VOCATIONAL TRAININGPRESENTATION
ONIOP & STORAGE
AT
GAIL(INDIA )LTD.
PRESENTED BY-
AKHIL MOHAN MISHRA
ME (4th YEAR)
0702940015
-
8/8/2019 Vocational Training_ Akhil
2/15
CONTENTS
Introduction of GAIL
IOP &S
DESCRIPTION OF IOP PLANT
DESCRIPTION OF POWER PLANT UTILITY BOILER
-
8/8/2019 Vocational Training_ Akhil
3/15
Introduction of GAIL
GAIL, Indias principal gas transmission and marketing company , was set
Government of India in August 1984 to create gas sector infrastructure for
sustained development of the natural gas sector in the country.
GAIL (India) Ltd. at Pata, Distt. Auraiya, U. P. It is based on Natural Gas asfeedstock from GAILs HBJ pipeline, which has been set up in accordance
with GAILs mission to maximize the value addition from each fraction of
Natural Gas.
The Plant consists of four major units i.e. GPU, GCU, HDPE and LLDPE Unit.
Current capacity of the cracker plant is 300,000 tones per annum ofEthylene.
-
8/8/2019 Vocational Training_ Akhil
4/15
TECHNOLOGY
Technology for the Gas Cracker unit has been licensed by Stone and
Web star, USA. Technology for the HDPE unit has been licensed by
Mitsui of Japan and Nova Chemicals, Canada for swing plant of
HDPE & LLDPE unit. Ethane, a constituent of Natural Gas is
converted into ethylene as its main product in the Gas Cracker Unitbased upon latest technology from USA .
PRODUCTS
GAIL is the major supplier of HDPE & LLDPE with the back-up of two
separate technologies. Some of the products are used, are Injection
Molding, Woven Sacks, Pipe & Fittings, Roto Molding, HM film, IM
Crates, Luggage, Blow Molding, HM Blow Molding etc.
-
8/8/2019 Vocational Training_ Akhil
5/15
I
OP&S [I
NTEGRATED OFF SI
TE PLANTS AND STORAGES ]
RAW WATER TREATMENT PLANT
COOLING TOWER OPERATION AND C.W. MANAGEMENT
POWER PLANT
-
8/8/2019 Vocational Training_ Akhil
6/15
RAW WATER TREATMENT PLANT
COOLING WATER SYSTEM
SERVICE WATER SYSTEM
DRINKING WATER SYSTEM
FIRE WATER SYSTEM
MISC. WATER SYSTEM
SOURCES OF RAW WATER ARE :-
WATER FROM CANAL
WATER FROM BOREWELL
-
8/8/2019 Vocational Training_ Akhil
7/15
RAW WATER RECEIPT AND STORAGE
RAW CANAL WATER IS RECEIVED THROUGH CHANNEL AT A RATE OF 500
1000 M3/HR AND STORED IN RW RESERVOIRS .
TREATMENT IN R.W. TREATMENT PLANT
PRECHLORINATION
COAGULATION WITH ALUM
GRAVITY SAND FILTRATION
-
8/8/2019 Vocational Training_ Akhil
8/15
COOLING WATER SYSTEM
COOLING WATER SYSTEM CONSISTS OF 3 INDEPENDENT COOLING TOWER.
COOLING TOWER 1
SUPPLIES WATER TO GPU, C2/C3 & GCU, CRYOGENIC STORAGE AREA ANDUTILITY SYSTEM .
COOLING TOWER 2
SUPPLIES WATER TO LLDPE, HDPE (SWING), HDPE (SLURRY) AND BUTENE I.
COOLING TOWER - 3
SUPPLIES WATER TO LPG PLANT.
-
8/8/2019 Vocational Training_ Akhil
9/15
COOLING WATER TREATMENT
TREATMENT OF PH CONTROL.
TREATMENT FOR PREVENTION OF CORROSION.
TREATMENT FOR PREVENTION OF BIOFOULING.
BLOWDOWN FOR CONTROLLING CONCENTRATION OF DISSOLVED SOLIDS.
REMOVAL OF SUSPENDED SOLIDS .
-
8/8/2019 Vocational Training_ Akhil
10/15
DESCRIPTION OF POWER PLANT UTILITY BOILER
The Steam Generated from all these boilers is utilized for production of
Electrical Power.
2 Nos. of Turbo Generators having Generating Capacity of 15.5 MW(Extraction
type) & 25.6 MW(Condensing type) .
The very high pressure steam (102 Kg/Cm2 (g) ) produced from all the 3 boilers .
-
8/8/2019 Vocational Training_ Akhil
11/15
UTILITY BOILERS
IN THIS PLANT WE USE VERTICAL TYPE BOILER .
There are 3 nos. of utility boilers present in UPPC.
2 boilers run at a time and one boiler act as a standby for them .
FUEL: RICH GAS ,LEAN GAS.
-
8/8/2019 Vocational Training_ Akhil
12/15
BOILER ACCESSORIES
ECONOMISER
The purpose of the economizer is to preheat the boiler feed
water before it is introduced into the steam drum, and to recoversome of the heat from the fuel gases leaving the boiler.
SUPER HEATER
THE PURPOSE OF SUPER HEATER IS TO SUPER HEAT THE STEAM.
-
8/8/2019 Vocational Training_ Akhil
13/15
DESUPER HEATER
The purpose of the economizer is to preheat the boiler feed water before it is
introduced into the steam drum, and to recover some of the heat from the fuel
gases leaving the boiler.
BOILER MOUNTINGS
EMERGENCY STOP VALVE
CONTROL VALVE
OVER SPEED TRIP
EMERGENCY TRIPPING DEVICE
-
8/8/2019 Vocational Training_ Akhil
14/15
POWER GENERATION THROUGH STGs
Presently the Maximum requirement of Electrical power for the complex
is around 32 3 MW.
This demand of 32 3 MW of power requirement in met by 2 SteamTurbo Generators .
Power Generated by these Generators is at 11 KV. It is further stepped up
to 33 KV through transformers which are synchronized with the 33 KV
grids.
-