Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer...
Transcript of Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer...
![Page 1: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/1.jpg)
www.vaughn.com.ng
![Page 2: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/2.jpg)
Who We Are 3
Our Vision 4
Our Mission 4
Our Values 6
Board & Management 7
Technical Partners 7
Our Services 8
Directional Surveying Services 8
Wireline Services 9
Slickline Services: 10
Coiled Tubing/pumping Services
For Pipelines & Oil/gas Wells 13
Valve & Wellhead Services 13
Supply Of Drilling Equipment & Accessories: 18
Procurement Services 19
Well Intervention/Slickline/Gyro Jobs done till date 20
Clients 27
TABLE OF CONTENTS
// PAGE 2
![Page 3: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/3.jpg)
WHOWE ARE
aughn Energy Services, a fast-growing indigenous Service VCompany in Nigeria was established in January 2011 to
provide Oilfield Services to the upstream sector of the
expanding Oil and Gas industry in Nigeria and the West Africa Coastal
region. The Government policies aimed at encouraging and ensuring
more participation by competent indigenous organisations in the
upstream Oil & Gas Industry has contributed to our growth process.
Vaughn Energy Services constantly markets innovative products &
solutions that will reduce cost, yet provide the true benefits of
reliability and uncomplicated design to meet our customers' needs.
Vaughn Energy Services Limited provides high quality Directional
Surveying, DD, MWD & LWD (real-time services), wireline/slickline, well
intervention, well testing (EPF/EWT), Coiled Tubing, Mudlogging,
wireline logging, Well Head Services and Procurement Services.
Emphasis is placed on quality of services, timely and cost-effective
service delivery and client relations extending beyond the well site.
Vaughn Energy Services Limited has done well over 200 jobs and
counting in the Nigeria Oil and Gas industry and the West Africa
Coastal region across International Oil Companies and Marginal Field
Operators. Vaughn's continuous stride for excellence, health safety
adhered practices, cost-effective, quality and timely job delivery are
attributes that makes her being continuously preferred in the industry.
// PAGE 3
![Page 4: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/4.jpg)
OURVISION
o be the ULTIMATE PARTNER OF CHOICE to our clients in Twellbore placement and productivity around the Niger Delta
and the Gulf of Guinea.
// PAGE 4
![Page 5: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/5.jpg)
OURMISSION
WE MAKE IT EASY for customers to do business.
We place your needs above our own. We earn your loyalty one job at a
time. We match the right crew to each assignment, and we hold
ourselves accountable to the highest standards of quality.
WE BUILD GREAT CAREERS by hiring and developing the best people.
We enable our personnel with a deep understanding of their operating
environment. Then we combine their knowledge with fit-for-purpose
technology to exceed the expectations of our customers. We always
find a way to succeed.
WE PIONEER NEW TECHNOLOGY to maximize the value we create for
our customers.
We are always looking for new ways to multiply our impact through
effective innovation and collaboration. Wherever feasible, we integrate
proprietary technology with partners' capabilities to achieve our
customer's goals.
Every CUSTOMER counts. Every EMPLOYEE counts. Every JOB
counts.
// PAGE 5
![Page 6: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/6.jpg)
OURVALUES
Safety: “We Live It”We design safety into every action we take. Safety is our most
important priority. We ensure that all our employees and those with
whom they work, perform their jobs in a safe manner. All employees
have a STOP work authority if they see an unsafe situation.
Integrity: “We Do the Right Thing”Doing the right thing requires honesty and truthfulness in all of our
corporate and individual actions. We employ professionals who can
always be counted on to do the right thing wherever they are.
Teamwork: “We Succeed Together”We work together, and we win together. Collaboration, communication
and openness are core to our culture of partnership. Teamwork brings
out the best in all of us. We practice it everywhere we go; from the rig,
to the customer's office, to our vendors, and home to our families.
Innovation: “We Are Redefining Wellbore Placement”
// PAGE 6
![Page 7: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/7.jpg)
BOARD &MANAGEMENT
he Board of Vaughn Energy comprises of well-placed Nigerians Twith extensive executive experience, manifesting in the
emergence of a preferred service provider.
The Management Team comprises of persons with direct experience in
the provision of Directional Drilling, MWD, Gyro Surveying and Electric
Wireline Logging services, in collaboration with its Foreign Technical
Partners who are world leaders in Gyro tools manufacturing and
Directional technology suite.
TECHNICALPARTNERS
Cetco Oilfield Services
Downhole Products, Aberdeen, UK.
Wireline Engineering.
Antares Datensysteme GmbH.
// PAGE 7
![Page 8: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/8.jpg)
OURSERVICES
DIRECTIONAL SURVEYING SERVICESIt is our commitment to provide our customers the accuracy of the well
path to minimize the well bore effect of inclination changes.
This can cause extreme dog leg severity and also affect the true
vertical depth (plus/minus) even while drilling with steerable bottom
hole assembly. This is a major obstacle in the production of the well
bore.
A directional survey by Vaughn Energy Services Limited will produce
very reliable data that pinpoints the exact position of a borehole or well
path. Our Gyro equipment is conveyed on electric line and slickline. The
main objective of any Vaughn directional survey is to save our client's
money by determining the optimal method of drilling a quality
wellbore, in the shortest time possible, under those specific
circumstances and in that particular environment.
Figure 1 Gyro Probe Figure 2 Survey Equipment
// PAGE 8
![Page 9: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/9.jpg)
Figure 3 E-Line Unit
With Vaughn directional survey, you can always expect extreme sensor accuracy
and outstanding data quality. This means that any downhole sensor problem can
be readily identified, and often fixed in real time without interrupting your
operations.
Our surveys are able to accurately model and predict critical factors such as
torque/drag, bit hydraulics, pressure loss output and coefficients of friction. And
to develop a viable directional drilling solution for your particular project, we
consistently consider design and environmental parameters such as offset well
performance, formation type, well plan trajectory and build requirements,
desired ROP, hoisting equipment limitations, MWD/LWD working requirements,
surface equipment limitations, and hole cleaning requirements.
WIRELINE SERVICES Vaughn Energy Services performs wireline services to set flow control on various
devices within an oil or gas well, as part of a clean-out process, or to place
instruments that will measure temperature and/or pressure to get a clearer
picture of the situation within the well. This is accomplished by running a single or
multi-strand wire into the well.
// PAGE 9
![Page 10: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/10.jpg)
The pressure control equipment used by Vaughn wireline services can withstand
the harsh extremes of pressure up to 15,000 pounds per square inch and
extremely high temperatures. It can also withstand the wide array of corrosive
substances that inhabit an oil or gas well. The pressure control equipment used
by Vaughn Energy Services comes in various sizes for various applications. Our
smallest unit can be used in a borehole as small as an inch and a half in diameter,
while our large units traverse holes as large as nine inches in diameter. Our
wireline services include but not limited to:
Production logging.
Cement Bond logging.
Pipe Recovery.
Setting Services.
Tubing perforation etc.
SLICKLINE SERVICES:Vaughn slickline services offer a wide range of quality services on land, swamp
and offshore locations with the use of truck mounted and portable wireline units.
OUR SLICKLINE SERVICES INCLUDE BUT NOT LIMITED TO: Subsurface data gathering services.
Tubing integrity check.
SCSSSV Change out .
Wax cutting services.
Sand bailing services.
Gaslift valve services.
Zone change services.
Swabbing services.
Fishing services.
// PAGE 10
![Page 11: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/11.jpg)
SUBSURFACE DATA GATHERINGAll downhole data gathering activities include (subsurface pressures and
temperatures, production logging and caliper surveys) and they have longer
impact on cash flow.
Direct measurement of subsurface pressures/temperatures is by use of
electronic gauges. We have down hole Electronic Gauges (quartz and piezo) The
survey consists of the determination of pressure/temperature gradients, static or
flowing and builds up, by taking gauge readings at intervals.
Figure 4 Electronic Downhole Memory Gauge
TUBING INTERGRITY CHECKTubing integrity check is used to establish that there are no leaks from the
connections of the tubing joints and also that the tools can get to its target depth
with ease.
A drift or gauge cutter run will establish that there are no hold up and tight spots
in the tubing. While pressure testing would reveal leaking joints. To pressure test
tubing, wireline plug is set in the nipple at the tubing tail and pressure applied
with a high-pressure pump.
// PAGE 11
![Page 12: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/12.jpg)
SCSSSV CHANGE OUT:All Subsurface Safety Valves are fail safe types. They will shut in the well in the
event surface control fails or becomes damaged. The valves are either flapper or
ball valve. Periodic test is required to ascertain the integrity of the valve in hole.
Valves that fail the test are pulled out and replaced with redressed ones from the
workshop.
We have Otis DK Ball valves and Camco Flapper valves.
WAX CUTTING SERVICES:Clearing of wax (paraffin or asphaltenes) from tubing is also an activity with
immediate impact on cash flow. Wax may be defined as organic deposit that
resists the flow/ production of crude oil. They are constituent of most crude oil.
The most common method of removing wax from tubing is by mechanical means
(scraper and cutter) or we also use hot oil services.
GASLIFT VALVE SERVICES:Gaslift is basically a system whereby relatively high-pressure gas is injected into
the tubing through the annulus to decrease the pressure gradient of the fluid
column and back pressure on the formation. The communication between the
tubing and annulus is through the Gaslift valves. We calibrate the live Gaslift
valves, remove the dummies and install the live Gaslift at intervals.
SWABBING:Swabbing is a form of “well control” that releases bottom hole pressure in order
to “kick” the well off. It is a process to remove liquids from the production zone of
a gas or oil well. Throughout the life of a well, liquids flow back with the natural
gas or oil as a well ages. If bottom-hole pressures are not enough to push the
liquids out of the well, production then falls off. The well must then be swabbed or
hydrostatic pressure must be reduced to maintain production.
// PAGE 12
![Page 13: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/13.jpg)
COILED TUBING/PUMPING SERVICES FOR PIPELINES & OIL/GAS WELLSVaughn Energy Services Limited is into pumping services and has a whole range
of pumping and other equipment for various oilfield pumping services. Vaughn
Energy Services Limited has experienced and well-trained engineers, technicians
and Pump operators to deliver superior service when it comes to oilfield pumping
services.
Our Pumping Services include the following:
· Coiled Tubing and Production enhancement services.
· Pumping and stimulation services.
· Well kill / well intervention services.
· Remedial cementing services.
· Pigging and pipeline support services.
· Intelligent pigging of small bore pipes / bulk lines.
· Filtration services.
· Wellbore Clean out services.
· Pre-commissioning of pipelines.
· Hydro testing / pressure testing of pipeline.
VALVE & WELLHEAD SERVICESVaughn Energy Services limited wellhead maintenance service is responsive to
changing operations and will ensure that your asset is maintained in accordance
with your standards and industry best practice. Our team of experts carry out
periodic inspection, function testing, repair and wellhead intervention services
for major oil producing companies. Our experiences and expertise in wellhead
cover various OEM wellheads, chokes, valves, Manifolds, BOP's such as Cameron,
FMC, Vetco Gray, Aker Kvaerner and Suzhou Douson products.
// PAGE 13
![Page 14: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/14.jpg)
PRODUCTS / SERVICES OFFERED1. First- and second-line wellhead maintenance, routine and non-routine.
2. Repair, Refurbishment and Installation of Wellhead equipment and
accessories.
3. Supply, installation and maintenance of OEM wellhead Equipment and
accessories.
4. Wellhead completions.
5. Tools rentals: Lubricators, X -Overs, Drilling Spools / Adapters, Running /
Retrieving tool for seal assembly and wear bushing / combination running
tools / test plug.
6. Repair, refurbishment and installation of chokes and valves.
7. Pneumatic / hydraulic Bolting services.
8. Supply of valves (gate, ball, globe, Butterfly, plug).
9. Supply, maintenance, repair of pneumatic and hydraulic actuators.
10. Design, fabrication, construction of wellhead control panels and Emergency
Shutdown System (ESD).
11. Large Stock of wellheads 5,000psi and 10,000psi series.
Some of our reliable equipment's are shown below:
Figure 5 Slickline Double drum portable Equipment
// PAGE 14
![Page 15: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/15.jpg)
Figure 6 Slickline Tools
Figure 7 Swab Tank
// PAGE 15
![Page 16: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/16.jpg)
Figure 8 Swab pump
Figure 9 Coiled Tubing
// PAGE 16
![Page 17: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/17.jpg)
Figure 10 Gate Valves
Figure 11 Well Heads
// PAGE 17
![Page 18: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/18.jpg)
WELL TESTING
At Vaughn Energy Services Limited, our Well Testing technique is carried out in
order to assess the true and full potential of the reservoir under dynamic
conditions.
We have a wide variety of well testing packages available for exploration and
appraisal operations through development and production campaigns, Vaughn
has the technology and the expertise to acquire accurate and reliable data,
knowing fully well that inaccurate data can lead to early depletion.
Figure 12 Seperator
// PAGE 18
Figure 13 ESD Valve
![Page 19: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/19.jpg)
// PAGE 19
PROCUREMENTSERVICES
Another important aspect of our service line is the procurement and
supply of equipment, machinery, spares, material and chemicals etc to
the energy, service and allied sectors of the Nigerian economy.
Vaughn sources products from local or international manufacturers or
their appointed representatives. This has sustained our growing
tradition of servicing every purchase order with very high quality and
standard products to the utmost satisfaction of our highly valued
clients.
We have well trained team with deep experience and understanding
of the local and international sourcing market and supply chain
management.
With track record of several successful project materials delivery for
our clients. Vaughn is a leader in providing turnkey procurement
solutions. We have selected suppliers and vendors who are passionate
for excellence and primarily focus on quality , schedule and price.
In summary, the procurement and supply department of Vaughn
Energy Services Limited focuses on the following lines of product:
Equipment Supply
Tools(manual and powered)
Valves
Pipes
Pumps
Materials and consumables
Chemicals
OCTG
Drill Bits
![Page 20: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/20.jpg)
// PAGE 20
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE FOR CHEVRON NIGERIA LIMITED
AND HERITAGE OIL LIMITED
CHEVRONCHEVRONCHEVRONCHEVRONHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSL
Meren-29Meren-30Meren-91HMeren-98HOLOMORO 30LOLOMORO 27LOLOMORO 16LOLOMORO 33LOLOMORO 26LOLOMORO 3LOLOMORO 15LOLOMORO 31LOLOMORO 10SOLOMORO 18LOLOMORO 28SOLOMORO 36SOLOMORO 37LOLOMORO 38LOLOMORO 39SOLOMORO 24SOLOMORO 35OLOMORO 19OLOMORO 12OLOMORO 25OLOMORO 34AFIESERE 4LAFIESERE 15TAFIESERE 11SAFIESERE 38LAFIESERE 26LAFIESERE 19TAFIESERE 29L
6,709ft4,678ft7,000ft5,978ft9590ft9840ft9600ft5136ft9600ft6900ft9400ft9400ft7800ft7700ft9400ft6900ft8700ft9400ft8300ft8500ft8300ft8600ft8500ft8800ft7200ft2100ft6500ft6400ft7000ft7100ft6600ft6700ft
COMPANY LOCATION DEPTH/FEET
![Page 21: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/21.jpg)
// PAGE 21
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE FOR CHEVRON NIGERIA LIMITED
AND HERITAGE OIL LIMITED
HEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSLHEOSL
AFIESERE 22LAFIESERE 28LAFIESERE 31LAFIESERE 30SAFIESERE 25TAFIESERE 8LAFIESERE 24TAFIESERE 37LAFIESERE 18TAFIESERE 20TAFIESERE 3LAFIESERE 14LAFIESERE 5LAFIESERE 13LAFIESERE 27SAFIESERE 2LAFIESERE 1LAFIESERE 36LAFIESERE 9SAFIESERE 21TAFIESERE 33SAFIESERE 22TAFIESERE 17SAFIESERE 41LAFIESERE 10TAFIESERE 7LAFIESERE 23LAFIESERE 12LAFIESERE 35SAFIESERE 39SAFIESERE 40S
8700ft6600ft8600ft6600ft6600ft6700ft6700ft6975ft6400ft6500ft6900ft6800ft7000ft7200ft6500ft4000ft6700ft7100ft6500ft6600ft5345ft6600ft5000ft7200ft5100ft5100ft6700ft8000ft6900ft4500ft2300ft
COMPANY LOCATION DEPTH/FEET
![Page 22: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/22.jpg)
// PAGE 22
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE TILL DATE
COMPANY DEPTH/FEET
SEPLAT
NPDC-OML 34AMT
SEPLAT
NPDC
NPDC
SEPLAT
NPDC
PLATFORM
SEPLAT
NPDC
NPDC/ND WESTERN
SEEPCO
NPDC/ND WESTERN
SEEPCO
NPDC/ND WESTERN
NPDC
NPDC/ND WESTERN
PLATFORM
PLATFORM
NPDC/ND WESTERN
NDPR
NPDC/ELCREST
NPDC/ND WESTERN
NDPR
SEPLAT
NPDC/ELCREST
MIDWESTERN
MIDWESTERN
SEPLAT
SEPLAT
MIDWESTERN
SEPLAT
NPDC
NPDC
NPDC/ELCREST
SEPLAT
SEEPCO
OVOHR 6ST
UGHELI EAST 39
OVOHR 6ST
UGHELI EAST 39
OREDO 17
OVHOR 20
UGHELI EAST 39
EGBAOMA 10
Ovhor 20
Ughelli East 40
UGHELLI EAST 35
AGU 27PH
UGHELLI EAST 35
OKW 78PH
UGHELLI EAST 6L
Abura 5st
UGHELLI EAST 36
EGBAOMA 4ST2
EGBAOMA 4ST2
UGHELLI EAST 36
OMERELU 2
GBE-04
UGHELLI EAST 37
OMERELU 2
SAPELE 33
GBE-4st
Umusadege 18
Umusadege 18
OVHOR 18
OVHOR 18ST
Umusadege 18
SAPELE 34
Oghareki 3
Oredo 16
GBE-05
SAPELE 35
IKAKI 1
LOCATIONYEAR
2020
2019
5963.40ft
366ft
5963.40ft
366ft
11355.81ft
455ft
11305.63ft
10562.71ft
8276.43ft
767.19ft
330ft
1354m
5300ft
1649.59m
9400ft
3463.56ft
340ft
7300ft
10687ft
10957.83ft
415ft
2115.44ft
3954.80ft
254.11ft
3246.51ft
629.89ft
4512.04ft
6044ft
393ft
9466ft
280ft
1067.95ft
480ft
3284.97ft
280ft
249.45m
![Page 23: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/23.jpg)
// PAGE 23
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE TILL DATE
COMPANY DEPTH/FEET
ELCREST
NDPR
NDPR
NDPR
SEEPCO
NDPR
NPDC/ND WESTERN
ELCREST
NDPR
NPDC/ND WESTERN
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
NPDC/ND WESTERN
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
NPDC/ELCREST
NDPR
HEOSL
HEOSL
HEOSL
HEOSL
NDPR
NDPC/ND WESTERN
OPUAMA 9
OGBELE 10
OGBELE 10
OGBELE 10
AGU 13
OGBELE 10
UGHELLI EAST 33
OPUAMA 10
OGBELE 10ST
UGHELLI EAST 33
OLOMORO 30L
OLOMORO 27L
OLOMORO 16L
OLOMORO 33L
OLOMORO 26L
OLOMORO 3L
OLOMORO 15L
OLOMORO 31L
OLOMORO 10S
OLOMORO 18L
OLOMORO 28S
OLOMORO 36S
OLOMORO 37L
OLOMORO 38L
UGHELLI EAST 34
OLOMORO 39S
OLOMORO 24S
OLOMORO 35
OLOMORO 19
OLOMORO 12
OLOMORO 25
OPUAMA 11
OGBELE 11
OLOMORO 34
AFIESERE 4L
AFIESERE 15T
AFIESERE 11S
OGBELE 11
UGHELLI EAST 34
LOCATIONYEAR
2018
3228.48ft
825ft
5937ft
553.76m
9219ft
5921.38ft
3493.92ft
9703ft
11064.55ft
9590ft
9840ft
9600ft
5136ft
9600ft
6900ft
9400ft
9400ft
7800ft
7700ft
9400ft
6900ft
8700ft
9400ft
1057.79ft
8300ft
8500ft
8300ft
8600ft
8500ft
8800ft
3353.70ft
840ft
7200ft
2100ft
6500ft
6400ft
1495ft
5831ft
![Page 24: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/24.jpg)
// PAGE 24
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE TILL DATE
COMPANY DEPTH/FEET
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
SEEPCO
HEOSL
HEOSL
NPDC/ND WESTERN
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
HEOSL
NPDC/ELCREST
NPDC/ELCREST
AFIESERE 38L
AFIESERE 26L
AFIESERE 19T
AFIESERE 29L
AFIESERE 22L
AFIESERE 28L
AFIESERE 31L
AFIESERE 30S
AFIESERE 25T
AFIESERE 8L
AFIESERE 24T
AFIESERE 37L
AFIESERE 18T
AFIESERE 20T
AFIESERE 3L
AFIESERE 14L
AFIESERE 5L
AFIESERE 13L
AFIESERE 27S
AFIESERE 2L
AFIESERE 1L
AFIESERE 36L
AFIESERE 9S
AFIESERE 21T
AFIESERE 33S
AFIESERE 22T
AGU 22
AFIESERE 17S
AFIESERE 41L
UGHELLI EAST 34
AFIESERE 10T
AFIESERE 7L
AFIESERE 23L
AFIESERE 12L
AFIESERE 35S
AFIESERE 39S
AFIESERE 40S
GBE-01
GBE-03
LOCATIONYEAR
2018
7000ft
7100ft
6600ft
6700ft
8700ft
6600ft
8600ft
6600ft
6600ft
6700ft
6700ft
6975ft
6400ft
6500ft
6900ft
6800ft
7000ft
7200ft
6500ft
4000ft
6700ft
7100ft
6500ft
6600ft
5345ft
6600ft
1144.87m
5000ft
7200ft
12268ft
5100ft
5100ft
6700ft
8000ft
6900ft
4500ft
2300ft
10200ft
2742ft
![Page 25: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/25.jpg)
// PAGE 25
2017
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE TILL DATE
COMPANY DEPTH/FEET
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
SEEPCO
DUBRI OIL
SEEPCO
SEEPCO
SEEPCO
SEEPCO
ELCREST
ELCREST
SEEPCO
PLATFORM
PLATFORM
SEEPCO
NPDC
NPDC
NDPR
NDPR
WSPL
WSPL
NDPR
NPDC
WSPL
WSPL
WSPL
WSPL
WSPL
WSPL
NPDC
WSPL
WSPL
AKARA 1 NW 2
OKW 55
OKW 56
AKARA 1 NW 2
AKARA 1 NW 2
AMESHI 2ST 2
MAT-S-A2
ANUABO 1
ENYIE 1
OKW 59
AKUBO 2
AGU - 6 PH
GILLI GILLI 8
AGU - 7 PH
OKW 61
AGU 8H
AGU 9H
OPUAMA 7ST
OPUAMA 8
OKW 65
Egbaoma 6ST
Egbaoma 9
OKW 54
Ogini 25
Ogini 26
Ogbele 7st
2Ogbele 7st2
IBIGWE 9
IBIGWE 9
Ogbele 7st2
Okono 3st
IBIGWE 10
IBIGWE 10
IBIGWE 10
IBIGWE 10
IBIGWE 11
IBIGWE 11
Ughelli East 25
IBIGWE 5ST
IBIGWE 5
LOCATIONYEAR
2015
692.07m
458.83m
556.82m
2702m
2880m
1399m
440.44m
360.90m
1538.54m
957.96m
941.09m
8758.88ft
1032.96m
601.03m
583m
496m
5945ft
3415.76ft
660.98m
10614.99ft
10172.13ft
1164.32m
1749.97ft
1471.37ft
5429.71ft
12000ft
3920.20ft
7977.38ft
14458.77ft
4749.03ft
428ft
961ft
2945ft
5256.44ft
3052.13ft
5532.06ft
10760ft
831.06ft
4569ft
2016
![Page 26: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/26.jpg)
// PAGE 26
2014
2013
WELL INTERVENTION/SLICKLINE/GYRO JOBS DONE TILL DATE
NPDC
Newcross Pet.
SEPLAT
NDPR
NDPR
NAOC
NPDC
NPDC
NPDC
NPDC
NPDC
NDPR
NDPR
NPDC
NPDC
NPDC
STERLING Global
Shebah E & P
Network E & P
Pan Ocean Oil
Newcross Pet.
Newcross Pet.
CHEVRON
CHEVRON
CHEVRON
CHEVRON
Pan Ocean Oil
NAOC
Waltersmith
Waltersmith
Waltersmith
NPDC
NPDC
Belbop/Conoil
Pan Ocean Oil
NAOC
Shell
NAOC
Steling Global
NAOC
Waltersmith
Oredo-14
Efe-3
Sapele-28
Ogbele-8
Ogbele-8
Ogbainbiri Deep-3
Ogini-22
Ogini-22
Ogini-23
Ogini-23
Utorogu-38
Ogbele-9
Ogbele-9
Ogini 24
Oredo-13
Oredo-13
Okw-24
Ukpokiti-1
Qua-Ibom-3
Obiayinma-4
Efe-1
Efe-2
Meren-29
Meren-30
Meren-91H
Meren-98H
Obiayinma-5
Azuzuama-4
Ibigwe-6
Ibigwe-7
Ibigwe-8
Oredo-12 ST
Oredo-12 ST
Otuo S7 (Delta Queen)
Agbada 67
OBIAFO
Agbada 68
Oshi-9
Okw15H
Ebegoro 4
Ibigwe-4
2012
1475ft
5636ft
10,969ft
869.4ft
5869.4ft
577.36ft
5343ft
296.50ft
5100ft
578.93ft
797.33ft
4870.60ft
291ft
1600ft
7000ft
490m
9000ft
10,000ft
7,000ft
6,000ft
9,700ft
6,709ft
4,678ft
7,000ft
5,978ft
6,000ft
7598.43ft
4000ft
9950ft
7500ft
7192ft
6500ft
9300ft
5500ft
4921ft
5131ft
4921ft
295ft
6561ft
9570ft
COMPANY DEPTH/FEETLOCATIONYEAR
2011
![Page 27: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/27.jpg)
OURCLIENTS
Below is our list of growing Clients:
1. Waltersmith Petroman Oil Limited.
2. Nigeria Agip Oil Company.
3. South Atlantic Petroleum.
4. Prime Energy.
5. Universal Energy.
6. Sterling Global.
7. Shell Petroleum Development Company of Nigeria Limited
(SPDC).
8. Nigerian Petroleum Development Company (NPDC) Ltd.
- OML 26
- OML 30
- OML 34
- OML 40
- OML 42
- OML 65
- OML 111
9. Elcrest Exploration and Production Nigeria
10. Addax Petroleum.
11. Pan Ocean Oil Corporation (Nigeria) Ltd.
12. Newcross Exploration and Production Limited (NewcrossEP).
13. Platform Petroleum Limited.
14. Niger Delta Exploration & Production Plc (NDEP).
15. Conoil Producing Limited.
16. Seplat Petroleum Development Company (SEPLAT) .
17. Sterling Energy and Exploration Production Limited (SEEPCO).
18. Shebah Exploration and Production Company Limited (SEPCOL).
19. Network Exploration and Production Company Nigeria Limited
(NEPN).
// PAGE 27
![Page 28: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/28.jpg)
// PAGE 28
TUNDE ADESOLA – MANAGING DIRECTORAn entrepreneur with a successful track record, a solid background and several years' international experience, Adesola Babatunde is the founder and CEO of Vaughn Energy Services Limited, one of the foremost indigenous oil servicing companies in Nigeria. Under his supervision Vaughn Energy has successfully completed over 200 oil and gas jobs spanning across Well Intervention, Slickline, Gyroscopic Survey, Directional Drilling, LWD & MWD, Well Testing and Mudlogging. Prior to starting Vaughn Energy Nigeria, he held various strategic positions in different blue chip organisations including Expro Group Nigeria, VIGEO Limited. A strong advocate of continuous learning, Babatunde is an ardent reader of a range of books covering leadership, motivation, relationship building, crime, autobiographies, and Christian literature. He is also a presenter and speaker at international conferences with specific interests in Strategic Alliances, Nigerian Content, and Entrepreneurship. Babatunde is a keen saxophonist, and an avid animal lover, with interests in exotic breeds of dogs, parrots, horses and wild life. He is also a staunch Formula 1 follower, a lover of cricket, rugby, snooker, polo, sailing and a lifelong supporter of Arsenal Football Club. A University of Ibadan alumnus, Babatunde is a highly motivated and articulate professional with deep insight, strategic thinking, and extensive management and business development experience and expertise spanning many key business areas. Babatunde serves on the board of a number of companies such as Casafina Capitals, including several start-ups, provides advisory services to many organisations within and outside the oil industry and supports young aspiring entrepreneurs in translating ideas into business reality. Babatunde holds a B.Sc & M.Sc (Hons) degree in Petroleum Engineering, M.Sc (Hons) degree in Geophysics and a PHD in view.
MANAGEMENTPROFILE
![Page 29: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/29.jpg)
// PAGE 29
OLUSEYI A. ESEZOBOR – DIRECTOR BUSINESS DEVELOPMENTOluseyi A. Esezobor earned a bachelor's degree in Petroleum Engineering from the University of Ibadan and a master's degree in Oil & Gas Engineering from The Robert Gordon University in Scotland. He has had a few stints of work experience as a practicing Petroleum Engineer earlier on in his career, later focusing on the Business Development, Project Management and the Commercial side of the business, thereby establishing himself as a consummate Business Development Engineer & Project Management Consultant, roles that comes naturally to him. Seyi has worked with a few companies both in Nigeria and the United Kingdom, some of which include Index Brook, Amazon Energy, Bell Oil & Gas, GE Oil & Gas, Babcock International, BAE Systems, HM Royal Navy, ISG and a host of various international companies.
As the Business Development Director of Vaughn Energy Services Ltd., Seyi has been involved in the growth of the company from its humble beginnings into a full-fledged Integrated Energy Services provider with interests in the Upstream and Downstream Oil & Gas industry. Described as a focused, passionate and decisive individual by his peers and colleagues alike, Seyi continues to pursue the vision of growing Vaughn Energy Services into an African Champion with operating offices in markets across Nigeria, West & Central Africa.
Seyi has attended various management courses and several other short professional courses at home and abroad.
OGUNWOLE BABATUNDE – NON-EXECUTIVE DIRECTOR(Not Available)
TEMITOPE ADESOLA- NON-EXECUTIVE DIRECTOR(Not Available)
ARUOTURE BENSON UGEGE – CHIEF OPERATING OFFICERBenson Ugege is a Directional Survey Engineer with over 16 years' work experience in the oil and gas industry with experience across Nigeria, Middle East and Texas. Before Vaughn, he has worked as Lead Engineer in DHS Energy Services in Iraq, GME Surveying Limited in UAE, as Field Engineer at Vigeo Limited with technical partner in Texas, Kasolute Nigeria Limited and Stonecraft CFTZ Calabar. Benson is an alumnus of University of Jos with a BSc. Geology & Mining. He joined Vaughn Energy in year 2013 as Operations Manager and later became GM, Operations and now COO. He has vast knowledge of Directional Surveying (MWD/LWD & Gyro) with trainings in Nigeria and abroad. He has led and successfully completed so many projects on a wide variety of Rig-type(land, swamp, and deep offshore).
![Page 30: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/30.jpg)
// PAGE 30
CHIOMA JULIANA OKENWA – GENERAL MANAGER, BUSINESS DEVELOPMENTChioma Okenwa is an ardent business development professional with over 3 years' experience in the oil and gas industry as a Business Developer. She holds a B.Sc. in Geology and Mining at the Enugu State University of Science and Technology and a Masters of Science in Petroleum Engineering at the University of Benin. She has work experience in both indigenous oil and gas servicing companies and exploration and production companies. She plays a key role in business development, creating and maintaining relationships with executive business partners at Vaughn Energy Services Limited. She is a leader and has a positive influence on people around her.
OMOZUHIOMWEN EGBE GREGORY – GM, DRILLING AND MEASUREMENTA data analyst with a successful track record with solid background and several years of experience in the oil and gas sector. Omozuhiomwen Egbe Gregory is the General Manager Drilling and Measurement Vaughn Energy Services Limited, before now he served in different capacity in various organization such a Field Engineer in Kasolute Nigeria Limited, Field Sevice Engineer in Vigeo Limited, Field Service Manger Vaughn Energy Service Limited, Acting General Manager Operations (west) Vaughn Energy Services Limited.
Gregory has strong passion for learning; he has B.Eng in Electrical and Electronics Engineering, Masters in Engineering Management (M.Sc) and currently running a Ph.D. program in Industrial Engineering. He loves reading Christian books and motivational books.
Gregory is a highly motivated, detailed and articulated professional with extensive managerial skills and experience which he has used to provide leading edge Services that has added value to organization corporate goals, with undiluted Passion for excellence.
STEPH-JENN CHINYERE OGWO – HUMAN RESOURCES MANAGERSteph-Jenn Chinyere Ogwo is the Human Resources Manager - whose aims at seeing that Strategic Human Resource Management is fully employed thereby ensuring that the HR objective tallies with the overall objective of the organization.
She obtained B.Sc. in Accounting from Madonna University Okija in 2005, went forward to run an MBA program in Benson Idahosa University in Benin City and currently running a professional course with the Chartered Institite of Personnel Management.
![Page 31: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/31.jpg)
DAMILARE AKINLOYE – MANAGER, BUSINESS DEVELOPMENTDamilare Akinloye is a professional Business Developer with over 3 years' experience in the upstream oil and gas industry, managing and developing new business opportunities, attending to bids and tenders, reviewing contracts, cultivating and maintaining relationships with executive business partners and optimizing company's sales and growth. He has technical field experience in the oil and gas industry as a Facility Engineer, He has worked in multi-national companies as well as indigenous oil and gas servicing company. He possesses solid educational foundation in Chemical Engineering from Obafemi Awolowo University. He has passion for business and information technology and possesses certificates in paid online courses in these areas. He is an ardent reader of books covering business, leadership, inspirational and Christian literature. Damilare is value oriented, result driven, team player and a leader.
DR ADEBAYO OLAGUNJU(Not Available)
OMOGIATE ENOMA – GYRO MANAGERAlso graduated with B.Sc Electrical Engineering from the prestigious University of Benin, (UniBen).
He has over 7 years industry experience.
He has done all manners of Gyro Surveying and he's very conversant with Drilling Engineering and Formation Evaluation.
He has also attended Chief Gyroscopic Supervisor course in Cairo, Egypt and UK.
He is a great coordinator, responsible and very reliable.
// PAGE 31
![Page 32: Vaughn Profile New · temperatures, production logging and caliper surveys) and they have longer ... The most common method of removing wax from tubing is by mechanical means (scraper](https://reader036.fdocuments.us/reader036/viewer/2022081617/607f17e2a19260602d3beca9/html5/thumbnails/32.jpg)
Plot 82, Trans Amadi Industrial Layout, Bewac Junction,Port Harcourt, Rivers State.
Tel: 084-301894; 08033509640Email: [email protected] Website: www.vaughn.com.ng