VAMED Civil and Structural-12-2008
description
Transcript of VAMED Civil and Structural-12-2008
Text for General Hospital 50 Bedsl, Ver. 1.0
AIRFORCE (SLAF) HOSPITAL COLOMBO
Democratic Socialist Republic of Sri Lanka
Democratic Socialist Republic of Sri Lanka
AIRFORCE (SLAF) HOSPITAL COLOMBO
Democratic Socialist Republic of Sri Lanka
CIVIL AND STRUCTURAL WORKS
GENERIC SPECIFICATIONS
FINISHING SCHEDULE
TABLE OF CONTENTS
31.Civil works
31.1.Site preparation
31.2.Fence and access doors
31.3.Roads, ramps and Parking
31.3.1.Roads
31.3.2.Parkings and walkways
31.3.3.Ramps
31.3.4.Patio on Ground floor
31.4.Foundations
42.Construction works
42.1.Main structural system, load bearing structure
42.2.Outside and inside non bearing walls
42.3.X-ray room walls
42.4.Facade, windows and outside doors
42.4.1.Facade external finish
42.4.2.Windows
42.4.3.Doors (outside)
52.5.Roof
52.5.1.Substructure
52.5.2.Roofing
62.6.Floor, wall and ceiling finishes
72.7.Painting
82.8.Internal doors
82.8.1.Standard doors
82.8.2.Doors to Operation Theatres
82.8.3.Double wing doors, partly glazed
82.8.4.X-ray doors
1. Civil works1.1. Site preparation
Approx site area is 14.350 m with access to existing main road via side road on reserved site (see attached drawing: Site Plan). The erection of the side road outside the site boundaries and the preparation of all needed media connections (water, sewage, electricity, telecom, etc.) are excluded from VAMED scope of work.
The site area is flat land .
Existing trees and bushes on the site have to be rooted out where necessary.
Main trenches for channels, (for building supplying services) potable water, fire fighting water, electricity etc. will be excavated and backfilled with the soil placed alongside the trenches. Electrical power supply cables will be protected with brick layer and warning tape.
Gardening and landscaping: Green areas around the buildings have to be covered with humus and planted with suitable grassing and some trees. Trees and bushes have to be cultivated according to the site-layout.
1.2. Fence and access doors
The fence around the site has to be made of galvanized mesh 1.80 m height.
Total length according to drawings.
Site entering gates: metal, with galvanized mesh, manually operated 6 m width (or 2x3m), H=1,8 m
1.3. Roads, ramps and Parking1.3.1. Roads
The roads inside hospital site area shall be tared, made with double surface dressing on compacted under-layer with curbstones or blinded hardcore shoulder on request.
Front area of the hospital - emergency, ambulant and main entrance area - will be on the first floor level. Carefully designed and properly executed infill, road, ramps, sidewalks and drainage system shall avid possible sliding or erosions.
Design criteria are applicable to Local Regulations.
1.3.2. Parkings and walkways
Car parks as well as walkways shall be tared as well, made with double surface dressing on compacted under-layer, designed for loads of private cars, and motorcycles.
1.3.3. Ramps
Road ramps shall be designed according to Local Regulations or/and BS.
1.3.4. Patio on Ground floor
The courtyard in the central area of the hospital building provide high qualty landscape and good drainage.
1.4. Foundations
The foundations provide typical piling foundations according to static calculations and structural design requirements, based on the latest soil investigation report.
The area in front of the main hospital access will be filled up to the level of the Hospital first floor level, as will be done for the helipad. Alongside the buildings a proper rain water drainage system has to be designed according to ground conditions and local climatic conditions.
2. Construction works2.1. Main structural system, load bearing structure
The main structural system shall be designed as typical reinforced concrete structure with columns and slabs, and solide concrete block work as infill.
Static calculations follow the design requirements of the preliminary design.
2.2. Outside and inside non bearing walls
Outside and inside non-bearing walls shall be built of local made hollow blockwork (or solid concrete blocks or red bricks where applicable) min.10 cm thick, incl. all necessary lintels, girders, columns, inside and outside plastered, ready for painting, tiling or laying of vinyl sheet.
All walls have to be able to carry wall mounted facilities, cupboards, MT equipment, etc. wherever necessary, acc. to the approved detailed shop drawings.
Building parts within air-conditioned areas must have fully insulated walls (double walls 10+5+10 cm, with 5 cm insulation)
Walls must be connected with wire loops to the main structural system to avoid possible cracks in the joints.
2.3. X-ray room walls
Walls shall be lead shielded for X-ray protection, thickness according to standards for X-Ray facilities (max 150 kV) authoritys approval.
2.4. Facade, windows and outside doors2.4.1. Facade external finish
External finish to be 20 mm thick coat render with 3 mm grain textured finish, traditional.
Color of facade coating according to the Contractor and the based on Standard colors.Will be proposed by the Project Architect.
2.4.2. Windows
The windows shall be typical standard aluminum framing, single glazed, including insect screens fixed on aluminum or metal frames. Applicable details according to manufacturer and design standards.
2.4.3. Doors (outside)
Entrance doors - double wing, public and medical areas:
Doors for main entrances to the hospital and the departments shall be made of aluminium framing, with security glazing, acc. to standard hospital design requirements.
All main corridor doors shall be provided with standard handles, cushions and cylinder type locks including cylinders and door bumpers as necessary.
Details as standard by the manufacturer.
Doors for technical rooms:
Metal doors (galvanized steel or aluminium) manufactured of coated or solid metal grid on metal frames. Internal doors in the main corridors with trolley traffic have typical shutters with base plates and push plates (approx. 15 cm high) made of 1 mm stainless steel or 2 mm aluminium, fixed on both sides.
Details as standard by the manufacturer.
Ventilation louvers according to standard design requirements.
2.5. Roof2.5.1. Structure and Substructure
Sloping roof structure shall be executed according proposed design requirements and static calculations.
Roof truss shall be made of steel/metal. Main structural framing shall be especially coated with aluminum-zinc coating to prevent rust.
All details according to the manufacturer's production details and shop drawings.
2.5.2. Roofing
The roof shall be made of special coated profiled steel or aluminum sheets, standard color acc. manufacturer (protection coat), outside colored, support made of corrosion protected metal profiles.
The roof has to be watertight and insect tight.
All openings for ventilation with insect protection screen.
2.6. Floor, wall and ceiling finishes
HOSPITAL MEDICAL SERVICES
ROOMTYPE
FLOOR FINISHES
WALL FINISHES
CEILING
H01
consulting/examination / treatment rooms
vinyl sheet, anti-slip
special (antibacterial) paint, ceramic tiles around basins, skirting of same material as floor finish min. 10 cm high
latex paint
H02
patient bedrooms
vinyl sheet, anti-slip
special (antibacterial) paint, ceramic tiles around basins, skirting of same material as floor finish min. 10 cm high
latex paint
H03
OT, ICU, NICU, recovery, labour&delivery room
static conductive vinyl sheet
special (antibacterial) paint, easy cleaning, rounded molding and skirting of same material as floor finish min. 10 cm high or vinyl sheet, rounded molding
suspended plasterboard ceiling, special (antibacterial) paint
H04
x-ray rooms
vinyl sheet, anti-slip, radiation protection
facing plaster board wall, radiation protection, latex paint, skirting of same material as floor finish min. 10 cm high
suspended plasterboard ceiling, radiation protection, latex paint
H05
dirty utility, clean utility, disposal, pantry
ceramic tiles, good quality, easy to clean
special (antibacterial) paint, ceramic tiles around basins, skirting of same material as floor finish min. 10 cm high
latex paint
H06
various stores, cleaners room
ceramic tiles, good quality, easy to clean, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
latex paint
H07
toilets, showers
ceramic tiles, good quality, easy to clean, anti-slip
ceramic tiles
latex paint
H08
corridors, waiting zones in closed areas, nurse base, various bays
ceramic tiles, good quality, anti-slip
latex paint, easy cleaning, skirting of same material as floor finish min. 10 cm high, wall protections
suspended ceiling with mineral board tiles or plasterboard, latex paint
H09
laboratories
ceramic lab tiles, anti-slip
special (antibacterial) paint
suspended ceiling with mineral board tiles or plasterboard, latex paint
H10
CSSD
vinyl sheet, anti-slip
special (antibacterial) paint, ceramic tiles around basins, skirting of same material as floor finish min. 10 cm high
suspended plasterboard ceiling, special (antibacterial) paint
NON MEDICAL SUPPORT SERVICES
FLOOR FINISHES
WALL FINISHES
CEILING
N01
offices, corridors and waiting zones in admin
ceramic tiles, good quality, easy to clean, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
suspended ceiling with mineral board tiles or plasterboard, latex paint
N02
main entrance, dining area
natural stone, good quality, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
suspended ceiling with mineral board tiles or plasterboard, latex paint
N03
staircases, corridors, waiting zones in open areas
natural stone, terrazzo or ceramic tiles, good quality, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
latex paint
N04
waste management services
ceramic tiles, heavy duty, anti-slip
ceramic tiles
latex paint
N05
engineering services, cleaning / housekeeping, hospital medical stores
ceramic tiles, heavy duty, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
latex paint
N06
catering department (kitchen), laundry / linen services
ceramic tiles, heavy duty, anti-slip
ceramic tiles
suspended plasterboard ceiling, latex paint
N07
central staff facilities, relatives dormitories
ceramic tiles, easy to clean, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
suspended ceiling with mineral board tiles or plasterboard, latex paint
N08
open walkways on ground floor, M&E plants
sealed concrete, anti-slip
latex paint
concrete
N09
terraces
concrete tiles, anti-slip
N10
offices ground floor
ceramic tiles, easy to clean, anti-slip
latex paint, skirting of same material as floor finish min. 10 cm high
suspended ceiling with mineral board tiles or plasterboard, latex paint
Corner guards on wall corners and columns must be made of aluminum or stainless steel and designed for heavy duty use, according to the function of the relevant room.
Wall tiles range up to upper edge of doorframes, except in catering department, laundry / linen services and CSSD, where the wall tiles shall be up to the (suspended) ceiling.
The grouting will be the choice of SLAF adjusted to the purposes of the specific rooms, acc. to design guidelines of the Project Architect.
In wet areas the walls must be impregnated by a water resistant liquid protection prior to tiling or painting.
Suspended ceilings must have inspection openings for maintainance wherever necessary.
2.7. Painting
In general, all walls, gypsum boards and ceilings must be painted with emulsion paint, primer and final coat. The colors shall be selected by SLAF and the Project Architect.
Washable emulsion paint in corridors up to 1,5 m high shall be provided.
In the operating theatres, the painting of the walls shall be epoxy paint in three layers or vinyl sheet. SLAF and the Project Architect shall select the colors.
2.8. Internal doors2.8.1. Standard doors
Door leaf: standard aluminium frame, melamine filling
Door frames: steel frames, manufactured from zinc coated steel, ready for paint finish, acc. BS
Handles: stainless steel (hygienic areas e.g. OT-dept., CSSD) and anodized aluminium, emergency escape doors with panic handle set, all acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary
2.8.2. Doors to Operation Theatres
Door leaf: manually operated, standard aluminium frame, stainless steel cover
Door frames: steel frames, manufactured from zinc coated steel, ready for paint finish, acc. BS
Handles: stainless steel, acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Push plates: base plates and push plates (approx.15 cm high) made of 1mm stainless steel or 2mm aluminum plates on both sides of the door.
2.8.3. Double wing doors, partly glazed
Door leaf: standard aluminium frame, acc. to BS
Glazing: single glazed, acc. BS
Door frames: steel frames, manufactured from zinc coated steel, ready for paint finish, acc. BS
Handles: stainless steel (hygienic areas e.g. OT-dept., CSSD) and anodized aluminium, emergency escape doors with panic handle set, all acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary
2.8.4. X-ray doors
Door leaf: standard aluminium frame, melamine filling, X-ray protection acc. BS1178
Door frames: steel frames, manufactured from zinc coated steel, ready for paint finish, X-ray protection acc. BS1178
Handles: stainless steel, acc. to BS and design guideline by Project Architect
Hinges: stainless steel, acc. BS
Door bumpers, stoppers: where necessary
Democratic Socialist Republic of Sri Lanka