Vacuum system upgrade

31
15.1.204 1 V. Vorobel, SuperNEMO meeting, Aussois Vacuum system upgrade Vacuum probe installed Spectrometer sealed – vacuum improved from 300 Pa to 7 Pa. We have to change a hoose for further improvement. Efect on spectra is significant

description

Vacuum system upgrade. Vacuum probe installed Spectrometer sealed – vacuum improved from 300 Pa to 7 Pa. We have to change a hoose for further improvement . Efect on spectra is significant. Electronics upgrade. - PowerPoint PPT Presentation

Transcript of Vacuum system upgrade

Page 1: Vacuum system  upgrade

115.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Vacuum system upgradeVacuum probe installedSpectrometer sealed – vacuum improved from 300 Pa to 7 Pa.We have to change a hoose for further improvement.

Efect on spectra is significant

Page 2: Vacuum system  upgrade

215.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Electronics upgradePC controlled disriminator CAEN installed in VME – simplification of electronics, well defined and stable threshold, no possible interference between crates

Independent HV sources for different PMTs – to equilibrate differences in gains. We are waiting for delivery of VME PC controlled HV modules.

Cables fixation

Waiting for new PC controled HV modules and repaired VME doesn‘t prevent measurement.

Page 3: Vacuum system  upgrade

315.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Magnetic history influence

Does the electron beam energy depend on the previously set energy due to the magnetic hysteresis?1) If we keep the rule – first go up to magnetic saturation then go down to the desired energy2) If we keep the rule – don‘t keep 1) if the desired energy < the original energy

Page 4: Vacuum system  upgrade

415.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Swapping measurement

Does the peak position depend on the measurement position in the Black-Box due to magnetic field variations?

Page 5: Vacuum system  upgrade

515.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Magnetic shielding upgrade- 4 m-metal cylinders internal f133mm,length 305mm, thickness 1mm for PMT shielding

instead of the low C steel cylinders which were used up to now- plan to make a m-metal box (thickness 1mm) to cover the spectrometer completly

Page 6: Vacuum system  upgrade

615.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Magnetic shielding measurement- Magnetic sensor placed instead of PMT in measurement possition 1.- B-field measured in 3 directions in 3 shielding configurations (no shield, low C steel, m-metal)

for currents in the coil corresponding to the electron beam energies 0-1600keV, saturation.

0 500 1000 1500 2000 2500 3000 3500-50

0

50

100

Series1Series3Series5

0 500 1000 1500 2000 2500 3000 3500

-60-50-40-30-20-10

0

Series1Series3Series5

0 500 1000 1500 2000 2500 3000 3500

-20-15-10-505

Series1Series3Series5

Page 7: Vacuum system  upgrade

7

PMT HV optimization

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 8: Vacuum system  upgrade

8

DE detector setting optimization

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 9: Vacuum system  upgrade

9

DE detector setting optimization

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 10: Vacuum system  upgrade

10

DE detector setting optimization

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 11: Vacuum system  upgrade

11

DE detector setting optimization

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

- PMT HV 1300 V- DE HV 1200 V- Vacuum 6.4 Pa- E=1000 keV- R=13.6 %

Page 12: Vacuum system  upgrade

12

Oscilloscope snap

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 13: Vacuum system  upgrade

13

Observed spectra

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

- PMT HV 1300 V- DE HV 1200 V- DE threshold 15 mV- Vacuum 7 Pa

Page 14: Vacuum system  upgrade

14

Conclusions

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 15: Vacuum system  upgrade

15

Backup

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 16: Vacuum system  upgrade

16

Magnetic shielding measurement

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 17: Vacuum system  upgrade

17

Electronics view

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 18: Vacuum system  upgrade

18

Testing station setup

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 19: Vacuum system  upgrade

19

Routine measurement setup view

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

Page 20: Vacuum system  upgrade

20

Oscilloscope snap 1

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 21: Vacuum system  upgrade

21

Oscilloscope snap 2

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 22: Vacuum system  upgrade

22

Oscilloscope snap 3

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 23: Vacuum system  upgrade

23

Oscilloscope snap 4

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 24: Vacuum system  upgrade

24

Oscilloscope snap 5

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 25: Vacuum system  upgrade

25

Oscilloscope snap 6

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 26: Vacuum system  upgrade

26

Oscilloscope snap 7

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 27: Vacuum system  upgrade

27

Oscilloscope snap 8

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 28: Vacuum system  upgrade

28

Oscilloscope snap 9

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 29: Vacuum system  upgrade

29

Oscilloscope snap 10

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 30: Vacuum system  upgrade

30

Oscilloscope snap 11

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block

Page 31: Vacuum system  upgrade

31

Oscilloscope snap 12

15.1.204 V. Vorobel, SuperNEMO meeting, Aussois

DE left

DE right

scint. block