VAL.N 2VALORIZACIN DE AVANCE DE OBRA N 02ProyectoMEJORAMIENTO DEL SERVICIO DEL SISTEMA DE RIEGO DEL CANAL PICHACTACUNAN EN EL CASERIO DE QUITACANCHA, DISTRITO DE QUILLO , PROVINCIA DE YUNGAY ANCASHEjecuta: MUNICIPALIDAD DISTRITAL DE QUILLOFinancia: MUNICIPALIDAD DISTRITAL DE QUILLOResidente: ING. DAVID APOLINAR RAMIREZ ORIHUELASupervisor: ING. MIGUEL ANGEL DIOSES PARDOFecha: CORRESPONDE DEL 01 /12/14 AL 31/12/14PARTIDADESCRIPCINPRESUPUESTOAVANCESSALDOANTERIORACTUALACUMULADOUnd.MetradoP. Unit.Presup.MetradoValorizado%MetradoValorizado%MetradoValorizado%MetradoValorizado%S/.S/.S/.S/.S/.01OBRAS PROVISIONALES7,100.007,100.000.007,100.000.007,100.007,100.007,100.007,100.0001.01CARTEL DE OBRA 3.60m x 2.40mUnd.1.001,300.001,300.001.001,300.00100.000.000.000.001.001,300.00100.000.000.000.001,300.001,300.001,300.001,300.0001.02CASETA PARA GUARDIANIA Y/O DEPOSITOGLB1.003,200.003,200.001.003,200.00100.000.000.000.001.003,200.00100.000.000.000.003,200.003,200.003,200.003,200.0001.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTASGLB1.002,600.002,600.001.002,600.00100.000.000.000.001.002,600.00100.000.000.000.002,600.002,600.002,600.002,600.002CAPTACION Y DESARENADOR8,425.45584.650.00584.657,840.808,425.45584.65584.658,425.4502.01TRABAJOS PRELIMINARES112.47112.470.00112.470.00112.47112.47112.47112.4702.01.01LIMPIEZA Y DESBROCE DE TERRENO S/EQm217.253.6462.7917.2562.79100.000.000.000.0017.2562.79100.000.000.000.0062.7962.7962.7962.7902.01.02TRAZO Y REPLANTEO DE ESTRUCTURASm217.252.8849.6817.2549.68100.000.000.000.0017.2549.68100.000.000.000.0049.6849.6849.6849.6802.02MOVIMIENTO DE TIERRAS674.15472.180.00472.18201.97674.15472.18472.18674.1502.02.01EXCAVACION EN ROCA SUELTAm321.8521.61472.1821.85472.18100.000.000.000.0021.85472.18100.000.000.000.00472.18472.18472.18472.1802.02.02BASE DE CAPTACION CON MATERIAL PROPIO SELECCIONADO, E=10CM.m221.566.31136.040.000.000.000.000.000.000.000.000.0021.56136.04100.00136.040.000.00136.0402.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m310.356.3765.930.000.000.000.000.000.000.000.000.0010.3565.93100.0065.930.000.0065.9302.03OBRAS DE CONCRETO6,850.770.000.000.006,850.776,850.770.000.006,850.7702.03.01ENCOFRADO Y DESENCOFRADO EN ESTRUCTURASm245.8842.451,947.610.000.000.000.000.000.000.000.000.0045.881,947.61100.001,947.610.000.001,947.6102-03-02CONCRETO F'C= 210 KG/CM2m34.46594.442,651.200.000.000.000.000.000.000.000.000.004.462,651.20100.002,651.200.000.002,651.2002.03.03ACERO DE REFUERZO GRADO 60 EN ESTRUCTURASkg139.306.07845.550.000.000.000.000.000.000.000.000.00139.30845.55100.00845.550.000.00845.5502.03.04CONCRETO F'C= 175 KG/CM2m32.77507.731,406.410.000.000.000.000.000.000.000.000.002.771,406.41100.001,406.410.000.001,406.4102.04CARPINTERIA METALICA788.060.000.000.000.00788.06100.00788.060.000.00788.0602.04.01COMPUERTA TARJETA METALICA DE 0.30*0.40 MUnd.2.00394.03788.060.000.000.000.000.000.000.000.000.002.00788.06100.00788.060.000.00788.0603CANAL DE CONDUCCIN ENTUBADO D=200MM,111107.5921405.1052391.0773796.1737311.42111,107.5973,796.1773,796.17111,107.5903.01TRABAJOS PRELIMINARES4441.064441.060.004441.060.000.004,441.064,441.064,441.064,441.0603.01.01LIMPIEZA DE TERRENO MANUALm21000.001.351,350.001000.001350.00100.000.000.000.001,000.001350.00100.000.000.000.001,350.001,350.001,350.001,350.0003.01.02TRAZO, NIVELACION Y REPLANTEOKM1.003091.063,091.061.003091.06100.000.000.000.001.003091.06100.000.000.000.003,091.063,091.063,091.063,091.0603.02MOVIMIENTO DE TIERRAS27087.0216964.044542.4521506.495580.5327,087.0221,506.4921,506.4927,087.0203.02.01CORTE DE TERRENO NIVEL SUBRASANTE MANUALm3448.0019.128,565.76213.004072.5647.540.000.00213.004072.5647.54235.004493.2052.468,565.764,072.564,072.568,565.7603.02.02CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm3288.4044.7012,891.48288.4012891.48100.000.000.00288.4012891.480.000.000.00100.0012,891.4812,891.4812,891.4812,891.4803.02.03RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M.m3184.1011.472,111.630.000.000.00160.001835.200.00160.001835.200.0024.10276.43100.002,111.631,835.201,835.202,111.6303.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m3552.306.373,518.150.000.000.00425.002707.2576.95425.002707.2576.95127.30810.9023.053,518.152,707.252,707.253,518.1503.03REFINE Y NIVELACION2044.000.000.000.002044.002,044.000.000.002,044.0003.03.01REFINE Y NIVELACION EN TERRENO ROCOSOm2700.002.922,044.000.000.000.000.000.000.000.000.000.00700.002044.00100.002,044.000.000.002,044.0003.04CONFORMACION DE CAMA DE APOYO1550.540.000.000.001550.541,550.540.000.001,550.5403.04.01CONFORMACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMOm340.5938.201,550.540.000.000.000.000.000.000.000.000.0040.591550.54100.001,550.540.000.001,550.5403.05MEJORAMIENTO DE SUB RASANTE CON CONCRETO EN ZONA INESTABLE11874.980.000.000.000.000.000.000.0011874.98100.0011,874.980.000.0011,874.9803.05.01CONCRETO SIMPLE FC=175 KG/CM2m327.20436.5811,874.980.000.000.000.000.000.000.000.000.0027.2011874.98100.0011,874.980.000.0011,874.9803.06TUBERIA64110.000.0047848.6247848.6274.640.0016261.3864,110.0047,848.6247,848.6264,110.0003.06.01SUMINISTRO E INST. EN TUBERIA PVC ISO 4435 DN 200mm.-S20m1000.0062.4262,420.000.000.000.00756.0047189.520.00756.0047189.5275.60244.0015230.4824.4062,420.0047,189.5247,189.5262,420.0003.06.02PRUEBA HIDRAULICA TUB.8"(200MM) A ZANJA TAPADAm1000.001.691,690.000.000.000.00390.00659.100.00390.00659.100.00610.001030.901,690.00659.10659.101,690.0004TOMAS LATERALES(10und)5,902.2233.450.0033.450.570.005,868.775,902.2233.4533.455,902.2204.01TRABAJOS PRELIMINARES33.4533.450.000.0033.450.0033.4533.4533.4533.4504.01.01TRAZO Y REPLANTEOm215.002.2333.4515.0033.45100.000.000.000.0015.0033.450.000.000.0033.4533.4533.4533.4504.02MOVIMIENTO DE TIERRAS203.600.000.000.000.000.00203.60203.600.000.00203.6004.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm33.5044.70156.450.000.000.000.000.000.000.000.000.003.50156.45100.00156.450.000.00156.4504.02.02REFINE Y NIVELACION EN TERRENO ROCOSOm27.002.9220.440.000.000.000.000.000.000.000.000.007.0020.44100.0020.440.000.0020.4404.02.03BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m20.706.314.420.000.000.000.000.000.000.000.000.704.42100.004.420.000.004.4204.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m33.506.3722.300.000.000.000.000.000.000.000.000.003.5022.30100.0022.300.000.0022.3004.03OBRAS DE CONCRETO5,665.170.000.000.000.000.005,665.175,665.170.000.005,665.1704.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm220.0053.501,070.000.000.000.000.000.000.000.000.0020.001,070.00100.001,070.000.000.001,070.0004.03.02CONCRETO SIMPLE FC=175 KG/CM2m31.50436.58654.870.000.000.000.000.000.000.000.000.001.50654.87100.00654.870.000.00654.8704.03.03COMPUERTA TARJETA METALICA DE 0.25*0.30 MUnd.10.00394.033,940.300.000.000.000.000.000.000.000.000.0010.003,940.30100.003,940.300.000.003,940.3005CAJAS DE INSPECCION 108,631.99667.420.00667.427,964.578,631.99667.42667.428,631.9905.01TRABAJOS PRELIMINARES28.9928.990.0028.99100.000.0028.9928.9928.9928.9905.01.01TRAZO Y REPLANTEOm213.002.2328.9913.0028.99100.000.000.0013.0028.99100.000.000.000.0028.9928.9928.9928.9905.02MOVIMIENTO DE TIERRAS725.44638.430.00638.4387.01725.44638.43638.43725.4405.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm313.6644.70610.6013.66610.60100.000.000.000.0013.66610.60100.000.000.000.00610.60610.60610.60610.6005.02.02BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m24.416.3127.834.4127.83100.000.000.004.4127.83100.000.000.000.0027.8327.8327.8327.8305.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m313.666.3787.010.000.000.000.000.000.000.000.000.0013.6687.01100.0087.010.000.0087.0105.03OBRAS DE CONCRETO ARMADO7877.560.000.000.000.000.007877.567,877.560.000.007,877.5605.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm264.6053.503456.100.000.000.000.000.000.000.000.000.0064.603,456.10100.003,456.100.000.003,456.1005.03.02CONCRETO SIMPLE FC=175 KG/CM2m36.18436.582698.060.000.000.000.000.000.000.000.000.006.182,698.06100.002,698.060.000.002,698.0605.03.03ACERO DE REFUERZO FY=4200 KG/CM2 - GRADO 60kg283.926.071723.390.000.000.000.000.000.000.000.000.00283.921,723.39100.001,723.390.000.001,723.3906CAPACITACION EN SEGURIDAD EN OBRA Y MEDIO AMBIENTE4200.004200.00100.000.000.004200.00100.000.000.004,200.004,200.004,200.004,200.0006.01CAPACITACION DE TRABAJADORES DURANTE LA EJECUCION DE LA OBRAGLB1.004200.004200.001.004200.00100.000.000.000.001.004200.00100.000.000.000.004,200.004,200.004,200.004,200.0007CONTROL DE CALIDAD EN OBRA900.000.000.000.00900.00900.000.000.00900.0007.01PRUEBAS DE CONCRETO900.000.000.000.000.000.000.000.00900.00900.000.000.00900.0007.01.01ENSAYO DE RESISTENCIA DE CONCRETOGLB1.00900.00900.000.000.000.000.000.000.000.000.000.001.00900.00100.00900.000.000.00900.0008FLETE8,600.008,600.000.008,600.00100.000.000.008,600.008,600.008,600.008,600.0008.01FLETE TERRESTRE RURALGLB1.004,300.004,300.001.004,300.00100.000.000.000.001.004,300.00100.000.000.000.004,300.004,300.004,300.004,300.0008.02FLETE RURAL CON ASEMILAGLB1.004,300.004,300.001.004,300.00100.000.000.000.001.004,300.00100.000.000.000.004,300.004,300.004,300.004,300.00COSTO DIRECTO154,867.2642,590.6227.50%52,391.0733.83%94,981.6961.33%59,885.5738.67%154,867.26100.00%154,867.26GASTOS GENERALES (13%)20,132.745,536.786,810.8412,347.627,785.1220,132.7420,132.74SUBTOTAL175,000.0048,127.4059,201.91107,329.3167,670.70175,000.00175,000.00VALOR REFERENCIAL175,000.0048,127.4059,201.91107,329.3167,670.70175,000.00175,000.00100.00%175,000.00

CRON.VALORIZ PROG.CRONOGRAMA VALORIZADO PROGRAMADOProyectoMEJORAMIENTO DEL SERVICIO DEL SISTEMA D ERIEGO DEL CANAL PICHACTACUNAN, EN EL CASERIO DE QUITACANCHA, DISTRITO DE QUILLO,PROVINCIA DE YUNGAY - ANCASHEjecuta: MUNICIPALIDAD DISTRITAL DE QUILLOFinancia: MUNICIPALIDAD DISTRITAL DE QUILLOResidente: ING. DAVID APOLINAR RAMIREZ ORIHUELASupervisor: ING. MIGUEL ANGEL DIOSES PARDOUnd.MetradoP. Unit.Presup.EJECUCION PROGRAMADAS/.NOVIEMBREDICIEMBREENEROFEBRERO01OBRAS PROVISIONALES7,100.007,100.000.000.000.007,100.0001.01CARTEL DE OBRA 3.60m x 2.40mUnd.1.001,300.001,300.001,300.000.000.000.001,300.0001.02CASETA PARA GUARDIANIA Y/O DEPOSITOGLB1.003,200.003,200.003,200.000.000.000.001.001.003,200.0001.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTASGLB1.002,600.002,600.002,600.000.000.000.001.001.002,600.002CAPTACION Y DESARENADOR8,425.457,637.390.00788.060.001.001.008,425.4502.01TRABAJOS PRELIMINARES112.47112.470.000.000.00112.4702.01.01LIMPIEZA Y DESBROCE DE TERRENO S/EQm217.253.6462.7962.790.000.000.001,086.781,086.7862.7902.01.02TRAZO Y REPLANTEO DE ESTRUCTURASm217.252.8849.6849.680.000.000.001,086.781,086.7849.6802.02MOVIMIENTO DE TIERRAS674.15674.150.000.000.00653.15653.15674.1502.02.01EXCAVACION EN ROCA SUELTAm321.8521.61472.18472.180.000.000.0032.0032.00472.1802.02.02BASE DE CAPTACION CON MATERIAL PROPIO SELECCIONADO, E=10CM.m221.566.31136.04136.040.000.000.00136.0402.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m310.356.3765.9365.930.000.000.00626.06626.0665.9302.03OBRAS DE CONCRETO6,850.776,850.770.000.000.00411.84411.846,850.7702.03.01ENCOFRADO Y DESENCOFRADO EN ESTRUCTURASm245.8842.451,947.611,947.610.000.000.001.581.581,947.6102-03-02CONCRETO F'C= 210 KG/CM2m34.46594.442,651.202,651.200.000.000.00144.19144.192,651.2002.03.03ACERO DE REFUERZO GRADO 60 EN ESTRUCTURASkg139.306.07845.55845.550.000.000.00845.5502.03.04CONCRETO F'C= 175 KG/CM2m32.77507.731,406.411,406.410.000.000.001.581.581,406.4102.04CARPINTERIA METALICA788.060.000.00788.060.0063.1063.10788.0602.04.01COMPUERTA TARJETA METALICA DE 0.30*0.40 MUnd.2.00394.03788.060.000.00788.060.00603.89603.89788.0603CANAL DE CONDUCCIN ENTUBADO D=200MM,111107.594441.0625051.7879924.751690.007.117.11111,107.5903.01TRABAJOS PRELIMINARES4441.064441.060.000.000.00129.71129.714,441.0603.01.01LIMPIEZA DE TERRENO MANUALm21000.001.351,350.001,350.000.000.000.00124.20124.201,350.0003.01.02TRAZO, NIVELACION Y REPLANTEOKM1.003091.063,091.063,091.060.000.000.003,091.0603.02MOVIMIENTO DE TIERRAS27087.020.0021457.245629.780.0027,087.0203.02.01CORTE DE TERRENO NIVEL SUBRASANTE MANUALm3448.0019.128,565.760.008,565.760.000.008,565.7603.02.02CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm3288.4044.7012,891.480.0012,891.480.000.0012,891.4803.02.03RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M.m3184.1011.472,111.630.000.002,111.630.002,111.6303.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m3552.306.373,518.150.000.003,518.150.003,518.1503.03REFINE Y NIVELACION2044.000.002044.000.000.002,044.0003.03.01REFINE Y NIVELACION EN TERRENO ROCOSOm2700.002.922,044.000.002,044.000.000.002,044.0003.04CONFORMACION DE CAMA DE APOYO1550.540.001550.540.000.001,550.5403.04.01CONFORMACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMOm340.5938.201,550.540.001,550.540.000.001,550.5403.05MEJORAMIENTO DE SUB RASANTE CON CONCRETO EN ZONA INESTABLE11874.980.000.0011874.980.0011,874.9803.05.01CONCRETO SIMPLE FC=175 KG/CM2m327.20436.5811,874.980.000.0011,874.980.0011,874.9803.06TUBERIA64110.000.000.0062420.001690.0064,110.0003.06.01SUMINISTRO E INST. EN TUBERIA PVC ISO 4435 DN 200mm.-S20m1000.0062.4262,420.000.000.0062,420.000.0062,420.0003.06.02PRUEBA HIDRAULICA TUB.8"(200MM) A ZANJA TAPADAm1000.001.691,690.000.000.000.001,690.001,690.0004TOMAS LATERALES(10und)5,902.22156.4558.311,747.173,940.305,902.2204.01TRABAJOS PRELIMINARES33.450.0033.450.000.0033.4504.01.01TRAZO Y REPLANTEOm215.002.2333.450.0033.450.000.0033.4504.02MOVIMIENTO DE TIERRAS203.60156.4524.8622.300.00203.6004.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm33.5044.70156.45156.450.000.000.00156.4504.02.02REFINE Y NIVELACION EN TERRENO ROCOSOm27.002.9220.440.0020.440.000.0020.4404.02.03BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m20.706.314.420.004.420.000.004.4204.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m33.506.3722.300.000.0022.300.0022.3004.03OBRAS DE CONCRETO5,665.170.000.001,724.873,940.305,665.1704.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm220.0053.501,070.000.000.001,070.000.0024.9524.951,070.0004.03.02CONCRETO SIMPLE FC=175 KG/CM2m31.50436.58654.870.000.00654.870.0024.9524.95654.8704.03.03COMPUERTA TARJETA METALICA DE 0.25*0.30 MUnd.10.00394.033,940.300.000.000.003,940.303,940.3005CAJAS DE INSPECCION 108,631.99639.5927.837,964.570.001.001.008,631.9905.01TRABAJOS PRELIMINARES28.9928.990.000.000.0015.0015.0028.9905.01.01TRAZO Y REPLANTEOm213.002.2328.9928.990.000.000.00254.95254.9528.9905.02MOVIMIENTO DE TIERRAS725.44610.6027.8387.010.00725.4405.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm313.6644.70610.60610.600.000.000.0020.2220.22610.6005.02.02BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m24.416.3127.830.0027.830.000.00744.63744.6327.8305.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m313.666.3787.010.000.0087.010.0087.0105.03OBRAS DE CONCRETO ARMADO7877.560.000.007877.560.007,877.5605.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm264.6053.503456.100.000.003,456.100.003,456.1005.03.02CONCRETO SIMPLE FC=175 KG/CM2m36.18436.582698.060.000.002,698.060.002,698.0605.03.03ACERO DE REFUERZO FY=4200 KG/CM2 - GRADO 60kg283.926.071723.390.000.001,723.390.0012.0012.001,723.3906CAPACITACION EN SEGURIDAD EN OBRA Y MEDIO AMBIENTE4200.004200.000.000.000.004,200.0006.01CAPACITACION DE TRABAJADORES DURANTE LA EJECUCION DE LA OBRAGLB1.004200.004200.004200.000.000.000.002.002.004,200.0007CONTROL DE CALIDAD EN OBRA900.000.000.00900.000.001.001.00900.0007.01PRUEBAS DE CONCRETO900.000.000.00900.000.00900.0007.01.01ENSAYO DE RESISTENCIA DE CONCRETOGLB1.00900.00900.000.000.00900.000.0024.00900.0008FLETE8,600.008,600.000.000.000.008.008,600.0008.01FLETE TERRESTRE RURALGLB1.004,300.004,300.004300.000.000.000.004,300.0008.02FLETE RURAL CON ASEMILAGLB1.004,300.004,300.004300.000.000.000.004,300.00COSTO DIRECTO154,867.2632,774.5025,137.9191,324.555,630.30154,867.26PORCENTAJE DE AVANCE100%21.16%16.23%58.97%3.64%100.00%GASTOS GENERALES (13%)20,132.744,260.683,267.9311,872.19731.94SUBTOTAL175,000.0037,035.1828,405.84103,196.746,362.24VALOR REFERENCIAL175,000.0037,035.1828,405.84103,196.746,362.24175,000.00

CURVA "S"CONTROL DE AVANCE DE OBRAPERIODO DEL 01 /11/14 AL 31/11/14EJECUTADO Vs. PROGRAMADOVALORIZACIONESEJECUTADOEJEC. ACUMULADOPROGRAMADOPROG. ACUMULADO0000Valorizacion N 0142,590.6242,590.6232,774.5032,774.50Valorizacion N 0252,391.0794,981.6925,137.9157,912.41Valorizacion N 030.00.091,324.55149,236.96Valorizacion N 040.00.05,630.30154,867.26CURVA "S"DIAGRAMA DE BARRAS

CURVA "S"

PROGRAMADOEJECUTADO

COMPARACION112233

PROGRAMADOEJECUTADO

COMPARACION METRADOS PROGRAMADOS VS EJECUTADOSProyectoMEJORAMIENTO DEL SERVICIO DEL SISTEMA D ERIEGO DEL CANAL PICHACTACUNAN, EN EL CASERIO DE QUITACANCHA, DISTRITO DE QUILLO, PROVINCIA DE YUNGAY - ANCASH PROVINCIA DE CASMA ANCASHEjecuta: MUNICIPALIDAD DISTRITAL DE QUILLOFinancia: MUNICIPALIDAD DISTRITAL DE QUILLOResidente: ING. DAVID APOLINAR RAMIREZ ORIHUELASupervisor: ING. MIGUEL ANGEL DIOSES PARDOUnd.MetradoTotalP. Unit.Presup.EJECUCION PROGRAMADAMetradosDiferenciaS/.MES 1MES 2ProgramadosEjecutados01OBRAS PROVISIONALES01.01CARTEL DE OBRA 3.60m x 2.40mUnd.1.000.000.000.0001.02CASETA PARA GUARDIANIA Y/O DEPOSITOGLB1.000.000.000.0001.03MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTASGLB1.000.000.000.002CAPTACION Y DESARENADOR02.01TRABAJOS PRELIMINARES02.01.01LIMPIEZA Y DESBROCE DE TERRENO S/EQm217.250.000.000.0002.01.02TRAZO Y REPLANTEO DE ESTRUCTURASm217.250.000.000.0002.02MOVIMIENTO DE TIERRAS02.02.01EXCAVACION EN ROCA SUELTAm321.850.000.000.0002.02.02BASE DE CAPTACION CON MATERIAL PROPIO SELECCIONADO, E=10CM.m221.560.000.000.0002.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m310.350.000.000.0002.03OBRAS DE CONCRETO02.03.01ENCOFRADO Y DESENCOFRADO EN ESTRUCTURASm245.880.000.000.0002.03.02CONCRETO F'C= 210 KG/CM2m34.460.000.000.0002.03.03ACERO DE REFUERZO GRADO 60 EN ESTRUCTURASkg139.300.000.000.0002.03.04CONCRETO F'C= 175 KG/CM2m32.770.000.000.0002.04CARPINTERIA METALICA02.04.01COMPUERTA TARJETA METALICA DE 0.30*0.40 MUnd.2.000.000.000.0003CANAL DE CONDUCCIN ENTUBADO D=200MM,03.01TRABAJOS PRELIMINARES03.01.01LIMPIEZA DE TERRENO MANUALm21000.000.000.000.0003.01.02TRAZO, NIVELACION Y REPLANTEOKM1.000.000.000.0003.02MOVIMIENTO DE TIERRAS03.02.01CORTE DE TERRENO NIVEL SUBRASANTE MANUALm3448.00448.000.00448.0003.02.02CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm3288.40288.400.00288.4003.02.03RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE 0.20 M.m3184.100.00160.00-160.0003.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m3552.300.00425.00-425.0003.03REFINE Y NIVELACION03.03.01REFINE Y NIVELACION EN TERRENO ROCOSOm2700.00700.000.00700.0003.04CONFORMACION DE CAMA DE APOYO03.04.01CONFORMACION DE CAMA DE APOYO CON MATERIAL DE PRESTAMOm340.5940.590.0040.5903.05MEJORAMIENTO DE SUB RASANTE CON CONCRETO EN ZONA INESTABLE03.05.01CONCRETO SIMPLE FC=175 KG/CM2m327.200.000.000.0003.06TUBERIA03.06.01SUMINISTRO E INST. EN TUBERIA PVC ISO 4435 DN 200mm.-S20m1000.000.00756.00-756.0003.06.02PRUEBA HIDRAULICA TUB.8"(200MM) A ZANJA TAPADAm1000.000.00390.00-390.0004TOMAS LATERALES(10und)04.01TRABAJOS PRELIMINARES0.0004.01.01TRAZO Y REPLANTEOm215.0015.000.0015.0004.02MOVIMIENTO DE TIERRAS04.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm33.500.000.000.0004.02.02REFINE Y NIVELACION EN TERRENO ROCOSOm27.007.000.007.0004.02.03BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m20.700.700.000.7004.02.04ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m33.500.000.000.0004.03OBRAS DE CONCRETO04.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm220.000.000.000.0004.03.02CONCRETO SIMPLE FC=175 KG/CM2m31.500.000.000.0004.03.03COMPUERTA TARJETA METALICA DE 0.25*0.30 MUnd.10.000.000.000.0005CAJAS DE INSPECCION 1005.01TRABAJOS PRELIMINARES05.01.01TRAZO Y REPLANTEOm213.000.000.000.0005.02MOVIMIENTO DE TIERRAS05.02.01CORTE EN TERRENO ROCOSO- NIVEL SUBRASANTE MANUALm313.660.000.000.0005.02.02BASE DE CANAL CON MATERIAL PROPIO SELECCIONADO, E=10CM.m24.414.410.004.4105.02.03ELIMINACION MATERIAL EXCEDENTE HASTA 30.00 MT (A MANO USANDO CARRETILLA)m313.660.000.000.0005.03OBRAS DE CONCRETO ARMADO05.03.01ENCOFRADO Y DESENCOFRADO TOMA LATERALES DE CANALESm264.600.000.000.0005.03.02CONCRETO SIMPLE FC=175 KG/CM2m36.180.000.000.0005.03.03ACERO DE REFUERZO FY=4200 KG/CM2 - GRADO 60kg283.920.000.000.0006CAPACITACION EN SEGURIDAD EN OBRA Y MEDIO AMBIENTE06.01CAPACITACION DE TRABAJADORES DURANTE LA EJECUCION DE LA OBRAGLB1.000.000.000.0007CONTROL DE CALIDAD EN OBRA07.01PRUEBAS DE CONCRETO07.01.01ENSAYO DE RESISTENCIA DE CONCRETOGLB1.000.000.000.0008FLETE08.01FLETE TERRESTRE RURALGLB1.000.000.000.0008.02FLETE RURAL CON ASEMILAGLB1.000.000.000.00COSTO DIRECTO0.000.000.00PORCENTAJE DE AVANCE0%0%0%0%0%GASTOS GENERALES (11%)0.000.000.00SUBTOTAL0.000.000.00VALOR REFERENCIAL0.000.000.00