Total Area: (2.410 Acre or 0.975 Ha), Category-B2 ~..(\.-0'Mining Plan Period 5 Years
File No.:-JH/SARA/BK/14/8
Mining Plan(As Per MoEF& CC Notification No-S.0.14l(E) Dated 15 Jan 2016 under Appendix-XI)
With
Progressive Mine Closure PlanSoil/Clay Mining Project of
Mis A. R. F. BricksVillage - Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela
Kharsawan, Jharkhand.
Mining Plan Submitted to DMO, Saraikela-KharsawanJharkhand
PROJECT PROPONENTShri Abdul GaniS/o Late Abdul Aziz
Village - Baliguma , P.O. - Kolabira , P.S. - Saraikela , District - Saraikela-Kharsawan,Jharkhand
PREPARED BYEnvironment Consultant
ENV DAS (India) Pvt. Ltd.(QCI Accredited Consultant Under NABET Scheme) ~'" ~e111
D-2247 Indira Nagar, Lucknow ~ ~ \!1'1ct\4/''' ·~fllV'
RQP:- Biras Tirkey llO·"WRegistration No. RQP/RNC/147/2011/A Valid Upto 08/06~1
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016WPhsitP: www.tlasintlia.nr11
Fax:4021236Tel: +91522 4007470, 410762F.mail: atlmin!liltlasintliaoro
PROFORMA-02
CERTIFICATE
l, Biras Tirkey hereby certify that-
1. Provisions of Mines Act. Rules and Regulations made there under have been observed in the
aforesaid Mining plan and wherever specific permissions are required the lessee will approach
the Director General of Mines Safety(DGMS).
2. lt is further certified that the aforesaid Mining Plan is prepared as per the copies of the records
and documents provided by lessee and information given as per discussions held with lessee his
representative.3. lt is also certified that the informations furnished in the aforesaid Mining plan are true and
correct to the best of my knowledge & belief and in case of default the approval would be
withdrawn.
Place: Saraikela-Kharsawan
\\I~0/.r~1\!~~\.,,i~,.y\\~oJl\V
~o-'~Name 1f\QP- Biras Tirkey
RegistrationNo.- RQP/RNC/147/2011/A Valid
Upto 08/06/2021 •Date:
SanOist. T~o OfficerDist; .f111ri><1 OfficeSeraik~1ia-i\:i.arsawanOtpt. Mine$ s Geology
Govt. of Jharkhand, Ranchi
Paae I of 19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
MINING PLAN
1.0General Information About Project Proponent
1.1Name and Address of Project Proponent
Shri Abdul Gani S/o Late Abdul Aziz
Village - Baliguma, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan, Jharkhand.
1.2Status of Project Proponent
The Project Proponent is private individual involved in manufacturing the bricks.
1.3Mineral I Minerals Which the Project Proponent Intends to Mine
The project proponent has applied for mining of the brick clay by manual/semimechanized
method(if permitted) to manufacture kuccha bricks to be used furthur in brick kiln.
1.4Name, Address and Registration number of the QCI Consultant & RQP
ENVDevelopmental Assistance Systems (I) Pvt. Ltd.(QCI acredited consultant under NABET scheme Sr. No. 45 as per revision 37(A) Jan 7, 2016)
D-2247, Indira Nagar, Lucknow-226016,Tel: +91 522 4007470, 4107624
Fax: 4021236,Email: [email protected]: www.dasindia.org
RQP:- Shri Biras TirkeyRQP Reg No.:- RQP/RNC/147/2011/A Valid Upto 08/06/2021
2.0Details of Proposed Area
2.1Detail of Proposed Area
The project proponent applied for a proposed area for .975 hectare for excavation of Brick Earth.
2.2 Name of Mineral
The project proponent intends to mine Brick Earth from the proposed area.
(%V-- T<H9\ 522 400~~· 4021236/''' ~\t~e~ 1110\ffi'l'•I' odmin@d.,ln~i:7o62
~· ~ivJ!Cf\A . rg
~o.~i.Q\te,~·
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -1'f.INING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,,, " Jharkhand.
2.3 Description Report of the Mining Lease/Quarry Licensee with Plan (Enclose Copy of
Sanction Order)
The proponent has applied for proposed area. The area for excavation of brick earth is .975 hectare
in khasra number 697, 720, 696. The land is leased provided for excavation of Brick Earth to Shri
Abdul Gani. Khasra details is given in annexure-2. The mining of brick clay will be done brick kiln
having a sanction capacity payas for manufacturing of 600000 bricks annually.
2.4 Details of the Permit
Village : Kolabira
Tehsil :
District : Saraikela-Kharsawan
Plot(s) Excavable Area Depth as Proposed Duration Area of Volume Available Volume of Mineable
No. area(ha) (sqm) per depth (as per berm left of top quantity of blockage quantityagreement of mining lease surrounding soil( cum) soil (cum) of soil
(m) (m) deed)* the site 0.15 m after leaving (cum)(sqm) berm( cum)
697 0.352 3520 2.00 1.850 5.00 70.400 528.000 6,381.760 260.480 5,593.280
720 0.263 2630 2.00 1.850 5.00 52.600 394.500 4,768.190 194.620 4, 179.070
696 0.360 3601 2.00 1.850 5.00 72.020 540.150 6,528.613 266.474 5,721.989
Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.339
*The digit before decimal indicating year and after decimal indicating month.
2.5 Social Infrastructure
3.0 Geology and ReserveKumar
Di&(. -Mfftjng OfficerDist. Mining OfficeSeraikella-KharsawanDept. Mines & Geology
Govt. of Jharkhand, ~anchi3.1 Type of Project
This is an independent brick clay project. The proposed project is for the extraction of Brick Clay
from the allotted plot(s) manually.
Location (Map Showing General Location and Project Boundary and Project Site) with
Coordinates
Page 2of19ENV Developmental Assistance Systems (I) Pvt. Ltd. Fax: 4021236D-2247, Indira Nagar, Lucknow-226016 Tel: +915224007470, 410762Website: www .dasindia.org ~keY
47120JI If. Email: admin@dasind ia.org
JtQp/JtNC/lRtg. l'Jo.-
Page 3of19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANl Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
The mining lease area is located at Plot no. 697, 720, 696, Village - Kolabira, P.O. - Kolabira, P.S. -
Saraikela, District - Saraikela-Kharsawan, Jharkhand. The proposed project activity will be carried
out in the allotted plot(s). Topographical map and location map are showing project location of
plot(s) to be excavated is attached as plate 1.0& 2.0 respectivity.
3.2 Physiography
The predominant physical feature over major part of the district is the rolling topography dotted with
isolated inselbergs except in the Borijore and Sundarpahari blocks. A substantial part of Borijore and
Sundarpahari block is under forest cover. The altitude of the land surface increases from west to the
east. The major hills are confined to the eastern part of the district comprising the Gandeshwari
Pahar (238.41m) and Kesgari Pahar (268.29m), while in the western part of the district isolated hills
are in the form of the inselbergs and other small hillocks.
Mining Plots Co-ordinates:
Plot(s) No. Pillar No. Latitude Longitude
696,697 A 22°47' I0.56"N 86° l '50.57"E
B 22°47'10.32"N 86° I'5 l.82"E
c 22°47'9.SS"N 86° J '52.30"E
D 22°47'9 .05"N 86°1'52.21 "E
E 22°47'8.9l"N 86°1'53.35"E
F 22°47'7.53"N 86° l '53.27"E
G 22°47'7.56"N 86° l'5 I.60"E
H 22°47'8.06"N 86°1'51.6l"E
I 22°47'8.02"N 86° l '49.99"E
J 22°47'8.77"N 86°1'50.0l "E
K 22°47'8.8 l "N 86°1'50.42"E
L 22°47'9. l 9"N 86°1'50.4l"E
M 22°47'9. l 9"N 86° l '50.00"E
N 22°47'9.77"N 86°1'49.97"E
0 22°47'10.06"N 86° l '50.84"E
720 A 22°4 7' I 1.00"N 86° I'52.30"E
B 22°47'10.97"N 86°1 '53.08"E
c 22°47'10.72"N 86°1 '53.17"E
Fax:4021236Tel: +91 522 4007470, 410762
Email: [email protected]
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLA~IKolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
D 22°47'10.51"N 86°1'53.0l "E-
E 22°47' I0.02"N 86°1'53.0T'E
F 22°47'10.05"N 86° I'52.38"E
G 22°47'10.28"N 86°1 '52.40"E
I IH 22°47'10.49"N 86°1'52.28"E
Geology
This area is dominated by hilly ranges, valleys and plateaus. Hilly and steeply sloping area are under dense
forest cover. Dalma hills ranges are stretched from Chandil towards Ghatsila. Geologically the area is
comprised of Archean lava, laterite and pre-cambrian fold mountains. Major River flowing in the district is
Kharkai.
Lithology
No rock unit is exposed in the area applied for proposed project.
Structure
Not applicable in absence of rock unit.
Nature of Mineralisation
Not applicable in absence of rock unit.
Effect of Weathering
Not applicable in absence of rock unit.
Nature of Wall Rocks
Not applicable in absence of rock unit.
Physical CharacteristicsThe brick earth is light brownish. The brick earth is suitable for making the bricks.
3.3 Details of Exploration
(A)Already Carried Out in the Area
No pit is observed in the area.
(B) Proposed to be Carried Out
Page 4of19Fax:4021236
Tel: +91 522 4007470, 410762Email: [email protected]
ENV Developmental Assistance Systems (I) Pvt. Ltd.0-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Paee 5 of 19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
Brick Earth is available on the surface, thus prospecting is not needed.
3.4 Method of Estimation of Reserves
The reserves are calculated by the following formula
Volume of earth = excavable area* depth of Mine
Brick earth in tonnes =Volume of Brick earth * bulk density.
The bulk density of the brick earth is 1.2 tonnes per cum.
Volume of brick earth
Plot(s) Excavable Area Depth Proposed Duratio Area of Volume Available Volume of Mineable
No. area(ha) (sqm) as per depth n berm left of top quantity of soil blockage quantityagreement of mining (as per surrounding soil(cum) after leaving (cum) of soil
(m) (m) lease the site 0.15 m berm(cum) (cum)deed)* (sqrn)
697 0.352 3520 2.00 1.850 5.00 70.400 528.000 6,381.760 260.480 5,593.280
720 0.263 2630 2.00 1.850 5.00 52.600 394.500 4,768.190 194.620 4,179.070
696 0.360 3601 2.00 1.850 5.00 72.020 540.150 6,528.613 266.474 5,721.989
Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.3)9
*The digit before decimal indicating year and after decimal indicating month.
Brick earth in cum = 15494.339 cum ~1%/San· KumarDist. Mi mg OfficerDist. Mining OfficeSeraikella-KharsawanDept. Mines & Geology
Govt. of Jharkhand, Ranchi
Proved mineable reserves(l 11) =Volume in cum
4.0Method of Mining
The excavation of Brick Earth will be done by manual/semimechanized(if permitted) opencast
method. The Brick Earth required per year will be around 1,200.00 cum.
Restriction
The lessee will work in the area keeping in view regulation 111, 106 of MMR 1957.
Others
a. The approach road will be smooth and wide.b. Plantation will be done in near and around the proposed area during monsoon. Tree guards and
Fax:4021236Tel: +91 522 4007470, 410762
os-: J..J. Email: [email protected],,,,'flt . ~e~ oHIAB· 'fi!lJcti47t2Qr1~~~o.~R
'}leg·
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Page 6of19
1MJNINGPLAI
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.
separate watering arrangements will be provided.c. Personal protective equipments like safety helmet, safety shoes, safety goggles, dust respirators
will be provided to the labourers as per work requirement.
d. Drains with parapet walls will be provided around the pit to check the entry of flowing monsoon
water in the pit.e. Fencing will be done around the excavation to check the inadvertent entry of human and live stock
is the mining zone.
4.1Development Proposed for the Period of the Project
First Yearr-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of
6,00,000 bricks.
Second Year:-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of
6,00,000 bricks.
Third Year:-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of
600000 bricks.
Fourth Year.-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of
600000 bricks.
Fifth Year.-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of
600000 bricks.
Total Brick Earth incum Per Year
I Year I 1200~~~~~~___!~~
2 Year 12003 Year 1200
Duration
~
Tel:+9152240o~f':4021236
I' II"",;.. EmaH,.dmio@d70, 41.0762
11 'f\t1'e1 o\11~ asindia.org
p• fttl'lc1147/'2ttei·l'fO·"JQP
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
j
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MJ:NING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
4 Year 12005 Year 1200
In case Brick Earth is fully exploited in the area and further no more Brick Earth is available,
applicant will separately apply for other land and Mine Plan will be prepared accordingly.
4.2 Proposed Rate of Production
During the period of the project the required production of Brick Earth is around 1,200.00cum per
year.
4.3 Reserves of Brick Earth Used During the Period of the Project in Area
As per paragraph 3.3 the mine-able reserve of Brick Earth is 15494.339cum. Around 1,200.00cum
of brick earth will be excavated per year for the proposed period. ln case Brick Earth is fully
exploited in the area and further no more Brick Earth is available, applicant will separately apply for
other land and Mine Plan will be prepared accordingly.
4.4Method of Mining
The mining i.e. excavation of Brick Earth is by manual/semimechanized(if permitted) method of
opencast mining. The approach road from surface to bottom will be provided with 1 in 16
gradients. The length and depth of the road will depend on the depth of excavation. The excavation
of Brick Earth will be by simple hand tools. around 98 tonnes of Brick Earth has to be excavated
and loaded per day considering 150 days of effective working after deduction of monsoon period
and other holidays.For transportation of casted bricks from proposed site to kiln, one wheel wooden cart will be
utilized.
4.5 Preparation of Kuchcha Bricks san7! KumarDist. mgOfficerDist. iningOffice
Pasar: The place where Brick Earth is mixed with water for moulding. SeraikM~lla-Kh&aGrseao~~g"yDept. mesGovt. of Jharkhand, Ranchi
Mould: Wooden/Iron mould of average 9" x 4.5" x 3" Size is used for making the kuchcha brick.
Prepared clay will be poured in the mould and pressed manually, than mould will be removed
leaving kuchcha brick.
Page 7of19
~
Tel:+91522400~:x:4021236
I' Iriflft'.. ·t" 011/.A.Email: admin@d70~41.0762• ~ cf\4i1i asindia.org
· ~RQPI~R'~~-~O·
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-224 7, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
Sun Drying: The kuchcha brick will be allowed for sun drying. This is an important step for
making the adobe(kuchchi brick). The final moisture content of the adobe brick remains around
10% to 15%.
Transportation: The kuchcha bricks transported from drying place to brick kiln chamber by one
wheel hand operated cart. This cart transports around 30 to 40 bricks at a time.
Site Specification
i. Site Office: The site office with all requisite facilities is available at site.
ii. Water Huts: Water huts are available at requisite sites.
iii. Latrine & Bathrooms: This facility is mobile and available at site.
iv. Staff Quarters: Available at site.
v. Rest Shelters: The rest shelter for labourers is available just near by the site.
vi. Other: Temporary site services will be provided as advised by the officials time to time.
4.6 Employment Potential
Almost 20 unskilled labours will be deployed in brick clay mining.
4.7 Site Service
The workings will be for 5 years. The following site service are available at site:
1. Temporary toilet will remain available at site.
2. Migrants are not allowed as local resident will be employed.
4.8 Conceptual Mining Plan
Conceptual mining plan ·is necessary to know the ultimate limit if the pit crust when whole reserves
will be exhausted. The ultimate pit limit is limit of pit surface at the end of mining. It is also
necessary to select the sites for waste dump, site service, plantation etc. in such a place that these
sites should not get any disturbance during the life of the mine. Considering the aforesaid aspects
the conceptual mining plan is proposed as follows:
A) Ultimate Extent & Size of the Pit(s)
Pa11:e 8of19
·~,.. Tel:+9152240/ax:4021236.iI" Email. adm ·
7470, 410762/ · Jl irtte1
7120111~· m@d.,india.o<g
·Qr,~c114}l~·~O·"W
ENV Developmental Assistance Systems (I) Pvt. Ltd .D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Proposed Brick Clay Mining for M/s A. R. F. Bricks from Village -MINING PLANi Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
Plot(s) Excavable Area Depth Proposed Duratio Area of Volume Available Volume of Mineable
No. area(ha) (sqm) as per depth n berm left of top quantity of blockage quantityagreement of mining (as per surrounding soil( cum) soil (cum) of soil( cum)
(m) (rn) lease dee the site 0.15 m after leaving(sqm) berm( cum)
697 0.352 3520 2.00 1.850 5.00 70.400 528.00C 6,381.760 260.480 5,593.280
720 0.263 2630 2.00 1.850 5.00 52.600 394.SOC 4,768.190 194.620 4, 179.070
696 0.360 3601 2.00 1.850 5.00 72.020 540.1 SC 6,528.613 266.474 5,721.989
Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.339
*The digit before decimal indicating year and after decimal indicating month.
B) The Final Slope Angle Adopted
Considering final slope angle will be 45°.
C) Ultimate Capacity of Dumps
The dumps are not required as whole earth is useable.
D) Stabilization of Dumps
There will be no waste generate in brick earth mining. The excavated brick earth will be used for
manufacture of kuchcha bricks.
e) Ultimate Pit Limit
lt is an Brick Clay Mining Project and the ultimate pit limit is the boundary of .975 Hectare land,
with its safety margin as per the closure plan.
5.0Drainage
The principal rivers of the district are Subarnrekha and Kharkhai Rivers. The general trend of the
drainage is from NW-SE and SW-SE. The structural features particularly the foliation and joints
exert profound impact upon the drainage and control the drainage pattern of the district.
Dewatering
During the monsoon, the rain water will collect in the pit. This water will percolate in ground
containing Brick Earth. Thus dewatering is not required. Rain
plantation.
be used in proposedVED
Sa.Oist"?MmingOfficerDist. Mining Offic~
. Seraik~lla-Kharsawan Page 9 of 19ENV Developmental Assistance Systems (I) Pvt. Ltd ... Gbv~~~(1'~:.;kh~~_:R;;_;7.fsix:4021236D-2247, Indira Nagar, Lucknow-226016 · ,. rei: ~r-,n-qu~'1~70, 410762Website: www.dasindia.org ~ r Email: [email protected]
I''',,,,.,~11'°r~e~111011/Al\· ~~~crt4
~O·'~QReg·
ENV Developmental Assistance Systems (I) Pvt. Ltd. Fax: 40212360-2247, Indira Nagar, Lucknow-226016 Tel: +91 522 4007470, 410762Website: www.dasindia.org t'h.A .- /~Email: [email protected]
~»:,,,~ • \\e~ 1io\\I .ti it 1141
• t'l~c. ~O·'RQ
Re~·
Page 10of19
MININGPLAProposed Brick Clay Mining for M/s A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.
6.0 Plan and Section
The plan and sections of the proposed area are enclosed as per index of plates.
6.1 Year Wise Annual Programme of Mining for Next 5 Year Wise Development Provided in
Para 4B(l). The Details of Production is as Follows
Total Brick Earth inDuration cum Per Year
1 Year 1200
2 Year 1200
3 Year 1200
4 Year 1200
5 Year 1200
7.0Details of Employment
A. A kiln manager is required.
B. Total 20 labour required.
The Organization Chart is Proposed as Follows
Owner
lKiln Manager
Mine Staff and Laborers Clerk!
Watchman
8.0Beneficiation
Page 11of19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANI Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
No beneficiation is required.
9.0Measures Taken and to be Taken to Restoration, Reclamation in or Near the Lease Area
Restoration, Reclamation & Rehabilitation
The restoration and reclamation is not proposed in this mining plan as the brick earth will excavate
from the proposed area and after excavating brick earth the excavated area may be used for
agriculture or as water reservoir. The reclamation and restoration proposals will be provided if
required.
10.0Measure Taken and to be Taken for Protection of Environment in and Around the Lease
Area
Existing
Present environment and aesthetic beauty of the area is good.
Proposed
Due to mining the level of the surface will lowered 1.0-2.0 meters. No waste will generate. No tree
will destroy by proposed mining activities. For protection of environment and improving the
aesthetic beauty of the area following measures will be provided:
The mining will be systematic and scientific in supervision of technical staff.
The land use by mining is as follows:
~
- /San· KumarDist. M. · g Offi.cerDist. Mining OtficeSeraikella-KharsawanDept. Mines & Geology
Govt. of Jharkhand, Ranchi
Fax:4021236Tel: +91 522 4007470, 410762
Email: [email protected]
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Jndira Nagar, Lucknow-226016Website: www.dasindia.org
rainy seasons.
~
Climatic Conditions ~. . . S.an. · - Kumar
The Climate of the district rs temperate Di.st. ·. mg OfficerDist. Mining OfficeSeraikella-KharsawanDept.Mines & Geology
and, Ranchi Page 12of19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING P~A.N]Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
SNo. Category Proposed Land Use (ha)
I. Quarry Area 0.897
2. Waste Dump 0.000
3. Top Soil dump 0.005
4. Road Area 0.010
5. Builtup Area 0.000
6. Processsing Area 0.010
7. Storage Area 0.010
8. Plantation Area 0.034
9. Undistributed Area 0.010
Total Mining Area .975
Flora
In such areas are seen Sal -(Shora-robusta), Sisoo (Shisham)(Dalbergia), Murga (Ptercarpus), Siris
(albizzia-procera), Bostal (D- latifolia), (Pongamia glabra), palas-(Butea-frondosa), Mahua ( Bassia
latifolia), Kend (diosphros-melanoxylon), Gamhar (gamelina-arborea)., Maluaceae, Bombax
Malabaricum (Shimal), Lawsonia-alba (Mihendi), Wood fordia-floribunda (Dhatki), Oroxyum
indicum (Sonae), Mango- (Mangifera indica), Bhelwa -(Semecarpus anacardium), Jamun (Eugenia
jambolanda), Imli (Tamarindus-indica), Kadam (Anthocephalus cadamba), Kend ( Daiosphyros
melanoxylon), Katha! (Artocarpus integrifolia).
Fauna
Only domestic animals like cow, goat, buffalo, cat, dog etc are observed I found in the area. As
there is no natural forest cover, the area does not contain any wild animals. Only stray jackals are
seen sometimes. Both poisonous and non-poisonous types of snakes are seen during summer and
Fax:4021236Tel: +91 522 4007470, 410762
Email: [email protected]
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
Human Settlements
o human settlement observed in the applied area.
11.0Measures Taken and to be Taken for Dumping Overburden, Stacking of Top Brick Earth
and Utilisation of Top Brick Earth
In Brick Earth mining for brick kiln the maximum quantity of excavated Brick Earth will use in
making the adobe bricks.
Waste Dump and Stabilization
No waste will generate due to Brick Earth mining.The bricks are sailable from full brick to crack bricks (pieces of bricks).
Top Brick Earth
The mining will be for Brick Earth and the Brick Earth will use in manufacturing the bricks.
12.0Measures Taken and to be Taken for Control ofWater, Noise and Air Pollution
General ground level in nearby area of project is 331mRL whereas level of ground water table is
around 70 meters below from general ground level Thus ground water table in the area is at around
16JmRL. This level fluctuates around 3 meters in dry and wet season. ln dry season it lowered
around 3 meters. Proposed deepest working will be around 2 meters deep. Thus ground water will
not come across.
Dewatering
During monsoon the rain water of direct precipitation will collect in the working pits. The monsoon
water of upper altitude side may also collect in the pit.
A drain will be provided around the pit to divert the rain water away from the pit.The rain water come across during the monsoon, the rain water will collect in the pit. This water will
percolate in Brick Earth.
The source of drinking water is tube well
not get any adverse effect from mining.
ENY Developmental Assistance Systems (I) Pvt. Ltd. O~pt.M~nes& Ge!i. ·· ax: 4021236D-2247, IndiraNagar, Lucknow-226016 Govt.otJffa~ • 0, 410762Website:www.dasindia.orgm ~f' .Em-xra mm asindia.org
,,,,((' it~e~ 1/'20111. J). p1Rtlc114!'lO·~RQ
Re~·
Proposed Brick Clay Mining for M/s A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.
Noise
Approach roads within the premises of brick kiln area will be stabilized with brick bats/keri etc. The
whole process is manual thus noise pollution will remain in permissible limit.
Air Pollution
The roads within the area will be kept wide, smooth and properly wet by water spray.
Dust pollution Measures proposed
A. All the haul roads will be kept wide, leveled and compact.Regular water Sprinklers should be done on road from site to tar road once or twice in a day
especially during dry season to check the generation of dust during vehicular movement.
B. The green belt in and near the lease area will minimize dispersion of dust in near by area. The
proposed plantation is illustrated on the plan.C. The proposed plantation along both sides of haul road from tar road and between tar road and
mine site will also check the spread of dust in near by area.D. Monitoring in six month is proposed for assessment of impact for generation of dust due to
vehicular movement, drilling, blasting and loading etc. and measures should be adopted to minimize
the gaseous pollution.
Personal Protective Equipment
The safety helmet, safety shoos, safety belts will be provided to the labourers. The dust respirators
will be provided to the workers who will work near the noise creating machines.
13.0 Contribution Regarding the Social Development of the Nearby Residents
The socio-economic benefits can be maximized, if environmental concerns are integrated in
planning during development of the project i.e., by eco-friendly mining. The environmental patterns
likely to be affected are as follows:There is no impact of mining on local residents of the area as habitation is away from the proposed
area. The maximum persons will be employed from nearby villages. There is no source of
employment in near by area and thus the employment wilf develop by the proposed mining activity
in near by area. The villagers may use the wastage of bricks (not sailable) free of cost.
The impact of mining on social demographic profile is always positive, because all the persons have
Page 14of19
Page 15of19
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
;. Jharkhand.
been employed from nearby villages. Apart from indirect employment, some persons get satellite
occupation like tea stall, shops and small workshops due to mining activities in the area. Some
persons will get occupation as transporter of pucka brick from site to consumers. Thus the mining
has raised the economic status of nearby villagers.
The project proponent will contribute some fund from the income and the fund will used only for the
social development of the people in the field of Education and medical.
14.0 Details of Health Checkup and Insurance of All the Employed Persons (for Existing
Lease)
The health and safety hazards will be anticipated to affect the persons employed at the brick kiln.
The persons may get injury by fall of bricks or may suffer from professional diseases while working
at brick kilns. Safety boots and hats will be provided to the employed persons. A first-aid box is
kept at the mine. The dispensary is located near by the area.
15.0 Others
=- The approach road to site of brick kiln (including the storage site) from the nearest public road for
the transportation of final products must be paved or hard surfaced.
Water storage facility(minimum 3000 liters) must be provided at the brick kiln site.
A Sign Board showing the name, address and capacity of the brick kiln industry should be displayed
at the entrance of the site and on nearest road.
Dust respirators will be provided to the labourers.
16.0 Financial Assurance
As per rule 37J(1) and (3) the applicant will submit the financial assurance of Rupees 40000 I Ha in
term of fixed deposit receipt from any scheduled Bank before issuing the sanction letter.
17.0 Mine Closure Plan
17.1 Land Use Pattern
The existing land use pattern of the area is agricultural and the pattern of the area as per requirement
during mining will be as tabulated below.
ISNo.1 Category Proposed Land Use(ha)
istance Systems (I) Pvt. Ltd.
~
• Tel: +91 522 400~;x: 4021236
I•t I?" Email: admin@d70! 41.0762
1·r1't1 11/A. asindia.org
ll· '~c114112°~o...RQ1'1
Reg·
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANl Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
11 Jharkhand.
=
I. Quarry Area 0.897
2. Waste Dump 0.000
3. Top Soil dump 0.005
4. Road Area 0.010
5. Builtup Area 0.000
6. Processsing Area 0.010
7. Storage Area 0.01·0
8. Plantation Area 0.034
9. Undistributed Area 0.010
Total Mining Area .975
17.2 Water Quality Management
.::. No surface water body located in the lease area. General ground level in nearby area of project is
345mRL whereas level of ground water table is around 70 meters below from general ground level
Thus ground water table in the area is at around 275mRL. This level fluctuates around 3 meter in
dry and wet season. In dry season it lowered around 3 meter. Proposed deepest working will be
around 2 meter deep. Thus ground water will not come across.
17.3 Air Quality Survey
The magnitude of air pollution in mining is machineries with method of mining, type of mineral and
level of mechanization. The Brick Earth is loose and thus blasting etc will not require. The source of
air pollution will be excavation and loading of Brick Earth and transportation vehicle. The
excavation and loading is totally manual. The transportation of bricks from pasad to kiln is by one
wheel hand operated cart. The following measures will be provided:1. Water spray will be provided over the Brick Earth before excavating. The spray will be in upper
layers. In lower layer the Brick Earth comes across in wet form.2. Water sprinklers will be provided on the kucha approach road to minimize the dust during
vehicular movement.3. The plantation along the kucha approach road will also helps to spread the dust out side.
Page 16of19Fax:4021236
Tel: +915224007470, 410762Email: [email protected]
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN1Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
17.4Waste Management
Not applicable in absence of waste.
17.5Top Brick Earth Management
The Brick Earth will be excavated from the area, thus no management will require.
17.6Tailing Dam Management
No tailing dam is proposed hence this paragraph is not applicable.
17.7Infrastructure
No infrastructure is proposed at site for the proposed project. However rest shelter, drinking water
huts & mobile toilets will be provided at site
17.8Disposal of mining machineriesNo big machineries will deploy in this work. The excavation of Brick Earth, transportation of
kuccha bricks are by manual means. The other machineries, moulds etc not disposed during the
period of the project.
17.9Safety and Security
For safety purpose the following proposals are proposed:
As the project will be for 5 years thus it is proposed to fence the excavated area to check the
inadvertent entry of human and live stock after closed the mining operation.
The safe workings are proposed in the supervision of technical and qualified supervisory staff
provided as per Mines Act. Safety measures will be the personal
provided to the labourers.
17.10Disaster Management Plan and Risk Assessment g;ameey'. t<0uffimar.«t. -MfrilnQ 1cerDrst.. Mining..,Office
No landslide in this area is observed. o8:prtaiMke1_11a-K4ha0rsawan• nes eotogy,
The workings are proposed from top to bottom by forming proper benching. «fg~tp9b~MfM!~h~will be by opencast mining method. Underground mining is not proposed. Face height will
maintain safe. No tailing dam is proposed. Thus high -risk accidents like land slide, subsidence,
flood, inundation, fire, seismic activities etc. not come across. Dispensary is available near the area.
Page 17of19
~
Tel:+9152240/ax:4021236
I•11-rtl..:.
r Email: admin@7470~41_0762• 1'eY dasindia.org
B· ~cJl47/lOlll/.
tteg· ~o.-ttQP
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-224 7, Indira Nagar, Lucknow-226016Website: www.dasindia.org
18.7 Abandoned Cost
.,.. Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN! Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.1
17.11Care and Maintenance During Temporary Discontinuance
ot applicable.
18.0Economic Repercussion of Closure of Mine and Manpower Retrenchment
18.1Number of Local Residents Employed
Around 20 labourers will be engaged per day during the period of this project.
18.2Compensation
The compensation to the employees with sustenance of himself and their family members will beprovided as per Labour Law and Mines Act.
18.3Satellite Occupations Connected with Mining Industry
Some people will get satellite occupations during the period of project only.
18.4Continued Engagement of Employment in the Rehabilitated Status of Mining Lease Areaand any other Remnant Activities
Not applicable in this mine closure plan.
18.5 Envisaged Repercussions on the Expectation of the Society Around Due to Closure ofMineNil.
18.6Time Scheduling for Abandonment
The project will be for 5 years. The working will closed after the period for which EC is given. The
excavated area will be fenced at the end of closing of working. The trees will be planted along the
kucha approach road, around the excavated area and along the tar road. Trees will be planted in
each monsoon. Total 322 trees will be planted during the period of the project around the~excavation site.
SanDisy.'Mjriing OfficerDist. '1ining OfficeSeraikella-KharsawanDept. Mir.es &. Ge· ... iy
Govt. o: Jna1 ,,han~j., . "•..::hi
Abandoned cost is within the financial assurance deposited by the project proponent.
19.0Budget for Mine Closure
ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org
Page 18of19
~
• Tel: +91 522 400~:x:4021236I'/ 1<'1'1 Email: admin@d70? 41.0762
1•~ asindia org
II·'{ir~e,4112n111A .QPl~c/l
Reg. l'Jo.~R
Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MJNJNG PLAN)Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,
Jharkhand.
SNo. IReclamation Activity Amount (in Rupees/ Ha)
500.00I. Preservation of top Soil.2. Formation of Bund walls around excavation plot and
plantation of fencing species along with past plantation care.3. I Plantation on slope terraces/ benches of soil binding species
and past plantation care.
4. ILeveling and landscaping of flat pit area and making it fit forcultivation.
500.00
1,500.00
1,500.00
4,000.00Total
20.0Analysis of Proposal (Final Recommendation)
Overall the project will have positive and long term impact on environment. The project will also
bring positive changes in terms of socio economic development by way of generating direct and
indirect employment opportunities to the people of vicinity. Also the project will bring economic
benefit to the state in terms of revenue generation.
*********
-Hf- Page 19of19ENV Developmental Assistance Systems (I) Pvt. Ltd. Fax: 4021236D-2247, Indira Nagar, Lucknow-226016 Tel: +91 522 4007470, 410762Website: www.dasindia.org Email: [email protected]