March 2017 Update Virginia's Phase III Watershed Implementation Plan (WIP) Update: Local Engagement Program for the Chesapeake Bay Clean Up In light of the strong emphasis on local engagement for the Phase III WIP, Virginia has developed and begun implementing a local engagement program that will continue throughout the Phase III WIP development process and beyond. The components of the local engagement program include: Ongoing meetings of the Chesapeake Bay Stakeholder Advisory Group (SAG). This group is comprised of representatives of the agricultural, conservation, development and industrial communities as well as representatives of local governments and soil & water quality conservation districts. The state will be providing updates to this group and eliciting their comments on all aspects of Phase III WIP planning, including the local engagement program. Outreach to local government, soil & water conservation district and stakeholder association meetings to provide continuous updates throughout the Phase III WIP process. Initial regional outreach meetings to local governments and soil & water conservation districts throughout the Chesapeake Bay Watershed portion of the state (currently on-going). Facilitated work sessions for local governments, soil & water conservation districts and stakeholders. These work sessions will involve training on the various tools available for the development and prioritization of pollutant reducing strategies and how to report Best Management Practices (BMPs). On-going assistance to local governments and stakeholders and outreach. For more information, visit the webpage below or contact Joan Salvati at [email protected],(804) 698- 4230. http://www.deq.virginia.gov/Programs/Water/ChesapeakeBay/ChesapeakeBayTMDL.aspx DEQ Office of Water Supply Update: Virginia Water Withdrawal Reporting Regulation: DEQ appreciates the assistance of the VASWCD and Districts as we continue to register farms to report water withdrawals. DEQ is wrapping up 2016 withdrawal data collection and QA/QC. Program Contacts for Withdrawal Reporting: Tammy Stephenson: [email protected], (540) 562-6828 Sara Jordan: [email protected], (540) 574-7901 Potomac River Basin-Wide Comprehensive Water Resources Plan: The Interstate Commission on the Potomac River Basin (ICPRB) is developing a water resources plan for the entire Potomac basin which stretches across parts of four states (Maryland, Pennsylvania, Virginia and West Virginia) as well as the District of Columbia. Stakeholder participation is essential for the successful development and implementation of the plan. ICPRB has established an advisory committee, comprised of about two dozen diverse stakeholders representing various interests and geographic regions. The third advisory committee meeting was held on March 2, 2017. In addition to the advisory committee, the ICPRB maintains a "Keep Informed" list that will have opportunity to comment on the plan and receive updates about the Potomac Comprehensive Plan process as milestones are achieved. To join the effort, contact [email protected] at ICPRB and request to be added to the “Keep Informed” list for the basin-wide plan.

Transcript of Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of...

Page 1: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

March 2017 Update

Virginia's Phase III Watershed Implementation Plan (WIP) Update:

Local Engagement Program for the Chesapeake Bay Clean Up

In light of the strong emphasis on local engagement for the Phase III WIP, Virginia has developed and begun

implementing a local engagement program that will continue throughout the Phase III WIP development process

and beyond. The components of the local engagement program include:

Ongoing meetings of the Chesapeake Bay Stakeholder Advisory Group (SAG). This group is comprised of

representatives of the agricultural, conservation, development and industrial communities as well as

representatives of local governments and soil & water quality conservation districts. The state will be providing

updates to this group and eliciting their comments on all aspects of Phase III WIP planning, including the local

engagement program.

Outreach to local government, soil & water conservation district and stakeholder association meetings to

provide continuous updates throughout the Phase III WIP process.

Initial regional outreach meetings to local governments and soil & water conservation districts throughout the

Chesapeake Bay Watershed portion of the state (currently on-going).

Facilitated work sessions for local governments, soil & water conservation districts and stakeholders. These

work sessions will involve training on the various tools available for the development and prioritization of

pollutant reducing strategies and how to report Best Management Practices (BMPs).

On-going assistance to local governments and stakeholders and outreach.

For more information, visit the webpage below or contact Joan Salvati at [email protected],(804) 698-

4230.

http://www.deq.virginia.gov/Programs/Water/ChesapeakeBay/ChesapeakeBayTMDL.aspx

DEQ Office of Water Supply Update:

Virginia Water Withdrawal Reporting Regulation:

DEQ appreciates the assistance of the VASWCD and Districts as we continue to register farms to report water

withdrawals. DEQ is wrapping up 2016 withdrawal data collection and QA/QC.

Program Contacts for Withdrawal Reporting:

Tammy Stephenson: [email protected], (540) 562-6828

Sara Jordan: [email protected], (540) 574-7901

Potomac River Basin-Wide Comprehensive Water Resources Plan:

The Interstate Commission on the Potomac River Basin (ICPRB) is developing a water resources plan for the entire

Potomac basin which stretches across parts of four states (Maryland, Pennsylvania, Virginia and West Virginia) as

well as the District of Columbia. Stakeholder participation is essential for the successful development and

implementation of the plan. ICPRB has established an advisory committee, comprised of about two dozen diverse

stakeholders representing various interests and geographic regions. The third advisory committee meeting was

held on March 2, 2017. In addition to the advisory committee, the ICPRB maintains a "Keep Informed" list that

will have opportunity to comment on the plan and receive updates about the Potomac Comprehensive Plan

process as milestones are achieved. To join the effort, contact [email protected] at ICPRB and request to be

added to the “Keep Informed” list for the basin-wide plan.

Page 2: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

The Groundwater Withdrawal Regulation (9 VAC 25-610-10 et seq.) requires a permit for withdrawals in a

groundwater management area of over 300,000 gallons in a month of groundwater. With the knowledge that

there likely are groundwater users who withdrawal enough to require a permit but have not applied, the DEQ is

initiating a Compliance Assistance Framework. The Framework applies to all unpermitted users in the Eastern

Groundwater Management Area (GWMA) and the Eastern Shore GWMA who submit an application and permit fee (no

fee for agricultural withdrawals) for a new Groundwater Withdrawal Permit between April 1st

, 2017 and December 15,

2017. After December 15, 2017, any unpermitted groundwater users withdrawing more than 300,000 gallons in any

one month may be subject to compliance and enforcement actions.

Program Contacts for the Compliance Assistance Framework:

Ryan Green: [email protected], 804-698-4258

Erinn Tisdale: [email protected], 804-698-4066

Virginia Nonpoint Source Program Update:

DEQ Watershed Program Contacts:Regional TMDL Nonpoint Source Coordinators:Valley Regional Office (VRO), Harrisonburg: [email protected], (540) 574-7850Northern Regional Office (NRO), Woodbridge: [email protected], (703) 583-3835Blue Ridge Regional Office (BRO), Roanoke: [email protected], (540) 562-6738Piedmont Regional Office (PRO), Glen Allen: [email protected], (804) 527-5058Southwest Regional Office (SWRO), Abingdon: [email protected], (276) 676-4803Tidewater Regional Office (TRO), VA Beach: [email protected], (757) 518-2153

Central Office (CO):Liz McKercher, Watershed Program Manager: [email protected], (804) 698-4291Nicole Sandberg, 319(h) Grant Manager: [email protected], (804) 698-4043Lars Bolton, NPS Grant and Data Coordinator: [email protected], (804) 698-4006Ram Gupta, TMDL Coordinator, [email protected], (804) 698-4184Ashley Wendt, TMDL Implementation Analyst, [email protected], (804) 698-4042

Current Water Quality Improvement Fund ProjectsProject Sponsor Project Title

Culpeper SWCD Expanding Culpeper SWCD Residential On-Site Septic Cost Share Program

Middle Peninsula PlanningDistrict Commission

Middle Peninsula Septic Repair Program

Newport News (City) Deep Creek Shoreline Restoration

Newport News (City) Richneck Regional Water Quality Retrofit and Flood Control

Shenandoah Valley SWCD Rockingham County Septic Assistance Program

Thomas Jefferson SWCD Thomas Jefferson Regional Residential Septic System Management Program:Building on a Targeted Approach

Town of White Stone Install Central Sewer to Replace Failing Drainfields

Virginia Department of Mines,Minerals and Energy

Elkins Branch Landslide Emergency

Current 319(h) TMDL Implementation ProjectsSponsor (DEQ Region) Project Area

Culpeper SWCD (NRO) Upper Rapidan RiverUpper Hazel RiverUpper York RiverUpper Robinson & Little Dark Run

Evergreen SWCD (SWRO) Upper Middle Fork Holston River

Hanover Caroline SWCD (PRO) Chickahominy River

Headwaters SWCD (VRO) Middle River

Page 3: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

New River SWCD (SWRO) Chestnut Creek

Peter Francisco SWCD (CO) Slate River and Rock Island Creek (1)Slate River and Rock Island Creek (2)

Piedmont SWCD (PRO) Spring Creek Et Al Watershed Residential SepticFlat and Nibbs Creek

Shenandoah Valley (VRO) Linville Creek

Tazewell SWCD & Upper TN RiverRoundtable (SWRO)

Upper Clinch River

Thomas Jefferson SWCD (VRO) Hardware RiverTye River

Tri-County Action Agency (BRO) Lower Banister River

Virginia Tech (BRO) Stroubles Creek

Pending 319(h) TMDL Implementation ProjectsSponsor (DEQ Region) Project/Project Area

Lord Fairfax SWCD (VRO) Livestock Exclusion

Holston River SWCD (SWRO) Livestock ExclusionNorth Fork Holston - Washington County

Clinch Valley SWCD (SWRO) Livestock Exclusion

Big Walker SWCD (SWRO) Livestock Exclusion

Culpeper SWCD (NRO) Upper Hazel River TMDLUpper York River TMDL

Chesapeake Bay Foundation(VRO)

South River and Christians Creek

Natural Bridge SWCD (VRO) Buffalo, Colliers Creek

Blue Ridge SWCD (BRO) Blackberry Creek and Smith River

LENIWISCO PDC (SWRO) North Fork Holston - Scott County

TMDL implementation projects support agricultural, residential septic and urban BMP activities in impairedwatersheds. They are supported mainly by Federal 319(h) funds, but some have received supplemental statefunding from either the Water Quality Improvement Fund or the Virginia Natural Resources Commitment Fund.DEQ reports annually on progress in TMDL implementation watersheds. Final progress reports are posted to:

http://www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/TMDL/TMDLImplementation/TMDLImplementationProjects.aspx

The 2016 progress reports will be posted after EPA approval. Two reports pending approval, the Lower Banisterand the Stroubles Creek, follow:

Page 4: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

A = Acres, F = Linear Feet, S = System,

Control Measure Units Goal In-stalled %

Agricultural

Stream Exclusion Fencing F 322 18 6

Stream Exclusion Fencing S 633,600 56,710 9

Vegetated Buffer A 55 35 64

Reforestation of Pasture A 155 1 <1

Permanent Vegetative Cov-er on Cropland A 160 155 97

Manure Storage S 2 0 0

Residential Septic

Septic Tank Pump-out S 300 8 3

Septic System Repair S 92 0 0

Septic System Installation S 33 0 0

Alternative Waste Treat-ment System S 2 0 0

Table 1: Lower Banister River Watershed

BMP Summary July 2013—June 2016

The Virginia Nonpoint Source Management Program: The Virginia NPS Management Program is managed by the Virginia Department of

Environmental Quality (DEQ) and is funded, in part, through grants from the U.S. Environmental Protection Agency, under the Clean Water Act

Section 319(h). For more information regarding Virginia’s Nonpoint Source Management Program, please visit us on the web at: http://

www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/NonpointSourcePollutionManagement.aspx . An electronic copy of

this report can be found here: http://www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/TMDL/

TMDLImplementation/TMDLImplementationProjects.aspx General NPS Program questions? email: [email protected]

LOWER BANISTER RIVER WATERSHED

Project Location and Background

The Banister River watershed is located in the Roanoke River Basin in Pittsylvania and Halifax Counties, Virginia. The watershed is approxi-mately 197,913 acres in size, and land use is predominantly forested and hay/pasture. The Lower Banister River and its tributaries (Sandy and Polecat Creeks) were listed as impaired on Virginia’s 1996 Section 303(d) Total Maximum Daily Load (TMDL) Priority List and Report due to violations of the State’s Water Quality Stand-ards for fecal coliform bacteria. The Banister River TMDL was completed in September 2007, and a TMDL implementation plan was complet-ed for the watershed in October 2012. The im-plementation project started in July 2013.

Implementation Highlights

The Lower Banister River TMDL residential septic implementa-tion project, which covers only the Halifax County portion of the implementation watershed, is administered by Tri-County Com-munity Action Agency (TCCAA) in partnership with Halifax Soil and Water Conservation District (HSWCD, District) and Virginia Cooperative Extension. The HSWCD also administers an agricul-tural cost-share program throughout the watershed. The table on the left shows project-specific BMPs implemented from July 2013 – June 2016 in addition to overall implementation goals for the project area. This project focuses specifically on imple-menting residential septic BMPs and agricultural BMPS from work with the District .

The residential program generated interest early on in the pro-ject. Radio public service announcements resulted in a number of septic pump-outs. This particular project area is very chal-lenging in that it is very rural, making it difficult to inform the public about the septic funding opportunity. Many residents tend to be lower-income and elderly. Additionally, many resi-dents do not travel often or have internet access.

Page 5: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

Period Pathogens

(Coliform) (CFU) Nitrogen (lbs/year)

Phosphorus (lbs/year)

Sedimentation (tons/year)

July 2013-June 2016 2.38E+15 11,493 2,370 2,386

Water Quality Monitoring Results

Water quality data collected by DEQ for the period of 2010 through 2016 were analyzed to determine the impact of BMPs implemented in the project area on E. coli violation rates and associated long-term trends, if any, in water quality improvements. The bar graph to the right shows the percent violation rate for samples collected annually at monitor-ing station 4ABAN039.76, which did not meet the water quality standard of 235 cfu/100 mL. The number of samples collected each year is shown above each bar. The linear regression fitted to the data shows a poten-tially decreasing trend in violation rates over the sampling period, indicating possible improvements in water quality in Lower Banister River.

For More Information Please Contact:

James Moneymaker, DEQ - TMDL NPS Coordinator,

[email protected], (540) 562-6738

William J. Coleman, Tri-County Community Action Agency.

[email protected], (434) 575-7916, ext. 224

LOWER BANISTER RIVER WATERSHED

Implementation Highlights— Continued

TCCAA distributed information packets and brochures to local churches. Community volunteers also distributed materials to residents and organizations in the project area. Indoor Plumbing Rehabilitation Program (IPR) funding has been utilized as match on some repair projects. Leveraging funds from the IPR program has enabled some citizens to participate who may not have been able to afford the out-of-pocket expense. Other challenges include misinformation regarding the cost of septic pump-outs, some residents thinking the program is only for low-income citizens, and citizens being interested but unable to participate because their property falls outside of the TMDL implementation area. Pollution reductions are sum-marized below. Table 2: Pollution Reductions for

Lower Banister River Watershed:

July 2013—June 2016

0%

10%

20%

30%

40%

50%

60%

70%

2010 2011 2012 2013 2014 2015 2016

E.

Co

li V

iola

tio

n R

ate

%

Sample Year

Lower Banister River (4ABAN039.76) E.coli % Violation Rates: E. Coli Standard

6

6

6 6 6

6

3

Graph 1: E. coli data for

Lower Banister River

(Station 4ABAN039.76) for

2010-2016

Page 6: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

The Virginia Nonpoint Source Management Program: The Virginia NPS Management Program is managed by the Virginia Department of

Environmental Quality (DEQ) and is funded, in part, through grants from the U.S. Environmental Protection Agency, under the Clean Water Act

Section 319(h). For more information regarding Virginia’s Nonpoint Source Management Program, please visit us on the web at: http://

www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/NonpointSourcePollutionManagement.aspx . An electronic copy of

this report can be found here: http://www.deq.virginia.gov/Programs/Water/WaterQualityInformationTMDLs/TMDL/

TMDLImplementation/TMDLImplementationProjects.aspx General NPS Program questions? email: [email protected]

STROUBLES CREEK WATERSHED

Project Location and Background

The Stroubles Creek watershed is located in the New River Basin in Montgomery County, Virginia. The headwaters of the Stroubles Creek originate in the northeastern part of the town of Blacks-burg, flowing in a generally southwestern direc-tion. The Upper Stroubles Creek watershed con-tributing to the impaired section of the creek is 6,119 acres in size, and land use is mainly urban/ residential (46%), forested (28%), pasture (21%), and cropland (5%). The urban and residential area is mainly in the northeastern (upstream) section of the watershed, and the forested area is mainly downstream in the southwestern cor-ner of the watershed. Stroubles Creek was listed as impaired on Virginia’s 1996, 1998, and 2002 Section 303(d) Total Maximum Daily Load (TMDL) Priority List and Re-ports due to violations of the State’s General Standard (benthic). The Benthic TMDL for Stroubles Creek was completed in 2003. A stressor analysis performed during TMDL development identified sediment as the primary stressor causing the aquatic life use impairment in the creek. A TMDL implementation plan was completed in 2006, and implementation projects were active from 2006 through 2014 through efforts of local partners, without Section 319(h) funding. The TMDL IP was revised in 2014, and a 319(h)-funded implementation project started in May 2014.

Table I: Stroubles Creek BMP Summary: June 2006 – June 2016

Control Measure Units Goal In-

stalled %

Agricultural

Stream Exclusion Fencing F 13,937 9,260 66

Riparian Forest Buffer A 30 4 13

Urban/Residential Stormwater

Infiltration Trench Retrofits CF 55.386 0 0

Urban Riparian Forest Buffer S 7 1 13

Infiltration BMPs S 10 0 0

Additional Bioretention BMPs

S 12 1.1 9

Stream Channel

Stream channel restoration F 6,881 6,336 92

Adopt-A-Stream cleanup F N/A 6,336 N/A

A =Acres, S =System, F = Feet, CF = Cubic Feet

Implementation Highlights

The Stroubles Creek TMDL implementation pro-ject is administered by the Virginia Tech Biologi-cal Systems Engineering (BSE) Department, Blacksburg, Virginia. The Section-319(h)-funded grant did not start until May 2014; prior to that, Virginia Tech and partners worked on imple-menting BMPs listed in the TMDL IP. The De-partment was contracted to manage the 319(h) grant and provide technical assistance and edu-cational outreach to watershed residents, land-owners, and other stakeholders for agricultural, stormwater, and stream channel BMP imple-mentation. The table on the right shows BMP implementation since the implementation plan was completed in 2006 (continued on page 2)

Page 7: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

STROUBLES CREEK WATERSHED

Implementation Highlights— Continued

Implementation is summarized since 2006 even though the section 319(h) grant project did not begin until May 2014. Be-tween IP completion and December 31, 2013, a number of agricultural and stormwater management BMPs were com-pleted in the Stroubles Creek watershed. These BMPs include two stormwater pond stabilization projects, six bioretention ponds and a bio-cell, an infiltration trench, 1.3 miles of stream restoration, 9,260 linear feet of livestock exclusion fencing, 0.22 miles of tree planting along retention ponds, forested buffer along one mile of stream length, and an Adopt-A-Stream program for 1.2 miles of the creek. Between May 2014 and June 2016, several stormwater management and agricultural BMPs were completed as part of this project. Three bioretention cells to treat runoff from roofs and parking lots were installed at an apartment complex. A data transmission system was completed to route data au-tomatically through the existing StREAM Lab wireless system. Additionally, monthly water quality sampling and monitoring of precipitation and stream flow were conducted. One live-stock exclusion practice was completed totaling 1,200 linear feet of fencing and 600 linear feet of pipeline to connect a frost-proof trough. In addition, a total of 4.5 acres of riparian buffer were installed inside the livestock exclusion area. A second riparian buffer planting consisting of 440 bareroot hardwood seedlings was completed downstream of StREAM Lab. To showcase completed BMP projects and local partnerships, BSE created a project website: http://stroubles.weebly.com. A story map is also under development; it will exhibit 319(h)-funded BMPs as well as BMPs installed by the Town of Blacks-burg. Further, BSE is planning a watershed module for high school students. And two student organizations at Virginia Tech adopted a section of Stroubles Creek at StREAM Lab through the Virginia Department of Conservation and Recrea-tion (DCR) Adopt-a-Stream Program. Pollutant reductions from BMP installations are not included at this time and will be included in the closeout report that will be completed after the project ends March 2017.

Photo 1 (Top Right): Location of stormwater biocells; Photo 2

(Middle Right) Large bioretension cell; Photo 3 (Lower Right) Small

bioretension cell.

Page 8: Virginia's Phase III Watershed Implementation Plan (WIP ... · Chesapeake Bay Watershed portion of the state (currently on-going). ... Tidewater Regional Office (TRO), VA Beach: Kristie.Britt@deq.virginia.gov,

STROUBLES CREEK WATERSHED

Water Quality Monitoring Results

DEQ monitors water quality at several stations throughout the Stroubles Creek. Water quality data collected were ana-lyzed to determine the impact of BMPs implemented in the project area on the biological conditions, bacteria (E. coli) levels and associated long-term trends, if any, in water quality conditions. The bar graph to the right shows the per-cent violation rate for samples collected annually from 2004-2010 at monitoring sta-tion 9-STE007.29, which did not meet the water quality standard of 235 cfu/100 mL. The number of samples collected each year is shown above each bar. The linear regres-sion fitted to the data shows possible in-creasing trend in bacteria violation rates over the sampling period, indicating a possi-ble decline in water quality of Stroubles Creek. Note that the sampling period oc-curred before the Stroubles Creek imple-mentation project but after other activities had occurred in the watershed. The Virginia Stream Condition Index (VSCI) is used to designate biological impairment of a stream. Streams with VSCI scores greater than 60 are considered non-impaired, whereas streams scoring less than 60 are considered impaired. The biological water quality samples collected at monitoring sta-tion 9-STE007.29 in the spring and fall sea-sons of 2001 and 2015 were analyzed for VSCI scores and the results are shown in the graph below. The number above each bar shows the VSCI score. Though VSCI scores remain below the water quality standard of 60, monitoring over a longer period of time with consistent trends is needed to corrobo-rate water quality changes.

For More Information Please Contact:

James Moneymaker, DEQ TMDL NPS Coordinator, [email protected], (540) 562-6738

Dr. Cully Hession, PhD., PE, CED, Biological Systems Engineering, Virginia Tech , [email protected]

Graph 1 (Top Right): DEQ E.coli monitoring data from 2004-2010 for Stroubles Creek (9-STE007.29). Graph 2 (Bottom Right): DEQ

Biological monitoring data from 2001-2015 in Stroubles Creek (9-STE007.29)