~o·' ~--- I /~'I>< 'f..V ~\C~ 0 f..,cliJ .(\\~<)I'\ 0 ~t~ . \(\":' ~ ;'i • ,,(\~'(\'l>Geo~<'~ e,\\'?>.. "' «.~ ~~,<'e;_'(\~<'o' -,,v-• ~'(\~~ Total Area: (2.410 Acre or 0.975 Ha), Category-B2 ~..(\.-0' Mining Plan Period 5 Years File No.:-JH/SARA/BK/14/8 Mining Plan (As Per MoEF& CC Notification No-S.0.14l(E) Dated 15 Jan 2016 under Appendix-XI) With Progressive Mine Closure Plan Soil/Clay Mining Project of Mis A. R. F. Bricks Village - Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela- Kharsawan, Jharkhand. Mining Plan Submitted to DMO, Saraikela-Kharsawan Jharkhand PROJECT PROPONENT Shri Abdul Gani S/o Late Abdul Aziz Village - Baliguma , P.O. - Kolabira , P.S. - Saraikela , District - Saraikela-Kharsawan, Jharkhand PREPARED BY Environment Consultant ENV DAS (India) Pvt. Ltd. (QCI Accredited Consultant Under NABET Scheme) ~'" ~e1 11 D-2247 Indira Nagar, Lucknow ~ ~ \!1'1ct\4 /''' ·~fllV' RQP:- Biras Tirkey llO·"W Registration No. RQP/RNC/147/2011/A Valid Upto 08/06~1 ENV Developmental Assistance Systems (I) Pvt. Ltd. D-2247, Indira Nagar, Lucknow-226016 WPhsitP:www.tlasintlia.nr11 Fax:4021236 Tel: +91522 4007470, 410762 F.mail:atlmin!liltlasintliaoro

Transcript of With Progressive Mine Closure...

~o ·'~---I/~'I><

'f..V ~\C~0 f..,cliJ.(\\~<)I'\0 ~t~. \(\":' ~ ;'i •,,(\~'(\'l>Geo~<'~

e,\\'?>.. "' «.~~~,<'e;_'(\~<'o'-,,v-• ~'(\~~

Total Area: (2.410 Acre or 0.975 Ha), Category-B2 ~..(\.-0'Mining Plan Period 5 Years

File No.:-JH/SARA/BK/14/8

Mining Plan(As Per MoEF& CC Notification No-S.0.14l(E) Dated 15 Jan 2016 under Appendix-XI)

With

Progressive Mine Closure PlanSoil/Clay Mining Project of

Mis A. R. F. BricksVillage - Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela­

Kharsawan, Jharkhand.

Mining Plan Submitted to DMO, Saraikela-KharsawanJharkhand

PROJECT PROPONENTShri Abdul GaniS/o Late Abdul Aziz

Village - Baliguma , P.O. - Kolabira , P.S. - Saraikela , District - Saraikela-Kharsawan,Jharkhand

PREPARED BYEnvironment Consultant

ENV DAS (India) Pvt. Ltd.(QCI Accredited Consultant Under NABET Scheme) ~'" ~e111

D-2247 Indira Nagar, Lucknow ~ ~ \!1'1ct\4/''' ·~fllV'

RQP:- Biras Tirkey llO·"WRegistration No. RQP/RNC/147/2011/A Valid Upto 08/06~1

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016WPhsitP: www.tlasintlia.nr11

Fax:4021236Tel: +91522 4007470, 410762F.mail: atlmin!liltlasintliaoro

PROFORMA-02

CERTIFICATE

l, Biras Tirkey hereby certify that-

1. Provisions of Mines Act. Rules and Regulations made there under have been observed in the

aforesaid Mining plan and wherever specific permissions are required the lessee will approach

the Director General of Mines Safety(DGMS).

2. lt is further certified that the aforesaid Mining Plan is prepared as per the copies of the records

and documents provided by lessee and information given as per discussions held with lessee his

representative.3. lt is also certified that the informations furnished in the aforesaid Mining plan are true and

correct to the best of my knowledge & belief and in case of default the approval would be

withdrawn.

Place: Saraikela-Kharsawan

\\I~0/.r~1\!~~\.,,i~,.y\\~oJl\V

~o-'~Name 1f\QP- Biras Tirkey

RegistrationNo.- RQP/RNC/147/2011/A Valid

Upto 08/06/2021 •Date:

SanOist. T~o OfficerDist; .f111ri><1 OfficeSeraik~1ia-i\:i.arsawanOtpt. Mine$ s Geology

Govt. of Jharkhand, Ranchi

Paae I of 19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

MINING PLAN

1.0General Information About Project Proponent

1.1Name and Address of Project Proponent

Shri Abdul Gani S/o Late Abdul Aziz

Village - Baliguma, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan, Jharkhand.

1.2Status of Project Proponent

The Project Proponent is private individual involved in manufacturing the bricks.

1.3Mineral I Minerals Which the Project Proponent Intends to Mine

The project proponent has applied for mining of the brick clay by manual/semimechanized

method(if permitted) to manufacture kuccha bricks to be used furthur in brick kiln.

1.4Name, Address and Registration number of the QCI Consultant & RQP

ENVDevelopmental Assistance Systems (I) Pvt. Ltd.(QCI acredited consultant under NABET scheme Sr. No. 45 as per revision 37(A) Jan 7, 2016)

D-2247, Indira Nagar, Lucknow-226016,Tel: +91 522 4007470, 4107624

Fax: 4021236,Email: [email protected]: www.dasindia.org

RQP:- Shri Biras TirkeyRQP Reg No.:- RQP/RNC/147/2011/A Valid Upto 08/06/2021

2.0Details of Proposed Area

2.1Detail of Proposed Area

The project proponent applied for a proposed area for .975 hectare for excavation of Brick Earth.

2.2 Name of Mineral

The project proponent intends to mine Brick Earth from the proposed area.

(%V-- T<H9\ 522 400~~· 4021236/''' ~\t~e~ 1110\ffi'l'•I' odmin@d.,ln~i:7o62

~· ~ivJ!Cf\A . rg

~o.~i.Q\te,~·

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -1'f.INING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,,, " Jharkhand.

2.3 Description Report of the Mining Lease/Quarry Licensee with Plan (Enclose Copy of

Sanction Order)

The proponent has applied for proposed area. The area for excavation of brick earth is .975 hectare

in khasra number 697, 720, 696. The land is leased provided for excavation of Brick Earth to Shri

Abdul Gani. Khasra details is given in annexure-2. The mining of brick clay will be done brick kiln

having a sanction capacity payas for manufacturing of 600000 bricks annually.

2.4 Details of the Permit

Village : Kolabira

Tehsil :

District : Saraikela-Kharsawan

Plot(s) Excavable Area Depth as Proposed Duration Area of Volume Available Volume of Mineable

No. area(ha) (sqm) per depth (as per berm left of top quantity of blockage quantityagreement of mining lease surrounding soil( cum) soil (cum) of soil

(m) (m) deed)* the site 0.15 m after leaving (cum)(sqm) berm( cum)

697 0.352 3520 2.00 1.850 5.00 70.400 528.000 6,381.760 260.480 5,593.280

720 0.263 2630 2.00 1.850 5.00 52.600 394.500 4,768.190 194.620 4, 179.070

696 0.360 3601 2.00 1.850 5.00 72.020 540.150 6,528.613 266.474 5,721.989

Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.339

*The digit before decimal indicating year and after decimal indicating month.

2.5 Social Infrastructure

3.0 Geology and ReserveKumar

Di&(. -Mfftjng OfficerDist. Mining OfficeSeraikella-KharsawanDept. Mines & Geology

Govt. of Jharkhand, ~anchi3.1 Type of Project

This is an independent brick clay project. The proposed project is for the extraction of Brick Clay

from the allotted plot(s) manually.

Location (Map Showing General Location and Project Boundary and Project Site) with

Coordinates

Page 2of19ENV Developmental Assistance Systems (I) Pvt. Ltd. Fax: 4021236D-2247, Indira Nagar, Lucknow-226016 Tel: +915224007470, 410762Website: www .dasindia.org ~keY

47120JI If. Email: admin@dasind ia.org

JtQp/JtNC/lRtg. l'Jo.-

Page 3of19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANl Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

The mining lease area is located at Plot no. 697, 720, 696, Village - Kolabira, P.O. - Kolabira, P.S. -

Saraikela, District - Saraikela-Kharsawan, Jharkhand. The proposed project activity will be carried

out in the allotted plot(s). Topographical map and location map are showing project location of

plot(s) to be excavated is attached as plate 1.0& 2.0 respectivity.

3.2 Physiography

The predominant physical feature over major part of the district is the rolling topography dotted with

isolated inselbergs except in the Borijore and Sundarpahari blocks. A substantial part of Borijore and

Sundarpahari block is under forest cover. The altitude of the land surface increases from west to the

east. The major hills are confined to the eastern part of the district comprising the Gandeshwari

Pahar (238.41m) and Kesgari Pahar (268.29m), while in the western part of the district isolated hills

are in the form of the inselbergs and other small hillocks.

Mining Plots Co-ordinates:

Plot(s) No. Pillar No. Latitude Longitude

696,697 A 22°47' I0.56"N 86° l '50.57"E

B 22°47'10.32"N 86° I'5 l.82"E

c 22°47'9.SS"N 86° J '52.30"E

D 22°47'9 .05"N 86°1'52.21 "E

E 22°47'8.9l"N 86°1'53.35"E

F 22°47'7.53"N 86° l '53.27"E

G 22°47'7.56"N 86° l'5 I.60"E

H 22°47'8.06"N 86°1'51.6l"E

I 22°47'8.02"N 86° l '49.99"E

J 22°47'8.77"N 86°1'50.0l "E

K 22°47'8.8 l "N 86°1'50.42"E

L 22°47'9. l 9"N 86°1'50.4l"E

M 22°47'9. l 9"N 86° l '50.00"E

N 22°47'9.77"N 86°1'49.97"E

0 22°47'10.06"N 86° l '50.84"E

720 A 22°4 7' I 1.00"N 86° I'52.30"E

B 22°47'10.97"N 86°1 '53.08"E

c 22°47'10.72"N 86°1 '53.17"E

Fax:4021236Tel: +91 522 4007470, 410762

Email: [email protected]

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLA~IKolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

D 22°47'10.51"N 86°1'53.0l "E-

E 22°47' I0.02"N 86°1'53.0T'E

F 22°47'10.05"N 86° I'52.38"E

G 22°47'10.28"N 86°1 '52.40"E

I IH 22°47'10.49"N 86°1'52.28"E

Geology

This area is dominated by hilly ranges, valleys and plateaus. Hilly and steeply sloping area are under dense

forest cover. Dalma hills ranges are stretched from Chandil towards Ghatsila. Geologically the area is

comprised of Archean lava, laterite and pre-cambrian fold mountains. Major River flowing in the district is

Kharkai.

Lithology

No rock unit is exposed in the area applied for proposed project.

Structure

Not applicable in absence of rock unit.

Nature of Mineralisation

Not applicable in absence of rock unit.

Effect of Weathering

Not applicable in absence of rock unit.

Nature of Wall Rocks

Not applicable in absence of rock unit.

Physical CharacteristicsThe brick earth is light brownish. The brick earth is suitable for making the bricks.

3.3 Details of Exploration

(A)Already Carried Out in the Area

No pit is observed in the area.

(B) Proposed to be Carried Out

Page 4of19Fax:4021236

Tel: +91 522 4007470, 410762Email: [email protected]

ENV Developmental Assistance Systems (I) Pvt. Ltd.0-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Paee 5 of 19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

Brick Earth is available on the surface, thus prospecting is not needed.

3.4 Method of Estimation of Reserves

The reserves are calculated by the following formula

Volume of earth = excavable area* depth of Mine

Brick earth in tonnes =Volume of Brick earth * bulk density.

The bulk density of the brick earth is 1.2 tonnes per cum.

Volume of brick earth

Plot(s) Excavable Area Depth Proposed Duratio Area of Volume Available Volume of Mineable

No. area(ha) (sqm) as per depth n berm left of top quantity of soil blockage quantityagreement of mining (as per surrounding soil(cum) after leaving (cum) of soil

(m) (m) lease the site 0.15 m berm(cum) (cum)deed)* (sqrn)

697 0.352 3520 2.00 1.850 5.00 70.400 528.000 6,381.760 260.480 5,593.280

720 0.263 2630 2.00 1.850 5.00 52.600 394.500 4,768.190 194.620 4,179.070

696 0.360 3601 2.00 1.850 5.00 72.020 540.150 6,528.613 266.474 5,721.989

Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.3)9

*The digit before decimal indicating year and after decimal indicating month.

Brick earth in cum = 15494.339 cum ~1%/San· KumarDist. Mi mg OfficerDist. Mining OfficeSeraikella-KharsawanDept. Mines & Geology

Govt. of Jharkhand, Ranchi

Proved mineable reserves(l 11) =Volume in cum

4.0Method of Mining

The excavation of Brick Earth will be done by manual/semimechanized(if permitted) opencast

method. The Brick Earth required per year will be around 1,200.00 cum.

Restriction

The lessee will work in the area keeping in view regulation 111, 106 of MMR 1957.

Others

a. The approach road will be smooth and wide.b. Plantation will be done in near and around the proposed area during monsoon. Tree guards and

Fax:4021236Tel: +91 522 4007470, 410762

os-: J..J. Email: [email protected],,,,'flt . ~e~ oHIAB· 'fi!lJcti47t2Qr1~~~o.~R

'}leg·

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Page 6of19

1MJNINGPLAI

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.

separate watering arrangements will be provided.c. Personal protective equipments like safety helmet, safety shoes, safety goggles, dust respirators

will be provided to the labourers as per work requirement.

d. Drains with parapet walls will be provided around the pit to check the entry of flowing monsoon

water in the pit.e. Fencing will be done around the excavation to check the inadvertent entry of human and live stock

is the mining zone.

4.1Development Proposed for the Period of the Project

First Yearr-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of

6,00,000 bricks.

Second Year:-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of

6,00,000 bricks.

Third Year:-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of

600000 bricks.

Fourth Year.-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of

600000 bricks.

Fifth Year.-From the MLA 1200 cum earth clay will be excavated from the area for achieving a production of

600000 bricks.

Total Brick Earth incum Per Year

I Year I 1200~~~~~~___!~~

2 Year 12003 Year 1200

Duration

~

Tel:+9152240o~f':4021236

I' II"",;.. EmaH,.dmio@d70, 41.0762

11 'f\t1'e1 o\11~ asindia.org

p• fttl'lc1147/'2ttei·l'fO·"JQP

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

j

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MJ:NING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

4 Year 12005 Year 1200

In case Brick Earth is fully exploited in the area and further no more Brick Earth is available,

applicant will separately apply for other land and Mine Plan will be prepared accordingly.

4.2 Proposed Rate of Production

During the period of the project the required production of Brick Earth is around 1,200.00cum per

year.

4.3 Reserves of Brick Earth Used During the Period of the Project in Area

As per paragraph 3.3 the mine-able reserve of Brick Earth is 15494.339cum. Around 1,200.00cum

of brick earth will be excavated per year for the proposed period. ln case Brick Earth is fully

exploited in the area and further no more Brick Earth is available, applicant will separately apply for

other land and Mine Plan will be prepared accordingly.

4.4Method of Mining

The mining i.e. excavation of Brick Earth is by manual/semimechanized(if permitted) method of

opencast mining. The approach road from surface to bottom will be provided with 1 in 16

gradients. The length and depth of the road will depend on the depth of excavation. The excavation

of Brick Earth will be by simple hand tools. around 98 tonnes of Brick Earth has to be excavated

and loaded per day considering 150 days of effective working after deduction of monsoon period

and other holidays.For transportation of casted bricks from proposed site to kiln, one wheel wooden cart will be

utilized.

4.5 Preparation of Kuchcha Bricks san7! KumarDist. mgOfficerDist. iningOffice

Pasar: The place where Brick Earth is mixed with water for moulding. SeraikM~lla-Kh&aGrseao~~g"yDept. mesGovt. of Jharkhand, Ranchi

Mould: Wooden/Iron mould of average 9" x 4.5" x 3" Size is used for making the kuchcha brick.

Prepared clay will be poured in the mould and pressed manually, than mould will be removed

leaving kuchcha brick.

Page 7of19

~

Tel:+91522400~:x:4021236

I' Iriflft'.. ·t" 011/.A.Email: admin@d70~41.0762• ~ cf\4i1i asindia.org

· ~RQPI~R'~~-~O·

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-224 7, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

Sun Drying: The kuchcha brick will be allowed for sun drying. This is an important step for

making the adobe(kuchchi brick). The final moisture content of the adobe brick remains around

10% to 15%.

Transportation: The kuchcha bricks transported from drying place to brick kiln chamber by one

wheel hand operated cart. This cart transports around 30 to 40 bricks at a time.

Site Specification

i. Site Office: The site office with all requisite facilities is available at site.

ii. Water Huts: Water huts are available at requisite sites.

iii. Latrine & Bathrooms: This facility is mobile and available at site.

iv. Staff Quarters: Available at site.

v. Rest Shelters: The rest shelter for labourers is available just near by the site.

vi. Other: Temporary site services will be provided as advised by the officials time to time.

4.6 Employment Potential

Almost 20 unskilled labours will be deployed in brick clay mining.

4.7 Site Service

The workings will be for 5 years. The following site service are available at site:

1. Temporary toilet will remain available at site.

2. Migrants are not allowed as local resident will be employed.

4.8 Conceptual Mining Plan

Conceptual mining plan ·is necessary to know the ultimate limit if the pit crust when whole reserves

will be exhausted. The ultimate pit limit is limit of pit surface at the end of mining. It is also

necessary to select the sites for waste dump, site service, plantation etc. in such a place that these

sites should not get any disturbance during the life of the mine. Considering the aforesaid aspects

the conceptual mining plan is proposed as follows:

A) Ultimate Extent & Size of the Pit(s)

Pa11:e 8of19

·~,.. Tel:+9152240/ax:4021236.iI" Email. adm ·

7470, 410762/ · Jl irtte1

7120111~· m@d.,india.o<g

·Qr,~c114}l~·~O·"W

ENV Developmental Assistance Systems (I) Pvt. Ltd .D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Proposed Brick Clay Mining for M/s A. R. F. Bricks from Village -MINING PLANi Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

Plot(s) Excavable Area Depth Proposed Duratio Area of Volume Available Volume of Mineable

No. area(ha) (sqm) as per depth n berm left of top quantity of blockage quantityagreement of mining (as per surrounding soil( cum) soil (cum) of soil( cum)

(m) (rn) lease dee the site 0.15 m after leaving(sqm) berm( cum)

697 0.352 3520 2.00 1.850 5.00 70.400 528.00C 6,381.760 260.480 5,593.280

720 0.263 2630 2.00 1.850 5.00 52.600 394.SOC 4,768.190 194.620 4, 179.070

696 0.360 3601 2.00 1.850 5.00 72.020 540.1 SC 6,528.613 266.474 5,721.989

Total 0.975 9751 195.020 1462.650 17,678.563 721.574 15,494.339

*The digit before decimal indicating year and after decimal indicating month.

B) The Final Slope Angle Adopted

Considering final slope angle will be 45°.

C) Ultimate Capacity of Dumps

The dumps are not required as whole earth is useable.

D) Stabilization of Dumps

There will be no waste generate in brick earth mining. The excavated brick earth will be used for

manufacture of kuchcha bricks.

e) Ultimate Pit Limit

lt is an Brick Clay Mining Project and the ultimate pit limit is the boundary of .975 Hectare land,

with its safety margin as per the closure plan.

5.0Drainage

The principal rivers of the district are Subarnrekha and Kharkhai Rivers. The general trend of the

drainage is from NW-SE and SW-SE. The structural features particularly the foliation and joints

exert profound impact upon the drainage and control the drainage pattern of the district.

Dewatering

During the monsoon, the rain water will collect in the pit. This water will percolate in ground

containing Brick Earth. Thus dewatering is not required. Rain

plantation.

be used in proposedVED

Sa.Oist"?MmingOfficerDist. Mining Offic~

. Seraik~lla-Kharsawan Page 9 of 19ENV Developmental Assistance Systems (I) Pvt. Ltd ... Gbv~~~(1'~:.;kh~~_:R;;_;7.fsix:4021236D-2247, Indira Nagar, Lucknow-226016 · ,. rei: ~r-,n-qu~'1~70, 410762Website: www.dasindia.org ~ r Email: [email protected]

I''',,,,.,~11'°r~e~111011/Al\· ~~~crt4

~O·'~QReg·

ENV Developmental Assistance Systems (I) Pvt. Ltd. Fax: 40212360-2247, Indira Nagar, Lucknow-226016 Tel: +91 522 4007470, 410762Website: www.dasindia.org t'h.A .- /~Email: [email protected]

~»:,,,~ • \\e~ 1io\\I .ti it 1141

• t'l~c. ~O·'RQ

Re~·

Page 10of19

MININGPLAProposed Brick Clay Mining for M/s A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.

6.0 Plan and Section

The plan and sections of the proposed area are enclosed as per index of plates.

6.1 Year Wise Annual Programme of Mining for Next 5 Year Wise Development Provided in

Para 4B(l). The Details of Production is as Follows

Total Brick Earth inDuration cum Per Year

1 Year 1200

2 Year 1200

3 Year 1200

4 Year 1200

5 Year 1200

7.0Details of Employment

A. A kiln manager is required.

B. Total 20 labour required.

The Organization Chart is Proposed as Follows

Owner

lKiln Manager

Mine Staff and Laborers Clerk!

Watchman

8.0Beneficiation

Page 11of19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANI Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

No beneficiation is required.

9.0Measures Taken and to be Taken to Restoration, Reclamation in or Near the Lease Area

Restoration, Reclamation & Rehabilitation

The restoration and reclamation is not proposed in this mining plan as the brick earth will excavate

from the proposed area and after excavating brick earth the excavated area may be used for

agriculture or as water reservoir. The reclamation and restoration proposals will be provided if

required.

10.0Measure Taken and to be Taken for Protection of Environment in and Around the Lease

Area

Existing

Present environment and aesthetic beauty of the area is good.

Proposed

Due to mining the level of the surface will lowered 1.0-2.0 meters. No waste will generate. No tree

will destroy by proposed mining activities. For protection of environment and improving the

aesthetic beauty of the area following measures will be provided:

The mining will be systematic and scientific in supervision of technical staff.

The land use by mining is as follows:

~

- /San· KumarDist. M. · g Offi.cerDist. Mining OtficeSeraikella-KharsawanDept. Mines & Geology

Govt. of Jharkhand, Ranchi

Fax:4021236Tel: +91 522 4007470, 410762

Email: [email protected]

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Jndira Nagar, Lucknow-226016Website: www.dasindia.org

rainy seasons.

~

Climatic Conditions ~. . . S.an. · - Kumar

The Climate of the district rs temperate Di.st. ·. mg OfficerDist. Mining OfficeSeraikella-KharsawanDept.Mines & Geology

and, Ranchi Page 12of19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING P~A.N]Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

SNo. Category Proposed Land Use (ha)

I. Quarry Area 0.897

2. Waste Dump 0.000

3. Top Soil dump 0.005

4. Road Area 0.010

5. Builtup Area 0.000

6. Processsing Area 0.010

7. Storage Area 0.010

8. Plantation Area 0.034

9. Undistributed Area 0.010

Total Mining Area .975

Flora

In such areas are seen Sal -(Shora-robusta), Sisoo (Shisham)(Dalbergia), Murga (Ptercarpus), Siris

(albizzia-procera), Bostal (D- latifolia), (Pongamia glabra), palas-(Butea-frondosa), Mahua ( Bassia­

latifolia), Kend (diosphros-melanoxylon), Gamhar (gamelina-arborea)., Maluaceae, Bombax­

Malabaricum (Shimal), Lawsonia-alba (Mihendi), Wood fordia-floribunda (Dhatki), Oroxyum­

indicum (Sonae), Mango- (Mangifera indica), Bhelwa -(Semecarpus anacardium), Jamun (Eugenia­

jambolanda), Imli (Tamarindus-indica), Kadam (Anthocephalus cadamba), Kend ( Daiosphyros­

melanoxylon), Katha! (Artocarpus integrifolia).

Fauna

Only domestic animals like cow, goat, buffalo, cat, dog etc are observed I found in the area. As

there is no natural forest cover, the area does not contain any wild animals. Only stray jackals are

seen sometimes. Both poisonous and non-poisonous types of snakes are seen during summer and

Fax:4021236Tel: +91 522 4007470, 410762

Email: [email protected]

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN] Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

Human Settlements

o human settlement observed in the applied area.

11.0Measures Taken and to be Taken for Dumping Overburden, Stacking of Top Brick Earth

and Utilisation of Top Brick Earth

In Brick Earth mining for brick kiln the maximum quantity of excavated Brick Earth will use in

making the adobe bricks.

Waste Dump and Stabilization

No waste will generate due to Brick Earth mining.The bricks are sailable from full brick to crack bricks (pieces of bricks).

Top Brick Earth

The mining will be for Brick Earth and the Brick Earth will use in manufacturing the bricks.

12.0Measures Taken and to be Taken for Control ofWater, Noise and Air Pollution

General ground level in nearby area of project is 331mRL whereas level of ground water table is

around 70 meters below from general ground level Thus ground water table in the area is at around

16JmRL. This level fluctuates around 3 meters in dry and wet season. ln dry season it lowered

around 3 meters. Proposed deepest working will be around 2 meters deep. Thus ground water will

not come across.

Dewatering

During monsoon the rain water of direct precipitation will collect in the working pits. The monsoon

water of upper altitude side may also collect in the pit.

A drain will be provided around the pit to divert the rain water away from the pit.The rain water come across during the monsoon, the rain water will collect in the pit. This water will

percolate in Brick Earth.

The source of drinking water is tube well

not get any adverse effect from mining.

ENY Developmental Assistance Systems (I) Pvt. Ltd. O~pt.M~nes& Ge!i. ·· ax: 4021236D-2247, IndiraNagar, Lucknow-226016 Govt.otJffa~ • 0, 410762Website:www.dasindia.orgm ~f' .Em-xra mm asindia.org

,,,,((' it~e~ 1/'20111. J). p1Rtlc114!'lO·~RQ

Re~·

Proposed Brick Clay Mining for M/s A. R. F. Bricks from Village -Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,Jharkhand.

Noise

Approach roads within the premises of brick kiln area will be stabilized with brick bats/keri etc. The

whole process is manual thus noise pollution will remain in permissible limit.

Air Pollution

The roads within the area will be kept wide, smooth and properly wet by water spray.

Dust pollution Measures proposed

A. All the haul roads will be kept wide, leveled and compact.Regular water Sprinklers should be done on road from site to tar road once or twice in a day

especially during dry season to check the generation of dust during vehicular movement.

B. The green belt in and near the lease area will minimize dispersion of dust in near by area. The

proposed plantation is illustrated on the plan.C. The proposed plantation along both sides of haul road from tar road and between tar road and

mine site will also check the spread of dust in near by area.D. Monitoring in six month is proposed for assessment of impact for generation of dust due to

vehicular movement, drilling, blasting and loading etc. and measures should be adopted to minimize

the gaseous pollution.

Personal Protective Equipment

The safety helmet, safety shoos, safety belts will be provided to the labourers. The dust respirators

will be provided to the workers who will work near the noise creating machines.

13.0 Contribution Regarding the Social Development of the Nearby Residents

The socio-economic benefits can be maximized, if environmental concerns are integrated in

planning during development of the project i.e., by eco-friendly mining. The environmental patterns

likely to be affected are as follows:There is no impact of mining on local residents of the area as habitation is away from the proposed

area. The maximum persons will be employed from nearby villages. There is no source of

employment in near by area and thus the employment wilf develop by the proposed mining activity

in near by area. The villagers may use the wastage of bricks (not sailable) free of cost.

The impact of mining on social demographic profile is always positive, because all the persons have

Page 14of19

Page 15of19

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANj Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

;. Jharkhand.

been employed from nearby villages. Apart from indirect employment, some persons get satellite

occupation like tea stall, shops and small workshops due to mining activities in the area. Some

persons will get occupation as transporter of pucka brick from site to consumers. Thus the mining

has raised the economic status of nearby villagers.

The project proponent will contribute some fund from the income and the fund will used only for the

social development of the people in the field of Education and medical.

14.0 Details of Health Checkup and Insurance of All the Employed Persons (for Existing

Lease)

The health and safety hazards will be anticipated to affect the persons employed at the brick kiln.

The persons may get injury by fall of bricks or may suffer from professional diseases while working

at brick kilns. Safety boots and hats will be provided to the employed persons. A first-aid box is

kept at the mine. The dispensary is located near by the area.

15.0 Others

=- The approach road to site of brick kiln (including the storage site) from the nearest public road for

the transportation of final products must be paved or hard surfaced.

Water storage facility(minimum 3000 liters) must be provided at the brick kiln site.

A Sign Board showing the name, address and capacity of the brick kiln industry should be displayed

at the entrance of the site and on nearest road.

Dust respirators will be provided to the labourers.

16.0 Financial Assurance

As per rule 37J(1) and (3) the applicant will submit the financial assurance of Rupees 40000 I Ha in

term of fixed deposit receipt from any scheduled Bank before issuing the sanction letter.

17.0 Mine Closure Plan

17.1 Land Use Pattern

The existing land use pattern of the area is agricultural and the pattern of the area as per requirement

during mining will be as tabulated below.

ISNo.1 Category Proposed Land Use(ha)

istance Systems (I) Pvt. Ltd.

~

• Tel: +91 522 400~;x: 4021236

I•t I?" Email: admin@d70! 41.0762

1·r1't1 11/A. asindia.org

ll· '~c114112°~o...RQ1'1

Reg·

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLANl Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

11 Jharkhand.

=

I. Quarry Area 0.897

2. Waste Dump 0.000

3. Top Soil dump 0.005

4. Road Area 0.010

5. Builtup Area 0.000

6. Processsing Area 0.010

7. Storage Area 0.01·0

8. Plantation Area 0.034

9. Undistributed Area 0.010

Total Mining Area .975

17.2 Water Quality Management

.::. No surface water body located in the lease area. General ground level in nearby area of project is

345mRL whereas level of ground water table is around 70 meters below from general ground level

Thus ground water table in the area is at around 275mRL. This level fluctuates around 3 meter in

dry and wet season. In dry season it lowered around 3 meter. Proposed deepest working will be

around 2 meter deep. Thus ground water will not come across.

17.3 Air Quality Survey

The magnitude of air pollution in mining is machineries with method of mining, type of mineral and

level of mechanization. The Brick Earth is loose and thus blasting etc will not require. The source of

air pollution will be excavation and loading of Brick Earth and transportation vehicle. The

excavation and loading is totally manual. The transportation of bricks from pasad to kiln is by one

wheel hand operated cart. The following measures will be provided:1. Water spray will be provided over the Brick Earth before excavating. The spray will be in upper

layers. In lower layer the Brick Earth comes across in wet form.2. Water sprinklers will be provided on the kucha approach road to minimize the dust during

vehicular movement.3. The plantation along the kucha approach road will also helps to spread the dust out side.

Page 16of19Fax:4021236

Tel: +915224007470, 410762Email: [email protected]

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN1Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

17.4Waste Management

Not applicable in absence of waste.

17.5Top Brick Earth Management

The Brick Earth will be excavated from the area, thus no management will require.

17.6Tailing Dam Management

No tailing dam is proposed hence this paragraph is not applicable.

17.7Infrastructure

No infrastructure is proposed at site for the proposed project. However rest shelter, drinking water

huts & mobile toilets will be provided at site

17.8Disposal of mining machineriesNo big machineries will deploy in this work. The excavation of Brick Earth, transportation of

kuccha bricks are by manual means. The other machineries, moulds etc not disposed during the

period of the project.

17.9Safety and Security

For safety purpose the following proposals are proposed:

As the project will be for 5 years thus it is proposed to fence the excavated area to check the

inadvertent entry of human and live stock after closed the mining operation.

The safe workings are proposed in the supervision of technical and qualified supervisory staff

provided as per Mines Act. Safety measures will be the personal

provided to the labourers.

17.10Disaster Management Plan and Risk Assessment g;ameey'. t<0uffimar.«t. -MfrilnQ 1cerDrst.. Mining..,Office

No landslide in this area is observed. o8:prtaiMke1_11a-K4ha0rsawan• nes eotogy,

The workings are proposed from top to bottom by forming proper benching. «fg~tp9b~MfM!~h~will be by opencast mining method. Underground mining is not proposed. Face height will

maintain safe. No tailing dam is proposed. Thus high -risk accidents like land slide, subsidence,

flood, inundation, fire, seismic activities etc. not come across. Dispensary is available near the area.

Page 17of19

~

Tel:+9152240/ax:4021236

I•11-rtl..:.

r Email: admin@7470~41_0762• 1'eY dasindia.org

B· ~cJl47/lOlll/.

tteg· ~o.-ttQP

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-224 7, Indira Nagar, Lucknow-226016Website: www.dasindia.org

18.7 Abandoned Cost

.,.. Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MINING PLAN! Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.1

17.11Care and Maintenance During Temporary Discontinuance

ot applicable.

18.0Economic Repercussion of Closure of Mine and Manpower Retrenchment

18.1Number of Local Residents Employed

Around 20 labourers will be engaged per day during the period of this project.

18.2Compensation

The compensation to the employees with sustenance of himself and their family members will beprovided as per Labour Law and Mines Act.

18.3Satellite Occupations Connected with Mining Industry

Some people will get satellite occupations during the period of project only.

18.4Continued Engagement of Employment in the Rehabilitated Status of Mining Lease Areaand any other Remnant Activities

Not applicable in this mine closure plan.

18.5 Envisaged Repercussions on the Expectation of the Society Around Due to Closure ofMineNil.

18.6Time Scheduling for Abandonment

The project will be for 5 years. The working will closed after the period for which EC is given. The

excavated area will be fenced at the end of closing of working. The trees will be planted along the

kucha approach road, around the excavated area and along the tar road. Trees will be planted in

each monsoon. Total 322 trees will be planted during the period of the project around the~excavation site.

SanDisy.'Mjriing OfficerDist. '1ining OfficeSeraikella-KharsawanDept. Mir.es &. Ge· ... iy

Govt. o: Jna1 ,,han~j., . "•..::hi

Abandoned cost is within the financial assurance deposited by the project proponent.

19.0Budget for Mine Closure

ENV Developmental Assistance Systems (I) Pvt. Ltd.D-2247, Indira Nagar, Lucknow-226016Website: www.dasindia.org

Page 18of19

~

• Tel: +91 522 400~:x:4021236I'/ 1<'1'1 Email: admin@d70? 41.0762

1•~ asindia org

II·'{ir~e,4112n111A .QPl~c/l

Reg. l'Jo.~R

Proposed Brick Clay Mining for Mis A. R. F. Bricks from Village -MJNJNG PLAN)Kolabira, P.O. - Kolabira, P.S. - Saraikela, District - Saraikela-Kharsawan,

Jharkhand.

SNo. IReclamation Activity Amount (in Rupees/ Ha)

500.00I. Preservation of top Soil.2. Formation of Bund walls around excavation plot and

plantation of fencing species along with past plantation care.3. I Plantation on slope terraces/ benches of soil binding species

and past plantation care.

4. ILeveling and landscaping of flat pit area and making it fit forcultivation.

500.00

1,500.00

1,500.00

4,000.00Total

20.0Analysis of Proposal (Final Recommendation)

Overall the project will have positive and long term impact on environment. The project will also

bring positive changes in terms of socio economic development by way of generating direct and

indirect employment opportunities to the people of vicinity. Also the project will bring economic

benefit to the state in terms of revenue generation.

*********