128: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 128

C) ACSR for Overhead LinesNomenclature/ Dimensions:

The conductors shall be specified by their code names and the cross sectional area shall be mentioned in sq. mm only.Equivalent copper area in sq. inch is no longer being used. Given below is an example to convert conductor sizes into

sq. mm if it is given in equivalent copper area in sq. inch:

Size of ACSR Dog in equivalent Copper area = 0.1 inch2= 0.1 X 25.4 X 25.4 = 64.51 mm2

Conductivity of Copper = 1.6 X Conductivity of Aluminum (for same area of copper)

Therefore cross sectional area of ACSR Dog in sq. mm = 1.6 X 64.51=100 mm2 (Approx)

Following table gives technical details of conductors widely used in Sub Transmission and Distribution networks:

Code Nameof ACSR

EquivalentCopper

Area (Inch2)

NominalAl. Areain mm2

Stranding andwire diameter

(mm)

Approx.Mass

(Kg/Km.)

CalculatedResistance

at 200 C(Ohm/Km)

Approx.calculatedbreaking

load)KN

Current ratingfor AmbientTemperature

of 350 C (Amp)

Al Steel

Squirrel 0.02 20 6/ 2.11 1/ 2.11 85 1.394 7.61 110Weasel 0.03 30 6/2.59 1/2.59 128 0.9289 11.12 145Rabbit 0.05 50 6/3.35 1/3.35 214 0.5524 18.25 200Racoon 0.08 80 6/4.09 1/4.09 319 0.3712 26.91 255Dog 0.1 100 6/4.72 7/1.57 394 0.2792 32.41 305Leopard 0.125 125 30/2.36 7/2.36 603.8 0.2221 56.56 380Wolf 0.15 150 30/2.59 7/2.59 727.4 0.1844 67.59 420Panther 0.2 200 30/3.00 7/3.00 976.0 0.1375 89.66 510

REC Specification 1/1971 (Revised 1993) Table-II, IS 398 -1961

Page 129: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 129

The design of conductor shall be based on Voltage Regulation, Thermal rating and mechanical loading.

The conductor for overhead lines shall be designed with following regulation:

( CBIP Publication no 198 page 10)

The calculation for voltage regulation shall be based on KW-KM for 1% voltage drop to be taken from following REC ConstructionStandards:

Nominal voltage of line Reference to REC construction standard forKW-KM

LT Lines B-911kV A-933kV M-12

Nominal voltage of line Voltage Regulation

33kV 9%11kV 9%LT Lines 6%

Page 130: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 130

8.10 General Guidelines for Execution of Electric Works:A) Control Cables/C&R Panels:

No openings shall be left in the panels, marshalling kiosks, terminal boxes etc. Special care shall be taken in sealing outdoorcubicles to ensure IP 55 protection. All spare holes in gland plates for cable entry shall be sealed.

The punches in gland plates shall be made by hole punching machine or some other approved mechanical means. Making ofholes by welding shall not be allowed. Contractor shall replace gland plates in which holes have been made with weldingmachines immediately at his cost.

Outdoor cables lying on the yard metal without any protection shall not be acceptable. Cables to equipments like CTs, PTs,CBs, Transformers shall be routed through cable trays, conduits etc.

Cables without glands shall not be allowed.

Contractor shall ensure that space heaters, thermostats, lights, sockets in all cubicles are working.

Contractor shall provide inter-panel and panel to equipment cable cores with tube type cross ferrules printed by ferruleprinter. The ferrules shall have address of the terminal block and terminal of the panel in which terminated and address ofpanel / equipment , terminal block and terminal of other side.“Cross Ferruling is a global standard for identification of cable cores in a sub station. Suppose a cable core is to be connectedfrom 5th terminal of Terminal Block No. X2 of Control Panel K1 to the 2nd terminal of Terminal Block X3 of another panel R1.The cross ferrule in panel K1 will be “5-X2-K1-R1-X3-2”. 5 is to be kept towards terminal block and 2 side away from theterminal block in K1. Similarly the cross ferrule in panel R1 for the same core will be 2-X3-R1-K1-X2-5. 2 side is to be kepttowards terminal block and 5 away from terminal block in R1. Similarly the practice is to be followed for panel to equipmentwiring. Cross ferrule is very convenient for identification of cores and fault finding. Earlier ring type PVC ferrules were used foridentification of cores. Electronic ferrule printers are now available which print ferrules on PVC tubes. The electronic printercan be hooked on to the computer and ferrules can be printed from the cable schedules directly from the computer”.

Cable entries to the panels shall be from the bottom. Cable gland plate fitted on the bottom of the panel shall be connectedrigidly to the earthing of the panel/station through a flexible braided copper conductor.

Page 131: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 131

Wire termination shall be made with solder-less crimping type and tinned copper lugs which firmly grip the conductor andinsulation. Insulated sleeves shall be provided at all the wire terminations. Engraved core identification plastic ferrulesmarked to correspond with panel wiring diagram shall be fitted at both ends of each wire. Ferrules shall fit tightly on the wireand shall not fall off when the wire is disconnected from the terminal blocks.

All wires directly connected to trip circuit breaker or device shall be distinguished by the addition of red coloured “T”lettered ferrule. Number 6 and 9 shall not be included for ferrule purpose.

CT and VT secondary neutral or common lead shall be earthed at one place only at the terminal blocks where they enter thepanel.

For all single core cables, gland plates shall be of non-magnetic material.

The cable opening and cable entries for cables terminating to the panels shall be sealed with fire sealing materials.

At least one (1) core shall be kept as spare in each copper control cable of 4C, 5C or 7C size whereas minimum number ofspare cores shall be two (2) for control cables of 10 core or higher size.

Looping of earth connections shall be such that it would not result in loss of earth connections to other devices when the loopis broken. However, looping of earth connection between equipment to provide alternative paths to earth bus shall beprovided.

For control cables only round wire armouring shall be used.

Not more than 2 wires shall be connected to any terminal.

Disconnecting type terminal blocks shall be provided for Current Transformer and Voltage Transformer secondary leads. AllCT secondary leads shall be provided with short circuiting and earthing facilities.

The terminal blocks shall be fully enclosed with removable covers of transparent, non-inflammable, non-deteriorating typeplastic material.

At least 20% spare terminals shall be provided at each panel and these spare terminals shall be uniformly distributed on allterminal blocks.

All panels shall be equipped with an earth bus securely fixed. Location of earth bus shall ensure no radio interference foreffectively earthed systems under various switching conditions of isolators and breakers. The material and the size of the bus

Page 132: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 132

bar shall be at least 25X6 sq.mm perforated copper with threaded holes at a gap of 50 mm with the provision of bolts andnuts for connection with cable armours and mounted equipment etc. for effective earthing. When several panels are mountedadjoining each other, the earth bus shall be made continuous.

Panels shall be provided with two separate and distinct earthing terminals suitable to receive the earthing conductors of size50 X 8 mm GS flat.

All panel doors, removable covers and plates shall be gasketed all round with EDPM/ Neoprene gaskets.

Cable gland shall be dust tight, screw or double compression type and made up of brass. The glands shall have provision forsecuring armour of the cable separately and shall be provided with earthing tag.

All cubicles shall be provided with a thermostatically controlled space heater, interior lighting facilities and one single-phasepower outlet ( 3 pin) with socket. All indicating and control devices shall be mounted on the front door.

The bay marshalling kiosks shall be provided with danger plates and a diagram showing the numbering/connection/ferrulingby pasting the same on the inside of the door.

Aluminium conductor XLPE insulated armoured cables shall be used for main power supply purpose from LT AuxiliaryTransformers to control room, between distribution boards and for supply for colony lighting from control room.

Aluminium conductor PVC insulated armoured power cables shall be used for various other applications in switchyardarea/control room except for control/protection purposes.

Separate cables shall be used for AC & DC.

Progressive sequential marking of the length of cable in metres at every one metre shall be provided on the outer sheath ofall cables.

B) Laying of ACSR

For 11kV lines, at straight runs and light angles (00 to 100) pin insulators shall be used. The conductor shall be tied to theinsulator at the top groove at straight runs and to side groove on top of insulator through helically formed fittings (RECConstruction drawing no. C-3 and C-4).

Page 133: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 133

Tying of conductor to insulator skirt shall not be allowed in any case whatsoever. It reduces the creepage path of insulatorand causes surface flashover and earth fault in dirty, humid and rainy conditions and leads to premature failure of insulator.

Use of pin insulator at sharp angles, tap off points and dead ends for taking conductor load shall not be allowed in any casewhatsoever. Pin insulator is not designed for such applications.

At sharp angles, tap off points and dead ends disc insulators shall be used as per REC Construction drawing no. C-5. Tension points caused by ascend or descend of terrain shall be provided with disc insulators. The shackle insulators at straight runs shall be installed such that D-fitting of insulator is at right angles to the conductor and

at dead ends the D-fitting is in line of the conductor. This will require installation of poles in such a way that holes provided forfixing insulators are at right angles to the conductor at straight runs and in line to the conductor at tension points and deadends. (REC Construction drawing no. D-6).

Conductor joints shall be crimped. Crimping sleeves shall be used for this purpose as per REC construction drawing no. E-26. The conductor shall be strung at specified sag and tension as per REC construction drawing no. E2 to E22. The sag chart

pertaining to 100Kg/m2 wind zone shall be used from REC standards. 11kV main lines in Srinagar City and Towns shall be constructed with ACSR Dog (100 mm2 ). However the tap lines and in

rural areas lower sizes of ACSR can be used.

C) Clearances of Sub Transmission and Distribution Lines

The clearances of 33KV, 11KV and LT lines from ground and from buildings shall be as per J&K Electricity Rules which areas under:

(a) Minimum clearance above ground of the lowest conductor:

Line Voltage(Phase to phase)

Clearance acrossstreet (Mts)

Along Street(Mts)

Elsewhere than along or acrossany street (Mts)

LT Lines 5.791 5.486 4.57211kV Lines 6.069 5.791 4.57233kV Lines 6.965 6.965 5.182

(J&K Electricity Rules 1978 page 44)

Page 134: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 134

(b) Clearance from buildings

Where an electrical line passes above or adjacent to or terminates on any building, the following minimum clearance from anyaccessible point, on the basis of maximum sag shall be observed:

S.No Line Voltage (Phase tophase)

Vertical Clearance fromhighest point of building

(Mts)

Horizontal Clearance fromnearest point of building (Mts)

1 LT Lines 2.439 1.2192 11kV Lines 3.658 1.3193 33kV Lines 3.658 1.529

(J&K Electricity Rules 1978 page 45&46)Note: The horizontal clearances shall be measured when the line is at a maximum deflection from the vertical due to wind

pressure.

(c) Phase to phase Clearances

The phase-to-phase clearances of 33kV, 11kV and LT lines shall be as per Rural Electrification Corporation ConstructionStandards, which are as under:

S.No Line Voltage (Phase tophase)

Minimum Phase to PhaseClearance (mm) Preferred configuration

1 LT Lines300 Vertical450 Horizontal

2 11kV Lines 1070 Triangular on V-Cross Arm

3 33kV Lines 1525 Triangular on V-Cross Arm

The preferred configuration for LT lines is vertical due to economic considerations.

Page 135: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 135

D) 11kV/ 433V Distribution Sub Station Installation

(a) Clearances: As per REC standard specification no. F-1, F-2, F-3 and F-4 and TATA Consultants report onremodeling of distribution scheme in Srinagar City, following clearances shall be maintained for 11/0.433kV Sub Stations:

Description Polemounted

Transformer

Padmounted

Transformer

References

Capacity Up to andincluding250kVA

Above250KVA

TATA Consultants report, Drg. No. 7-3

Phase to Phase spacing ofdown conductors

760mm 460mm REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7-3

Phase to ground clearance ofdown conductors (Horizontal)

460mm 460mm REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7-3

HT terminal of 11kV bushingupto ground 5440 mm 2200 mm

REC Standards Drg. No. F1,F2,F3 and F4,TATA Consultants report, Drg. No. 7- 4

Note : The transformer jumpers and bushing terminals of pad mounted transformers shall be insulated with PVCsleeves or coated with epoxy compound.

(b) Earthing

1. Three independent earths shall be provided to 11/0.433kV Sub Stations as per REC Construction Drawing no. F-5 and F-10

2. To one of the earth electrodes one direct connection shall be provided from three Lightening Arresters.3. To each of remaining two electrodes

(a) one separate connection from the neutral of the transformer.(b) one separate connection from the transformer body and the handle of 11kV AB switch.(c.) one separate connection from the earthing of poles.

Page 136: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 136

4. The earthing electrodes shall be 2.5meter perforated GI pipe 40mm dia or 20mm GI rod as per REC constructiondrawing no. J-1

(c.) 11kV Air Break Switches

11kV link sets shall not be used henceforth. The link sets are a safety hazard. Instead 3-phase gang operated Air BreakSwitches shall be used. The air break switches shall be installed as per REC Construction Drawing no. F-2, F-3 and F-4.

E) Earthing of 33/11kV Sub Stations

An earth mat shall be laid inside 33/11kV sub station designed as per standard practice. The earth mat shall bedesigned so that step and touch potential is kept within 32 volts.

The minimum size of steel electrodes shall be 22mm dia and 3 mtrs long buried in ground at a minimum depth of750mm.

The number of electrodes required in a sub station may be selected in such a way that each rod does not carrymore than 500 Amps of ground fault current. The number of electrodes may have to be increased if the combinedearthing resistance exceeds 2 ohms. .

The electrodes shall be uniformly distributed within the sub station area. Spacing between the electrodes shall bemore than twice the depth of the electrodes driven below ground level so as to keep resistance to minimum.

The top end of the earth electrode shall be interconnected with steel flat of minimum size of 50X6 mm.

Separate earthing electrodes shall be driven for neutral point of power and auxiliary power transformers and foreach lightening arrester. These electrodes shall be interconnected to main earth mat.

An earth ring shall be formed around sub station at a distance of 2 meters to earth the sub station fencing. This ringshall be interconnected to the main mesh. Alternate fencing posts shall be earthed.

Sufficient risers shall be provided to earth non current carrying parts such as tank of power transformer, frame workof circuit breaker, Isolator operating handle, all steel structures, power cable sheath and armour. Each connectionshall be made in duplicate so as to ensure that at least one safety earth remains in case any one of the two fails.

Page 137: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 137

The risers to equipment or risers to steel structure shall not be welded. All these connections shall be bolted. Therisers shall be connected to steel structures through bolts/nuts of minimum size of 16mm and the riser toequipment connection shall be through the bolts/nuts provided with the equipment by manufacturer.

The risers shall not be embedded in concrete.

All welded mesh joints shall be painted with red lead and aluminum and later coated with bituminous.

The power cables shall be grounded at one end only. If the cables are grounded at both ends, the induced currentsflow through a continuous loop formed by armor/ sheath through ground and may damage the cable and/ortermination due to overheating.

Crushed rock may be used as surface layer as it provides high resistivity, keeps away the reptiles and also avoidsformation of pools of oil in case of leakage. It also helps in presence of moisture in the under layer of soil and thushelps in maintaining low resistivity.

Crushed rock of size 3cm to 5cm to a depth of approximately 10 cm may be spread in the yard area. Electricequipments and structures supporting live conductors may be surrounded be a surface layer of crushed rock withina distance of above two meters. This is so as a person is not likely to be exposed to touch voltage when he is twometers away from any live equipment or structure swith yard.

(Source : REC Earthing Manual; PDD Earthing Booklet; PDD Const. Practice)

F) Electrical Clearances in 33/11kV Sub Stations (Receiving Stations)

Minimum phase – phase clearance of 33kV Bus shall be 1200mm.(REC Construction Drawing no. L-1)

Minimum phase – column clearance of outermost conductors of 33kV Bus shall be 1050mm. (REC ConstructionDrawing no. L-1)

Minimum Phase to ground clearance of 33kV Bus shall be 4500mm.(REC Construction Drawing no. L-1)

Minimum ground clearance of HV terminal of 33KV Circuit Breaker and 33/11kV Transformer shall be 3660mm.

Minimum phase – phase clearance on 11kV gantry shall be 900mm .(REC Construction Drawing no. L-1)

Page 138: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 138

Minimum distance from 33kV switchyard up to control room shall be 7500mm (REC Construction Drawing no.L-1)

Minimum spacing between 11kV panels and control room wall shall be 1000mm (with back door open)

Tilting of V-Cross ArmsSome field engineers have approached the committee with complaint regarding tilting of V-Cross Arms at angle locations. Thecommittee examined the issue and following clarifications are hereby given:

The tilting problem has been noticed mostly at angle locations more than 100 .

The committee has recommended V-Cross arm for tangent locations (straight runs) and light angles (upto100) only. Forangle locations 100 to 600 two pole structure shall be used and for angle locations 600 to 900 4 pole structure shall be used.(KEECC Record note no dated 09-07-2005 ) (REC Construction Drawing no. A-10)

At some locations the cross arms have slipped and/ or tilted because back clamp for the cross arm was not fabricated asper REC Construction drawing no. K-2. Please note 20mm gap is to be left between the cross arm and back clamp afterfirm tightening

Still if the field engineers have apprehensions that the cross arm may slip/ tilt they can use supporting braces as perenclosed drawing (CBIP publication no 88 page 58 )

Standardized V-Cross arm has been in use in the country since September 1972. This cross arm is considered to be thebest choice of power engineers all over the country in view of its advantage of reducing the bird faults considerably. Due tothis advantage Central Board of Irrigation and Power has also upheld its use. TATA consultants have also recommended itsuse in Srinagar and Jammu Cities. REC has again standardized this cross arm for RGGVY Schemes (REC Guide Line forRGGVY Schemes- Attachment-I)

Since Kashmir Valley is gifted with vast variety of birds some of which are large sized like crows, Kites, Vultures etc. the birdfaults are very common here. The bird sits on the flat cross arm and its beak or tail touches the live conductor resulting inearth fault. This problem was not widespread earlier because wooden poles and wooden cross arms were used in SubTransmission and Distribution System in Kashmir Valley. These poles/ cross arms provided sufficient insulation to ground.Ever since the wooden poles and wooden cross arms have been replaced by Steel/PCC poles and steel cross arms, theoccurrence of bird faults has become a regular feature reducing reliability of power supply.

The V-cross arm has been designed in such a way that bird cannot sit on it due to its slanting design.

Page 139: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 139

Under the circumstances the committee considers the V-Cross Arm is the best choice for Sub Transmission and DistributionSystem in Kashmir Valley for reliability and safety of the system.

HVDS (High voltage distribution system)

HVDS stands for High Voltage System. In this system high voltage line is drawn as near the load as possible andsmall capacity distribution transformer is installed. This system is best suited to meet scattered rural loads. Theadvantages of this system are:

(i) Reduction in losses because LT line length is reduced.

(ii) Improvement in voltage at the consumers premises.

(iii) Theft of energy by direct tapping of long LT lines eliminated.

(iv) Frequent faults on LT side are reduced.

(v) Failure of Transformers prevented because transformer is feeding 3-5 consumers and these consumers havesense of belonging of the transformer and they take care of the transformer.

REC specification no. 50/1987 specifies the Single Phase Distribution Transformers. Fig.1, Fig.2, Fig.4 and fig.5 attached tothis specification gives the connection diagram of the single phase transformers. In each drawing continues 11kV neutral is shown onHT side connected to the transformer. In order to accomplish this scheme a continuous neutral shall have to be run on existing polesfrom the star point of 33/11kV Power Transformer right up to the distribution sub station.

The prevailing practice of HVDS in Kashmir Valley is to use a single conductor for HVDS transformer. The other terminal ofHT winding of the single-phase transformer is grounded locally. This connection is nothing but Single Wire Earth Return System(SWER).

REC specification no 14/1979 specifies SWER distribution transformers. This specification was issued for gaining experienceonly. REC did not issue any construction standard for SWER system till 1994. The REC standards available with the committeeare amended up to 30-07-1994.

The committee tried to obtain information from World Wide Web on SWER systems and following are the findings:

A record note regarding HVDS (High Voltage Distribution System) was issued on 23-09-2005. The issue remainedinconclusive at that time because of non-availability of sufficient information on the subject.

Page 140: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 140

REC has recently issued Standard Technical Specification (Specification No. 75/2005) for 5kVA HVDSTransformers, wherein it has been made clear that in case of single phase 11/3 HVDS transformers, 3 ph., 4Wire system at 11kV (with separate neutral wire running continuously from 33/11kV sub-station) shall beadopted and proper earthing of neutral wire separately at both ends shall be ensured. In view of thisdevelopment the committee decided to issue following guideline for construction of HVDS substations:

The standard rating of HVDS transformers shall be 5, 6.3, 10 & 16kVA for 11/√3 (Phase to Neutral) transformersand 10 & 16kVA for 11kV (Phase to Phase) transformers. (REC Specification no. 50/1987 & 75/2005)

5kVA transformers will be of great help in feeding small habitations were small loads are to be supplied in ruralareas. Also 5kVA transformers can be used as a dedicated transformer for every consumer in urban area. (Fore-word to REC Specification no. 75/2005)

The 3 phase and 2 phase HVDS transformers shall be fed from 3 wire 11kV system in conventional manner.However in case of single phase HVDS transformers (11/√3 kV primary), 3 Ph, 4 wire system at 11kV withseparate neutral wire running continuously from 33/11kV sub-station shall be adopted and proper earthing ofneutral wire separately at both ends shall be ensured. (REC Specification no. 50/1987 & 75/2005)

The transformers shall be mounted on single poles. The neutral wire shall be of minimum size ACSR/AAACrecommended for 11kV by REC (eg ACSR 7/2.11mm, 20mm2 aluminum area)( REC Specification no. 1/1970revised 1993 & A-32, F-13& F14)

The neutral shall be run on LT shackle insulators installed on 11kV pole directly through D-clamps. The point ofattachment of neutral wire shall be 800mm below lowermost 11kV phase conductors.( REC Specification no. A-16)

The single phase HVDS transformers shall be distributed equally on the 3 phases of 11kV system to ensurebalancing of load at 33/11kV sub station feeding the single phase HVDS system.

METER INSTALLATION

In view of ongoing metering drive in the department a guideline was issued for consumer meter installation for wallmounted and pole mounted meters. However APDRP task force set up by Ministry of Power has devised a

Page 141: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 141

comprehensive guideline for meter installation. It was decided to issue the same to the field engineers forimplementation. This guideline supersedes the guideline devised by the committee.

The first Para of the guideline states: “Choose a location where the meter will be protected from exposure to directsunlight and rainwater. The location should be away from children's approach and should have enough ventilationand light for meter installation, testing, meter reading, etc. There should be free space for meter mains fuseinstallation and maintenance”.

In view of above and also for convenience of downloading the readings from meter to the AMR/ Laptop computerthe committee felt that meters shall be installed on walls of the consumer installations only. However in case ofextreme necessity where installation on wall is not feasible or for the purpose of exposing of unscrupulousconsumers, the meters may be installed on poles as per guideline issued by the committee earlier.

The present practice of tying the meters to poles, especially in Srinagar city, with steel standards without clamps,lugs and meter seal and with undersized service line is a sub standard practice and shall not be acceptable toinspection wing.

TECHNICAL SPECIFICATION FOR CROSS-ARMS FOR 33 kV AND 11 kV OVERHEAD POWER LINES

1.0 ‘V’ SHAPE M.S. CROSS ARM WITH CLAMPS

1.1 X-arms shall be made out of 100 x 50 x 6 mm and 75 x 40 x 6 mm M.S. Channel for 33KV and 75x40X6mm for11KV.

1.2 The cross arm shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.3 The X-arm should not be welded/ jointed at any place except as specified.

1.4 The clamps for the X-arm shall be of G.I. & shall be hot dipped galvanized generally conforming to IS – 2633/72.

1.5 The clamps shall be designed to fit for the specified rail & PSC poles.

2.0 Shape & Size

2.1 The cross arms shall be of MS channel.

Page 142: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 142

2.2 The cross arms shall have two holes of 22 mm dia (for 11kV line) and 26 mm dia (for 33kV line) for fixing of pininsulators. The center-to-centre distance between the holes shall be 1070 mm (for 11kV) and 1525 mm (for 33kV)and holes shall be in the middle of the top width of cross arm.

2.3 If required by the owner, holes of specified size and spacing shall also be provided for fixing of pole back clamp tosuit the pole.

3.0 Marking

The following information shall be marked on each cross arm:

a) Manufacturer’s name or trademark.

b) Year of manufacture

Page 143: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 143

8.11 COSNTRUCTION DRAWINGSOF

CROSS ARMS, SUB STATION FRAME ETC

Page 144: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 144

1 2

3 4

Unstable ConfigurationEach pole demands a guyProne to bird fautsHigh reactive dropNeeds poles of high strengthNot speicified in standardsHence not recommonded

Unstable ConfigurationEach pole demands a guyProne to bird faultsHigh reactive dropNeeds poles of high strengthVery difficult to get phase clearanceNot speicified in standardsHence not recommonded

Very difficult to get phase phase clearanceProne to bird fautsHigh reactive dropNot speicified in standardsHence not recommonded

Unstable ConfigurationEach pole demands a guyProne to bird faultsNeeds poles of high strengthNot specified in standardsHence not recommended

SUB STANDARD CROSS ARMS AND CONDUCTOR CONFIGURATION ( 5 Cases)

Page 145: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 145

5

Prone to bird faultsNot specified in standards

Not recommended for straight runs

CONDUCTOR FORMATION AND CLEARENCE OF 11 KV AND 33 KV LINES

1070

100100

650 75x40 mm MSChannel

PCC/ST Pole

75x40 mm MS ChannelV Cross Arm ( Refer toREC drawing No A-6)

11KV LINES (TANGENT LOCATIONS

100x50 mm MSChannel Piecewelded on 75x40MS Channel

PCC/ST Pole

100x50 mm MS Channel VCross Arm (Refer to RECdrawing No A-6)

33 KV LINES (TANGENT LOCATIONS

50X6 mmMS Strip

1525

100100

1320

Page 146: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 146

Page 147: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 147

Page 148: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 148

Page 149: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 149

Page 150: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 150

Page 151: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 151

Page 152: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 152

Page 153: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 153

Suspension and Dead end clamps for Aerial Bunched Cable (ABC)

Page 154: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 154

Page 155: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 155

INSTALATTION OF METERS ON PCC & ST POLES

Leave 20mm fortightening

4 no 5X30 mmbolts with nuts andwashers

25X4 mm MSClamp

PCC Pole

Leave 20mm fortightening

4 no 5X30 mmbolts with nuts andwashers

25X4 mm MSClamp

PCC Pole

Leave 20mm fortightening

4 no 5X30 mm boltswith nuts andwashers

Electronic Meter

Electronic Meter

STPole

Electronic Meter

Page 156: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 156

Note:- This Drawing is Not to Scale

Combined 3PhaseCT/PTUnit

33 kVincomingLine

33 KVIsolator

WeatherProof MeterBox

33/11 KVPowerTransformer

33 KV DOFuse

75 mm GIPipe(threadedboth ends)4000 mm

ACSRACSR

Title :- 33 kV Consumer Metering Scheme

SurgeArrestor

Combined3 Phase

CT/PT Unit

Page 157: With Standard Construction Practices & Technical Data for ... · With Standard Construction Practices & Technical Data for Distribution Works With Standard Construction ... New 66kV

Page | 157

a

11 kV Consumer Metering Scheme

TITLE : 11 kV Consumer Metering Scheme

07

08

03

05

07

04

02

1625

710 710

710

710

10

09

1500

SR.NO DESCRIPTION1 11 KV EPOXY CAST CT 3 NOS.2 11 KV EPOXY CAST 3 Ø PT 1 NO.3 MOUNTING CHANNEL 2 NOS. SIZE 100X50X504 BUSBAR TO CONNECT THE CTS 40 mm COPPER STRIP5 BUSBAR TO CONNECT THE PTS FLEXIBLE COPPER PLATE6 SIZE OF MS PLATE 2 mm7 SIZE OF WIREMESH SQUARE OF 35 mm8 SIZE OF ACRYLIC SHEET 3 mm9 RS 232 PORT10 HINGED COVER FOR RS 232 PORT WITH LOCKING ARRANGEMENT