What’s New from the High-Level Group?

20
United Nations Economic Commission for Europe Statistical Division United Nations Economic Commission for Europe Statistical Division What’s New from the High-Level Group? Steven Vale UNECE steven.vale@unece. org

description

What’s New from the High-Level Group?. Steven Vale UNECE [email protected]. HLG Background. High-Level Group for the Modernisation of Statistical Production and Services Created by the Conference of European Statisticians in 2010 - PowerPoint PPT Presentation

Transcript of What’s New from the High-Level Group?

Page 1: What’s New from the High-Level Group?

United Nations Economic Commission for EuropeStatistical DivisionUnited Nations Economic Commission for EuropeStatistical Division

What’s New from theHigh-Level Group?

Steven ValeUNECE

[email protected]

Page 2: What’s New from the High-Level Group?

High-Level Group for the Modernisation of Statistical Production and Services

Created by the Conference of European Statisticians in 2010

10 heads of national and international statistical organisations

HLG Background

Page 3: What’s New from the High-Level Group?

The Challenges

Increasing cost &

difficulty of acquiring

data

New competitors & changing

expectations

Rapid changes in the environment

Competition for skilled resourcesReducing

budget

Riding the big data

wave

Page 4: What’s New from the High-Level Group?

These challenges are too big for statistical organisations to

tackle on their own

We need to work together

Page 5: What’s New from the High-Level Group?

Transform vision to reality New sources and products Streamlined processes Managing organisational change to support

modernisation and collaboration

A strategy for modernisation

Page 6: What’s New from the High-Level Group?

Transform vision to reality New products Rationalised processes

• “Plug and play” architecture – based on the GSBPM and GSIM

Managing organisational change to support modernisation and collaboration

Conference of European Statisticians, June 2012

A strategy for modernisation

Endorsed

Page 7: What’s New from the High-Level Group?
Page 8: What’s New from the High-Level Group?

Information objects

Things that flow between GSBPM sub-processes

Things that drive and integrate sub-processes

Page 9: What’s New from the High-Level Group?

GSIM and GSBPM

GSIM describes the information objects and flows within the statistical business process.

Page 10: What’s New from the High-Level Group?

So what is GSIM? A reference framework of information objects:

• Definitions• Attributes• Relationships

GSIM aligns with relevant standards such as DDI and SDMX

GSIM gives us standard terminology

Page 11: What’s New from the High-Level Group?

What next?

2 big projects for 2013

Page 12: What’s New from the High-Level Group?

Implementing GSIM• Help, support, training• Knowledge base• Platform for sharing experiences

Reviewing / revising GSBPM and GSIM Integrating standards

• Map GSIM to SDMX and DDI• Geospatial standards• Fundamental Principles of Official Statistics

1: Standards

Page 13: What’s New from the High-Level Group?

2: Common Statistical Production Architecture

GSBPM

Generalized Statistical

Production System

Common GenericIndustrial Statistics

Methods Technology

GSIM

Implementing standards-based statistical production

Page 14: What’s New from the High-Level Group?

“Plug and Play”

Page 15: What’s New from the High-Level Group?

CSPA: Progress and Plans Project proposal – Approved by HLG

• Common architecture• Proof of concept

“Sprint” Sessions:• Ottawa, 8-12 April• Rome, 10-14 June

Virtual groups / More sprints? / Workshops? All deliverables by end of 2013

Page 16: What’s New from the High-Level Group?

Big Data

HLG released a paper “What does Big data mean for official statistics?”• www1.unece.org/stat/platform/x/toeZB

Many Big data initiatives• Coordinating role for HLG?

Page 17: What’s New from the High-Level Group?

Do you want to get involved?

Sprints Virtual Task Teams Reviews

Let us [email protected]

Page 18: What’s New from the High-Level Group?

HLG governance issues

The work is growing Expectations are rising More efficient structure needed

• Re-organisation of UNECE expert groups• Clearer focus on modernisation

Page 19: What’s New from the High-Level Group?

&( 6 %XUHDX

+ / *

+/ * 6HFUHWDULDW7HDP

Modernisation Committee

Standards

Modernisation Committee Production

and methods

Modernisation Committee

Products and sources

0 RGHUQLVDWLRQ&RP P LWWHH

Organisational framework and

evaluation

MSIS SAB Data editing Plug and play

Data collection Confidentiality Big data Open data Micro-data

METIS GSBPM / GSIM DDI / SDMX Geospatial standards Metadata flows

HRMT Legal issues Licensing Evaluation

( [ HFXWLYH

%RDUG

Project management

HLG workshops Communications

Page 20: What’s New from the High-Level Group?

More information

GSIM• http://www1.unece.org/stat/platform/display/metis/Ge

neric+Statistical+Information+Model+(GSIM)

HLG• http://www1.unece.org/stat/platform/display/hlgbas