Initial Expedition Training Some basic knowledge to enable you to enjoy outdoor activities safely.
Vision For Sport To design a Dynamic and leading edge Sports Facility to enable University staff,...
-
Upload
katherine-fraser -
Category
Documents
-
view
212 -
download
0
Transcript of Vision For Sport To design a Dynamic and leading edge Sports Facility to enable University staff,...
Vision For Sport
“ To design a Dynamic and leading edge Sports Facility to enable University staff,
students and members of the public to enjoy involvement in sports to the ‘extent of their
abilities and interests “.
• Level 04
• Level 03
• Level 02
• Level 01
DEVELOPMENT OF DESIGN
The Design was developed from the already designated brief.
The structure relates to the site and follows the contours of the ground. The plan is developed on 4 levels and the form of the
building is evolved from the functional requirements of the Sports Centre and University Street
DEVELOPMENT OF DESIGN
UNIVERSITY STREET
SPORTS HALLS
SWIMMING POOL
• MAIN ACCESS & CIRCULATION • CAFÉS• RETAIL
• INFORMATION
• ACTIVITY AREAS• FITNESS• SOCIAL
• ADMINISTRATION
• CHANGING• ASSOCIATED AREAS
• POOL HALL • CLIMBING WALL
University Street - Circulation
• University Street goes West
• Main Access to Sports Centre at Level 03
• Access from existing parking and bus service
and Garthdee Road
• University Street goes East
• Stair & Lift from Level 03to • University Street at Level 02
Sports Centre - Circulation
• Fire Exit 01
• Main Entrance Concourse
• Lift
• Fire Exit 02
• Main Access Stair
University Street
• Coffee shop
• Potential retail units• Landscaped Zone
• Protected Environment
• Access to Sports Centre
• Campus Focus point
• Central Meeting/ Information Area
Visualisations of University Street
Visualisations ofCirculation Area inSports Hall
Sports Centre - Main Hall
Main Hall
• Range of Sports
Badminton & Short Tennis
Basketball
Gymnastics
5-a-side Football
Handball
Indoor Hockey
Korfball
Netball
Volleyball
Sports Hall Athletics
Cricket
• Range of Activities
Conferences
Educational
Entertainment
Lectures
Exhibitions
Sports Centre - Activity Halls
• Range of Sports
Fencing
Judo
Karate
Keep Fit
Aerobics
Movement & Dance
Yoga
Table Tennis
Meetings
Exhibitions
Receptions
Lectures
Examinations
• Range of ActivitiesActivity ?
Activity ?
Activity ?
Activity ?
Sports Centre - Fitness Area
Fitness
• CARDIOVASCULAR
Rowing Machines
Step Machines
Running Machines
Exercise Bikes
Cross Exerciser
• RESISTANCE
Weights
Leg Press
Shoulder Press
Chest Press
Leg Extension
• FITNESS ASSESSMENT
Sports Centre - Swimming Pool
SwimmingPool
Exercise
Training
Pleasure
Teaching
Sports Centre - Social Area
SocialArea
Socialising
Receptions
Meetings
Exhibitions
Sports Centre - Climbing Wall
ClimbingWall
Recreation
Training
Exhibition
Sports Centre - Offices, Sports Injury Clinic, Sport Shop ?
Reception
Offices
Sports Injury
Sport Shop ?
Sports Centre - Changing Areas
ChangingAreas
Sports Centre - Plant/ Storage
Plant &Storage Areas
Complete Sports Centre
& University Street
MainHall
Activity
Activity
Activity
Activity
UNIVERSITYSTREET
Social
Fitness
OfficesSports Injury
Swimming Pool
Changing
ClimbingWall
BUDGET COSTS Total Development
BUDGET COSTS
CONSTRUCTION
FEES (15%)
FURNITURE/ EQUIPMENT
VAT (17.5%)
£5,630,000
£844,500
£400,000
£1,203,037
£8,077,537
Diagrammatic Programme Complete Project
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Jan Feb Mar Apr May Jun Jul Aug
• client consultation
• appoint & brief
design team
• Detail Design
Structural/ Services Design
Specification/ Billing Information
Building Warrant
• Price
Tender Documents
• Consider
Tenders
• A
PP
OIN
T C
ON
TR
AC
TO
R• Contractor
Lead-in period
• CONTRACT PERIOD ( 13 MONTHS)
• Building
Commission
• P
roje
ct O
pen