What role for pp ps un ppp event - dec 12 2014 - final

10
What role for Public- Private Partnerships? Delivering on the Post-2015 Development Agenda Lessons from an IEG Evaluation December 12, 2014 Stefan Apfalter Senior Evaluation Officer, IEG

Transcript of What role for pp ps un ppp event - dec 12 2014 - final

Page 1: What role for pp ps   un ppp event - dec 12 2014 - final

What role for Public-

Private Partnerships?Delivering on the Post-2015 Development

Agenda

Lessons from an IEG Evaluation

December 12, 2014

Stefan Apfalter

Senior Evaluation Officer, IEG

Page 2: What role for pp ps   un ppp event - dec 12 2014 - final

Title of Presentation 2

How can PPPs help close the

$ 1 trillion infrastructure gap?

• Leveraging scares public resources

• Potential to increase efficiency

• USD 79bn p.a. PPP volume globally

• But PPPs are not the panacea

• PPPs require their own infrastructure!

Page 3: What role for pp ps   un ppp event - dec 12 2014 - final

Licensing and regulation

PrivatizationServices contracts

Construction contracts

“Pure public“ “Pure private“

Exis

ting

Asse

tsN

ew

Asse

ts

Performance-based

maintenance

Operations and

Maintenance (O&M)

Design, Build,

Finance, Maintain

Build, Transfer,

OperateBuild, Own,

Operate, Transfer

Lease

Concession

Core PPP types Other type of private sector involvementKey:

PPPs respond to market failure

while minimizing government failure

Page 4: What role for pp ps   un ppp event - dec 12 2014 - final

Applying a strategic country

approach

Advise governments on “if and how” to use PPPs

Based on comprehensive diagnostics

Readiness of sector

Public sector capacity

Fiscal implications

Integrated in NIPs

4

Page 5: What role for pp ps   un ppp event - dec 12 2014 - final

Addressing political economy

Sector reform is foundation of success,

but often fails

Broad-based and early stakeholder

consultations

Government

commitment required

Local capacity

5

Page 6: What role for pp ps   un ppp event - dec 12 2014 - final

Investing more at the frontier

6

% = PPP market in these countries

Page 7: What role for pp ps   un ppp event - dec 12 2014 - final

Learning through better M&E

7

Data

NO Data

Page 8: What role for pp ps   un ppp event - dec 12 2014 - final

Going forward

• Applying strategic country

approach

• Addressing political

economy factors

• Investing at the

frontier

• Learning through better M&E

8

Page 9: What role for pp ps   un ppp event - dec 12 2014 - final

9Thank you!

Page 10: What role for pp ps   un ppp event - dec 12 2014 - final

Upfront

VGP

Comparison of Public Sector

Payment Profiles

Costs /

Expenditures

Capital

Costs

Estimated Running

Costs

Running Costs

Overruns

Costs

Overruns

5 10 15 20 Years

Construction Operation and

Maintenance Phase

• Capital and operating

costs are paid for by the

public sector who also

takes the risk of cost

overruns and late

delivery

Traditional Government Procurement

Costs /

Expenditures

Preparation

Payment based on

Availability

Payment based on

Usage

5 10 15 20 Years

Construction Operation and

Maintenance Phase

• Public sector pays over the long

term as services are delivered

• Has to cover increased

preparation costs and, at times,

part of capital costs to make PPP

project bankable.

• Takes on contingent liabilities

PPP Procurement

Contingent Liabilities