Veracious infra pvt ltd corporate profile
description
Transcript of Veracious infra pvt ltd corporate profile
1
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
VERACIOUS INFRA PVT LTD.
Build for the Future
CORPORATE PROFILE
2
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Introduction
Rechristened in July-2013 as Veracious Infra Pvt Ltd from Holyplast Packaging Pvt Ltd estd in 1997, to be a
strong, multifaceted, multi-disciplinary and vibrant organization, committed to delighting our customers at
Construction projects through innovations.
We strive to achieve the highest degree of technical excellence while maintaining the finest standards of business
practices in all our present and forth coming endeavors. It is this trait that will attract the most talented people
to associate with our company.
We seek to build this organization by bringing in combination of old relationships and new energy into the
organization. All the stakeholders who have joined with us in our journey and those who keep joining the family
are a standing testimony of our beliefs.
Veracious Infra is equipped to cater to a range of specifications from
-Engineering to Food and Beverages,
-Oil & Chemical to Warehousing,
-Solid Waste to Hospitality,
-Foundry to Healthcare,
-Steel to Automobile and Commercial complexes etc.
Be it a General Contract or a Turn Key contract , we are geared to cater to Design & Build, Build to Suit sign-Ups,
nationwide.
Strong teamwork, dedication and sheer hard work is our motto
3
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Vinod is the Managing Director and founder of Veracious group. He possess over 20 years of experience in the management, analysis design, review and construction of significant projects across PAN India. He has extensive experience in project team leadership on a variety of engineering projects including structures in steel, Reinforce concrete, Roads etc. His past role include Project and Site Management for Mahan Hindalco Industries , M/s Colgate Palmolive (India) Ltd, INBISCO, M/s Hindustan Coca Cola Beverage pvt Ltd, M/s Hindustan Unilever, M/s Ashok Leyland, M/s Keihin Fie Pvt Ltd, Simplex infra. Vinod is respected for “ his hands” on team leadership and for his innovative and effective solutions. His meticulous attention to detail ,excellent communication skills, and proven track record is what made him rise through ranks very quickly . In 2013, Vinod decided it was the natural progression to start his own company.it has grown to where it is today from hardwork , commitment and excellent workmanship , from small projects to high value Contracts.
Contact Details: Vinod K Singh +91 9760053001
Email: [email protected]
4
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Our People
We expect our employees to achieve highest standard of professionalism in all they do and
we undertake to treat them fairly and deserve.Veracious offers substantial scope for personal development in support of both the
goals of the business and individual career aspirations.
Customers and Suppliers
We continue to actively develop mutually beneficial relationships with all those with whom we do business.We regularly review our business process with a view to improving quality
and productivity ,thereby enhancing our ability to create value ,whilst at the same time working to achieve the aspirations of sustainable development . In support of this , all
areas of the business are encouraged to innovate and share knowledge in the pursuit of a continual drive for excellence.
5
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Values “Excellence” for us means to raise the bars against bench marks.
“Transparency” for us means diversity of opinion with respect & trust. “Innovation” for us means to embrace, nurture & support creativity.
“Integrity” for us means to practice high ethical standards.
Vision To set benchmarks in Quality, Economy and Speedy Delivery.
To set high standards in Safety. To be the preferred employer in the industry
Mission The VIPL strives to beat the deadlines, rather than meeting them through detailed
planning, meticulous execution, and optimum technological support with most stringent wastage control of all the resources: Material, Machinery, Manpower as well as Time.
To set high standards for safety, both of our employees as well as the environment. To recruit, develop and retain competent employees through training, empowerment,
rewards and growth for everyone who is a part of Veracious infra. .
6
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
SAFETY HEALTH & ENVIRONMENT Veracious Infra is strongly committed to the promotion of safe working practices in the Construction of Civil Engineering Projects; at par with the best practices of the Construction Industry. Company Standard Safety Procedure- -Making employees aware of safe work practices and healthy attitude towards Safety. -Planning safety in advance to carry out the work in safe manner. -Ensuring that safety confirms to specific objectives. Auditing safety practices to verify conformity with approved policies, procedures and applicable jurisdictional regulations. -Taking into account safety attitudes and past safety records when selecting Project Personnel. -Incorporating the Company’s Safety Procedures with those of Clients and Jurisdictional Authorities when preparing site specific Safety and Accident Prevention Programs.
At Veracious Infra we consider Quality of output as a natural consequence of the meticulousness in every step that precedes. Quality begins in the minds of all. It travels the continuum from the conception of a project to its final delivery. Environment, Health & Safety Policy Environment, Health and Safety are treated as an integral element of Construction Management and hence Safety, Quality and Productivity shall go hand in hand. It is our target to achieve the highest standards of Health and Safety, and to effectively control all risks that could result in accidental and incidental loss. All employees of the VIPL are required to: -Follow defined procedures with self discipline and work safely at all times. -Encourage safe behavior among their colleagues. -Participate actively in safety programmes and put the acquired knowledge into practice. -Take appropriate actions to protect air, water, animal and plant life. Consequently we aspire to attain high standards. through a process of continuous improvement and the adoption of Indian Codes and Standards where practicable.
All employees of the VIPL are required to:
Follow defined procedures with self discipline and work safely at all times.
Encourage safe behavior among their colleagues.
Participate actively in safety programmes and put the acquired knowledge into practice.
Take appropriate actions to protect air, water, animal and plant life.
Consequently we aspire to attain high standards.
through a process of continuous improvement and the adoption of Indian Codes and Standards where practicable.
7
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
.
Our Management Team
-
- The business is driven by 4 working directors.
They are involved in the business
development,procurement, project
Management and administration of the
company.
- The management team proactively gathers
feedback identifies changes in business
environment, reviews work processes and
communicates key learning and company
policy to all staff at regular meetings.
-
Our Organization Structure
Our Quality Policy
At Veracious Infra we consider Quality of output
as a natural consequence of the meticulousness
in every step that precedes. Quality begins in
the minds of all. It travels the continuum from
the conception of a project to its final delivery
We are continually evaluating and improving
the level of service we offer our clients to
ensure reputation for quality on which we pride
ourselves is maintained and grown.
Our quality management system provides
systematic process and system for long term
quality control.
Identify measures to achieve the required
quality as set by our Client including
construction method.
Ensuring Continuous improvement in the
process correcting any potential quality
deficiencies that may arise.
Our Quality system is an integral part of our
existing management process which sets high
standards of cooperation required by all
members of staff to ensure that the quality of
service we provide to our clients is second to
none.
We, at Veracious Infra, are committed to satisfy our customers and society by achieving excellence in our quality of work.
8
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
GEOGRAPHICAL REACH VERACIOUS INFRA
9
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
SCOPE OF SERVICES
VERACIOUS INFRA
10
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
SCOPE OF SERVICES
VERACIOUS INFRA
11
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CLIENTS- CURRENT & PAST PROJECTS
VERACIOUS INFRA (CURRENT)
- Ashokleyland, Alwar Design and built of PEB Structure only and associated Civil Work for (Rajasthan) Warehouse facility 7mn
- Hindustan Coca Cola Beverages A brown field project enhancing the capacity (West Bengal) by adding a 720BPM high speed PET line 100 Cr
- Simplex Infrastructure, : Area Grading at Suratgarh (Rajasthan) Super Critical Thermal Plant in Rajasthan . 100 Cr
PAST PROJECTS- DIRECTOR
- Mahan Hindalco : Aluminium Plant: Carbon Plant, Cast House at Singhrauli for Hindalco Industries
- M/s Colgate-Palmolive(India)Ltd : Construction of Turbo Project at Baddi , Himachal
- Hindustan Unilever limited : Construction of Soap Plant
- Keihin Fie Pvt Ltd, Chakan Pune: Construction of Carburator plant
- M/s Ashokleyland : Civil and External Services Works at Pantnagar ,Uttarakhand
- Tata Bluescope Steel Bhiwadi Civil and Electro –Mech works on single point responsibility for Factory Building and other facilities for Roll and Frame Fabrication Plants
- M/s INBISCO India Sanand Ahmedabad: Green Field project Manufacturing Unit at Sanand GIDC Phase II, Gujarat.
- Hindustan Zinc Limited Melting and Casting facility at Pantnagar, Uttarakhand
12
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Not every milestone has to be the "big" . In fact, the more mundane the milestone is the more useful it may be to the project manager in gauging whether the project is on track or whether adjustments need be made to the schedule. Although less exciting than the pinnacle milestone, typical milestones usually recognize the completion of an important deliverable such as the Recource planning, or the hiring of essential personnel.
However, these commonplace milestones are important in advancing the project to the next level and should be given their due acknowledgment. The strategy behind project planning typical milestones is to ensure that the little things do not fall through the cracks that could end up leading to project failure.
Below are Milestones achieved by Director (Past Project) ( Ashok Leyland and Mahan Hindalco )
Milestone Achieved- Director
13
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
“Bringing relevant and current experience to all sectors of the construction industry,
We offer a comprehensive and complete solutions for construction services:
BE CONFIDENT WITH VERACIOUS
14
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
.
Errection in Progress
CO
NS
TR
UC
TIO
N A
CT
IVIT
IES
IN P
RO
GR
ES
S
15
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Construction process At Veracious, we believe that the success of any
project commences with the understanding individual
strength and the formation of a compatible ,
committed and well structured construction team that
understands the requirements and anticipated
outcomes.
Consideration is also given to to the construction
teams ability to function collaboratively within project
control group.
We have all formalized many management processes
into our quality assurance systems inorder to better
integrate and transfer information between disciplines
and group. The Management process commence with
the understanding the works , the achievable
timeframes and the conditions under which the work
are performed. To achieve this we perform the
following activities prior to commencing with the
tender preparation.
- Site Inspection report
- Formal review of the documentation with our
estimating and construction staff.
- Preperation of tender programme to ensure
that the process is tracked and the anticipated
deadlines are managed.
- Construction programme is prepared by
the construction team to fully
comprehend the timeframes, critical
activities, and their interrelationships.
Once the work are procured through tender or
negotiation, we immediately undertake a
through risk analysis and prepare
comprehensive construction programme.
Detailed scope of works are agreed and letting
contract commences according to the critical
path and risk requirements.
Weekly internal and subcontract meeting are
held where timeframes are discussed, problem
resolved, Health and Safety ,Environment and
quality matters are also discussed and
minuted.Our project Manager attends all site
meetings to ensure that we achieve our clients
expectations and that we establish lasting and
valuable relationship.
For Construction, accurate field data including
surveying and soil information is necessary for
the successful of infrastructure project.
Veracious site operations provide experienced
staffing , under the guidance of licenced
professional engineers and surveyors. Team
includes
- Project Manager
- Civil Engineers
- Structural Engineers
- Quality Engineers
- Planning Engineers
- Quantity Surveyors
- QA/ QC
- Safety Officer/Supervisors
- Supervisors
- Foreman
- Store & HR
- Workers
a veniam.
16
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
VE
RA
CIO
US
CO
NS
TR
UC
TIO
N
17
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CIVIL ENGINEERING INDUSTRIAL
M/s Hindustan Coca Cola Beverage, SILIGURI
300 KLRCC Water Tank work, Coke Siliguri
Project Name Hindustan Coca Cola Beverages
A brown field project enhancing the capacity by
adding a 720BPM high speed PET line
Location: Siliguri, West Bengal
Project Cost 100 Cr.
Civil & Structural : 14 Cr
Consultant Name Semac , Hyderabad
Completion Period
Civil & Structural Virtual Completion by Nov 14
Commissioning of Plant: Feb’15
Location Siliguri, West Bengal
SELECTED CURRENT
PROJECTS (IN HAND)
VIPL
18
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
SELECTED CURRENT
PROJECTS (IN HAND)
VIPL
19
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CIVIL ENGINEERING EARTH WORK
M/s SIMPLEX INDIA
Site Grading and Land Development works for proposed plant at Suratgarh , Super critical thermal plant, Phase-II under JV with National earth movers pvt ltd, for SIMPLEX india Ltd in Rajasthan.
Project Name Area Grading SIMPLEX India Ltd at Suratgarh Super Critical Thermal Plant in Rajasthan
Project Cost (INR Million)
17 Cr
Consultant Name BHEL
Completion Date February 15
Location Suratgarh, Rajasthan
SELECTED CURRENT
PROJECTS (IN HAND)
VIPL
20
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CIVIL ENGINEERING Design and Built of PEB Structure
M/s Ashok Leyland, Alwar
Project Name Design and built of PEB Structure
and associated Civil Work for Warehouse facility
Project Cost (INR Million)
07MN
Completion Date IN PROGRESS
Location Alwar, Rajasthan
SELECTED CURRENT
PROJECTS (IN HAND)
VIPL
Design and built of PEB Structure and associated Civil Work for Warehouse facility
21
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CIVIL ENGINEERING INDUSTRIAL
HINDALCO INDUSTRIES, SINGHRAULI
Carbon-ABF Sub Station, Singhrauli Madhya Pradesh
Carbon Area, Singhrauli Madhya Pradesh
Project Name Civil & External Services Works at Pantnagar ,
Uttarakhand for Ashokley Land Pantnagar,
Uttarakhand
Project Cost
(INR Million)
2000.00+
1000.00
Consultant Name M/s Sijcon Consultants
Completion Date Year 2010-2013
Location Rudrapur, Uttarakhand
Project Name Aluminium Plant: Carbon Plant, Cast House at
Singhrauli for Hindalco Industries
Consultant Name Engineers India
Completion Date Year 2010-2012
Location Singhrauli, Madhya Pradesh
SELECTED PAST PROJECTS
( DIRECTORS PROFILE)
22
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Cast House-Internal View, Singhrauli Madhya Pradesh
Carbon-Compressor House –South East View, Singhrauli Madhya Pradesh
SELECTED PAST PROJECTS
( DIRECTORS PROFILE)
23
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Cast House- South West View, Singhrauli Madhya Pradesh
Miscellaneous Area-Laboratory Building, Singhrauli Madhya Pradesh
SELECTED PAST PROJECTS
( DIRECTORS PROFILE)
24
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Pre Engineering Building-MEW & VMW, Singhrauli Madhya Pradesh
Township-Operator Hostel, Singhrauli Madhya Pradesh
SELECTED PAST PROJECTS
( DIRECTORS PROFILE)
25
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
6.5m High Seamless Furnace RCC Wall, Singhrauli Madhya Pradesh
Furnace Wall Shuttering, Singhrauli Madhya Pradesh
SELECTED PAST PROJECTS
( DIRECTORS PROFILE)
26
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CIVIL ENGINEERING INDUSTRIAL
M/s Hindustan Coca Cola Beverage, Bangalore
Project Name Hindustan Coca Cola Beverages
Design & Construction of Green Field Project . Manufacturing unit in Bidadi Industrial Area , Bangalore , Karnataka.
Completion Period
May 13 to Dec13 (07 mnths)
Location Bidadi, Bangalore
SELECTED PAST PROJECTS ( DIRECTORS PROFILE)
27
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
CONSTRUCTION SUPPLY LIST OF EQUIPMENT OWNED
Name of the Machinery Description Qty Condition
Concrete Machinery
1 RM 800 Mixer ( RD Mixer ) 1 Good Running
2 10/7 Mixer 2 Good Running
3 Bar Bending Machine 2 Good Running
4 Bar Cutting Machine 2 Good Running
5 Weigh Batcher 1 Good Running
6 Vibrator Petrol 4 Good Running
7 Vibrator Electrical 4 Good Running
8 Batching Plant 18-21 Cum/Hr 1 Good Running
9 DG Set 82.5 kva 1 Good Running
10 Transit Mixer 6 Cum 2 Good Running
11 Concrete Pump 1 Good Running
12 Mobile Tower Crane 1 Good Running
13 Tuff Rider 1 Good Running
14 Loader 1 Good Running
15 Concrete Boom Placer 1 Good Running
16 Loader 1 Good Running
Lab. Eqipments(Set) Lab. Eqipments 1 Good Running
Survey Equipments 1 Theodolite 1 Good Running
2 Auto level 2 Good Running
3 Total Station Good Running
Earth moving Machinery
1 Pocleins 210 3 Good Running
2 Hyva Dumper 10 Good Running
3 Road Roller Vibro 1 Good Running
4 Dozer 1 Good Running
5 Tractor with tanker 1 Good Running
Structural Steel Machinery
1 Hydra-14m & 10m boom 4 Good Running
2 Pick & Carry Crane (Farrana) 1 Good Running
3 Crane 40T 1 Good Running
4 Rectifier Welding Machines 20 Good Running
5 Pug Cutting 2 Good Running
6 Cutting torch set 5 Good Running
7 Slings & shackles Adequate Good Running
28
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
Common Machinery Description Qty Condition
1 Compactor-EL 2 Good Running
2 Compactor-DL 2 Good Running
3 Diesel Water Pump 3 Good Running
4 Electric Motor- 1HP-5HP 2 Good Running
5 Lighting cables etc Adequate Good Running
6 DG Set 30 kva 1 Good Running
7 DG Set 15 kva 1 Good Running
8 Grinding Machine 2 Good Running
9 Drilling Machine 2 Good Running
10 DG Set 125 kva 1 Good Running
11 Hilti Machine 2 Good Running
Shuttering Material: Description Qty Condition
1 Acrow Props Set 3.00-5.00mtr 400 Good Running
2 Acrow Span Set 3.00 to 5.00mtr 250 Good Running
3 Couplers-Double Swivel /Fix Type 1250 Good Running
4 Cuplock Joint Pin 1500 Good Running
5 Cuplock Pipe-2.00Mtr(Horizontal) 1000 Good Running
6 Cuplock Pipe-1.50Mtr(Horizontal) 2500 Good Running
7 Cuplock Pipe-1.20Mtr(Horizontal) 2500 Good Running
8 Cuplock Pipe-3.00Mtr(Vertical) 750 Good Running
9 Cuplock Pipe-1.50Mtr(Vertical) 750 Good Running
10 Cuplock Pipe-2.00Mtr(Vertical) 250 Good Running
11 Cuplock Pipe-1.00Mtr(Vertical) 250 Good Running
12 Scaffolding Pipe 10ft 500 Good Running
13 Scaffolding Pipe 20ft 1000 Good Running
14 M.S.Shikanja 2′ 200 Good Running
15 M.S.Shikanja 3′ 300 Good Running
16 Shuttering Plate 3’x2′ 1000 Good Running
17 Ply & Wooden shuttering Adequate Good Running
18 Stirrup Head 450 x 36 mm 350 Good Running
19 Base Plates 150x150x6mm 350 Good Running
20 Wallforms 1200x500mm 500 Good Running
21 U Clamp 350 Good Running
22 M.S challi 100 Good Running
23 Clamps swivel & fixed 2000 Good Running
29
Corporate Profile Veracious Infra Pvt Ltd .Copyright. All Rights Reserved
COMPANY INFORMATION
VERACIOUS INFRA PVT LTD
Registration No:
Incorporation Date: 24th
July 2013
CONTACT ADDRESS:
48, CHANDITOLA BRANCH ROAD, ACHARJEE WHITE PLOT - 46, GROUND FLOOR, UDAYAN PARK KOLKATA - 700053 WEST BENGAL, INDIA Email - [email protected] REGIONAL OFFICE: Ward no. - 02, Krishna Colony, Transit Camp, City- RUDRAPUR, State- UTTARAKHAND, India
Principal Activities: Construction Work