WELCOME TO THE PRESENTATION ON BY DR.R.K.GUPTA, CMD WAPCOS & MR.R.K.AGRAWAL, CHIEF ENGINEER WAPCOS MINI RATNA-1 ISO 9001 : 2008

description

Seminar Session 11

Transcript of UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Page 1: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

WELCOME TO THE PRESENTATION

ON

BY DR.R.K.GUPTA, CMD WAPCOS

& MR.R.K.AGRAWAL, CHIEF ENGINEER WAPCOS

MINI RATNA-1ISO 9001 : 2008

Page 2: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

International Consultants in Water Resources, Power and Infrastructure Development MINI RATNA-1

ISO 9001 : 2008

Page 4: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INTRODUCTION Lao PDR is one of the Six Riparian Countries of the Mekong

River Basin

Mekong River - Key Source for Development of Agriculture/ Irrigation and Power Projects

Northern Part of the country is hilly, Southern Part has large level areas in Savanakhet and Champassack Provinces

The following 6 Lift Irrigation Schemes were planned and also partially executed in Champassack Province between 1992-1998

Savang irrigation scheme Sak Muang irrigation scheme Thaphosy irrigation scheme Som Hong irrigation scheme Ban He irrigation scheme Muang Sen irrigation scheme

Page 5: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

SAVANG

SAK MUANG

THAPHOSY

BAN HE

SOM HONG

MUANG SEN

Page 6: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INTRODUCTION (Contd.)

Five Irrigation Schemes are located on the Right Side of River Mekong

Sixth Scheme of Muang Sen irrigates the Island of Khong, formed by bifurcation of Mekong River into two limbs

Schemes were only partially completed due to Financial Constraints resulting in their nominal utilization

Lao PDR Government requested Government of India for a Soft Loan for completion of these schemes

WAPCOS Ltd. (Government of India Undertaking) was deputed to submit a preliminary evaluation report on the proposed project and suggest a suitable approach

Based on the recommendations of WAPCOS, GOI granted a Line of Credit of US$ 17.34 million for development of four components of the scheme.

Page 7: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

 Component 1: • Completion of 6 irrigation schemes and rehabilitation of the existing structures• Development of the Command Areas

Component 2: • Installation of 10 large pumps on pontoons and Commissioning to

pump river water to silting basins of the main canals in each scheme

Component 3: • Conversion and commissioning of Diesel Driven Pump sets into

Electric Driven Pump Sets Component 4:

• Improvement of Pump Service Centers at Pakse, Savann Khet and Vientiane

PROJECT COMPONENTS

Page 8: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

CONVERSION OF DIESEL PUMPS INTO ELECTRIC PUMPS AND IMPROVEMENT OF SERVICE CENTRES

In order to provide quick irrigation benefits to the farmers, the following two components were taken up on top priority basis:Conversion and commissioning of 34 diesel driven pumps into electric driven pumps. This included rehabilitation of existing power supply equipment and provision and installation of additional power supply equipments and transport vehicles. The work included: On-site inspection of diesel pumps and power supply arrangements and indepth assessment of their condition

Page 9: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

CONVERSION OF DIESEL PUMPS INTO ELECTRIC PUMPS AND IMPROVEMENT OF SERVICE CENTRES (Contd.)

Preparation of detailed inventory of equipment and parts required

Import of these parts from India Conversion of pumps into electric pumps and putting in place

power supply arrangement Testing and Commissioning Handing over to the Client/farmers

Page 10: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

CONVERSION OF DIESEL PUMPS INTO ELECTRIC PUMPS AND IMPROVEMENT OF SERVICE CENTRES (Contd.)

Improvement of the three existing pump service stations. This included provision of equipment and tools for testing and repairs of pump sets, training of workshop technicians

The work included: Inspection of the three service stations to

identify the requirement of equipment/tools and training requirement of the manpower to make them self sufficient and functional.

Import of the requisite equipment/tools from India

Extensive training of workshop technicians and staff

Page 11: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INSTALLATION OF 10 LARGE PUMPS (187-400 KW)

18 large electrically operated pumps were imported from India in the year 2000. Out of these, 8 were installed on pontoons and the remaining 10 were to be installed. These pumps are required for pumping water from Mekong river for providing irrigation water for the 6 irrigation schemes.The work involved:On-site inspection of pumps to identify the extent of servicing required before installation and repair of pontoons and stilling basinsServicing of pumps, delivery pipes and repair of pontoons and putting in place power supply arrangementInstallation of pumps on pontoonsRepair of stilling basinsTesting and commissioning of pumps

Page 12: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

SURVEY OF DIESEL PUMPS

Page 13: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

STATUS OF DIESEL PUMPS BEFORE PROJECT IMPLEMENTATION

Page 14: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

STATUS OF DIESEL PUMPS BEFORE PROJECT IMPLEMENTATION (Contd.)

Page 15: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 16: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 17: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 18: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 19: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Thaphosy Irrigation Scheme Located about 17 km from Pakse, in Champassack Province Envisaged to benefit a command area of about 400 ha Main canal, measuring about 1.72 km has already been constructed About 1.874 km out of 6.49 km of secondary/tertiary canals has been

constructed Average yield of paddy is about 3-4 tons/ha Other items cultivated are vegetable, banana, coconut and tamarind

 Muang Sen Irrigation Scheme Located about 150 km from Pakse, in Champassack Province Envisaged to benefit a command area of about 900 ha Main Canal with a length of 3.388 Km has already been constructed Secondary/Tertiary canal of about 21.655 km yet to be constructed paddy yields are about 2.2 tons/ha and 4 tons/ha Main crops are paddy, beans, cucumber, carrot, mint, chillies, salad leaves

and green vegetable Other items cultivated are Coconut, tamarind, mango and oranges

SIX IRRIGATION SCHEMES

Page 20: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Execution of stone pitching for river edge protection in Thaposy Scheme

SITE PHOTOGRAPHS

Concreting village road bridge in canal T-4 in Thapsoy Scheme

Page 21: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Cleaning of Main canal in Muang Sen Irrigation Scheme

Recently completed bank refurbishment at Canal T-6 at Muang

Sen Irrigation Scheme

SITE PHOTOGRAPHS

Page 22: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Som Hong Irrigation Scheme Located about 60 km from Pakse, in Champassack Province Envisaged to benefit a command area of about 1700 ha Main Canal measuring about 2.37 km has been constructed Secondary/Tertiary canals proposed for a length of 45.979 km is yet

to be constructed A Water Users Group (WUG) exists sub divided into 3 sub-groups

consisting of about 10-15 persons/members. Main crops grown are rice, tobacco, corn, sugarcane, cucumber,

beans and vegetables Average yield of rice in:

Dry Season is 4.5 ton/ha Wet Season is 3 ton/ha

Tobacco is mostly grown in small quantities for Self consumption Sugarcane and vegetables are cultivated commercially Corn, beans and cucumber are mostly used for domestic

consumption

SIX IRRIGATION SCHEMES (CONTD.)

Page 23: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Inspection in Somhong site

Page 24: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Ban Hea Irrigation Scheme Envisaged to provide irrigation to about 600 ha About 0.935 km out of 2.86 km of Main Canal has been constructed About 10.388 km long Secondary/Tertiary canals are yet to be

constructed Average yield of rice in:

Dry Season is 4.5 ton/haWet Season is 3 ton/ha

60-70% of the rice yield is sold @ 2100 Kips/kg Yield of peanut is about 1 ton/ha sold (about 25-30% of the total

yield) @ about 10,000 Kips/kg Fruits are cultivated for self consumption WUG with 6 members also exists.

SIX IRRIGATION SCHEMES (CONTD.)

Page 25: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Excavation of main canal in Ban He Scheme

Governor, Champassak Province along with DOI, WAPCOS and AIL visiting Ban He

irrigation scheme

Page 26: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Savang Irrigation Scheme Envisaged to irrigate a command area of about 420 ha About 0.4 km out of 2.169 km of main canal has been constructed Average yield of paddy is 1 ton/ha Vegetables grown are beans, peanuts and cucumber mostly in kitchen

gardens Fruits such as banana, guava, mango, tamarind are also grown Villagers supplement their incomes by sale of bamboo handicraft items

Sak Muang Irrigation Scheme Located about 26 km from Pakse, in Champassack Province Envisaged to benefit a command area of about 1100 ha Main Canal measuring about 3.18 km has been constructed About 3.76 km out of 22.493 km of Secondary/Tertiary canals has been

constructed Main crops grown are paddy, cucumber, beans, and vegetables Average yield of paddy in:

Dry Season is 4-4.5 ton/haWet Season is 3 ton/ha

SIX IRRIGATION SCHEMES (CONTD.)

Page 27: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Inspection of newly constructed and installed head regulators at

Sak Muang

Clearing and Stripping work under progress at main canal in Savang

Scheme

Page 28: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

On site inspection of 34 diesel pumps for indepth assessment of their condition

Inspection of the three pump service stations and preparation of detailed inventory of equipment & tools required and training requirement

On site assessment of the 10 large pumps to assess requirement of servicing and repair of pontoons.

Topographical Survey of the six irrigation schemes Site inspection of all schemes for:

 Ascertaining existing conditions of various components. Obtaining and studying the available data/reports. Developing the missing data based on the site conditions & discussions

with DOI Assessing the quantum of the balance work to make these schemes

functional    Planning and Design

Cost Estimation Economic Analysis

PREPARATION OF DPR

Page 29: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INSPECTION OF WORKS-SAVANG

Page 30: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INSPECTION OF WORKS- SAK MUANG

Page 31: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

INSPECTION OF WORKS - THAPOSY

Page 32: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

SURVEY OF DIESEL PUMPS

Page 33: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

STATUS OF DIESEL PUMPS BEFORE PROJECT IMPLEMENTATION

Page 34: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

STATUS OF DIESEL PUMPS BEFORE PROJECT IMPLEMENTATION (Contd.)

Page 35: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

CONDITION OF DIESEL PUMPS BEFORE PROJECT IMPLEMENTATION

Page 36: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

STATUS OF PROJECT IMPLEMENTATION

Page 37: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Following works have been completed and handed over to the Client:

Conversion of 34 diesel pumps into electric pumpsImprovement of 3 Pump Service Stations

     These pumps will provide irrigation in an area of 2800 ha.

WORKS COMPLETED

Page 38: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Testing of all 18 pump sets, motors and transformers have been carried out

A detailed inspection report for depicting the present status of these pumps has been prepared and submitted to client

After approval from DOI, Lao PDR, required spare parts would be imported from India and rehabilitation/installation work would be taken up

WORKS IN PROGRESS

Page 39: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 40: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 41: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 42: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 43: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 44: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 45: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 46: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 47: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Detailed Engineering Reports along with construction drawings have been prepared for all schemes

Canal length 131 km being constructed/rehabilitated at six large irrigation schemes viz. THAPOSY, SAK MUANG, SAVANG, SOM HONG, BAN HE AND MUANG SEN

3200 ha of Total command area would be achieved after completion of all schemes

Rehabilitation of existing structures is being done at all the schemes

Construction of cross drainage work, head works etc. are being carried out

Operation and maintenance training sessions are being conducted from time to time for Local officials of Lao PDR

     

SIX IRRIGATION SCHEMES

Page 48: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 49: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 50: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 51: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 52: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

Execution of stone pitching for river edge protection AT

THAPOSY IRRIGATION SCHEME

Page 53: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 54: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 55: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 56: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 57: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 58: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 59: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

SALIENT FEATURES

Description Length (in kms)

Total Length of All Canals 131

Total Length of All Canals already completed 17.5

Total Length of Main Canal 15.7

Total Length of Main Canal already completed 12

Total Length of Secondary/ Tertiary Canals 115.2

Total Length of Secondary/ Tertiary Canals already completed 5.6

Total Command Area achieved by Project 6000 ha

Page 60: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

TRAINING MODULES

WAPCOS has been imparting training to the DOI staff pertaining to various civil, mechanical and electrical works of the various components during construction.

Training on civil works comprises operation and maintenance of concrete structures, banks of the canals, drains etc.

Imparting knowledge on theory of Induction Motors and Centrifugal Pumps and their operation & maintenance with help of Electro-Mechanical equipment suppliers.

Training on the Transformers cover the importance of oil and deterioration of oil, maintenance of silica gel breathers, checking of LAs, etc.

Training on pumps covering their working & losses in head from suction to delivery and important issues relating to general O&M of the pumps, valves and strainers.

Page 61: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER
Page 62: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

BENEFITS

These schemes shall provide assured Irrigation during dry season- thereby providing additional crops to the farmers.

A total number of about 5500 families with a population of about 50,500 people would be benefited by commissioning of 6 large schemes.

A total number of about 2100 families in six different districts of Champassack, having population of 18,500 are being benefited by successful working of the 34 electric pumps.

A total command area of 6000 ha would be achieved after project completion.

An average increase in the yield of 2 ton/ha.

These schemes would improve the socio-economic condition of the local people.

Page 63: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

BENEFITS (Contd.)

There shall almost be no dislocation of population and no Rehabilitation and Resettlement problems are envisaged.

The project shall have no adverse effect on environment / ecology of the area.

Benefit Cost Ratio of the Project is 3.27:1

Page 64: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER

CONCLUSION

Page 65: UTILIZATION OF WATER RESOURCES OF MEKONG RIVER