MacDonald-Miller Facility Solutions We make buildings work better.
Why & How to Leverage ESCO
![Page 2: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/2.jpg)
Panel Members
Brian Hanson PE ESCO Development
Manager
MacDonald-Miller
John Van Hersett ESCO Project
Manager
MacDonald-Miller
Barry Holldorf
Director of Facilities
& Operations
Highline College
Joe Sullivan PE
Energy Engineer
Department of
Enterprise Services
![Page 3: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/3.jpg)
Highline’s Story B4 innovative project
• Project challenges
• Leverage federal funds for Commerce grants
• More dollars for building improvement
Failing Heating Water
Distribution System
• Corroded 10” mains
• Decouple from plant
• Solutions
![Page 4: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/4.jpg)
What is ESCO process & DES’ Role?
Prequalified
Providers Project
Oversight
Contractual
Framework &
Coordination
Financial
Transparency
1986 RCW 39.35
Legislative
Authority to GA
(Now DES)
![Page 5: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/5.jpg)
ESCO Benefits Collaboration between Owner, DES, and ESCO
Ability to fast-track
Owner involved with contractor selection
Owner involved with equipment selection
One responsible entity (ESCO)
GUARANTEED:
Maximum project cost
Energy savings
Equipment/System performance
![Page 6: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/6.jpg)
Current
Operational
Costs Savings
New
Operational
Costs
Before During
Savings
After
Utility &
Maintenance
Costs
Fin
an
cin
g Annual Debt
Service
Utility &
Maintenance
Costs
Utility &
Maintenance
Costs
![Page 7: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/7.jpg)
Department of Enterprise Services Experience
Energy conservation in public facilities since 1986
Over 500 projects totaling $300 million
Over $100 million in energy cost saved
$30 million in utility rebates brought to the projects
Clients include state agencies, colleges and universities, cities and towns, counties, school districts,
port districts, libraries, hospitals, health districts:
Highline College
Olympic College
Yakima School District
Valley Medical Center
City of Tukwila
King County
Tumwater School District
Department of Corrections
University of Washington
Veterans Administration
City of Olympia
Port of Bellingham
…and dozens more
Customers:
![Page 8: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/8.jpg)
Sequence of an ESCO Project
Project initiated by
Interagency
Agreement
ESCO
Selection
Investment
Grade Audit
Measurement
& Verification
Preliminary
Audit
#1
Design &
Construction
#3 #5
#4 #6 #2
![Page 9: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/9.jpg)
Highline College – Building 4 Energy Efficiency Upgrades
CONCERNS
Outdated lighting, controls &
mechanical system
147 EUI = Inefficiency
No Air Conditioning
Aircraft Noise Interruption
Failing heating distribution system
T-12 Light fixtures
Hydronic Baseboards &
Hydronic Multizone
System
Pneumatic Controls
Project Overview
![Page 10: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/10.jpg)
OPPORTUNITY
FAA Noise Abatement Grant - Port of Seattle
• In 2011, the College received a FAA Noise
Abatement Grant
• Envelope upgrades was primary focus
• Not enough funding to address the other
Identified challenges
Department of Commerce Grants
• Bundled EE projects on Campus leveraging
FAA funds to qualify for DOC grants
• Leveraged minimal funds available from College
Project Overview
![Page 11: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/11.jpg)
NEW
• HVAC System
• LED & T-5 Lighting
• Building Controls
GUARANTEED
• System
Performance
• Project Cost
• Energy Outcomes
OTHERS
• Removed from
Central Heating
Plant
• Air Conditioning
Addition
UNIQUE CONTRACTING STRUCTURE
Project Process
HC Building 4
HC / DES Project Management
![Page 12: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/12.jpg)
Aircraft Noise Reduction
Increased Occupant Comfort
Removed from Central Plant
State of the Art Lighting Control
Efficient HVAC & Lighting
147 EUI To 37
BENEFITS
Project Overview
![Page 13: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/13.jpg)
Measurement & Verification – B4 MacDonald-Miller conforms to the International Performance Measurement
and Verification Protocol (IPMVP)
IPMVP Option D. Energy Model Simulation
Agreed to by DES and College as the proper M&V option to use
Document building conditions for the energy model simulation
• Envelope
• Lighting
• Mechanical system operation
• Miscellaneous equipment energy usage
• Existing and proposed hours of operation
Post Project M&V:
• Infrared pictures of Envelope
• Document wattage of installed lighting
• Trend lighting panel to confirm schedules
• Trend HVAC operation to confirm scheduling, Occupied and unoccupied setpoints.
• Compare trending and equipment efficiencies to savings calculations and compare
them to the guaranteed savings. Sa
vin
gs
Ac
hie
ve
d
PRIMARY
OBJECTIVE: Deliver
the Expected Energy
Savings at the
Building Meter Year-
Over-Year
![Page 14: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/14.jpg)
Boilers, Oh My! • Performing Site survey for crane pick
– What's coming out of that vault?
– Uh oh….
• Engage DES approval for Engineering
investigation
• Develop cost analysis for repair options
• Expedited Contracting, Tight
construction window
![Page 15: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/15.jpg)
What was presented: Options Studied:
• Pipe Bursting (Trenchless)
• Cured-In-Place Pipe Lining (Trenchless)
• Open Cut Excavation and Pipeline
Replacement
• Direct Boring (Trenchless)
• Satellite Boiler
• Temporary Boilers (If piping failed prior
to a permanent fix)
Each Option Included:
• Overview of the option
• Advantages
• Disadvantages
• Impact of students and staff
• Timeframe for completion
• ROM Total Project Cost
![Page 16: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/16.jpg)
Construction B29 B4
Discovery
9/16/17 9/17/17 10/18/17 11/18/17 1/05/18
DES on Board NTP for IGA Report Delivered NTP for Construction
11/19/17
Installation
Completed
![Page 17: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/17.jpg)
Partnership Provided:
Integrated Design and Construction
Turn Key Solutions
Stretching Dollars
Innovative Project
Risk Mitigation
Time of Delivery & Project Flexibility
Interactive Communication
Guaranteed Cost
Best solution vs. Low Bid
Partnership & Trust
Transparency
Leverage Grants
![Page 18: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/18.jpg)
Attractive ESCO Projects
1. Projects with significant Energy/Utility
Savings • Interior and exterior Lighting (LED)
• HVAC projects – chillers, boilers, pumps, AHUs,
distribution systems, commissioning
• Water conversation projects
• Building Envelope Upgrade
![Page 19: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/19.jpg)
Attractive ESCO Projects
2. Projects with some energy savings and significant project complexities
• Projects that require scheduling work around client requirements on critical deadlines
• Projects with numerous unknowns like retro commissioning projects or major HVAC renovations
• Projects that need contractor flexibility
• Projects that need guaranteed cost & energy savings to apply for grants
![Page 20: Why & How to Leverage ESCO MacDonald-Miller Facility ...](https://reader031.fdocuments.us/reader031/viewer/2022012016/615b11af6a1f5558674ccfbb/html5/thumbnails/20.jpg)
John Van Hersett [email protected]
206-768-4250
Barry Holldorf [email protected]
206-870-3793
Questions? Contact us!
Brian Hanson PE [email protected]
206-768-3902
Joe Sullivan PE [email protected]
360-407-9377