Veracious infra pvt ltd corporate profile

29
1 Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved VERACIOUS INFRA PVT LTD. Build for the Future CORPORATE PROFILE

description

Rechristened in July-2013 as Veracious Infra Pvt Ltd from Holyplast Packaging Pvt Ltd estd in 1997, to be a strong, multifaceted, multi-disciplinary and vibrant organization, committed to delighting our customers at Construction projects through innovations. We strive to achieve the highest degree of technical excellence while maintaining the finest standards of business practices in all our present and forth coming endeavors. It is this trait that will attract the most talented people to associate with our company.

Transcript of Veracious infra pvt ltd corporate profile

Page 1: Veracious infra pvt ltd corporate profile

1

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

VERACIOUS INFRA PVT LTD.

Build for the Future

CORPORATE PROFILE

Page 2: Veracious infra pvt ltd corporate profile

2

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Introduction

Rechristened in July-2013 as Veracious Infra Pvt Ltd from Holyplast Packaging Pvt Ltd estd in 1997, to be a

strong, multifaceted, multi-disciplinary and vibrant organization, committed to delighting our customers at

Construction projects through innovations.

We strive to achieve the highest degree of technical excellence while maintaining the finest standards of business

practices in all our present and forth coming endeavors. It is this trait that will attract the most talented people

to associate with our company.

We seek to build this organization by bringing in combination of old relationships and new energy into the

organization. All the stakeholders who have joined with us in our journey and those who keep joining the family

are a standing testimony of our beliefs.

Veracious Infra is equipped to cater to a range of specifications from

-Engineering to Food and Beverages,

-Oil & Chemical to Warehousing,

-Solid Waste to Hospitality,

-Foundry to Healthcare,

-Steel to Automobile and Commercial complexes etc.

Be it a General Contract or a Turn Key contract , we are geared to cater to Design & Build, Build to Suit sign-Ups,

nationwide.

Strong teamwork, dedication and sheer hard work is our motto

Page 3: Veracious infra pvt ltd corporate profile

3

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Vinod is the Managing Director and founder of Veracious group. He possess over 20 years of experience in the management, analysis design, review and construction of significant projects across PAN India. He has extensive experience in project team leadership on a variety of engineering projects including structures in steel, Reinforce concrete, Roads etc. His past role include Project and Site Management for Mahan Hindalco Industries , M/s Colgate Palmolive (India) Ltd, INBISCO, M/s Hindustan Coca Cola Beverage pvt Ltd, M/s Hindustan Unilever, M/s Ashok Leyland, M/s Keihin Fie Pvt Ltd, Simplex infra. Vinod is respected for “ his hands” on team leadership and for his innovative and effective solutions. His meticulous attention to detail ,excellent communication skills, and proven track record is what made him rise through ranks very quickly . In 2013, Vinod decided it was the natural progression to start his own company.it has grown to where it is today from hardwork , commitment and excellent workmanship , from small projects to high value Contracts.

Contact Details: Vinod K Singh +91 9760053001

Email: [email protected]

Page 4: Veracious infra pvt ltd corporate profile

4

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Our People

We expect our employees to achieve highest standard of professionalism in all they do and

we undertake to treat them fairly and deserve.Veracious offers substantial scope for personal development in support of both the

goals of the business and individual career aspirations.

Customers and Suppliers

We continue to actively develop mutually beneficial relationships with all those with whom we do business.We regularly review our business process with a view to improving quality

and productivity ,thereby enhancing our ability to create value ,whilst at the same time working to achieve the aspirations of sustainable development . In support of this , all

areas of the business are encouraged to innovate and share knowledge in the pursuit of a continual drive for excellence.

Page 5: Veracious infra pvt ltd corporate profile

5

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Values “Excellence” for us means to raise the bars against bench marks.

“Transparency” for us means diversity of opinion with respect & trust. “Innovation” for us means to embrace, nurture & support creativity.

“Integrity” for us means to practice high ethical standards.

Vision To set benchmarks in Quality, Economy and Speedy Delivery.

To set high standards in Safety. To be the preferred employer in the industry

Mission The VIPL strives to beat the deadlines, rather than meeting them through detailed

planning, meticulous execution, and optimum technological support with most stringent wastage control of all the resources: Material, Machinery, Manpower as well as Time.

To set high standards for safety, both of our employees as well as the environment. To recruit, develop and retain competent employees through training, empowerment,

rewards and growth for everyone who is a part of Veracious infra. .

Page 6: Veracious infra pvt ltd corporate profile

6

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

SAFETY HEALTH & ENVIRONMENT Veracious Infra is strongly committed to the promotion of safe working practices in the Construction of Civil Engineering Projects; at par with the best practices of the Construction Industry. Company Standard Safety Procedure- -Making employees aware of safe work practices and healthy attitude towards Safety. -Planning safety in advance to carry out the work in safe manner. -Ensuring that safety confirms to specific objectives. Auditing safety practices to verify conformity with approved policies, procedures and applicable jurisdictional regulations. -Taking into account safety attitudes and past safety records when selecting Project Personnel. -Incorporating the Company’s Safety Procedures with those of Clients and Jurisdictional Authorities when preparing site specific Safety and Accident Prevention Programs.

At Veracious Infra we consider Quality of output as a natural consequence of the meticulousness in every step that precedes. Quality begins in the minds of all. It travels the continuum from the conception of a project to its final delivery. Environment, Health & Safety Policy Environment, Health and Safety are treated as an integral element of Construction Management and hence Safety, Quality and Productivity shall go hand in hand. It is our target to achieve the highest standards of Health and Safety, and to effectively control all risks that could result in accidental and incidental loss. All employees of the VIPL are required to: -Follow defined procedures with self discipline and work safely at all times. -Encourage safe behavior among their colleagues. -Participate actively in safety programmes and put the acquired knowledge into practice. -Take appropriate actions to protect air, water, animal and plant life. Consequently we aspire to attain high standards. through a process of continuous improvement and the adoption of Indian Codes and Standards where practicable.

All employees of the VIPL are required to:

Follow defined procedures with self discipline and work safely at all times.

Encourage safe behavior among their colleagues.

Participate actively in safety programmes and put the acquired knowledge into practice.

Take appropriate actions to protect air, water, animal and plant life.

Consequently we aspire to attain high standards.

through a process of continuous improvement and the adoption of Indian Codes and Standards where practicable.

Page 7: Veracious infra pvt ltd corporate profile

7

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

.

Our Management Team

-

- The business is driven by 4 working directors.

They are involved in the business

development,procurement, project

Management and administration of the

company.

- The management team proactively gathers

feedback identifies changes in business

environment, reviews work processes and

communicates key learning and company

policy to all staff at regular meetings.

-

Our Organization Structure

Our Quality Policy

At Veracious Infra we consider Quality of output

as a natural consequence of the meticulousness

in every step that precedes. Quality begins in

the minds of all. It travels the continuum from

the conception of a project to its final delivery

We are continually evaluating and improving

the level of service we offer our clients to

ensure reputation for quality on which we pride

ourselves is maintained and grown.

Our quality management system provides

systematic process and system for long term

quality control.

Identify measures to achieve the required

quality as set by our Client including

construction method.

Ensuring Continuous improvement in the

process correcting any potential quality

deficiencies that may arise.

Our Quality system is an integral part of our

existing management process which sets high

standards of cooperation required by all

members of staff to ensure that the quality of

service we provide to our clients is second to

none.

We, at Veracious Infra, are committed to satisfy our customers and society by achieving excellence in our quality of work.

Page 8: Veracious infra pvt ltd corporate profile

8

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

GEOGRAPHICAL REACH VERACIOUS INFRA

Page 9: Veracious infra pvt ltd corporate profile

9

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

SCOPE OF SERVICES

VERACIOUS INFRA

Page 10: Veracious infra pvt ltd corporate profile

10

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

SCOPE OF SERVICES

VERACIOUS INFRA

Page 11: Veracious infra pvt ltd corporate profile

11

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CLIENTS- CURRENT & PAST PROJECTS

VERACIOUS INFRA (CURRENT)

- Ashokleyland, Alwar Design and built of PEB Structure only and associated Civil Work for (Rajasthan) Warehouse facility 7mn

- Hindustan Coca Cola Beverages A brown field project enhancing the capacity (West Bengal) by adding a 720BPM high speed PET line 100 Cr

- Simplex Infrastructure, : Area Grading at Suratgarh (Rajasthan) Super Critical Thermal Plant in Rajasthan . 100 Cr

PAST PROJECTS- DIRECTOR

- Mahan Hindalco : Aluminium Plant: Carbon Plant, Cast House at Singhrauli for Hindalco Industries

- M/s Colgate-Palmolive(India)Ltd : Construction of Turbo Project at Baddi , Himachal

- Hindustan Unilever limited : Construction of Soap Plant

- Keihin Fie Pvt Ltd, Chakan Pune: Construction of Carburator plant

- M/s Ashokleyland : Civil and External Services Works at Pantnagar ,Uttarakhand

- Tata Bluescope Steel Bhiwadi Civil and Electro –Mech works on single point responsibility for Factory Building and other facilities for Roll and Frame Fabrication Plants

- M/s INBISCO India Sanand Ahmedabad: Green Field project Manufacturing Unit at Sanand GIDC Phase II, Gujarat.

- Hindustan Zinc Limited Melting and Casting facility at Pantnagar, Uttarakhand

Page 12: Veracious infra pvt ltd corporate profile

12

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Not every milestone has to be the "big" . In fact, the more mundane the milestone is the more useful it may be to the project manager in gauging whether the project is on track or whether adjustments need be made to the schedule. Although less exciting than the pinnacle milestone, typical milestones usually recognize the completion of an important deliverable such as the Recource planning, or the hiring of essential personnel.

However, these commonplace milestones are important in advancing the project to the next level and should be given their due acknowledgment. The strategy behind project planning typical milestones is to ensure that the little things do not fall through the cracks that could end up leading to project failure.

Below are Milestones achieved by Director (Past Project) ( Ashok Leyland and Mahan Hindalco )

Milestone Achieved- Director

Page 13: Veracious infra pvt ltd corporate profile

13

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

“Bringing relevant and current experience to all sectors of the construction industry,

We offer a comprehensive and complete solutions for construction services:

BE CONFIDENT WITH VERACIOUS

Page 14: Veracious infra pvt ltd corporate profile

14

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

.

Errection in Progress

CO

NS

TR

UC

TIO

N A

CT

IVIT

IES

IN P

RO

GR

ES

S

Page 15: Veracious infra pvt ltd corporate profile

15

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Construction process At Veracious, we believe that the success of any

project commences with the understanding individual

strength and the formation of a compatible ,

committed and well structured construction team that

understands the requirements and anticipated

outcomes.

Consideration is also given to to the construction

teams ability to function collaboratively within project

control group.

We have all formalized many management processes

into our quality assurance systems inorder to better

integrate and transfer information between disciplines

and group. The Management process commence with

the understanding the works , the achievable

timeframes and the conditions under which the work

are performed. To achieve this we perform the

following activities prior to commencing with the

tender preparation.

- Site Inspection report

- Formal review of the documentation with our

estimating and construction staff.

- Preperation of tender programme to ensure

that the process is tracked and the anticipated

deadlines are managed.

- Construction programme is prepared by

the construction team to fully

comprehend the timeframes, critical

activities, and their interrelationships.

Once the work are procured through tender or

negotiation, we immediately undertake a

through risk analysis and prepare

comprehensive construction programme.

Detailed scope of works are agreed and letting

contract commences according to the critical

path and risk requirements.

Weekly internal and subcontract meeting are

held where timeframes are discussed, problem

resolved, Health and Safety ,Environment and

quality matters are also discussed and

minuted.Our project Manager attends all site

meetings to ensure that we achieve our clients

expectations and that we establish lasting and

valuable relationship.

For Construction, accurate field data including

surveying and soil information is necessary for

the successful of infrastructure project.

Veracious site operations provide experienced

staffing , under the guidance of licenced

professional engineers and surveyors. Team

includes

- Project Manager

- Civil Engineers

- Structural Engineers

- Quality Engineers

- Planning Engineers

- Quantity Surveyors

- QA/ QC

- Safety Officer/Supervisors

- Supervisors

- Foreman

- Store & HR

- Workers

a veniam.

Page 16: Veracious infra pvt ltd corporate profile

16

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

VE

RA

CIO

US

CO

NS

TR

UC

TIO

N

Page 17: Veracious infra pvt ltd corporate profile

17

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CIVIL ENGINEERING INDUSTRIAL

M/s Hindustan Coca Cola Beverage, SILIGURI

300 KLRCC Water Tank work, Coke Siliguri

Project Name Hindustan Coca Cola Beverages

A brown field project enhancing the capacity by

adding a 720BPM high speed PET line

Location: Siliguri, West Bengal

Project Cost 100 Cr.

Civil & Structural : 14 Cr

Consultant Name Semac , Hyderabad

Completion Period

Civil & Structural Virtual Completion by Nov 14

Commissioning of Plant: Feb’15

Location Siliguri, West Bengal

SELECTED CURRENT

PROJECTS (IN HAND)

VIPL

Page 18: Veracious infra pvt ltd corporate profile

18

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

SELECTED CURRENT

PROJECTS (IN HAND)

VIPL

Page 19: Veracious infra pvt ltd corporate profile

19

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CIVIL ENGINEERING EARTH WORK

M/s SIMPLEX INDIA

Site Grading and Land Development works for proposed plant at Suratgarh , Super critical thermal plant, Phase-II under JV with National earth movers pvt ltd, for SIMPLEX india Ltd in Rajasthan.

Project Name Area Grading SIMPLEX India Ltd at Suratgarh Super Critical Thermal Plant in Rajasthan

Project Cost (INR Million)

17 Cr

Consultant Name BHEL

Completion Date February 15

Location Suratgarh, Rajasthan

SELECTED CURRENT

PROJECTS (IN HAND)

VIPL

Page 20: Veracious infra pvt ltd corporate profile

20

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CIVIL ENGINEERING Design and Built of PEB Structure

M/s Ashok Leyland, Alwar

Project Name Design and built of PEB Structure

and associated Civil Work for Warehouse facility

Project Cost (INR Million)

07MN

Completion Date IN PROGRESS

Location Alwar, Rajasthan

SELECTED CURRENT

PROJECTS (IN HAND)

VIPL

Design and built of PEB Structure and associated Civil Work for Warehouse facility

Page 21: Veracious infra pvt ltd corporate profile

21

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CIVIL ENGINEERING INDUSTRIAL

HINDALCO INDUSTRIES, SINGHRAULI

Carbon-ABF Sub Station, Singhrauli Madhya Pradesh

Carbon Area, Singhrauli Madhya Pradesh

Project Name Civil & External Services Works at Pantnagar ,

Uttarakhand for Ashokley Land Pantnagar,

Uttarakhand

Project Cost

(INR Million)

2000.00+

1000.00

Consultant Name M/s Sijcon Consultants

Completion Date Year 2010-2013

Location Rudrapur, Uttarakhand

Project Name Aluminium Plant: Carbon Plant, Cast House at

Singhrauli for Hindalco Industries

Consultant Name Engineers India

Completion Date Year 2010-2012

Location Singhrauli, Madhya Pradesh

SELECTED PAST PROJECTS

( DIRECTORS PROFILE)

Page 22: Veracious infra pvt ltd corporate profile

22

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Cast House-Internal View, Singhrauli Madhya Pradesh

Carbon-Compressor House –South East View, Singhrauli Madhya Pradesh

SELECTED PAST PROJECTS

( DIRECTORS PROFILE)

Page 23: Veracious infra pvt ltd corporate profile

23

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Cast House- South West View, Singhrauli Madhya Pradesh

Miscellaneous Area-Laboratory Building, Singhrauli Madhya Pradesh

SELECTED PAST PROJECTS

( DIRECTORS PROFILE)

Page 24: Veracious infra pvt ltd corporate profile

24

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Pre Engineering Building-MEW & VMW, Singhrauli Madhya Pradesh

Township-Operator Hostel, Singhrauli Madhya Pradesh

SELECTED PAST PROJECTS

( DIRECTORS PROFILE)

Page 25: Veracious infra pvt ltd corporate profile

25

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

6.5m High Seamless Furnace RCC Wall, Singhrauli Madhya Pradesh

Furnace Wall Shuttering, Singhrauli Madhya Pradesh

SELECTED PAST PROJECTS

( DIRECTORS PROFILE)

Page 26: Veracious infra pvt ltd corporate profile

26

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CIVIL ENGINEERING INDUSTRIAL

M/s Hindustan Coca Cola Beverage, Bangalore

Project Name Hindustan Coca Cola Beverages

Design & Construction of Green Field Project . Manufacturing unit in Bidadi Industrial Area , Bangalore , Karnataka.

Completion Period

May 13 to Dec13 (07 mnths)

Location Bidadi, Bangalore

SELECTED PAST PROJECTS ( DIRECTORS PROFILE)

Page 27: Veracious infra pvt ltd corporate profile

27

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

CONSTRUCTION SUPPLY LIST OF EQUIPMENT OWNED

Name of the Machinery Description Qty Condition

Concrete Machinery

1 RM 800 Mixer ( RD Mixer ) 1 Good Running

2 10/7 Mixer 2 Good Running

3 Bar Bending Machine 2 Good Running

4 Bar Cutting Machine 2 Good Running

5 Weigh Batcher 1 Good Running

6 Vibrator Petrol 4 Good Running

7 Vibrator Electrical 4 Good Running

8 Batching Plant 18-21 Cum/Hr 1 Good Running

9 DG Set 82.5 kva 1 Good Running

10 Transit Mixer 6 Cum 2 Good Running

11 Concrete Pump 1 Good Running

12 Mobile Tower Crane 1 Good Running

13 Tuff Rider 1 Good Running

14 Loader 1 Good Running

15 Concrete Boom Placer 1 Good Running

16 Loader 1 Good Running

Lab. Eqipments(Set) Lab. Eqipments 1 Good Running

Survey Equipments 1 Theodolite 1 Good Running

2 Auto level 2 Good Running

3 Total Station Good Running

Earth moving Machinery

1 Pocleins 210 3 Good Running

2 Hyva Dumper 10 Good Running

3 Road Roller Vibro 1 Good Running

4 Dozer 1 Good Running

5 Tractor with tanker 1 Good Running

Structural Steel Machinery

1 Hydra-14m & 10m boom 4 Good Running

2 Pick & Carry Crane (Farrana) 1 Good Running

3 Crane 40T 1 Good Running

4 Rectifier Welding Machines 20 Good Running

5 Pug Cutting 2 Good Running

6 Cutting torch set 5 Good Running

7 Slings & shackles Adequate Good Running

Page 28: Veracious infra pvt ltd corporate profile

28

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

Common Machinery Description Qty Condition

1 Compactor-EL 2 Good Running

2 Compactor-DL 2 Good Running

3 Diesel Water Pump 3 Good Running

4 Electric Motor- 1HP-5HP 2 Good Running

5 Lighting cables etc Adequate Good Running

6 DG Set 30 kva 1 Good Running

7 DG Set 15 kva 1 Good Running

8 Grinding Machine 2 Good Running

9 Drilling Machine 2 Good Running

10 DG Set 125 kva 1 Good Running

11 Hilti Machine 2 Good Running

Shuttering Material: Description Qty Condition

1 Acrow Props Set 3.00-5.00mtr 400 Good Running

2 Acrow Span Set 3.00 to 5.00mtr 250 Good Running

3 Couplers-Double Swivel /Fix Type 1250 Good Running

4 Cuplock Joint Pin 1500 Good Running

5 Cuplock Pipe-2.00Mtr(Horizontal) 1000 Good Running

6 Cuplock Pipe-1.50Mtr(Horizontal) 2500 Good Running

7 Cuplock Pipe-1.20Mtr(Horizontal) 2500 Good Running

8 Cuplock Pipe-3.00Mtr(Vertical) 750 Good Running

9 Cuplock Pipe-1.50Mtr(Vertical) 750 Good Running

10 Cuplock Pipe-2.00Mtr(Vertical) 250 Good Running

11 Cuplock Pipe-1.00Mtr(Vertical) 250 Good Running

12 Scaffolding Pipe 10ft 500 Good Running

13 Scaffolding Pipe 20ft 1000 Good Running

14 M.S.Shikanja 2′ 200 Good Running

15 M.S.Shikanja 3′ 300 Good Running

16 Shuttering Plate 3’x2′ 1000 Good Running

17 Ply & Wooden shuttering Adequate Good Running

18 Stirrup Head 450 x 36 mm 350 Good Running

19 Base Plates 150x150x6mm 350 Good Running

20 Wallforms 1200x500mm 500 Good Running

21 U Clamp 350 Good Running

22 M.S challi 100 Good Running

23 Clamps swivel & fixed 2000 Good Running

Page 29: Veracious infra pvt ltd corporate profile

29

Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved

COMPANY INFORMATION

VERACIOUS INFRA PVT LTD

Registration No:

Incorporation Date: 24th

July 2013

CONTACT ADDRESS:

48, CHANDITOLA BRANCH ROAD, ACHARJEE WHITE PLOT - 46, GROUND FLOOR, UDAYAN PARK KOLKATA - 700053 WEST BENGAL, INDIA Email - [email protected] REGIONAL OFFICE: Ward no. - 02, Krishna Colony, Transit Camp, City- RUDRAPUR, State- UTTARAKHAND, India

Principal Activities: Construction Work