VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ......

10

Transcript of VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ......

Page 1: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan
Page 2: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

VISION & MISSION

VisionOur vision is to be the world-class service provider and consistent solution for Oil & Gas

requirement.

MissionSince its establishment, PT Pasifik Timur Energindo is dedicated to carry out mission of

setting up an entity that provides excellent products and services to petroleum Industry

and contributing to Indonesia’s national development.

PT PASIFIK TIMUR ENERGINDO ENDEAVORS TO ANTICIPATE IN EVERY NEED

FOR THE PETROLEUM INDUSTRY.

We are grateful and concurrently take pride that PT Pasifik Timur Energindo is evidently

capable to hold dialogues relating to the technological development with other nations

and are the foundation for our future growth. We will bring our knowledge and expertise

truly to service local and multinational customers.

Hard work has become the keyword of our company in conjunctions with the increasing

importance of the global economic growth. Our long-term success requires a total

commitment to exceptional standards of performance and productivity, to working

together effectively and to a willingness to embrace new ideas and learn continuously.

Strategic Thrusts Be seen by our customers as THE RELIABLE SERVICES COMPANY by adding real

value to their business.

Sincerely,

Daud Edward Soewarto Director

Page 3: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

CORPORATE INFORMATION

Company Name

Date of incorporation

Nature of business

Authorized Capital

Issued & Paid Up Capital

Company Status

Products offering

Polymer Gel System

Farr Plunger

Technical Certification

Key Contacts

Main Office

Phone

Fax

Field Office

Web Site

E-Mail

VAT Registration No.

Bank

Management

Advisors

: PT. PASIFIK TIMUR ENERGINDO

: August 6, 1999

: Servicing Oil & Gas Industry

: Rp. 1.000.000.000,-

: Rp. 700.000.000,-

: Owned by Indonesian Nationals

: Design & Apply Passive Fire Protection Electric Submersible Pump Sales & Commissioning

: EPT

: Muth Pump LLC

: International Protective Coating-Akzonobel Chartek Fireproofing and HSE.

: Daud Edward Soewarto +62811826213 Iqdam Victor Soleman +62811804485 Subono Anwar +628158906136

: Jln. Haji Amil 28-A, Buncit Raya, Jakarta Selatan 12740

: (62-21) 7902770

: (62-21) 799 3435

: Jl. Salira Indah, Desa Margasari, Kec. Pulo Ampel Kab. Serang, Merak.

: www.ptenergi.com www.pasifiktimurenergindo.net

: [email protected] [email protected]

: 1.937.965.0.022

: Bank Negara Indonesia Chase Plaza Ground Floor Jakarta, BANK PERMATA, GedungGraha Mampang, Jakarta.

: Daud Edward Soewarto –Director. : Victor Iqdam Soleman - Commissioner. : Subono Anwar - Director Finance.

: Ralph W. Cooke Garold Muth David Muth

Page 4: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

RANGE OF PRODUCTS & SEVICES

I. ESP COMMISSIONING ACCESSORIES:

1. Cable Bands Stainless 2. Cable Splicing Table, Tapes: Hi-Modulus, Hi-Temp 3. Cable Spooler Electric or Diesel 4. Cable Banding Tools, Crimper, Tensioner/ Manual or Pneumatic 5. ESP Transformer / VSD Transformer / Micro Drives 6. Swage Nipple / Check Valves 7. Adapter for Flanges, Pipe or ESP System 8. Coupling 400 – 513 – 540 – 562 series 9. Genset, Gas or Diesel on Skid 10. Genset VSD Skid Protection made to order 11. Dog House made to order

COMMISSIONING ACCESSORIES REFERENCE CUSTOMERS:

- PERTAMINA UBEP JAMBI, SUMATERA - PERTAMINA UBEP TANJUNG, KALIMANTAN - PERTAMINA CIREBON, JAWA

II. COMPONENTS & ACCESSORIES FOR OIL & GAS REQUIREMENT.

1. Fluid End Parts of various Mud Pumps e.g. Cylinder Liners, Piston Rods, Valve Assy., Extension Rods, Pistons, Plungers – API Spec.

2. Sucker Rods, Pony Rods, Sinker Bars, Couplings And Sub- couplings, Sucker Rod tongs, Wrench, Elevators, Solder rod guide components - API Spec.

3. Miscellaneous, Tubing Tongs 1.1/2” to 3”, Tong Dies, Slip Die Inserts, Pup Joints, Swivels, Chickson Joints, Hammer Unions, Casing Scrapers, Was Pipes, Recovery Taps.

4. Rethreading of Drill Collars, Drill Pipes, Kellys and Cross Over.

III. MUTH PUMP LLC – USA

1. “FARR” PLUNGER FOR SANDY WELLS 2. ON – OFF TOOLS 3. FARR FLUNGER RENTAL

MUTH PUMP REFERENCE CUSTOMERS:

- CHEVRON PACIFIC INDONESIA, DURI SUMATERA - JOB LEKOM MARAS, PENGABUAN SUMATERA - PERTAMINA UBEP TANJUNG KALIMANTAN - CHEVRON USA - TEXACO USA - VENEZUELA STATE OIL

Page 5: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

IV. ENHANCED PETROLEUM TECHNOLOGY INC. (EPT).

1. POLYMER GEL SYSTEM FOR WATER SHUT OFF 2. SAND BAN 3. POLYMER GEL SYSTEM FOR PROFILE MODIFICATION

EPT REFERENCE CUSTOMERS:

- CALTEX PACIFIC INDONESIA, DURI, MINAS FIELD - MARATHON PETROLEUM – INDONESIA - SANTA FE SALAWATI – INDONESIA - CHEVRON – USA - PDVSA VENEZUELA STATE OIL CO. - OCCIDENTAL PERUANA INC. ETC

V. PASSIVE FIRE PROTECTION APPLICATION.

1. CERTIFIED APPLICATOR PASSIVE FIRE PROOFING 2. PFP LUMPSUM PROJECT TAKING 3. THERMAL INSULATION – INTERTHERM 7050 4. JET FIRE RATED FLEXIBLE JACKET (ISO 22899-1)-CONTRA FLEX

PFP APPLICATION REFERENCE CUSTOMERS:

- TOTAL INDONESIE – TUNU. - BP TANGGUH. - TOTAL INDONESIE – SISINUBI. - AFCONS – GUNANUSA JOINT VENTURE, MUMBAI. - PETROTHAI TOTAL BONGKOT - GUNANUSA

VI. ELECTRIC SUBMERSIBLE PUMP RENTAL / WELL TESTING:

ESP REFERENCE CUSTOMERS:

1. ELNUSA WELL SERVICE

VII.REMANUFACTURING OBSOLETE EQUIPMENT (PUMP, ENGINE GEAR BOX) INCLUDE REVERSE ENGINEERING PATTERN WORK, CASTING AND MACHINING

Page 6: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

Economic Analysis Numerous studies have indicated that the “Farr” plunger lasts from 2.46 to 5.98 times Top barrel

connecter Creator of the “Farr” plunger

longer than a standard conventional API plunger. For this economic analysis, let’s be

Your pull conservative and only use a factor of 4 times rod

Assumptions and facts for study. Farr No-go (stop to Ave. Production / Well = 20 BOPD protect plunger on Crude Oil Price = $50.00 / barrel upstroke)

Well Pulling Costs = $3,000 / well API top Pump Repairs = $1,000 / repair plunger connecter Farr Cost over Conv. = - $400 / repair Farr plunger Ave. Down Time = 4 days / well leading edge (taper) We do not ma

Ave. Increase in Run Life = 4 times pump your wells. We make them better.Conventional API plunger Savings Due to Farr Plunger Farr plunger Well Pulling Cost: ($3,000 x 3 ) = $ 9,000 Inside this brochure is a

Down Time: (4 days x 20 bopd x $50 x 3) = $12,000 Farr

Typical Pump Repair Cost: ($1,000 x 3 ) = $ 3,000 rod connecting Case Study in Venezuela with

Cost difference for Farr : (Average ) = - $ (400) PDVSA (government owned oil company). Costs Savings per Well = $ 23,600 Farr Connecter (bottom)

How Do You ….. Muth Pump LLC. Cut well pulling costs?

Traveling 13905 Romero Ave. Valves Increase (longer) pump life? Bakersfield,CA. 93314-9336 USA Increase pump efficiency? Sole Agent: Pump barrels Reduce down time?

PT. Pasifik Timur Energindo Reduce pump repairs? Jln. Haji Amil 28A, Buncit Raya, Jakarta 12740 Eliminate stuck plungers?

StandingValves

Only One Answer: United States Patent # 6,543,543 Canadian Patent # 2,201,497 Venezuela Patent Pending # 489-98 Indonesia Patent Pending # W00200102376 Old Conventional New Style "Farr" The “Farr” Plunger

API Plunger Plunger

UPCO DE VENEZUELA S.A. Case Study for PDVSACLIENT PDVSA-WEST FARR TEST RESULTSFIELDS TIAJUANA - LAGUNILLAS - BACHAQUERO Date 6/27/2005

Total run DaysField Well Installation Start date Ending date for # of times Average run Farr Final Reason Improvement

time for conv.

days more

conv. & start for all Conv. pulled for between Current or less Test well was of Farr over Conv. pulling over

data date for Farr pumps run time Date pulled Conventional pumps Conv. Conv. Tia Juana LSE-4591 313-4 12/20/2000 1/24/2002 400 6 67 144 77 6/17/2002 Note 3 2.16

Bachaquero LB-0486 313-5 2/15/2001 2/2/2002 352 6 59 190 131 7/28/2002 Note 2 3.24Tia Juana LSJ-3613 313-6 5/6/2001 2/7/2002 268 2.5 107 39 -68 3/18/2002 Note 1 0.36Tia Juana LSJ-4963 313-7 6/19/2001 2/8/2002 234 3 78 33 33 3/13/2002 Note 2 0.42Lagunillas LS-4619 2374 7/1/2001 7/26/2002 390 6 65 101 36 11/4/2002 Note 3 1.55

Bachaquero LB-1166 35-1-3/8 12/23/1995 5/8/2002 572 4 143 1146 1003 3/8/2003 8.01 LSE-

Tia Juana 4164 35 1-1/4 8/13/2001 5/9/2002 265 5 53 1145 1092 3/9/2003 21.60Lagunillas LS-5078 1036 4/16/2001 10/27/2002 559 6 93 974 881 8/27/2003 10.45

Total 3040 38.5 665 3772 3185

5.98 Average 83 472

Note 1 Traveling valves stuck open with sand (not pumping). Yield 82% Note 2 Well filled with sand Note 3 Friction ring destroyed, pump not seated. Savings due to the use of the Farr plunger $105,000.00

This case study indicates an increase in average run time of almost 6 times.

Farr Plunger Connecters Farr Plunger Leading Edge (Taper) API & Farr

All “Farr” plungers are manufactured in an API machine shop to API standards under the conditions set forth in API publication Q1 and API Spec 11AX.

47.81

Page 7: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

PASSIVE FIRE PROTECTION SPRAY UNITS

Page 8: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

TEAM APPLICATORS ON THE JOB

Page 9: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan

Selamat Datang di

PT Pasifik Timur Energindo Anggota Gratis

PT Pasifik Timur Energindo

Indonesia

Depan

Info Perusahaan

Hubungi Kami

Penawaran Dagang [3]

Penawaran Beli [1]

Penawaran Kerjasama [2]

Katalog Produk [5]

CABLE BAND STAINLESS STEEL 316 3/ 4" x22" x0.030"

Sand Resistant Pump Plunger [ tahan pasir]

Pompa

FLARING EQUIPMENT -JOHNZINK

Cost Saving Plunger Pump

Bagi pengalaman anda Menulis tinjauan

Kenalkan ke teman Anda

Bahasa

English

Indonesia

(Gambar)

Negara Asal:Harga:CaraPembayaran:Jumlah:Kemas &Pengiriman:Keterangan:

Kenalkan ke teman Anda

Kerjasama: CHARTEK 7, applicator [email protected]

Netherlands AntillesNego

Transfer Bank (T/T)

20 set

20Kg /Pail

Pemasok Bahan Chartek 7Kami bisa mensupply atau memasang/ aplikasi dengan tarifper mtr square x ketebalan dlm milimeter tergantung tempat,darat, laut dan sikon.

Korespondensi Perusahaan Nama:E-mail:

Tn. Subono Anwar / Abd Gani [Direktur/CEO/Manajer Umum] [email protected] / [email protected]

Pesan Instan penergindo

Nomer HP: Nomer Telpon: Nomer Faks: Alamat:

+62 815 890 6136/ +62 812 8492396 +62-21-790 2770 +62-21-799 3435 Jln. Haji Amil no.28a Buncit Raya Jakarta 12740, Indonesia

Page 10: VISION & MISSION - ptenergi.comptenergi.com/files/CompanyProfile.pdf · VISION & MISSION Vision ... Field Office Web Site E-Mail VAT Registration No. Bank Management ... Menulis tinjauan