Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

download Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

of 13

Transcript of Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    1/13

    CEME

    NTCEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEMEN

    T

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NT

    CEME

    NTCEME

    NT

    CEME

    NTCEM

    ENT

    CEME

    NT

    In assocIatIon

    wIth

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    2/13

    ou could be orgiven or

    picking up this supplement

    and thinking: "Ive got

    enough to worry about

    with the economy the way

    it is, I cant deal with this

    sustainability stuf right

    now". But the act youre

    reading this suggests thatyou, like me, believe that its

    not a binary choice between

    economy and environment,

    and that sustainable business

    and indeed a sustainable built

    environment will be central to

    our recovery, growth and uture

    prosperity.

    Thetopicothissupplement

    wholeliecycleassessment

    althoughit soundslikeabit otechie

    jargon,is reallyattheheartothis

    challenge.Ocourse,theenergyused

    inoperatingourhomesandbuildings

    isa bigissue,butsustainabilityis

    muchbroaderand goesmuchdeeper

    thanthis.Wholeliecycleassessment

    isan attempttotakeintoaccountthe

    truecostandimpactothematerials

    weuse,romsourcingtoendo lie,

    orpreerablyreuseandrenewal

    socalled "cradletocradle".

    This isnt particularly new

    thinking and resource eciency

    is not a recent phenomenon.

    Arguably were only just recapturing

    a previous attitude to "waste

    not, want not" that had been the

    dominant paradigm or centuries.Butthecaseor movingawayrom

    ourcu rrentconsumptionbased

    economytowardsanew,green

    economythatvaluesthescarcityo

    naturalresourceshasneverbeen

    stronger.Rapiductuationsinossil

    Waste not, want not

    uelprices,changingclimateand

    growingenvironmental pressures,

    marketsstillconstrainedbythe

    globalnancialcrisisand increasing

    demandor everdepleting

    resources,areorcingustolook

    closelyatthewaywedo things.Businesses that ourish in the

    uture will do so not because they

    have the best CSR programmes or

    green PR campaigns, but because

    they have made resource eciency

    the challenge o doing more with

    less a core business strategy and

    are creating lasting value rom more

    sustainable business practices. This

    supplement is ull o examples o

    good practice, which must become

    the norm, not the exception, i we

    are to begin to meet the needs obillions o people trying to live of

    the interest o one planet rather

    than using up all o its capital in one

    or two generations.

    Paul Kig, chi xcutiv, UK

    G Builig Cucil

    T WO STORY

    eword

    T

    8

    14

    10

    4-7 T BIR PICTR

    8-9 CAS STY: ASAR CITY

    10-13 T ACTS

    14-15 SI OR I

    16-17 BIR'S I18-19 CAS STY: TART zRO

    20-21 BRITO & OV COCI

    22 COT

    23 CRA- TO-RAV ATA

    Y

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    3/13

    "osuas a srs arsar o masur wo-fmpas su as mbo arbo"

    SRY

    tssomethingthatinstinctively

    weallknowis true.hisocuson

    creating"lowcarbon"buildingsin

    operationisa seriouscaseo tunnel

    vision.heimpactso constructing

    thatbuilding,withall itsmaterials

    andcomponents sourcedrom

    aroundthe world,andtheateo

    therubbleattheend oitslieare

    convenientlyignored.

    Butitsnotembodiedcarbon

    emissionsorresourcedepletionthat

    arekeepingthepropertycompany

    directorsawakeatnight.hat

    concernsthemis risk:isyourportolio

    worthwhatyouthinkitis?

    Anythingthatsariskto theuture

    valueoapropertywillconcentrate

    peoplesminds, saysDavid elord,

    whoheadsupurleyPalmerFlatts

    sustainabilitydivision.hatchiefy

    concernspropertyundmanagersis

    thatthereisa potentialoratipping

    point:atsomepointabuilding

    justwontbeleasableiit isnot

    sustainable.

    Andwhilemanypropertyowners

    justread"energyecient"or

    sustainable,themostorward

    lookingarerealisingthattheyneed

    totakeamuch morestrategicview

    owhatbringsvaluetoa building:its

    plannedlengtho service,fexibility

    ospace,abilitytorereshand

    reurbishand eventuallyhow

    preciouscommoditiessuchas copper

    nlightened client e tting t diclt qetint hlelie ict ch edied cn ndecyclle cnent

    why the future matters

    oucon

    willbereclaimed.Andin response,

    consultantsanddesignersare

    startingtomeasure whole-lie

    impactssuch asembodiedcarbon

    (seebox,below)andcreating

    measurementtools, databasesand

    benchmarks.

    hereis somecleverthinking

    goingonas thisdebatemovesout

    ouniversitiesandintothe hands

    opractitioners, saysChris rott,

    partnerand sustainabilityengineeratFoster+Partners.Itsprobably

    thebigportolioownerssuchas

    educationauthoriti es,NS rusts

    andlarge commercialportolios

    thatarestartingtoasktheright

    questions.

    hisapproachis stillverymuchin

    itsinancy,though,saysrott:he

    bigpropertycompaniesknowhow

    tolookatertheirbuildingsonce

    theyhavegotthem,butthebrieng

    partoitand theeedingbackin

    astructuredwayis stillrelatively

    immature.

    herearea selectewwhoare

    KSSE

    I I were lissues I w

    as important, I wat the embodieyour asset. Butyour asset to besae, be responand you shouldensure it demoresource ecieall aspects whiclooked at on a lemightsaythlonger,they aredoesnotmeantalsodemonstrawhichwouldenberecycledor,ecomponentsorre-used.

    KristianSteeleisas

    consultantatArupM

    impactoproducin

    avirginmaterial.

    hinkingothe

    alwaysthe preera

    Steele.Cradle-to-g

    waytogetstarted

    moreamiliarandca

    cradle-to-gravetyp

    Steeleand other

    advocatelookinga

    buildingslie mat

    andmanuacture, t

    andconstruction,o

    interestedinlookingatthe impacts

    andbenetsoverthewhole liecycle,

    romextractionrightthroughto

    end-o-lie,saysKristian Steele,

    seniorconsultantatArupMaterials.

    Manypeoplearejust tryingtoget

    theirheadsroundit.

    hereareclientswho are

    interestedinshowcasebuildings

    wheretheyaretryingtounderstand

    whatli ecycleassessment (CA)

    meansandlearnromtheprocesssothattheycandealwithit ina better

    wayastheirknowledgeprogresses.

    Muchotheuseulworkat the

    momentis aroundeducationand

    understandingasopposedtospecic

    changeodesigndecision.

    e ig deate

    neothe bigareasodebateis

    whetherembodiedimpactsshould

    takeintoaccountwhathappensto

    amaterialattheend oa buildings

    lie.Isomethingcanbere-usedor

    recycled,thenmuchothe carbon

    spentinproducingthatproductin the

    rstplacehasbeensavedwhich

    istakenintoaccountina

    cradle-to-graveassessment.

    Itis, ocourse,easierto lookonly

    atwhathappenstoa productup to

    thepointitleavesthemanuacturer;

    aso-called cradle-to-gateliecycle

    assessment.hebenetothisis

    thattheseprocessesaredenedand

    dontchange,whereaswhathappens

    onceaproductleavesthe actory

    gatevariesromprojecttoproject.owever,the downsideis thatthis

    approachcan misinormdecisions.

    hetroublewiththe

    cradle-to-gatemetricis thatyou

    maydrawthewrongconclusions

    istudyingtheembodiedcarbon

    otheinitialconstructionphase

    only,saysJamesFiske,headothe

    conomicResearchUnit atMott

    MacDonald.e thereorestrongly

    recommendthattheindustry

    adoptsa cradle-to-graveapproach

    tostudyingembodiedcarbon,

    linkingthisatthe sametimetothe

    calculationoemissionsoverthe

    lie,causedbyenergyconsumption

    orevencarbonabsorptioninsome

    cases.Measurementocarbonand

    costshouldbelinked,saysFiske,to

    savedierent constructionteams

    measuring theseitems separately.

    MottMacDonaldsapproachisto

    usea cradle-to-gatemeasureor

    embodiedcarbonandmodelwhat

    isdoneto amaterialorcomponent

    duringandateritslieseparately,

    combiningthemtogivea

    cradle-to-graveinsight. he

    maintenance,replacements,

    transportation,disposal andrecycling

    processesshouldbemodelled

    individuallyin ordertoimprove

    accuracy,asyoucanonly evaluate

    whatyouaredoingatone pointin

    timewithanyaccuracy,saysFiske.

    egoeson tosaythati thematerial

    isroma recycledsourcethenthe

    cradle-to-gatemetric should refect

    therecyclingprocess,ratherthanthe

    mbodiedcarbonisthe amountoC2

    emittedduringaproductsentire

    liecycle,includingraw material

    extraction,transport,manuacture,

    assembly,installation,maintenance,

    disassemblyor demolitionand

    decomposition.owever,peopleoten

    usetheterm "embodiedcarbon"toreer

    toemissionsduringthe earliestphasesoaproductslieonly.

    Manuacturerscan providedataonthe

    carbonthathas beenembodiedupto

    thepointit leavestheactory,so-called

    cradle-to-gateembodiedcarbon.hat

    happensnextmayvarydependingon

    productbutthoseuture eectsare

    lockedinassoonastheproductisused.

    Becausethecradle-to-gateguresare

    easytogethold o BathUniversitys

    Inventoryo Carbonandnergy(IC)

    listsembodiedimpactonlyto theend

    othemanuacturingprocess these

    areotentheonly onesconsidered.

    owever,theembodiedcarbonduring

    laterpartsoa productsliecyclecanbe

    signicant:orexample,imaterialsor

    smallprojectsaretransportedroma

    longwayawayor ia componentneedstobereplaced,repairedor maintained

    manytimesduringa buildingslie.

    Similarly,otherembodiedimpacts

    suchas greenhousegasemissions,

    wateruseorlandusecanalsobe

    considerablein laterphasessuchas

    disposalandrecycling.Andwhilethe

    currentpoliticalocusis oncarbon,

    theseotherimpactswill beconsidered

    equallyimportantinthe uture.

    WhEn S EmboE cAbon noEmboE cAbon?

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    4/13

    " mark w a sfor sma a r-uso -vau ms"

    Re-useandrecyclinghavebeenkeyconcernsortheDA onthelympicpark.

    heaquaticscentre,pictured,thelympicstadiumandthewaterpoloarenaall

    havetemporaryelementsdesignedsotheycan bedismantledandre-used

    SRY

    oucon

    maintenance,dismantling andre-use

    ordisposalin ordertopinpoint

    wherethebiggestimpactsare

    andthereorewherethebiggest

    improvementscan bemade.

    raillazers

    hileullCAstudiesthatconsiderthecradle-to-gravei mpactsor

    wholebuildingsarerare,andmay

    becarriedoutaterabuildinghas

    beendesignedas adatagathering

    exercise,designers arestarting

    touseCA-relatedinormationto

    helpmakedecisionson material

    andproductselection.Foster+

    Partners,orexample,is addingCA

    dataintoitsmaterialsdatabaseso

    thatarchitectswillautomatically

    havetheinormationwhentheyare

    researchingspecications.

    Inreurbishment,CAcanbea

    veryuseultool.Steeleanalysedthe

    replacemento damagedacade on

    Guysospitaltoworkout thatthe

    carbonspenton thenewrainscreen

    wouldbepaidbackbythe energy

    savedwithin12.5 years(let).

    CAcanalsobe usedasa weapon

    againstbu ilding controldepartments,

    reportsoneconsultantwhodidnot

    wanttobenamed.Sometimesit

    doesntmakesenseto insulateand

    upgradea buildingtocurrentPart

    standardswhenyouarespending

    morecarbonthan yousave.

    hileCAconsidersa widerange

    oenvironmental impactsthrough

    aproductorcomponentslie,

    inevitablytheocusis oncarbon.

    Climatechangeis thedening

    environmentalissueo ourtime,

    saysSteele.So inthe UK,mucho

    theworkbeingdonebyclientsin this

    areaocuseson abuildingscarbon

    ootprint:embodied, operationaland

    end-o-lie.

    hereareaewtrailblazers.In

    theMiddleast,thedevelopers

    oMasdarCityaremakingserious

    attemptstoconsidertheimpactso

    abuildingoveritsentireliecycle

    includingre-useandrecycling(see

    page8).Foster+Partnersusedtheir

    CA-inormedmaterials databasewhencomparingandselecting

    materialsorthebuildingsand

    public spaces.

    Closertohome,theDAhas made

    greatstrides.Manyothe main

    venues theaquaticscentre,the

    lympicstadiumandthe waterpolo

    arenahavetemporaryelements

    designedso theycanbedismantled

    andpossiblyre-usedandthe park

    alsoeaturesthelargestever

    temporarysteelramedbuilding,the

    basketballandhandballarena.

    Intheutilitiessector,ater

    regulatorwathasorcedwaterand

    sewagecompaniestoconsiderwhole

    lieratherthanjustoperational

    carbon.he resultorcompanies

    suchasAnglianater(seebox,

    right)isa newapproachtoprocuring

    componentsandsystems,takinginto

    accountembodied andoperational

    carbonalongsidecost.

    Inprivatesectorclientbries,

    mentionsoCAsor whole-lie

    carbonareconspicuousbytheir

    absence.heprivatesectorremains

    interestedinonething:getting

    thelowestcapitalcost withaew

    notableexceptions,says Robambe,

    whoheadsupillmottDixons

    sustainabilityconsultancy

    Re-hinking.here'sabit odebate

    aboutenergyeciencybutitis

    havinglittleimpactin termsoactual

    decision-making.Apartromone

    currentschemethatis outtotender,

    theFQ,we haven'texperienced

    anyseriousattemptataccountingor

    whole-liecarboninbidsissued.

    Consideringonlycapitalcostsleads

    todecisionsbeingbasedonapartial

    picture,saysambe,a actthatis

    recognisedinthe reasurysGreen

    Book,whichsaysallprocurement

    decisionsshouldbe basedon

    whole-liecostratherthancapitalcost.ambethinksweshouldgo

    onestepurthertoalsoconsider

    environmentalimpactovertheentire

    liecycle:verall,weshouldbe

    addressingwhole-lievalue,which

    isa combinationoenvironmental

    impact,includingcarbon,embodied

    andin use,costs,includingcapex

    andopex,unctionalityandabilityto

    meetperormance requirements.

    Anotherpotentialtrial groundor

    whole-liecarbonthinkingisthenew

    ecotowns.owever,the planning

    policystatementissuedbythe

    governmentin relationto ecotowns

    doesnotlistwhole-liecarbonas a

    consideration.

    Attheecotownin north-west

    Bicester,housing association

    A2Dominion,whichis partoP3co,

    anewl yormed eco-development

    companyresponsibleorthetown,

    isgoingsomewaytowardsthatgoal.

    ContractorsillmottDixonandill

    Partnershipshave beentargeted

    withreducingtheembodiedcarbon

    by40%comparedwitha standard

    new-buildhouse.[his]would

    bethesorto orderomagnitude

    thatwouldtakeustowardsthe low

    carbonootprint thatwe want,

    saysNicoleazarus,sustainability

    consultantto A2Dominion.

    market fres r reglati

    Chrisrottseesmarketorcesrather

    thanlegislationasthe strongest

    driverorclientstowardsliecycle

    thinking. igh-valuearteacts

    anditemsaremuchmorelikelyto

    bereadilyplannedortheirwhole

    liecyclebecausetheyhavearesidual

    valueatertheirrst lie,he says.

    Parto thesecrettoeectively

    designingbuildingsisto design

    componentsand assemblieswhere

    itemsohighvaluecanbe separated

    andrecycled.

    Designerswhodontconsider

    end-o-liein theirdesignsrisk

    lockingincommoditiesthatwould

    havebroughtvalueurtherdownthe

    line.hemarketwillleaddesignor

    dismantlingandre-useonthese

    high-valuei tems,providing designers

    risetothechallenge,saysrott.he

    designand proessionalraternities

    havearoletoplay too.Itsnotso

    muchaboutinventingnewthings,

    itsabouthowyougothroughthe

    processodesign.(seepage14).his

    isalreadyhappeningtosome degree,

    reportselord:on datacentres.

    hesebuildingshaverelativelyshort

    livesseventoeightyearsbeore

    retting.Butthecopperusedorthe

    busbarsis extremelyvaluable.e

    havestarteddiscussionswith some

    othemanuacturerswhowantto

    rentratherthansel

    sayselord.

    izGreen,seniors

    consultantatMottM

    thatCA should bec

    IntheUKitisstilln

    enorcedaspolicy,

    doesneedtochang

    CraigJones,asen

    atSustain,agrees:

    regulationorlegisla

    ramainstreamg

    includesembodied

    carbon.eneed ah

    rottis lesssure:

    minimumbartoent

    somanypeopletha

    setveryhigh.her

    mightbesuccessu

    assessmentstobe

    inormationbeing r

    governmentor oth

    Ultimatelyboth m

    andlegislationwill

    amorewhole-liep

    carbonand otherim

    suchasArup,Foste

    MottMacDonaldan

    recentlybought DC

    smartenoughto re

    commercialadvant

    buildinguptheexp

    datanow.

    Inresponseto watsclimatechange

    policy,Anglianateris takingwhole-lie

    carbonaswellas costintoaccount.

    orkingwithitsintegrateddesign-builddeliveryprovider

    @oneAlliance,thewaterrm is

    developinga catalogueoproducts

    thatgivebothcost andcarbonsavings.

    mbodiedandoperationalcarbonare

    calculatedwithaspeciallydeveloped

    CarbonModellerandthe goalisto halve

    embodiedcarbonby2015compared

    withsimilarassetsbuilt in2010.

    Innovativesystemsdevelopedbythe

    teamincludecreatinga curvedtrench

    orstructuredplasticwaterpipes

    usinga specialshapedbucket.his

    reducestheamounto beddingandsur-roundmaterialrequired,cuttingcosts

    by38%and reducingembodiedcarbon

    50%.Soar 60productshavebeen

    developedwith150 moreidentied.

    @oneAllianceincludesAnglian

    aterServices,BalourBeatty

    UtilitySolutions,Barhale,Black&

    Veatch,Grontmij,M,andSkanska

    AkerSolutions,andis supportedbyMott

    MacDonald.

    cASE Su y: AnGLAn WAE

    iecycleassessment(CA)studiescan reallycomeintotheir

    ownonreurbishmentprojects,whenwhole-liecarboncan be

    consideredalongsidecosttohelpinormdecisions.

    orkingorthe GuysandSthomasNSFoundation

    rust,replacingailingcladdingonGuysospital,Arupwas

    abletousesimpleliecycletoolsto comparesixdierent

    claddingsystems.

    Guy'S hoSpAL

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    Climate

    Change

    Hu

    man

    Toxicity

    Toxicityto

    Land

    Embo

    died

    Water

    Non-renewable

    Resource

    Use

    Frame

    Glazing

    Spandrel

    Guys Hospital - Impact Reduction

    Over50% of the carbonis attributable to theframing

    Reducingthe amount offramingwouldbe themost eective way ofreducingthe embodiedcarbon

    Move to sticksystem

    Cost benets as well

    ArupseniorconsultantKristianSteelelookedata broad

    rangeoimpactsorthecladdingsystems,althoughhe

    saysthatclientswillalmostalwaysocuson carbon.

    0 5 10 15 20 25 30

    Years

    -

    Guys Hospital - Cleaning and Maintainance

    Carbon usedto refurbishthe faade

    Carbon usedin cleaning& maintainance

    0

    000

    000

    000

    000

    000

    000

    000

    000

    000

    000

    ArupbuiltsimplemodelsusingCAtoshowcarbonin

    use.hesemodelsarenotreadilyavailablebutarevital

    tohelpclientsanddesignersmakewhole-liedecisions.

    No.Years

    -

    Guys Hospital - Carbon Payback

    TotalCarbon Saved

    InititalCarbonSpend

    PaybackPoint

    -10000

    -8000

    -6000

    -4000

    -2000

    0

    2000

    4000

    6000

    8000

    012 3 4 56 789 1011 12 1314 1516 171819 202122 2324 2526 2728 29 30

    CAalsoallowedAruptoworkoutwhenthe carbon

    spendwouldbepaidbackbythe operationalcarbon

    improvements,ameasurethatwasusedin planning.

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    5/13

    fyouwanted

    tochallengedecision-makingon

    sustainable development,

    AbuDhabimightbethe place.In a

    countrywherefreshwateris

    createdin desalinationplantsand

    materialsmustbetransportedfrom

    afar,competing environmental

    pressurescouldnotbemoreevident.

    MasdarCityaims tonda way

    throughtheseissues.Itsambitionistobe theworldsrstcarbon

    neutral,zero-waste citypowered by

    renewableenergy.

    DeveloperMasdar,awholly

    ownedsubsidiaryoftheAbu Dhabi

    governmentsMu badala Development

    Company,is pushingtheboundaries

    acrossarangeof sustainabilitytargets.

    Indoingso, itwill makenewdiscoveries

    andsetstandardsthatthe restof

    theworldwillfollow.Amongitsgoals

    isreducingthe embodiedcarbonof

    constructionmaterials,including

    theuseof recyclableand recycled

    materials.

    Thecountryitselfdoesnothave

    verymuchinthe wayofbuilding

    resources.They recognisethat

    theabilitytorecycle,designfor

    dismantlingandembodiedcarbon

    areimportant, saysDavid Telford,

    directorofHurleyPalmerFlatts

    energyand sustainabilitydivision,

    whoworkedontheconceptdesign

    fortheSprinterBuildingin theSwiss

    VillageinMasdar.On siteinJanuary

    nextyearandduetobe completed

    inearly2013,the SprinterBuildingis

    oneoftherst togoup inMasdarCity

    andwillhousethe Swissembassy.

    DesignedbyFoster+Partners,

    Masdaris basedona traditionalidea

    ofcompactcities:highdensitybut

    nothighrise.Constructionstarted

    ociallyin February2008andthe

    heartofthisresearch-basedcity,the

    MasdarInstitute,isalreadybuilt.

    Oncecomplete,thecitywill be

    hometoabout40,000people,with

    50,000commutingin.A lightrapid

    transitsystemwilltakeworkers

    intothecityand unusuallyforthis

    partoftheworld Masdarhas been

    designedwithgreenpedestrian

    streetstotemptpeopletowalk.

    Asa sustainablecity,Masdaris

    beingdesignedsoits buildings

    canrenewthemselvesasthecity

    changesanddevelopsovertheyears.

    FortheSprinterBuilding,futurelivesbeyondits rstuseasan ocehad

    tobeconsideredinitsdesign.Ithad

    tobeveryexiblesothatit could

    accommodatelotsof dierentuses

    overits life,saysTelford.Themain

    structureremainsthesamewhilethe

    internall ayoutchanges.

    Thenextstepisto planforthose

    partsofthebuildingthatwillbe

    replaced.Itsthinkingaboutthebits

    thatwouldneedtoberenewedand

    designingthemforrecycling,says

    Telford.Forexample, thedesi gn

    teamlookedatthe chilledbeams

    toexaminewhetherthevaluable

    commoditieswithinthemcould

    beeasilyseparatedandrecycled.

    Welookedat thesteel,aluminium

    andcopperhowtheywerejoined

    togetherandwhetheryoucanget

    thosematerials back.

    Majorplantmustalsobedesigned

    foreaseofreplacementandpipes

    andwiresmustbesizedto take

    intoaccountdierentloadingsand

    requirementsin thebuildingsfuture

    lives.Iftheinternallayoutofthe

    buildingchanges,wouldthebasic

    infrastructurebeableto beadapted

    andused? saysTelford.

    Thedesignteamalsohada whole

    rangeof sustainability targets

    tohitwith theirconceptdesign.

    Economically,the buildinghadtobe

    higheciency,achievinga netto

    grossofover75%;specicationshad

    touselocalsupplierswherepossible;

    embodiedcarbonhadtobe reduced

    by30%,operationalenergyand

    carbonby50%,operationalwater

    by30%andrecyclableandrecycled

    materialsusedwherepossible.

    Ithadtobe amulti-disciplinary

    approach,says Telfordwhos et

    theM&Edesignandsustainability

    strategy.So ata veryearlystage

    thedesigners SwissarchitectBGP

    whoprovidedthe conceptdesign,

    local deliverydesigners A+Dyer,

    andHurleyPalmerFlatt lookedatdierentoptionstondthebestt.

    Thereweretwoor threeconcepts

    andwealldidalittlebitoneachand

    ratedthemagainstwhateachof us

    wastryingtoachieveandgotthe

    bestcompromise.Andatthesame

    timewedida quickcostassessment.

    Onthisproject,theclientwasnot

    necessarilylookingforlowestcost.

    Theclientwasinterestedinthe

    shapeofthecurves:forexample,

    howmuchextracostwoulditbe

    togetan extraamountofcarbon

    reduction,says Telford.

    Telfordrecognisedthe challenges

    ofcompeting environmentaltargets,

    sodevelopedananalysistoolto help

    ndtheoptimumsolutions.Therst

    stepinusingthe toolisto takeall

    theenvironmental parametersand

    workwiththeclienttoweightthem

    accordingto mandatorytargets,

    strongdesires andgood-to-haves.

    Dierentscenarioscan thenbe

    runthroughthetool,witha score

    indicatinghowcloseto theclients

    valuesthatsolutionhasreached.

    Telfordbasedthe

    environmental,eco

    culturalsustainabi

    ofEstidama,Abu D

    buildingframewor

    beadaptedto mee

    requirementsof an

    Likeeverybuildin

    theinformationfro

    Buildingwillbefed

    databasesandtoolfuturephases ofde

    Tohelpdesigners

    Masdarhas setupa

    calledTheFutureB

    eectivelya directo

    materialsandprodu

    UnitedArabEmirat

    onthedatabasemu

    independentlyasse

    surethatitlivesup

    benetslistedthat

    Masdars15 environ

    Theplanis thatpr

    begintousethe po

    projectsin AbuDha

    ArabEmirates and

    itwill beusefultob

    professionalsaroun

    TheMasdarInstitueb

    inMasdarCity

    TheSprinterBuildingisbeing

    designedwithwhole-life

    useinmind

    t ablty t cycld f dmatlad mbdd caba mtat

    this pioneering au dhi eo-i oers

    unique opporuni o eveop ws o

    iprove uiing's susinii

    THE WHOLE STORY

    STUDY: new rulesSTUDY: new rules

    TH

    CASE STUCASE STU

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    6/13

    tsnotrocketscience.Iyou wanttocomparethe

    embodiedimpacts odierent structuralmaterials,

    justlookup theimpactfguresperkg,multiplyby

    theweightothatmaterialand heypresto!Theres

    youranswer.

    Ionlyit werethatsimple.

    Whilenobodyisclaimingthatliecycle

    assessmentison apar withrocketscience,there

    arecertainlya ewknottyissuestotacklebeore

    designersandengineerscanmakeinormed

    comparisonsbetweenmaterials.Ignorethem,and

    youreonlylookingat apartialpicture.

    Inthetableopposite,youwillfnd background

    inormationandexplanationstohelppeopleto

    understandwhattheyarereadingwhentheylook

    throughtablesodatasuch asBathUniversitys

    InventoryoCarbonandEnergy(ICE).Andonpages

    12and13 youwillfnd illustrationsthatshowwhat

    proportionsoourmainstructuralmaterialsare

    currentlyre-used,recycledorsenttolandfll.

    I you need a quick briefng on what liecycle

    assessment is all about, turn to page 16 or

    our Beginners Guide.

    Beore you start comparing the impacts o diferentmaterials over their liecycles, there are a ew thingsyou need to know ...

    BEhind ThE FiGURES

    whats in a lifecycle?How approaches and assumptions vary between the materials

    CB FI IQualityodata Thegeneralqualityodataisgood.

    Steelmakershaveahighprofleandhaverespondedtopressuretomakeull andcomprehensivestudiesotheir impacts.

    Thequalityodatais variable,somethingwhichboththeindustryandthegovernmentadmits.Hugevariationsin resultscanbecalculateddependingontheassumptionsmadeandnocommonagreementsexisttoassistinthis.

    Thegeneralqualityodatais gooomixcan haveasignifcantbeacarbon intensity.

    Methodsoanalysis

    Thesteelindustry,alongwithmostmetalsproducers,avourtheuseoa cradle-to-graveapproach,whichrecognisesthebeneftsouturerecycling.

    Timbermanuacturerstendtouseacradle-to-gateapproach,whichstopswhenthematerialleavestheactorygate.Sequestrationtheabilityo thetimbertostorecarbonoveritslietimeis usuallyassumedtooccur.

    Concretemanuacturers tendtocradle-to-gateapproachwithnooendo lie.WithintheUK,an amadethattherebarin reinorcedmaderom100%recycledsteel

    Whatarethevaluesusingthese

    methods?

    Onthebasiso acradle-to-graveapproach,takingintoaccountthe beneftsouturerecycling,thesteelindustryusesfgures

    between0.76kgCO 2/kgorstructuralsectionsand1.35kgCO

    2/kgorgalvanisedstrip.

    TheInventoryoCarbonandEnergy(ICE)databaseis cradle-to-gateandtakesnoaccounto end-o-lieissues.Itadmits

    thedicultyincalculatingtheburdensotimberbutcalculatesthoseoglulamtobe0.84kgCO

    2e/kgotimber.

    TheICEdatabasecontainsa fguo0.163kgCO

    2e/kgorC40concr

    Reinorcementburdensadd0.43

    osteeltothis fgure,accordingtCentredata.ThisassumesallrebintheUK.

    Whatarethevaluesusingacradle-to-graveapproach?

    Asabove.Onthebasiso acradle-to-graveapproach,takingintoaccountthebeneftsouturerecycling,thesteelindustryusesfguresobetween0.76kgCO

    2/kgand1.35kgCO

    2/kgo

    steel,dependingontheproduct.

    Onthebasis opublishedTRADAdataonend-o-lieoutcomesortimberin theUK,thecarbonintensityoglulamis 1.1kgCO

    2/kg.

    Basedonrecyclingandlandilldatagovernment,aigureo0.153kgCO

    2

    C40concrete.Tothismustbeaddeoreinorcement.TheWorldSteelAcalculatedthisas0.82kgCO

    2/kgost

    Otherissues Steelmanuacturedromironoreproducesaby-productcalledblasturnaceslag.Becauseitis classedasaby-product,LCArulesstatethatthemanuacturercantakecreditorsubsequentuse.A creditorthisis includedinthefguresorsteelmentionedabove.

    Thebeneftsotimberinconstructionarebasedonassumptionsthatthe timberissustainablysourced.Careneedstobetakentoensurethatthisis so.Inot, thecarbonburdensotimberwillincreaseconsiderably.

    Blasturnaceslag,aby-productomaking,iswidelyusedasa cemereplacement. Concretemanuactcreditorthis.However,this iscothesteelmanuacturersalsolayccredits.Thisissuehasyetto bere

    steel timber concrete

    -F-IF C

    Recycling Steelscraphasahigh valueandhasanecientcollectionandcaptureinrastructure.Globally,itis estimatedthat80%o steelscrapiscaptured.Inthe UK,94%is capturedromconstructiondemolitionand,orheavyramingproducts,99%is capturedor re-used.

    TheBREGreenGuideestimatesthat23%otimberromdemolitionsitesis recycled.In2008,TRADAestimatedthatapproximately10%otimberwastewasusedto makechipboard,suggesting13%isrecycledtoitsoriginalorequivalentuse.

    Approximately20%oaggregatdemolitionsitesis thoughttobeHowever,thecement,thatpartothataccountsorupto75%o COislost permanently.

    Re-use Astudycarriedoutin 2003estimatedthat13%ostructuralsectionsarere-used.Thisisthoughttobe highandtheactualfgureisprobablybetween5-10%.Sectionsre-usemainlyoccursintheagriculturalsector.

    Mostre-usedstructuraltimberis intheormobeams,joistsandstudwork.Salvagedtimberissometimesre-milledandsold toconsumersintheorm otimberooring,beamsanddecking.Littleinormationisavailableonthepercentageotimberre-usedinthis way.

    Structuralconcretedoesnotgenitseltore-use,mainlydueto itsnatureandthesubsequentdicseparatingcomponents.Thereistore-useprecastcomponents.

    Landfll Theamountosteelthatendsup inlandfllrombuildingdemolitionisa unctionotheeaseorecovery.Itis greatestorreinorcingbar,estimatedat6%, andleastorrolledsections,wherea nominal1%lossis assumed.

    TheBREGreenGuideestimatesthat58%otimberrombuildingdemolitionendsupin landfll,whichmaybeduetothedicultyinseparatingtimberwith valueromcontaminatedtimber.A 2008TRADApublicationputsthefgureat 80%.

    Increasesin landflltaxhaveresustridesinreducingtheconcreteginrecentyears.Constructionwasproblem,however,andis currenoa projecttoreduceby50%theendingupinlandfllby 2012.

    Downcycling Steelscrapismanuacturedintoproductswiththesamevalueas theoriginalmaterial.Downcyclingdoesnottakeplace.

    Agreatdealotimberwasteis cycledbackintoproductso lowervalueandutility.TRADAhasestimatedthatover1 milliontonnesowoodwastegoesintothemanuactureochipboard.

    Mostconcreteromdemolitionshardcoreandfllwhereit replacewhichisotherwisewonromgraCement,whichaccountsormosproduction,islost indemolition.

    Incineration Not applicable. About 6% is incinerated at end o lie. Energyrecoveryisrestrictedbylacko inrastructure.

    Notappli cable.

    THE WHOLE STORY

    FC

    TH

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    7/13

    enD-of-life scenarios

    concRETE TimBER STEElThegreatmajorityoconcreteromdemolition

    sitesiscrushedandusedassub-baseorfll.Thisis

    downcyclingrather thanrecycling, iea secondary

    usewhichisnotothe samevalueasthefrst.

    Aggregatesromdemolitionmaybere-usedin

    concreteproductionbutitsuseis restrictedbothby

    rulesgoverning maximumpercentagesallowed and

    alsobysupply,sincetheamountoaggregatethat

    canberecoveredorthispurposeislimited.Where

    aggregatesare re-usedin concrete,newcement,

    thesourceomostotheCO2

    emittedin concrete

    production,isstillneeded.TheConcreteCentreis

    thesourceothedowncyclingfgure,withtheother

    fguresestimated usingvarious sources.

    Deinitive inormation on what happens to

    timber waste ollowing building demolition

    is diicult to ind. Recent publications

    rom TRADA indicate that up to 80% o

    timber waste in the UK goes to landill. The

    inormation presented here is rom the BRE

    Green Guide.

    Thedowncyclingfgureisan estimatebased

    onpublishedinormationonhowmuchtimberis

    divertedromthewastestreamorthemanuacture

    ochipboard.

    Problemswithcontaminationinthewastestream

    inparticularrestrictopportunitiestodivertwaste

    orre-use andrecycling.

    Steelbeneftsromhavinga highintrinsicvalue

    supportedbya welldevelopedandecientscrap

    collectioninrastructure.It canbe recycledat

    endolietoormproductsthatareothesame,

    orhigher,standardand qualityas theoriginal

    materialand moststeelcomponentsare largeand

    easilycaptured.

    Captureratesvarydependingon

    oextractionromthedemolitions

    alwaysabove90%andaverage94

    components.Forsections,itis99%

    Theseratescanbe oundinMate

    analysisotheUK steelconstructi

    J.Ley,2001.

    What happens to a buildings structuralrame once it is demolished?

    94%CC

    13%CC

    20%CC

    5%

    58%

    6%

    10%

    13%

    1%

    5%

    75%

    THE WHOLE STORY

    FC

    TH

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    8/13

    Dsignrs should think not only about gtting a buildingup, but also hn and ho its lmnts ill b rtird, saysFostr + Partnrs sustainability xprt Chris Trott

    hris Trott

    doesnotbelievein designing

    buildingsthatlast.Well,not unless

    youreallyneedthemto.WhatI am

    notarguingforislonglife,says

    theFoster+ Partnerspartnerand

    sustainabilityengineer,"butfora

    goodlongthinkaboutthelifeof a

    buildingandthenactuallyplanning

    forthelifeyouhaveagreedon.

    Formostclients,this willrequirea

    paradigmshiftin thinking,saysTrott:Clientsneedto bemoreanalytical

    aboutwheretheirvalueslie. Dothey

    wantabuildingthatwilllast for150

    years?Or willtheyonlyneedit for

    20yearsbecausethingsaremoving

    quickly?Youmightrettwoor three

    timesinthattime.Afterthat,takethe

    buildingdownandrecyclethesite.

    Forinspiration,Trottsuggeststhat

    designersshouldlookto theworldsof

    sportandentertainment.If youfollow

    FormulaOne,everywheretheygo,

    theytaketheirown pavilionbuilding

    fortheirentertainmentwiththem.

    Theycandisassembleawhole building.

    Alot canbelearned fromtechnology

    transferfromother sectors.

    Fordesigners,thisapproachalso

    requiresfreshthinking.Trottguesses

    thatintheUKonlyahandfulof

    buildingsarebeingdesignedfor

    decommissioningatthe endoftheir

    life,in contrastwith countriesincentral

    continentalEuropeand Scandinavia.

    InSwitzerland, designers have

    ninephasesofservicebrieng,the

    ninthbeingdeconstructionor

    decommissioning,says Trott.There

    isa requirementfortheretobea

    planonhowbuildingswill be

    deconstructedandtakenoutof use.

    Greenthinkinganddesigninthese

    countrieshasadvancedfasterthan

    intheUK duetonecessity,suggests

    Trott:Theyhave beenenergy

    resourcepoor,soenergytendstobe

    alotmoreexpensive.Thataects

    buildings'costsandthe costsoftheirmaterials,sotheyhavehadtothink

    aboutissuesinthegreendebate

    alotearlierthanus.Trottthinksit

    wouldbesensibleiftheplanning

    processin theUKtookthis approach

    too:Weliveina severelyresource

    constrainedworld.Weare running

    outofnaturalresourceswiththe

    conventionalonce-through model.

    Probablynowoneofour greatest

    resourcesiswaste.Wehavetotake

    theviewthatwasteisa resourceto

    bere-usedwhethernewspaper,a

    tincanor apieceofa building.We are

    probablynowstartingtoapproach

    thepointwherethemajorityof

    naturalresourcesarealreadyin the

    thingsweuse.Eventuallywewill run

    out.Aplanningsystemthatsupports

    re-usewouldbe agoodmove.

    Beforeplanningcomesthebrief:

    therststepin decidingon asuitable

    lifeforabuildingis todrawoutwhat

    aclientsvaluesare,saysTrott:We

    wouldhavea dialoguetoestablish

    whatisimportantforthem.Itsabout

    usexplainingtheopportunitiesand

    themreactingtowhich ofthesethey

    thinktheyvalue.

    Itis notjustthebuildingslife

    whichmustbedecidedatthisstage,

    butthelifeof itscomponentstoo.

    Ifleasesonocesgetshorterfor

    example,theavailablecycle-timefor

    refurbishmentwill beshorterandthe

    elementsthatneedtobe replaced

    orrefreshedshouldaimto have

    liveswhichcoincidewiththeleaselengths.Ifsomebodyissayingwe

    aremovingtoa15-yearlease,then

    componentswould legitimatelybe

    reviewedinthe samecycleandthat

    wouldfeedintothedesignprocess.

    Conversely,if youareworkingtoa

    25-yearlease,whatdoyou dowith

    componentsthathaveto comeout

    after15years?

    Oncethissortofbriefhas beenset,

    itsacaseof designingyourbuilding

    sothatthebits thatdoneedtobe

    replacedcanbe easilydisassembled

    andchanged.Andcrucially,this

    shouldbepossiblewhilethebuilding

    or mostofit remainsinoperation.

    Foundationsare prettymuch

    thereforlife,asarethe structural

    frameandstructuraloorsystems,

    saysTrott.Cl addingsystems might

    bereplacedafter20years.Thatis

    perfectlylegitimateandshouldbe

    thoughtaboutfromthebeginningso

    theycanbedemountedand recycled.

    Ihavepersonallybeeninvolved

    withanexistingbuildingwhere

    thecladdingcouldnotbetakeno

    becauseit wasastructuralcladding

    systemand thebuildingwouldhave

    fallendown.Thebuildingwasa

    completeconstructionsiteinorderto

    bringitbackintouse. Whatyouneed

    isan ongoingassetwithincome

    cominginasthe workhappens.

    Similarly,M&Esystemsshouldbe

    easytoreplace.Quitea lotofthings

    tendtogointomodularplantrooms

    andrisers.Itsentirelylegitimateto

    expectthesethingstocomeout in

    thesamewaythatt

    withalittle bitofth

    Inthenew ordero

    disassembly,conne

    fastenerstakeona

    Dontmixthingsup

    advisesTrott.Andw

    cometogether,thin

    comeapart.Things

    wellfordismantling

    andthingsthatnee

    Afewcommoditi

    copper arealread

    towarrantdesignth

    easyextractionwh

    refreshedordisma

    resourcesaredeple

    applymorewidely.

    Withhighvaluet

    willlead,providing

    tothechallenge,sa

    aboutrecognisingw

    peoplewouldrecov

    andnotsinkingtha

    Thatchallengeis to

    meetrequirements

    Otherwiseclientsw

    we e v evee eCeCTeD wD

    CHRIS T

    One of ouresources is wasto take the viewis a resource to bwhether it's a tinpiece of a buildiChrisTrottisa susta

    andpartneratFoste

    100years?years?

    100years?years?

    25years?25years?

    50years?50years?

    Designinplains.Thestructureandthe claddingshouldbeseparate,ason SwissRe,

    sothatcladdingcanberefreshedevery20yearswhilestillkeepingmostofthe

    buildingoperational,andthereforemakingmoney.

    PI

    TE WOLE STORY

    w lOng IS a lIfe? HOw

    T

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    9/13

    Whats the dierence between

    cradle-to-grave and cradle-to-

    gate LCAs?

    Cradle-to-graveassessments cover

    thewholeliecycleromextractionto

    disposalandend olie.

    Cradle-to-gateassessments area

    partialLCA,whichstopsat theactory

    gate,ie beorethe fnishedproduct

    hasbeen transportedanywhere.

    What are the benets of using

    cradle-to-grave LCAs?

    Cradle-to-graveLCAs provideacomprehensiveanalysisothe

    resourcesusedandthesubstances

    emittedthroughaproduct'swhole

    liecycle.Thisallowsdecisionsto

    bebasedona trueassessmentoa

    productsimpact,andalso meansthat

    manuacturersor usersoa product

    cantargetthephasesina products

    liecyclewherethemostsignifcant

    improvementscould bemade.

    Cradle-to-gateLCAs only provide

    apartialpicture.Decisionsmade

    basedonthesealoneignoreimpacts

    duringtransport, construction,

    maintenance,disposal andrecycling

    andcouldmeanmaterialsor products

    withaworseoverallimpactonthe

    environmentare selected.

    Cradle-to-gatecalculations can

    evenleadtononsensicalresults.

    Forexample,materialsthatare

    responsibleortakingincarbon or

    sequestration aregivena negative

    emissionsvalue.Soin theory,the

    moreothatmaterialyouuse, the

    moreenvironmentallyriendlythe

    building becomes.

    Why are cradle-to-gate

    LCAs more common than

    cradle-to-grave LCAs?

    Thesimpleansweristhatit iseasier

    toconsiderimpactsonlyas arasthe

    actorygates. Manymanuacturers

    providecradle-to-gate LCA

    inormationanddatabasessuchas

    BathUniversitysInventoryoCarbon

    andEnergy(ICE)(seebox,above

    right)containdatatothe gateonly.

    WhatS CONSIDERED IN aN LCa?

    Emissionstoair,water

    andsoil

    Transportandconstruction

    Emissionstoair,water

    andsoil

    Operationandmaintenance

    Eto

    a

    Deand

    Emissionstoair,water

    andsoil

    Extractionandmanuacture

    hat is lifecycle assessment?

    Liecycleassessment(LCA)isa way

    oassessingtheenvironmental

    impactso allstagesina products

    lieromextractionoraw material

    throughprocessing, manuacture,

    transport,construction, maintenance

    anddisposalorrecycling.

    Where did it come from?

    SomesayCocaColawasthefrst

    companytodo LCAsin1969,but it

    wasntuntilthemid-eightiesand

    early-ninetiesthatitreallytook

    o.TheSocietyoEnvironmental

    Toxicologyand Chemistry( SETAC)

    coinedthephrase"liecycle

    assessment"in1990and in

    1997/1998,ISOproducedaserieso

    standardswhichwereupdated

    in2006.

    What environmental impacts do

    LCAs consider?

    Thesecanincludeglobalwarming,

    The best wy to juge the envionment eentisof pouts n mteis is to ook t the impt theywi hve fom the e to the gve

    ozonedepletion, acidifcation,

    eutrophication,smog, heavymetals,

    carcinogenic substances,waste,

    respiratoryeects, ionising radiation,

    ecotoxicsubstances,landuseand

    rawmaterials.

    How do you do one?

    Thisiswhat ISO14040saysyouneed

    todowhen carryingouta LCAstudy:

    1. Defnethegoalandscope

    understandingtheaimsothe study

    andsettingboundaries.

    2. Carryoutaliecycleinventory(LCI)

    analysismappingowsowater,

    energyandrawmaterialsrom

    natureandthereleasestonature.

    3. Do a liecycle impact assessment

    look at the materials and

    emissions in the LCI, decide how

    you will look at environmental

    impacts (eg all ozone depleting

    gases) and work out how much

    each set o emissions contributes

    to each o the impacts. There are

    many methods or assessment.

    4. Interprettheresultswithin

    thescopeothestudyand the

    methodologyused.This stageshould

    alsoi dentiyareas orimprovement.

    Is it all about carbon?

    As carbon dioxide is emitted by

    ossil uelled power stations to

    generate energy or the grid,

    carbon has become the currency o

    energy eciency. CO2

    is accepted

    as a major cause o global warming,

    but it is not the only greenhouse

    gas. Timber, which many people

    consider truly sustainable since

    it takes in CO2

    while growing,

    decays to orm methane, which

    is 21 times more potent than CO2

    as a greenhouse gas, according to

    Dera/DECC. Decay is one o the

    possibilities or timber at the end

    o its lie and a ull liecycle analysis

    should consider to what extent that

    is likely to happen.

    CAI j

    Cradle-to-gate fguresgive you an idea o what

    it takes to make a product. Itvery much depends on whathappens to that product as towhat its cradle-to-graveimpact will be.

    cradl-T-ra lca lTarT T a r TrT cld ad

    tO LIfECyCLE aSSESSmENt

    W Energyandrawmaterials Energyandrawmaterials Energyandrawmaterials Enraw

    DrCraigJonesisoneotheauthorso

    theInventoryoCarbonandEnergy

    (ICE),whichhedevelopedwithProessor

    GeoreyHammond whileat Bath

    University.Heis nowa seniorassociateat

    carbonreduction consultancySustain.

    Jonesstartedworkingonthe

    ICEattheendo2004,andwithin

    aboutninemonths thefrst

    versionothe databasewasready.Hisuniversityhomepagemade

    reerencetothe databaseandsoonhestartedto receivea ewemails.

    Thesteadystreamo emailsgrew

    andnowthere isan automated

    distributionsystem.Todate12,000

    peoplehavedownloadedthe ICE.It

    stillsurprisesProessorHammond

    andmyselhow widelyithas beenpickedup,saysJones.

    Thechallengesinbuildingthe

    databasewerethevariabilityo

    resultsandthe dierentmethods

    usedbydierentsectorsto

    calculateembodiedcarbonand

    energy,althoughthe

    datahasimprovedo

    hesays.The newEU

    methodwhichis com

    soonwillhelp withco

    commentsJones.

    Whenhe frststar

    thedatabase,Jonesa

    cradle-to-siteversiobecameapparentth

    workbecauseitwas

    makeassumptionswapplytoall cases.Cr

    fguresgiveyouani

    takestomakea prod

    Itverymuchdepend

    happenstothat pro

    itscradle-to-graveimThere is a risk pe

    the ICE data as is wh

    the subject, but as t

    more in this area, th

    that ull liecycle as

    not just cradle-to-g

    cradle-to-grave.

    THE WHOLE STORY

    A I LCA?

    TH

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    10/13

    tsaquestionthatsomepeople

    dontwantyoutoask:whycan you

    getsuchdierentanswersifyou look

    atembodiedcarbonoverthewhole

    lifeofa building,ratherthanjustup

    tothepointwherethematerialsin

    thatbuildingleavethefactory?

    Fortheanswer,we canturn

    toTargetZero:a detailedstudy

    intothecarbonfootprintsofve

    buildingtypes schools,oces,

    supermarkets,warehouses and

    mixeduse. SponsoredbytheBCSA

    fedtheinformationintoan

    LCAmodeldevelopedin-houseby

    TataSteel: CLEAR(Construction

    Life-CycleEnvironmental Assessment

    Resource).Thebuildingswere

    splitdownintodierentelements:

    foundations,bearing structure,

    roofandsoon. Youneedto break

    itdowntogivemeaningfulresults,"

    saysAvery."Ifyougroupedthemall

    together,you wouldnotknowwhere

    themostsignicantimpactswere.

    BestpracticeforLCAis touse

    currentdataforinformationsuchaswastageandrecyclingrates

    saysAvery.Ifyoudontuse current

    data,youarereallyopeningacan

    ofworms:youcanjustifyanything

    basedona futurescenario.You

    havetotakecurrentmanufacturing

    impactsandcurrentendof life

    performancenowandsay:Thisis

    whatthecurrentsnapshotlookslike.

    Sourcingsomeofthe dataneeded

    forthemodeltooktime.Wedid

    quitealotof worktotryand dene

    wastageratesontheconstruction

    site,saysAvery.Wethen hadto

    factorin additionalmaterialrequired

    tocover thewastage. Wherever

    possibletheyusedpublisheddata,

    muchofit fromWRAP.

    TheCLEARmodel,whichhasbeen

    independentlyreviewedbyArupto

    ISO14040and14044,takesinto

    accountrecyclingat endoflife,which

    sometoolsdont.Thefactthat99%

    ofscrapsteelismelteddownand

    usedagain,givesasignicantbenet

    totheenvironment:thedemolished

    buildingiseectivelyproducingsteel,

    whichwilltakelessenergytore-melt

    thananequivalenttonnageofvirgin

    material,argues Avery.Similarly,

    whereconcreteiscrushedandused

    foraggregate,somebenetsshould

    betakenintoaccount.

    Wearetryingtoaccountforthe

    valueofthatmaterial,tryingtodene

    whatthatvalueis,saysAvery.Using

    alimitedcradle-to-gateLCAanalysis,

    thebenetofrecyclingis ignoredand

    thereforeconsidered nobetter than

    sendingwasteto landll.

    Themostsurprisingndingfor

    Averywasthe largeproportionof

    embodiedcarbontiedupin the

    buildingsfoundationsandoorslabs.

    Ifyouwanttoreducethecarbon

    footprintofyourbuilding,youshould

    focusonyourfoundationandoor

    slabs,saysAvery.Itsreallydown

    totheamountofconcreteused.

    Reducingthatsomehowwouldyield

    greatimprovements.

    Whatthendingsalsoclearly

    highlightis thatusingcradle-to-gate

    LCAs,whereonlytheembodied

    carbontiedupin thematerialsby

    theendof manufactureis counted,

    canleadtoverydierentanswers.

    Lookattheschoolstudybuilding

    (seegraph,above).Atthe endof

    constructiontheconcreteand

    steeloptionslookcomparable,

    buttakingintoaccountendoflife

    considerationsthesteelframeis

    clearly ahead.

    Timber,too,can tellaverydierent

    storywhenitsfulllifecycleis

    considered,says Avery.Some people

    consideronlythe rstpartoftimbers

    lifecycleandso thinkofit ascarbon

    negativebecauseitabsorbscarbon

    asit isgrowingbut thiscarbon

    willeventuallybe returnedtothe

    atmospherebyburningorrotting.

    "IGNORING END OF LIFE, YOURE SAYINGRECYCLING AND REUSE IS NO BETTERTHAN LANDFILLING"

    TargetZeroisa freeresourcefor

    clientsanddesignersto helpwith

    theearlystages ofdecision-making.

    Itconsidersvedierentbuilding

    typesschools,oces,warehouses,

    supermarketsandmixeduseand

    spellsoutthe mostcost-eective

    routestowardsachievingzero

    carboninoperation,consideringlow

    andzerocarbon technology.

    Thestudyalso looksatthe most

    cost-eectiveroutestoachieving

    thehighestBREEAM ratingsand

    considerstheimpactof dierent

    framingmaterialsonthe carbonfootprintofabuilding,lookingat the

    wholelifecyclefrommaterial

    extractionrightthroughto

    demolitionandrecycling.

    Goto: www.targetzero.info

    WHAT ISTARGET ZERO?

    Anothercomplica

    currentlyupto 80%

    tolandllinthe UK

    methane,someofw

    capturedandsome

    Itsa complicateda

    noagreedmethodo

    it,saysAvery.The

    cametoonTargetZ

    emissionsarehighl

    Theseareallissue

    addressed.Unlessw

    careaboutwhatha

    thenext20years,o

    materialsshouldbe

    impactsor benets

    isdismantledor de

    thebestwaystoco

    ofglobalpopulatio

    resourceconsumpt

    thereuseandrecyc

    withminimallossin

    Avery.Youreallys

    intoaccountwhath

    materialatend ofli

    benecialtothe pla

    Avery.Ifyouignore

    sayingisit doesno

    theplanetwhethe

    recycledor landlle

    See page 23 for

    embodied carbon

    the materials con

    Target Zero stdy

    andTataSteel,the studylookedinto

    theoperationalcarbonofveactual

    buildings,consideringhowtheycould

    beadaptedtoreachzerocarbonin

    operation.Italsoworkedoutthe

    embodiedcarbonforeachbuilding

    carbonemittedin themanufacture,

    transport,construction,andend-

    of-lifephasesandconsideredthe

    impactofchangingframematerials.

    Theaimof theresearch,ledby

    lifecycleassessment (LCA)expert

    NickAvery,principalresearcherin

    TataSteelsenvironment group,was

    todevelopa betterunderstanding

    ofhowthedierentelementsand

    lifephasesofabuildingcontributeto

    itscarbonfootprint.Whilethemain

    studylookedat operationalcarbon,

    Averysremitwastoconsiderthe

    beginningandend ofthestory.

    Informeddecision-making should

    reallyconsiderthefull lifecycle,

    saysAvery,whositson technical

    committeeCEN/TC350whichis

    developingEuropean standardsfor

    LCAsinconstruction.Weshould

    alsondoutwhatsgoingtohappen

    atendoflife, whenabuildingis

    demolishedor dismantled,because

    tryingtolivesustainablymeans

    tryingtosaveresourcesforfuture

    generations.Itsaboutbeing

    forward-lookingandnotjust

    consideringwh atshappening now.

    TheTargetZerostudytookve

    actualbuildingsandusedan LCA

    modeltocalculatethe wholelifeor

    cradle-to-graveembodiedcarbon

    ofthemainstructure,lookingatphasesfrom materialsextraction

    throughto demolitionandrecycling.

    EngineersatAecomthenredesigned

    thebuildingstoconsiderthe same

    structureswithconcrete,steeland

    whereappropriate, timberframes,

    tocomparetheembodiedcarbon

    results.

    Usingbillsofquantitiesproducedby

    CyrilSweett,Averyandhisteamthen

    5,000

    4,000

    3,000

    1,000

    0

    -1,000

    Tot al l if ec yc le E nd of c on st r ct io n

    Emissions by lifecycle phase (tCOe), showinghow end-of-life impacts change the answers

    -2,000

    2,000

    Only considering embodied impacts as

    far as end of construction can seriously

    distort the answers, as the Target Zero

    study shows

    TE WOLE STORY

    TheTargetZeroschoolstudybuilding

    wasbasedontheChrist theKing

    CentreforLearning,Knowsley,Merseyside

    s

    T

    CASE STUSTUY: EMBODIED CARBOSTUY: EMBODIED CARBO CASE STUY: EMBCASE STUY: EMB

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    11/13

    w SRY

    rview

    rom July this year, any

    planning applicationsfor ne build housing

    n Brighton and ove must provide

    mbodied carbon information as

    art of the application process.

    while other councils' local planning

    olicies say that embodied impacts

    hould be considered, Brighton

    nd ove is the rst to make such a

    alculation a mandatory part of thelanning process

    hisisreallyimportantforus,

    ayssustainabil ityocer Francesca

    ie.Aspartofourdutyto deliver

    ustainable development,e

    nderstandthatsomeofthe

    iggestimpactsarearoundcarbon

    missions.All ofthefocusis onPart

    ,hichseeksto reducein-use

    arbonemissions,buta signicant

    roportionofemissionscomefrom

    mbodiedcarboninmaterials.

    Brightonandovecouncilorked

    ithlocalenviromentalconsultant

    hlorumto producea simpletool

    hatestimatestheembodiedcarbon

    fthematerialsandproducts

    eingused,uptothe endofthe

    manufacturingphase,usinga fe

    basicpiecesof informationaboutthe

    house.hetoolisfreeto useandhas

    beendesignedtotakeno morethan

    10minutestollout.

    weorkedithPhlorumto

    reallysimplifythis.we didnotant

    ittobe onerous,saysIlie.odo

    afulllifecycleassessmentforthe

    buildingandgetreallyaccurate

    dataouldmorethanlikelyinvolve

    usingconsultants.histoolisbased

    onaccuratedata,butprovidesan

    estimate.

    Atthemoment,Brightonandoves

    onlyrequirementisforapplicantsto

    submittheirpartialembodiedcarbon

    gures:thereareno targetssetand

    nosuggestionyetthatplanning

    decisionsillbe basedontheresults.

    Althoughthe toolconsidersonly

    cradle-to-gatecarbon, Ilifehopes

    thatintroducingitill bea step

    toardsconsidering hole-life

    impacts:Itis certainlyouraspiration

    atBrightonand ovethattherebe

    acradle-to-graveapproach andthat

    theseissuesbeconsideredasearly

    aspossiblebylocalarchitectsand

    developers.ur intentioniththe

    toolisto signalthatthecouncilsees

    embeddedcarbonasa signicant

    impactofdevelopmentandto initiate

    abasicmeasurementofhatcomes

    throughthe planningsystem.

    weareaarethatthereillbe

    inaccuraciesbutthistoolill provide

    moreinformationthanehaveever

    hadbeforeandisa rstattemptat

    quantifyingcarbonimpactsin aay

    ehavenottriedbefore.

    MarkPellant'shouseandstudioin

    ovehasabouthalftheembodied

    carbonofatraditionalbrickand

    blockhouse

    Initially, the council ill be using

    the information to build up a

    database. Its online sustainability

    checklist, hich as introduced

    in electronic form in 2008, allos

    the council to store a ide range of

    relevant information, and its latest

    version also includes a free tool

    for estimating operational carbon,

    hich ill allo for comparisons

    beteen cradle-to-gate embodied

    and in-use emissions.

    he2011checklistcontains15headingsunderhichapplicants

    mustsubmitinformation,although

    notallare mandatoryforevery

    development.heyrangefromC2

    to

    ater,foodgroingtoparking,ith

    theembodiedcarboncalculation

    comingunderaheadingofmaterials.

    wecangetreallyfantastic

    dataaboutthesustainabilityof

    developmentas itcomesthrough

    theplanningprocess,Iliesays.All

    planningauthoritieshaveadutyto

    deliversustain abledevelopment. But

    ifyouarentmeasuringit,hodo you

    knoifyouare deliveringit?

    Brightonandovecouncilhas

    alaysbeenambitiousaboutits

    sustainable developmentgoals.

    Itsadoptedlocalplanpolicysays:

    Planningpermissionsill begranted

    forproposalshichdemonstratea

    highstandardof e

    ofenergy, ateran

    In2008it introdu

    supplementaryplan

    onsustainablebuild

    calledforzerocarb

    use,astandardtha

    recessionbusting

    Asellashelping

    thecouncilsfuture

    sustainability,Ilifeh

    toolillhelpeduca

    planningagentsanaboutembodied ca

    andplanningagen

    optionsthensee

    theirembodied car

    herequirement

    embodiedenergyis

    buildresidential c

    commercialbuildin

    morecomplextool

    ove'spictureillb

    heotherlimitati

    measuresonlythe

    makeaproduct,no

    during transportat

    maintenanceor dis

    lookedat cradle-to

    asanextralevelo

    saysIlie,hoadd

    tool,fromhichBr

    asdeveloped,do

    odatetherehav

    planningapplicatio

    includedthe embo

    butmanymorepeo

    onlinetotrythe to

    Itis tooearlytosa

    if anythe embo

    measurementtool

    interestsofarhas c

    academicinstitutio

    otherlocalauthorit

    will other local a

    suit? Perhaps not i

    embodied impacts

    the local governme

    hen more mainst

    policy does turn to

    carbon, Brighton a

    ahead of the game

    Steps towardssustainabilityBrighton and Hove council now requires embodiedcarbon data or all new build housing applications.Sustainability ocer Francesca Ilife tells us why

    MarkPellantisapartnerinove

    practiceKoruArchitects.ehas

    experienceofbuildinghousesithlo

    embodiedcarbon.ishouseand studioatloydsRoadin ove(pictured)as

    completedlastyearandhas abouthalf

    theembodiedcarbonof atraditional

    brickandblock house.

    PellantissupportiveofBrightonand

    ove'smovetorecordtheembodied

    energyofnebuild housingat

    planningstage,butquestionshether

    itill haveanyimpacton thematerials

    architectschoose.

    Youhavetohavetheill anddesire

    toreducetheembodiedenergyor the

    environmentalimpactor toimprove

    theenvironmentfortheoccupants,hesays.hechecklistis agoodidea,but

    hodoyouencouragethe useofthese

    materials?Inevitablypeopleillgo for

    thecheapestoption.

    Clientsarenotasking forloembodied

    carbonmaterials,saysPellant.But

    somearelookingfor naturalmaterials

    forhealthreasons,to avoidogassing,

    andthesetendto beloin embodied

    carbon,hesays.

    An Architects view

    FrancescaIlie

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    12/13

    w SRY

    ver the past decade,the drive to reduce the

    environmental impact of

    construction has resulted in

    some of the most exciting

    innovations and dramatic

    changes that our industry

    has ever seen. And as all

    parts of the industrys

    supply chains orkincreasingly to targets and

    requirements set by construction

    clients and by the government, the

    means of measuring and assessing

    environmental performance is

    developing and improving too.

    hereislittledoubtthatlifecycle

    assessment(CA)isthemost

    sophisticated,useful environmental

    measurementapproach developed

    todate.CAis notane concept

    forconstruction,butitis becoming

    increasinglyrenedtomakethe

    resultsasusefulandaccurateas

    possible.Standardsthatarebeing

    developed,suchasCN/C350in

    theUK andurope,shothe

    importanceofcarryingoutanCA

    assessmentcorrectly.

    Bystudyingtheenvironmental

    aspectsand potentialimpacts

    fromramaterialextractionto

    manufacture,use anddisposal,

    aholeCAprovidesdatafor

    eachpointina materialslife.Itis

    themostcompleteayto assess

    environmentalimpact, andenables

    truecomparisonstobemade

    beteenthe environmentalimpacts

    ofmaterialsandbuildingapproaches.

    oeverthere arecurrently

    someareasofconfusionand

    uncertaintyassociatediththe

    holeCAapproach:theterm"CA"

    isappliedattimesto cradle-to-gate

    assessments,hichdo notinclude

    dataforamaterialinuse oratthe

    endoflife.Assessmentsthatare

    limitedtojustsomeofthe elements

    ofa materialslifecyclecanonly

    givepartofthepicture,andpose

    ariskthatimportantsustainability

    decisionsmaybe madeiththebest

    intentionsbutithoutthelonger

    termenvironmentalimpactshich

    canbebothpositiveandnegative

    beingtakenintoaccount.

    Bothcradle-to-gateand hole-life

    cradle-to-graveassessmentsrely

    ona numberofassumptionsintheir

    underlying methodology.oever,

    asthe cradle-to-graveapproachis,

    bydenition,foundedonthecorrect

    principleofconsideringthefull

    lifecycle,itshouldsurelybe treated

    asa moreaccurateassessmentthan

    anyapproachthatexcludeskeyparts

    ofamaterial'slifecycle.

    wholeCAarebeginningtofeature

    moreandmoreinthe mediaasell

    asin therequirementsofclients

    'We're on thecusp of amajor change'The steel sector is committed to helping theconstruction industry assess the environmental

    performance of materials in an accurate andmeaningful way. Alan Todd, director of marketdevelopment at the British ConstructionalSteelwork Association (BCSA), explains why

    andprojectteamsat theleading

    edgeofourindustryit isthe ay

    thatthesustainabilityofour built

    environmentillbemeasuredinthe

    future.But beforeereachthe point

    hereitis ourstandardsystemof

    evaluation,therearesomeobstacles

    thateillneedto orkontogether

    toovercome.

    Primarily,the informationabout

    hathappensto majorconstruction

    materialsattheend oftheir

    usefullife mustbemademore

    idelyavailable.withoutthis,the

    journeyto properholelifecycle

    cradle-to-graveassessments

    becomingthestandardacrossthe

    industryill beverychallenging.

    helimitedinformationthat

    isneededfora cradle-to-gateassessmentismorereadilyavailable,

    sothistypeof assessmentis

    currentlyeasiertocarryout.here

    isa dangerthatthisapproachill

    beacceptedbysomepractitioners

    as"goodenough".Shouldthis

    becomean attitudethatprevails,the

    constructioni ndustrysconsiderable

    eortsto reduceits environmental

    impactillbelesseective.

    hequestionfororganisations

    andindividualsho trulybelieve

    inthesustainabilityagenda,is

    hatcanedo tofacilitatethe

    processofchange?heBCSAand

    ataSteelarecommittedto making

    dataavailablethatillfacilitate

    cradle-to-graveassessmentsof

    steelsolutionsbutpractitioners

    musthaveaccesstocomparable

    dataforallthemajorconstruction

    materials.his supplementprovides

    cradle-to-graveemission guresfor

    steelandothermaterials,alongith

    theassumptionsthatebelieve

    arereasonable fortheir end-of-life

    treatment.

    wedelcomeviesandinputfrom

    otherorganisations pleasecontact

    JohnDoling(BCSAsustainability

    manager)at cradletograve@

    steelconstruction.orgif youare

    interestedingettinginvolvedand

    playingyourpartin construction's

    journeytoardscradle-to-grave

    holel ifecycleassessment. were

    onthecuspof amajorchangeand

    thisisan opportunitytohelpshape

    thatchange.

    "ASSSSTS T T STS ATS A ATASCC CA AT T CT"

    Cradle-to-grave embodcarbon of materials

    MENT

    MTE ril DT SOu rC E END Of li fESSuMpTiON

    SOurCE

    Fabricatedsteelsections

    wor ldsteel(2002) 99%closedloop r ecycling,1%landll

    MFAoftheUK steelconstructionsector

    S te el p ur li ns w or ld st ee l (2 00 2) 9 9% c lo se d lo op r ec yc li ng ,

    1%landll

    MFAoftheUK steel

    constructionsector

    rganiccoatedsteel

    wor ldsteel(2002) 94%closedloop r ecycling,

    6%landll

    MFAoftheUK steelconstructionsector1

    Steelreinforcement

    wor ldsteel(2002) 92%recycling,8 %landll M FAoftheUKsteelconstructionsector

    Concr ete(C25) GaBiCIdatabase2006-PInternational

    77%openlooprecycling,23%landll

    DepartmentforCommunitiesandocalGovernment

    Concrete

    (C30/37)

    GaBiCIdatabase2006-PInternational

    77%openlooprecycling,23%landll

    DepartmentforCommunitiesandocalGovernment

    Concr ete(C4 0) GaBiCIdatabase2006-PInternational

    77%openlooprecycling,23%landll

    DepartmentforCommunitiesandocalGovernment

    Glulam GaBi CI database2006-PInternational

    16%recycling,4%incineration,80%landll

    RADA

    Plyood GaBiCIdatabase2006-PInternational

    16%recycling,4%incineration,80%landll

    RADA

    Plaster boar d GaBiCIdatabase2006-PInternational

    20%recycling,80%landll

    wRAP

    Ag gr eg at e G aB i C Id at ab as e2006-PInternational

    50%recycling,50%landll

    DepartmentforCommunitiesandocalGovernment2(a)

    armac GaBi CI database2006-PInternational

    77%recycling,23%landll

    DepartmentforCommunitiesandocalGovernment

    1 Materialoanalysisof theUKsteel

    constructionsector,J.ey,2001

    2 SurveyofArisingsand UseofAlternativesto

    PrimaryAggregatesinngland,2005Construction,

    Demolitionandxcavationwaste,

    .communities.gov.uk/publications/

    planningandbuilding/surveyconstruction2005

    [a]Adjustedformaterialleftin groundat

    endoflife.

    3 RADAechnologyood info

    Sheet59 Recoveringand minim

    revisedJune 2008.

    4 wRAPNetwasteoolRefere

    2008(goodpracticerates).

    5 DataexcludesC2

    uptakeorC

    frombiomass.

    Beloisa tableshoingthefull lifecycle(cradle-to-grave)embodiedcarbon

    ofsomecommonconstructionmaterials.hesevalueseregeneratedforthe

    argetZerolo-carbonbuildingstudy(seepages18-19)usingrecognised

    informationsources.heyarepresentedasan appendixithinthe argetZero

    guidancedocuments. See .targetzero.info

    full l

  • 7/29/2019 Whole Life Cycle - STEEL, CONCERET AND TIMBER.PDF

    13/13

    The future is not completely

    beyond our control. It is the

    work of our own hands.

    Robert F Kennedy (1925-1968)