8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
1/39
Tolani Institute of Management 1
Welspun gujarat
stahl Rohren Ltd
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
2/39
Tolani Institute of Management 2
INDIAN PIPELINE INDUSTRY
Among the top three manufacturing hubs after
Japan and Europe.
Penetration level of pipelines in oil & gastransportation is low at 32% in India as
compared to 59% in USA and 79% globally
Highly Raw Material intensive with the RM
cost more than 70% of the total cost
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
3/39
Tolani Institute of Management 3
Low-cost quality products and various
certifications, Indian companies have augmented
their export sales over the last three to four years.
The global export market of the steel pipes is
stated to be close to $27 billion a year with theUS, Western Europe, Australia, and Japan being
the biggest importers. India is one of the major
exporting nations including Indonesia, Malaysia
and Thailand.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
4/39
Tolani Institute of Management 4
Freight cost high due to higher imports and
exports.
The building & construction industries along
with the oil & gas sector are the major
marketplaces for pipe.
High oil and gas discoveries worldwide,
increased efforts by the Government of India
on infrastructure development.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
5/39
Tolani Institute of Management 5
Demand of Pipelines
Demand is expected to be in excess of 3000 Km per Annum which would be more
or less in line with the total domestic capacity (Post expansion).
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
6/39
Tolani Institute of Management 6
Birth of a global pipe making
The Indian pipe majors Welspun Gujarat, Jindal
Saw, PSL, Man Industries and Ratnamani Metals
and Tubes set up their plants in the region to reach
a combined capacity of around 1 million tones per
year and likely to double it in near future.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
7/39
Tolani Institute of Management 7
INTRODUTION TO WELSPUN
Strong culture of Engineering Excellence
Set to be positioned as the World's Largest
Pipe Company with an increase in capacity
from 1 million ton per annum to 1.75
million ton per annum by March 2009.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
8/39
Tolani Institute of Management 8
Timely communication to
Target stakeholders in a
Transparent fashion
MISSION
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
9/39
Tolani Institute of Management 9
VISION
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
10/39
Tolani Institute of Management 10
Awards/Recognition
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
11/39
Tolani Institute of Management 11
CUSTOMERS OF WGSRL
Global Customers
British petroleum
Chevron
TransCanada
Lone star
(Bangladesh) Etc.
Domestic Customers
GSPL
GGCL
Reliance
GAIAL
IOC
Jay Somnath Etc.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
12/39
Tolani Institute of Management 12
MAJOR SUPPLIERS OF WGSRL
Most Important Raw Material = Coil
So major supplier for WGSRL are:-
ESSAR Steel
ISPAT Steel
POSCO
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
13/39
Tolani Institute of Management 13
COMPITITORS OF WGSRL
Jindal Steels
MAN Industries
PSL
Ratnamani Metals and Tubes ROD Etc.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
14/39
Tolani Institute of Management 14
WGSRL
Manufacturing Bending Coating
LSAW ERW Spiral/HSAW
S1 S2 S3
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
15/39
Tolani Institute of Management 15
Production Flow Chart of
Spiral-3
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
16/39
Tolani Institute of Management 16
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
17/39
Tolani Institute of Management 17
Flow Chart
ofCOATING
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
18/39
Tolani Institute of Management 18
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
19/39
Tolani Institute of Management 19
Concepts
ofPOM
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
20/39
Tolani Institute of Management 20
Competitive priorities:
Top quality
Consistent quality
On time delivery
Customization
Volume flexibility
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
21/39
Tolani Institute of Management 21
Core competencies:
Speed of production (150 pipes per day)
Quality
Employees (around 3000)
Backward integration
(captive in-house power and raw material)
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
22/39
Tolani Institute of Management 22
Batch Process:
Reasons for this:
More Variety
Moderate Volume
Average Quantity
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
23/39
Tolani Institute of Management 23
Make to order strategy:
Customized Product
Moderate Complexity & less Divergence
High Capital Intensity
Reasons for this:
Fixed Automation
Little Human Intervention
Latest technology
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
24/39
Tolani Institute of Management 24
LOCATION ADVANTAGES
Easy Availability labor at less cost
Tax benefits like excise duty exemption,
income & sales tax holiday for Kutch after the
earthquake in 2001.
Excellent logistics for import of steel, iron ore
and coal as well as export of pipes with all
season Kandla and Mundra port in the vicinity.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
25/39
Tolani Institute of Management 25
Availability of hassle free land at reasonable
prices.
Indigenous availability of raw material.
Nearer to supplier
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
26/39
Tolani Institute of Management 26
Process Layout
Line-flow Layout & Fixed Position Layout:
Linear PathFixed Manufacturing Site
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
27/39
Tolani Institute of Management 27
Inventory Control System
Periodic Review System
Reasons for this:
No uncertainty in Demand
No Constraint on lot size
Review Period = 30 Days
Order is received in 3 parts
2% additional for Safety against loss
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
28/39
Tolani Institute of Management 28
Cont.
Supply Chain Strategy: Efficient
Reasons for this:
Predictable demand & low forecastingerrors
Competitive priorities are low cost,consistent quality, on-time delivery
Infrequent new product introduction
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
29/39
Tolani Institute of Management 29
Cont.
Mass Customization:
Highly Customized Product
Low Cost
Benefits of Mass Customization:
Managing customer relationships
Eliminate finished goods inventory
Higher perceived value of product
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
30/39
Tolani Institute of Management 30
Cont.
Backward Integration:
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
31/39
Tolani Institute of Management 31
Capacity Related Discussion
Current Capacity : 150 Pipes/day
No Capacity Cushions:
Reason For this: 2 years Orderin hand
Expansion:
Domestic Expansion
Global Expansion: Plant in Little
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
32/39
Tolani Institute of Management 32
LEAN SYSTEM @ WGSRL
Pull method of Workflow
Quality at source
Small lot size(Maximum 50/lot)
Uniform Workstation load(150 pipes/day)
Standardized Components & Work Method
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
33/39
Tolani Institute of Management 33
Cont.
Backward Integration for Less Inventory Slack
Flexible Workforce
Automation
Continuous Improvement With
Lean System
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
34/39
Tolani Institute of Management 34
Other concepts.
Very Less Bullwhip Effect
Centralized Inventory Placement
system
Bottleneck Management
Past Bottleneck Production
Capacity
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
35/39
Tolani Institute of Management 35
Quality Control
ISO 9001 - By
PIQR
API 5L (Line Pipes)
API 5CT (Casing)
API 2B (Tubular)
ISO/TS 29001
Certifications:
ISI by Bureau of
Indian Standards
ISO 14001 by LRQA
OHSAS 18001 by
LRQA
Six Sigma certificate.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
36/39
Tolani Institute of Management 36
TQM @ WGSRL
Customer Satisfaction:Conformance to Specifications
Value
Fitness for usePsychological Impression
Employee Involvement
Quality at the SourceEmployee Empowerment
Continuous Improvement(Kaizen)
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
37/39
Tolani Institute of Management 37
Quality Procedure
Handling of Coils by C hookFrom storage to mill the coils are lifted by 30 Ton
crane
Handling of pipe inside the plant:
Rolling of the pipes on the level beds and
racksRubberized surface to prevent scratch
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
38/39
Tolani Institute of Management 38
Cont.
As per the specifications of the
customer testing are done at the
different places.
Finished goods are stocked in stand
for storage.
-
8/14/2019 WELSPUN GUJARAT PRODUCTION OPERATION MANAGEMENT
39/39