    Procedure for Welder Test

    Prior to testing:

    The welders must wear safety shoes & glasses and bring with themselves the required

    tools, such as grinding wire wheel, etc

    Material and size of test coupon:

    Material should be seamless pipe SA106Gr B or equivalent

    Diameter (2 inches NS or 2!1"2 inches NS# pipe schedule $%or 2 inches pipe

    schedule &&S (11 mm'# %or heav) *all pipe it needs to be used 2!1"2 inches

    NS the thic+ness should be 16mm or 1, mm and position (6G' o% each *eld test-

    .elder ma) brin/ *ith himsel% the special pipe# li+e 1 inches NS- 6 inches *ith schedule 0 (11 mm' thic+ness

    Weld coupon preparation:

    est coupon land *idth at discretion o% *elder-

    oot openin/ is at discretion o% *elder-

    2(t*o' root tac+ ma) be required %or 2 inches test coupon# 3(%our' root tac+ ma)

    be required %or 6 inches test coupon and ma) not be removed 4 (ma5 inch lon/'

    he tac+s become a part o% the *eldment7 brid/e tac+s are not allo*ed-

    Must tack coupon and obtain inspectors approval prior to proceeding.

    A%ter coupons are tac+ed the) need to be stamped b) *eldin/ inspector %ortraceabilit)-

    Weld test set-up:

    ac+ coupon to position and ad8ust hei/ht to *elder9s pre%erence

    :nspector mar+s"stamps must %ace the top end o% the pipe

    6 inches pipe test coupon shall be completed in the ;G and hori

  • 7/23/2019 Welder Testing Procedure 2014 2

    2/3

    deposited# the e5aminer shall instruct the *elder to run another pass or remove

    some o% the metal %or accurac) to the actual values accordin/ to the .>- Inspect*elder on the di%%erent inspection %it up points at completion o% root *eld

    and %inal inspection o% cap at completion o% *eldin/ .eld out coupon (hot pass# %ill and cap'- A /rinder *ire *heel ma) be used durin/

    *eldin/- ompleted *eld requires inspector9s approval be%ore proceedin/ %or .!16= as an acceptance criterion- No openin/

    /reater than 1"C is allo*ed in an) direction

    RT report requirements as per ASM I!:

    "# Inspection compan$ s%ould be specified in t%e RT report follo&ing:

    he si: number

    ASM? :&

    T%e le'el II tec%nician &it% (GS) number s%all sign t%e RT report*

    If t%e information and data in RT report is found incorrect t%is is t%e

    responsibilit$ of "# Inspection compan$ to correct an$ mista+e, not

    TSAS