WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

11
WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding Fall 2013 - Presented ‘gaps’ and possible project solutions to WHCA in Draft NCP - unanimously approved with one abstention. March 2014 - Presented draft list to WHCA for feedback. April 2014 – Presented draft list to County for input. April 9, 2014 – Revised list with deletions of some projects. Final draft list of options is presented tonight for discussion only – not voting. May 7, 2014 – Vote on Priorities Project List to NCAC.

description

WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding. Fall 2013 - Presented ‘gaps’ and possible project solutions to WHCA in Draft NCP - unanimously approved with one abstention. March 2014 - Presented draft list to WHCA for feedback. - PowerPoint PPT Presentation

Transcript of WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Page 1: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

WHCA – April 9, 2014Timeline for Choosing Priority Projects for NCAC Funding

Fall 2013 - Presented ‘gaps’ and possible project solutions to WHCA in Draft NCP - unanimously approved with one abstention.

March 2014 - Presented draft list to WHCA for feedback.

April 2014 – Presented draft list to County for input.

April 9, 2014 – Revised list with deletions of some projects. Final draft list of options is presented tonight for discussion only – not voting.

May 7, 2014 – Vote on Priorities Project List to NCAC.

Page 2: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Priority Project on Pedestrian Safety – 18th Street & Wakefield Discussed in March & Deleted from Original List

a. Sidewalk on south side of 18th Street from Glebe to Wakefieldb. Improvements to 18th Street and Wakefield intersectionRationale – To facilitate pedestrian safety en route to Glebe Elementary

School, the County submitted a Revenue Sharing Request last fall to the State. The budget of $152,000 includes some improvements on Glebe, but it specifically regards improvements to the south side of 18th St. N. from Glebe to Wakefield Street. Includes – sidewalk, retaining wall, curbs, and curb ramps. It also includes improvements to 18th St. & Wakefield intersection – school crosswalk sign, crosswalk pavement markers, and stop bars.

Response anticipated in June - State funds would eliminate the need for NCAC funding. If not approved, could complete survey of residents and submit to NCAC in the fall.

Page 3: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Priority Project for Improved Lighting along Utah – Discussed in March & Deleted from Priority List

Utah is an important pedestrian route from Metro. However, the WHCA can not submit this – staff said that existing cobras could be changed to LED but application has to come from Cherrydale ‘s CA – County does not typically install street lighting on both sides of any residential street.

Page 4: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Idea for Priority Project Option # 1 – Woodstock Park

Issue – Improvements have been implemented ad hoc, as thereIs no master plan to guide priorities. The County Parks and RecreationDepartment is implementing improvements to the playgrounds & BB court.It does not include the area closest to Woodstock Street, where the WHCAParks Committee has discussed a quieter zone with adult activities.

Proposed Project – Staff recommends that we submit as a single priority project with two internal steps, not phased…first a master plan and then implementation of the recommendations resulting from the master plan.

Possible MP Recommendations – Survey, new fencing, solar lighting, site furniture (benches, tables, trash, bike racks), landscaping, maintenance,urban ag, electricity, signage, etc.

Page 5: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Potential NCP Project –Woodstock Park - Master Plan

Option 2: Woodstock Park Master Plan

Page 6: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Implementation of recommendations in the Woodstock Park Master Plan

Page 7: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

FYI Other Funding - $13,374 in WHCA Fund at Parks and Rec Dept.

County has determined that this must be used for built improvements.Can not be used to fund a community event in the park.

Could recommend it be added to Woodstock Park project funding or could spend separately on ‘hardscape’ improvement.

Page 8: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Idea for Priority Project Option # 2 – Sidewalk on 20th Road & Utah Install 5’ Sidewalk (replace existing curb/gutter) Install retaining walls/replace one existing Replace steps/hand rails in front of four houses & screen of shrubs at corner house Move storm drain on 20th, two no parking signs, and Cobra at 2032 Utah

WHCA 2013 Draft NCP, 5.0 Transportation, Traffic and Pedestrian Concerns5.2 Sidewalks, Line 43

NEW SIDEWALK

Page 9: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Option 1: 20th Rd N, and Utah

View of proposed sidewalk at 20th Road & Utah

Page 10: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

1.Project is in accord with NCP & County goal to have one sidewalk every street

2. Improves pedestrian access(to Woodstock Park, LH buses, HBW School) and safety for owner at 2032 Utah

3.Residents surveyed indicated support(14 HH/11 Y/3 N/6 unknown-1 WH/5CC)

1.Retaining walls might be costly.2.One or two existing trees might be lost.3.Need to coordinate with Cherrydale.

Option 2: 20th Rd N, and Utah

Pros Cons

Alex Luchenitser
Paul, is this correct?
Page 11: WHCA – April 9, 2014 Timeline for Choosing Priority Projects for NCAC Funding

Q&A Priority Project Options – Submit one or two to CountyDiscussion tonight – Vote at May 7 Meeting

1. Woodstock Park Master Plan & Recommended Improvements2. 20th Road & Utah Sidewalk – will discuss with Cherrydale NCAC

Which option shall be the priority project? Shall the other be sent to the County as the second priority?

May 15, 2014 – Deadline for submitting to County for Dec. 2014 funding round; project would begin accumulating points. Any proposed project, especially the park project, will not be ready for qualification and funding until earliest 2015, probably later, as it has to gain enough points to compete for funding.