South 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point creative corridor

Transcript of Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August...

Page 1: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

South 5th Street Reconstruction Public Meeting August 24, 2015

Walker’s Point

creative corridor

Page 2: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Project Area: South 5th Street Virginia to Scott

PIERCE

VIRGINIA

WALKER

NATIONAL

SCOTT

MINERAL

BRUCE

WASHINGTON

Page 3: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Project Timeline

•2014 - 2015: Scheduled 5th St. repaving delayed pending Walker’s Point Action Plan completion and community determination on street design.

•Spring 2015: Walker’s Point Action Plan completed

•June 2015: Presented paving options to community

•July 2015: Gathered community input

•August 2015: Select street design option

Page 4: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Project Timeline

•September 2015: Tax Incremental District project plan presented to Common Council.

•Fall – Winter 2015: DPW design and engineering, including working with businesses to address concerns (parking, access, etc.)

•Spring - Summer 2016 – Begin street reconstruction (3 – 4 month construction period)

Page 5: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

GRAEF Parking Study (2014)

• Emphasize shared parking • Neighborhood valet • Reduce free or low-cost

on-street parking • Eliminate assigned, off-

street spaces

• Incentivize alternative transportation modes

Page 6: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Opportunities for Temporary Parking

1

3 2

1

3 4 S

5TH

ST

W NATIONAL AV

5

Page 7: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Existing Conditions South 5th Street

Page 8: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

9.5’ SIDE-WALKS

17’ ANGLED PARKING

11’ DRIVING

LANE

11’ DRIVING

LANE

9.5’ SIDE-WALKS

17’ ANGLED PARKING

OPTION 1 Small Sidewalks and Angle Parking on Both Sides

Page 9: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

13.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ DRIVING

LANE

11’ DRIVING

LANE

13.5’ SIDEWALKS

17’ ANGLED PARKING

OPTION 2 One Side Angle Parking / One Side Parallel Parking

Page 10: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

13.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ DRIVING

LANE

5’ BIKE LA

NE

13.5’ SIDEWALKS

OPTION 3 Parallel Parking on Both Sides and BIKE LANES

8’ PARALLEL PARKING

11’ DRIVING

LANE

5’ BIKE LA

NE

Page 11: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

18.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ SHARED

LANE

11’ SHARED

LANE

18.5’ SIDEWALKS

8’ PARALLEL PARKING

OPTION 4 Narrow Street and Wide Sidewalks

Page 12: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Public Input

•Businesses •Property owners

•Residents of the area •Other interested parties

Page 13: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

S. 5th Street business and property owners:

Option One or No Change 18% (7) Option Two 10% (4) Option Three 10% (4) Option Four 62% (24)

Page 14: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Walkers Point Association and near residents:

Option One or No Change 0% (0) Option Two 0% (0) Option Three 47% (8) Option Four 53% (9)

Page 15: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Other interested parties:

Option One or No Change 0% (0) Option Two 0% (0) Option Three 43% (3) Option Four 57% (4)

Page 16: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

18.5’ SIDEWALKS

8’ PARALLEL PARKING

11’ SHARED

LANE

11’ SHARED

LANE

18.5’ SIDEWALKS

8’ PARALLEL PARKING

OPTION 4 Narrow Street and Wide Sidewalks

Page 19: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Business Support Program • Provides support for business before

and during construction • Maintains regular communication

during construction • Minimizes impact of construction on

business • Works with businesses to provide

parking, access and signage • Removes unnecessary parking

restrictions

Page 21: Walker’s Point creative corridor - MilwaukeeSouth 5th Street Reconstruction Public Meeting August 24, 2015 Walker’s Point . creative corridor

Questions / Comments

Tonight’s presentation will be available on line at: http://city.milwaukee.gov/AreaPlans/NearSouth

Questions or Comments: Department of City Development [email protected] (414) 286-5724 Alderman Jose Perez [email protected] (414) 286-2221