U.S. U.S. Transmission Transmission Capacity & Capacity & ReliabilityReliability
Are we willing to do what it takes to
preserve the transmission option?David R. Nevius -
NERC
![Page 2: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/2.jpg)
About NERCAbout NERCHistoryMembersPurposeReliability Assessment
![Page 3: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/3.jpg)
Transmission Transmission AssessmentAssessment
Loadings increasing$$ and weather are the driversMore curtailments requiredNot designed for current levels and directions of transfersMost planning is short termMargins are thin
![Page 4: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/4.jpg)
Few Few Transmission Transmission AdditionsAdditions
Only 7,500 miles plannedMost additions driven by need to connect new generatorsNo significant improvement to long-distance transfersLess weight place on reliability in justifying transmission
![Page 5: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/5.jpg)
C a p a c i t y , D e m a n d , a n d T r a n s m i s s i o n
Transmission Growth Transmission Growth vs. vs. Generation and Generation and Demand GrowthDemand Growth
18%
Increase
5% Increase
![Page 6: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/6.jpg)
System System CongestionCongestion
![Page 7: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/7.jpg)
Impediments to New Impediments to New TransmissionTransmission
Opposition and litigationUncertain cost recovery Impacts vs. benefits?Who has responsibility to build?Siting across multiple jurisdictionsFederal agenciesRisky Business - Who will invest?
![Page 8: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/8.jpg)
Recent DelaysRecent DelaysAEP 765 kV (WV-VA) delayed from 1998 to 2004 – U.S. Forest ServiceConnecticut - Long Island Cable rejected by Connecticut Siting Council
![Page 9: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/9.jpg)
Previous Studies Previous Studies and Reportsand Reports
Moving Power – Flexibility for the Future (NGA 1987)Electric Power Wheeling and Dealing (OTA 1989)Keystone Policy Dialog – Model Siting Code (1994)
![Page 10: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/10.jpg)
Previous Previous RecommendationsRecommendations
Reasonable time frames and deadlinesClear decision criteria, need standards, and rules for cost recoveryEarly involvement of landowners, public, and regulatorsOne-stop siting and certification processCriteria for preferred sites - corridorsRegional or federal siting authority
![Page 11: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/11.jpg)
ERCOT - One Model ERCOT - One Model that Works!that Works!ISO responsible for transmission planningLoad serving entities request Planned Transmission Service (Firm)ISO & TSPs determine upgrades to meet criteriaAnnualized costs charged to load (pro rata)Single jurisdiction – predictable process90-mile 345 kV line certificated AND constructed in less than 2 years!
![Page 12: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/12.jpg)
Maintaining Maintaining TransmissionTransmissionas an Optionas an Option
Must change how transmission is certified and sited
Recognize multi-state nature and benefits of transmission in siting and certification processesRegional siting authorities?Role for RTOs?Federal role in siting?
Unless processes changed, major transmission will simply not be developed!
![Page 13: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/13.jpg)
The ChallengeThe ChallengeConcerted and cooperative effort to reform siting processesAll know what has to be doneUnless processes are fixed, will continue to work around congestion and constraints
![Page 14: U.S. Transmission Capacity & Reliability Are we willing to do what it takes to preserve the transmission option? David R. Nevius - NERC.](https://reader035.fdocuments.us/reader035/viewer/2022062800/56649de55503460f94add944/html5/thumbnails/14.jpg)
NERCNERC
www.nerc.com