Verona Area High School · 12/15/2019 · Verona Area High School December 13 th, 2019 The top...
Transcript of Verona Area High School · 12/15/2019 · Verona Area High School December 13 th, 2019 The top...
QUESTIONS? Please contact Project Manager Aaron Zutz at 608.441.6891 or [email protected]
DID YOU KNOW? The largest indoor stage is found at the Grand Sierra Resort Theater located in Reno, Nevada which has almost a full acre of usable space. The stage was able to fit a smaller-than-full scale mockup of a jetliner for one of its productions!
Above: The Wrestling room resilient flooring in the finishing stages this wee. Rolls of resilient flooring wasrolled out while the bricks are placed on the seams flattenout the flooring. The photo below shows the recently installed goalposts at the endzones of the football field!
Verona Area High School
Specialty Flooring
There has been amazing amount of progress the past couple of
weeks at the New Verona Area High School as the finishes
continue throughout the whole building! Up on level 3, the lab
casework and the final paint have been completed! In the library,
lights, carpet, and ceiling tile are all in the process of being
installed. In the kitchen and serving area the polished concrete has
been completed and ceiling grid is being installed. Over in the
Pool Area, the dividing glass wall otherwise called curtainwall
between the two pools has been installed and the slab on grade
was poured for half of the competition pool. Over in the
Performing Arts Center the stage sub-floor has been completed
and the rigging is ongoing. Over in the fieldhouse the resilient
flooring is completing on the first floor and the sub floor has
started in the fieldhouse! Over at the football field, the goalposts
have been installed at the endzones!
Coming up we have the topping slab on grade pour in the atrium,
the lab casework will be complete on level two, and the pool area
will begin to be painted!
The Past Week:
• Athletic flooring has begun in the Fieldhouse
• Performing Arts Center Stage sub-floor complete
• Pool curtainwall installed
• Kitchen polished concrete
Coming Up in the Week Ahead:
• Level two lab casework
• Ceiling grid and tile in the Art
• Atrium slab on grade pour
December 13th, 2019
QUESTIONS? Please contact Project Manager Aaron Zutz at 608.441.6891 or [email protected]
Verona Area High School
December 13th, 2019
Left: Epoxy flooring has been installed throughout the first floor in the tech ed area. Below is a view of inside the fieldhouse. The plywood has all been delivered and will start to be installed. Three layers of plywood will be installed throughout the whole fieldhouse. Bottom: wood finishes have started to be installed in the performing Arts Center.
The photo at the top is the recently completed polished concrete in the serving area. The photo above is a picture of recently installed sinks, soap and paper towel dispensers in the lower level fieldhouse locker room.
QUESTIONS? Please contact Project Manager Aaron Zutz at 608.441.6891 or [email protected]
Verona Area High School
December 13th, 2019
The top left photo is a view of the library with its carpet and ceiling tile installation well under way! The top right photo is a view of the divider curtainwall that was installed in the pool area. The photo on the bottom left is a view in a bathroom where the toilet partitions are being installed in the Fieldhouse. Finally, the photo below is of the completed sub-floor that was installed on the stage, as the final flooring will be installed after finishes are complete.