Vacon / Napal co-operation Maidu Eelmaa, AS NAPAL Vacon Baltic Days 22.-23.9.2011

Transcript of Vacon / Napal co-operation

Page 1: Vacon / Napal co-operation

Vacon / Napal co-operation

Maidu Eelmaa, AS NAPAL

Vacon Baltic Days 22.-23.9.2011

Page 2: Vacon / Napal co-operation

19.09.11 2

- established 1993- build and service boiler houses- more than 100 pcs installed- total 1000MW new boiler houses- total 500MW renovated boiler houses

Page 3: Vacon / Napal co-operation

19.09.11 3

Milestones

2010

1998

1993

1999

2005

Foundation AS Napal byToomas Laanpere

Start electrical & automation design

Authorized reseller of Vacon

Established Vacon Baltic

stockEstablished Vacon Service

Open new building

2004

Entrepreneurship Award 2011

2011

Page 4: Vacon / Napal co-operation

19.09.11 4

Vacon Stock

Drives

- NXP, 4kW...90kW, 5pcs

- NXS, 0,75kW...90kW 27pcs

- NXL, 0,75kW...22kW 46pcs

- V100, 5,5kW...55kW 12pcs

- V10, 0,37kW...5,5kW 134pcs

Page 5: Vacon / Napal co-operation

19.09.11 5

Vacon Stock

Options

- boards A1,A2,A3,AA,B2,B4,B5,C3

- upgrade kits to IP54 for NX, V100

- upgrade kits to IP21 for V10

- PAN-A,PAN-C,DRA-02B,DRA-02L

- programming tools

Page 6: Vacon / Napal co-operation

19.09.11 6

Vacon E-shop

Page 7: Vacon / Napal co-operation

19.09.11 7

Vacon Service

Service tools

- DC power supply

- NX I/O simulator

- Control board tester adapter

- Adapter for power unit

Well trained personal

Mobile shop

Page 8: Vacon / Napal co-operation

19.09.11 8

CASE: AHTME Boiler house

- year 2010- 5 boilers- total 100 MW- 41 x NXS drives- DH network pumps 3x315kW- burner fans w. BR- Profibus DP

Page 9: Vacon / Napal co-operation

19.09.11 9

CASE: Tartu Energia 6kV

- year 2003- 6kV, 500kW motor- step down / step up solution

Page 10: Vacon / Napal co-operation

19.09.11 10

CASE: Fortum Pärnu CHP(Combined Heat and Power)

- year 2010- 24MW electricity + 50MW heat- fuel – wood waste, peat- 53 x NXC, NXP drives, incl. 4x1000kW

Page 11: Vacon / Napal co-operation

19.09.11 11

CASE: Tallinn CHP

- year 2009- 25MW electricity + 49MW heat- fuel – wood waste- 48 x NXC, NXP, NXS drives, incl. 1X1000kW liquid-cooled

Page 12: Vacon / Napal co-operation

19.09.11 12