Water for Kabul BGR050730

28
08/2005 1 WATER FOR KABUL Extension of the Water Supply System of Kabul A Project financed by KfW and Worldbank so far Owner of the works: MUDH Beneficiary: Kabul Water Supply Consultants for the Implementation: a Joint Venture of BELLER IGIP BETS

Transcript of Water for Kabul BGR050730

Page 1: Water for Kabul BGR050730

08/2005 1

WATER FOR KABULExtension of the Water Supply System of Kabul

A Project financed by KfW and Worldbank so farOwner of the works: MUDH

Beneficiary: Kabul Water Supply

Consultants for the Implementation:

a Joint Venture of BELLER IGIP BETS

Page 2: Water for Kabul BGR050730

08/2005 2

1 Evolution of Population

� � ������� ���� � ���� �� � � � ���� ��� � �������� ����

2356

3042

3527

4089

0

500

1000

1500

2000

2500

3000

3500

4000

4500

200220032004200520062007200820092010201120122013201420152016

year

popu

latio

n (1

000c

ap)

Reihe1

Page 3: Water for Kabul BGR050730

08/2005 3

2 Parameters of service at present

• Pserved = 30,000hc x 15 cap/hc /2.8 million hab = 16% of Kabul population

• qspec = 60000m³/d/2.8 million hab = 12l/cap/d with falling tendency

• lspec = 530km/2.8 million hab = 0.19m/cap with falling tendency.

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 4: Water for Kabul BGR050730

08/2005 4

3 Resources

Project Target after IAP

Upper Kabul River aquifer (UKRA) 34,200m³/d 18,000

Paghman (and Kharga) River aquifer 10,000m³/d 10,000

Lower Kabul River aquifer (=Microroyan) 10,000m³/d not considered

Logar River aquifer 67,500m³/d 32,000

Total 121,700m³/d 60,000

equivalent to 44.4 million m³/a 22 million m³/a)

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 5: Water for Kabul BGR050730

08/2005 5

4 Parameters of demand and production in PROJECT 2005 2010 2015 General domestic consumption, dwellings without flushing toilet in existing quarters of the City 50l/cap/d 50l/cap/d 50l/cap/d Taken from the water house connection 30l/cap/d 35l/cap/d 40l/cap/d Taken from well 20l/cap/d 15l/cap/d 10l/cap/d General domestic consumption, dwellings without flushing toilet in extensions to the City 50l/cap/d 50l/cap/d 50l/cap/d Domestic consumption in blocks of flats Nothing taken from the well

100l/cap/d 113l/cap/d 125l/cap/d

Domestic consumption in quarters of high standing 150l/cap/d 150l/cap/d 150l/cap/d Taken from the water house connection 25l/cap/d 55l/cap/d 100l/cap/d Taken from well 125l/cap/d 95l/cap/d 50l/cap/d Domestic consumption from public taps 15l/cap/d Commercial demand in prorate of domestic demand 12% 13% 15% General administration demand in prorate of domestic demand 10% 10% 10% Industrial demand 10m³/ha/d 10m³/ha/d 10m³/ha/d Service level development, existing quarters, average 13% 56% 78% Service level of high standing quarters 50% 100% 100% Service level of quarters of average standing 20-60% 30-60% 80% Service level of quarters of low standing <30% 30% 60% Service level of semi-rural quarters 0% 30% 60% Service level of new extension zones n.a. 80% 80% Total losses as prorate of calculated demand 70% 40%for

existing, 25% for new

25% for all

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 6: Water for Kabul BGR050730

08/2005 6

5 Evolution of demand and Consumption

( Implementation of Short term project)

( Implementation of Medium term project)

0,0

20,0

40,0

60,0

80,0

100,0

120,0

140,0

160,0

2000

2005

2010

2015

2020

2025

Year

M m

3/a Demand

Consumption

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 7: Water for Kabul BGR050730

08/2005 7

6 Global target

• The global target is the improvement of the general living and health conditions of the Kabul population which at the end of 2002 was at 1.9million inhabitants and which is expected to reach 3.0 million and 3.5 million in 2005 and 2010, resp.

• The direct indicator for the achievement of the target is the index of waterborne diseases, which were reported from a random sample to make up for 38% of the consultations with a high proportion of acute bloody diarrhoea.

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 8: Water for Kabul BGR050730

08/2005 8

7 General project target

The general target is the extension of the Kabul water supply system and the access of a maximum of the inhabitants, if not of all, to the piped water as a replacement of the progressively deteriorating local ground water. The target indicators for the project is the achievement of the following:

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

million m³/a44water producedmillion m³/a34water sold

pieces>600public standpipes, working

pieces90,000house connections, working

km1,360distribution system length after reservoirs

unitvalueparameter

Page 9: Water for Kabul BGR050730

08/2005 9

8 Selection of quarters to be served

Regarding the restricted coverage of the demand, the quarters selected to be serviced under the project comprise:

• those already having a distribution network but an insufficient resource,

• those consolidated quarters where the construction of a network is pending since many years, in fact those earmarked already in the PRIL 1974 Masterplan, and

• new extensions already developped or where the development is iminent. In all of the 3 cases however under considerations of the ability to pay and a technically and economically reasonable overall system layout.

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 10: Water for Kabul BGR050730

08/2005 10

9 Technical design criteria

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Roughness value for trunks and principal mains k = 0.1mm Roughness for local mains, including valves and specials. k = 0.4mm Maximum velocity in trunks during peak v = 2.0m/s Maximum velocity in principal mains during peak v = 1.5m/s Minimum diameter for local mains DN 80 Minimum diameter for dc trunks DN 200 Standard house connection diameter DN 15 Hours of operation of biggest pump for suction tank sizing T = 2h Redundancy of pumps at peak none Maximum service pressure in network OPmax 6bar Minimum service pressure at peak hour at house connection OPmin 2,0bar Minimum transitional pressure above high points of trunks 2,0bar Nominal pressure of network components PN 10 Nominal pressure of trunk components, as may be the case PN 10, 16 or 25 Normal pump operating hours T op_av 20h Peak day operating hours T op_peak 23h Redundancy of pumps at peak day none Voltages for pump motors 0,4 or 0,7kV General consumers 0,4kV Frequency 50Hz MV 15 or 20kV Seismic coefficient To be investigated

Page 11: Water for Kabul BGR050730

08/2005 11

10 Network extensions

• The distribution network is increased from approx 530km by 830km to 1,360km and covers an area of 8,000ha with a total population of approx. 2.0 million inhabitants wherefrom 1.4 million are served by house connections.

• The trunks are increased from approx 41 km by 36 km to 78 km.

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 12: Water for Kabul BGR050730

08/2005 12

11 Investment costs including Consultancy Services

Total 100 million EUR

Time-phased investment schedule for project (in million EUR)

year 2005 2006 2007 2008 2009 Sum

Annual expenditure 4 16 30 30 20 100

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 13: Water for Kabul BGR050730

08/2005 13

12 Existing System 2005

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 14: Water for Kabul BGR050730

08/2005 14

13 Head works of Project

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 15: Water for Kabul BGR050730

08/2005 15

14 Head works Project plus Map of Kabul

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 16: Water for Kabul BGR050730

08/2005 16

15 Logar Wellfield Extensions

N ASAJIWell field

LOGARWell field

DN400

DN600

DN800trunk t runk

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 17: Water for Kabul BGR050730

08/2005 17

16 Kabul’s Medium Term Water Supply -- Headworks

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 18: Water for Kabul BGR050730

08/2005 18

17Kabul’s Medium Term Water Supply

Flow Chart

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 19: Water for Kabul BGR050730

08/2005 19

WATER FOR KABUL -- SUMMARY OF KABUL II PROJECT

18 Required Protection Zones

Page 20: Water for Kabul BGR050730

08/2005 20

19 Protectionof Resources?

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 21: Water for Kabul BGR050730

08/2005 21

20 Protectionof Resources?

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 22: Water for Kabul BGR050730

08/2005 22

21 Land Management ? Extra costs: 100,000 USD

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 23: Water for Kabul BGR050730

08/2005 23

22 Conflict of Water Users

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 24: Water for Kabul BGR050730

08/2005 24

23 Protection Zones of the former Urban Masterplan

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 25: Water for Kabul BGR050730

08/2005 25

24 Upper Kabul Aquifer - Land occupation development

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 26: Water for Kabul BGR050730

08/2005 26

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 27: Water for Kabul BGR050730

08/2005 27

The ENDThanking for your attention

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Page 28: Water for Kabul BGR050730

08/2005 28

13 Conflict of Water Users

WATER FOR KABUL --- SUMMARY OF KABUL II PROJECT

Evolution of Kabul Water Supply after completion of Project Brief Presentation of principal figures IAP 2005 Project size Inhabitants capita 2.800.000 3.400.000 + 600.000 served by house connections capita 450.000 1.400.000 + 950.000

public taps capita 600.000 600.000 No change not served capita 1.750.000 1.400.000 - 350.000

average day demand m3/d Not defined 175.000 peak day demand Not defined 263.000 annual Logar million m3/a 11,6 24,6 + 13,0 production Upper Kabul million m3/a 3,2 12,5 + 9,3

Lower Kabul million m3/a 3,7 3,7 + 0,8 Afshar million m3/a 3,5 3,7 + 0,2 total million m3/a 22,0 44,5 + 23,3

average production per population served l/cd 55,2 61,0 maintained average Logar 1000 m3/day 31,7 67,4 + 35,7 production Upper Kabul 1000 m3/day 8,6 34,2 + 25,6 day Lower Kabul= Microroyan 1000 m3/day 10,1 10,1 Not in project

Afshar 1000 m3/day 9,7 10,1 + 0,4 total 1000 m3/day 60,1 121,9 + 63,9

Technical data Total capacity of principal reservoirs m3 32.700 73.000 + 40.300 Total length of distribution network km 483 1.360 + 880 House connections units 30.000 90.000 + 60.000