LV-2002/042
apríl 2002
Urriðafoss Hydroelectric ProjectRiver bed of Þjórsá between Skeið and Holt
Geological investigations in April 2002
LV-2002/042
Urriðafoss Hydroelectric Project
River bed of Þjórsá between Skeið and Holt
Geological investigations in April 2002
April 2002
Joint Venture Sweco/Hnit/Rafhönnun
Jarðfræðistofan Ehf
JFS Geological services Ltd
Table of contents
1 Brief geological conditions ......................................................................................2
2 Investigations ..........................................................................................................2
2.1 Area 1 ..............................................................................................................2
2.2 Area 2 ..............................................................................................................2
2.3 Area 3 ..............................................................................................................3
3 Conclusion..............................................................................................................3
Tables
Table 1 Cobra drilling on the east bank Table 2 Cobra drilling on the west bank Table 3 Rotary and percussion drilling on the west bank
Drawings
Drawing 1 Location map 1 Drawing 2 Location map 2
Graphic drilling logs
Cobra boreholes UC-1 through UC-53, 7 sheets Rotary and percussion boreholes ULO-56 through ULO-75, 4 sheets
___________________________________________________________________________________________ Jarðfræðistofan ehf 2002 2 Urriðafoss Hydroelectric Project
1 Brief geological conditions
Upstream from the proposed damsite in Þjórsá (at the upstream end of the rapids at Þjótandi) the Þjórsá river flows along relatively flat area from 44 m a.s.l. until the next rapids exist at 54 m a.s.l. some 15 km upstream, where the island Árnes is splitting the river into two major channels. The river flows in a braided sandy channels along relatively flat area near the eastern margin of the extensive Þjórsá lava, which covers the lowland in the Skeið area along the west bank of the river. The east bank of the river is highly affected by the hummocky landscape of the old Pleistocene bedrock found discontinuously along the bank.
2 Investigations
The investigations described here were carried out on behalf of Landsvirkjun during spring 2002. The investigation layout was designed by the engineering consultants Hnit and Sweco Internatinal AB. Jarðfræðistofan (JFS Geological services) carried out the investigations as their subcontractor. Ræktunarsamband Flóa og Skeiða performed the percussion drilling.
The investigations in the river-bed of Þjórsá was made using two kinds of drilling methods, making very different capabilities of penetrating the sediments.
Firstly light Cobra percussion drilling (approx 30 kg vibrating hammer drilling with 25 mm steel rods), 53 holes with a total of 250 drilling meters.
Secondly rotary and percussion drilling using 22 tons drill rig with rotary drill bit of 62 mm and thrust of approx. 5 tons and additional percussion hammering where considered acceptable and convenient, 20 holes with a total of 150 m.
For convenience the research area will be divided into three parts as shown on Drawings 1 and 2.
2.1 Area 1
The upstream part from Árnes to Kaldárholt. All investigations were made on the west bank of the river.
As the velocity of the river decreases from the rapids at Árnes in the upstream end, the most coarse grained material is found there as gravel and sandy gravel with grain size up to some 100 mm in "former river channels" of high velocity. The main fraction of grain size seems to be sand with pebbles up to 50 mm.
Rotary and percussion drilling (holes ULO 56 through ULO-71) shows generally approx. 5 m thick layer of loose material supposedly sandy gravel. Few cobra boreholes were drilled in the downstream part of this area (UC-43 through UC-46) showing very similar results as the rotary drilling or 5-7 m thick loose sediments.
2.2 Area 2
The middle part of the area, from the alluvium north of Kaldárholt towards Blesastaðir. This area was investigated with cobra drilling on the east bank and both cobra and rotary drilling on the west bank. The sandy gravel is generally more fine grained than in Part 1 and lower ratio of pebbles (10-30%), seldom exceeding 3-5 cm in diameter. As elsewhere the coarse
___________________________________________________________________________________________ Jarðfræðistofan ehf 2002 3 Urriðafoss Hydroelectric Project
grained material is mainly confined to lenses and layers in former channels of higher velocity on the river.
East bank. Cobra boreholes UC-16 through UC-33, located in this part show approx. 5 m thickness of loose sediments (depth varying between 4,5-6 m).
West bank. Cobra boreholes UC-34 through UC-42 and UC-49 through UC-53 are within this area in addition to percussion holes ULO-72 through ULO-75. The cobra holes show 4-6 m thick loose sediments but the percussion drilling shows approx. 7 m thickness, possibly mixed with some larger stones at the base. Further below there is higher resistance probably in the top scoria of the Þjórsá lava mixed with sand.
2.3 Area 3
The downstream part of the area was investigated with Cobra boreholes UC-1 through UC-15 on the east bank. The sediments on the surface is mainly sand with scattered small pebbles and channels of sandy fine grained gravel.
These cobra holes show 3-5 m thick loose sediments of sand and sandy gravel. Usually the drilling stopped slowly on some semi-hardened material. One hole reached almost 7 m depth. In addition four percussion holes ULO-30 through ULO-33 were drilled further downstream near Kálfhóll on the west bank in the spring 2001. Three holes showed 3,5 - 7 m thick sediments but hole ULO-32, (probably near the eastern margin of the Þjórsá lava) reached almost 9 m depth without touching harder material.
3 Conclusion
Drilling has revealed mainly 5 m thick sediments, resting on some harder irregular base. The alluvium shows some grading in grain size from more coarse grained gravely sand in the uppermost part to sandy fine grained gravel in the downstream part. Groundwater level is very close to the surface. The sediments are easily excavatable and based on visual grain sizes, probably most of it could be pumped. If excavated by pumping, further investigations are needed to verify grain size distribution.
___________________________________________________________________________________________ Jarðfræðistofan ehf 2002 4 Urriðafoss Hydroelectric Project
Table 1. Cobra drilling on the east bank
Hole East North Elev. m Depth to high resist. UC-01 425530,8 386843,2 Not surv. 3,6 UC-02 425598,1 386864,7 Not surv. 2,9 UC-03 425737,9 386800,2 Not surv. 2,7 UC-04 425861,7 386762,5 Not surv. 3,1 UC-05 425977,3 386711,4 Not surv. 3,3 UC-06 425813,2 386356,2 Not surv. 3,5 UC-07 425619,5 386455,7 Not surv. 4,1 UC-08 426090,5 386684,5 Not surv. 4,6 UC-09 425784,0 387230,8 Not surv. 3,5 UC-10 426058,3 387117,8 Not surv. 4,3 UC-11 426195,6 387556,2 50,75 6,8 UC-12 426294,2 387505,3 50,33 4,2 UC-13 426419,2 387401,0 51,26 5,2 UC-14 426294,1 387866,5 50,33 4,1 UC-15 426416,1 387760,6 51,11 4,1 UC-16 426341,2 388454,4 50,90 5,15 UC-17 426470,2 388373,6 50,93 6,05 UC-18 426656,4 388276,8 51,20 5,5 UC-19 426451,8 388698,2 51,15 4,5 UC-20 426628,5 389061,0 51,50 4,4 UC-21 426760,1 388942,2 51,39 4,9 UC-22 426950,5 388762,4 52,01 3,6 UC-23 426884,2 389372,2 51,67 5,2 UC-24 427041,0 389260,0 51,80 5,8 UC-25 427354,1 389570,8 51,62 6,3 UC-26 427049,7 389931,8 52,11 4,5 UC-27 427180,9 389836,8 51,14 4,6 UC-28 427492,0 390458,5 51,30 6,4 UC-29 427633,9 390327,8 51,77 3,7 UC-30 427759,4 390094,4 51,82 4,8 UC-31 428108,0 390706,5 51,82 5,8 UC-32 428215,0 390438,5 52,22 3,9 UC-33 428654,7 390594,2 52,19 4,4
___________________________________________________________________________________________ Jarðfræðistofan ehf 2002 5 Urriðafoss Hydroelectric Project
Table 2. Cobra drilling on the west bank
Hole East North Elev. m Depth to high resist. UC-34 426375,3 389587,4 51,40 5,2 UC-35 426759,3 389942,3 51,72 4,3 UC-36 426364,6 390121,2 51,32 4 UC-37 426900,0 390127,0 51,80 5,4 UC-38 426725,9 390351,9 51,19 4,15 UC-39 427025,7 390418,0 51,83 4,5 UC-40 426670,4 390462,3 51,85 4,65 UC-41 427139,1 390592,8 51,84 5,35 UC-42 427000,2 390725,0 51,44 5,1 UC-43 427470,0 390864,3 52,58 5,1 UC-44 427343,6 391015,6 51,98 5,35 UC-45 427858,2 390987,0 52,48 6,6 UC-46 427827,6 391297,0 52,70 5,5 UC-47 428424,7 390792,6 53,01 5,3 UC-48 428444,9 391193,7 52,93 5,15 UC-49 426420,4 389239,5 50,88 5,2 UC-50 426209,8 388716,2 50,65 4,6 UC-51 426078,3 388423,4 50,44 6,6 UC-52 425854,6 388597,1 50,76 3,7 UC-53 425991,7 388976,1 50,42 4,8
Table 3. Rotary and percussion drilling on the west bank
Hole East North Elev. m Depth to high resist. Depth of hole ULO-56 430611,1 391411,5 53,70 5,7 8,7 ULO-57 430353,5 391531,1 54,31 4,5 5,7 ULO-58 430255,4 391239,3 53,36 5,2 5,7 ULO-59 430216,3 391375,7 53,72 3,5 5,7 ULO-60 429880,0 391413,9 53,58 5 5,7 ULO-61 429791,8 391267,8 52,76 4,5 8,7 ULO-62 429485,9 391188,9 53,09 6,5 7,9 ULO-63 429255,0 390879,1 52,55 4,2 5,7 ULO-64 428920,1 390695,2 53,12 3,7 5,7 ULO-65 428915,4 391179,1 53,14 4 5,7 ULO-66 428445,5 391090,9 52,90 6,2 8,7 ULO-67 428425,1 390800,1 52,97 4 5,7 ULO-68 428143,3 391141,9 52,98 5,5 6,3 ULO-69 427859,3 390988,0 52,58 5 5,7 ULO-70 427641,4 391118,3 52,77 >5,7 5,7 ULO-71 427503,5 390883,0 52,46 7 11,1 ULO-72 426832,7 390561,8 51,63 >7,5 8,7 ULO-73 426891,4 390109,1 51,93 7,5 8,7 ULO-74 426321,5 389858,7 51,41 >8,7 8,7 ULO-75 426420,4 389242,9 50,92 9 11,7
70
55
60
55
55
55
55
55
95
90
95
50
60
65707580
65
60 55
70
65
5560
75
65
75
60
60
65
75
70
85
80
60
65
70
75
85
80
55
90
85
80
75
7065
60
55
55
55 55
55
55
60
55
55
55
55
65
60
50
ttir
Brautarholt
Kaldárholt
X = 427000
Y =
3905
00
X = 430000
Y =
3915
00
500
X = 426000
Y =
3915
00
UC-19 / 4.5
UC-20 / 4.4
UC-21 / 4.9
UC-22 / 3.6
UC-23 / 5.2
UC-24 / 5.8
UC-25 / 6.3
UC-26 / 4.5
UC-27 / 4.6
UC-34 / 5.2
UC-49 / 5.2
UC-50 / 4.6
UC-53 / 4.8
ULO-74 / 8.7
ULO-75 / 9.0
UC-28 / 6.4
UC-29 / 3.7
UC-30 / 4.8
UC-31 / 5.8
UC-32 / 3.9
UC-33 / 4.4
UC-35 / 4.3
UC-37 / 5.4
UC-38 / 4.15
UC-39 / 4.5
UC-40 / 4.65
UC-41 / 5.35
UC-42 / 5.1
UC-43 / 5.1
UC-44 / 5.35
UC-45 / 6.6
UC-46 / 5.5
UC-47 / 5.3
UC-48 / 5.15
ULO-56 / 5.7
ULO-57 / 4.5
ULO-58 / 5.2
ULO-59 / 5.7ULO-60 / 5.0
ULO-61 / 4.5
ULO-62 / 6.5
ULO-63 / 4.2
ULO-64 / 3.7
ULO-65 / 4.0
ULO-66 / 6.2
ULO-67 / 4.0
ULO-68 / 5.5
ULO-69 / 5.0ULO-70 / 5.7
ULO-71 / 7.0
ULO-72 / 8.7
ULO-73 / 7.5UC-36 / 4.0
Area 2
Area 1
Area 2
Landsvirkjun DesignDrawnChk.Appr.
ScaleHH
April 2002
DrawingÁgG
JFS - 47Urriðafoss Hydroelectric ProjectJarðfræðistofan Ehf
JFS Geological services Ltd
1
0 1,0 km
UC-01 / 5.0 Cobra hole number / Thickness (m) of loose sediment
ULO-56 / 5.0 Percussion hole number / Thickness (m) of loose sediment
Location map
Intake lake areaÞjórsá river bed
55
55
55
80
55
50
50
80
70
75
65
70
75
6065 70 75 80 85 90
55
55
50
50
55
50
50
50
50
110
105
100
95
90
85
80
75
70
65
60
55
50
50
50
55
60
65
65
60
55
55
Skeiðháholt
X = 425000
Y =
3880
00
Blesastaðir
UC-11 / 6.8
UC-12 / 4.2
UC-13 / 5.2
UC-14 / 4.1
UC-15 / 4.1
UC-16 / 5.15
UC-17 / 6.05UC-18 / 5.5
UC-19 / 4.5
UC-20 / 4.4
UC-21 / 4.9
UC-22 / 3.6
UC-24 / 5.8
UC-49 / 5.2
UC-50 / 4.6
UC-51 / 6.8
UC-52 / 3.7
UC-53 / 4.8
ULO-75 / 9.0
UC-09 / 3.5
UC-10 / 4.3
UC-08 / 4.6UC-05 / 3.3
UC-04 / 3.1UC-03 / 2.7
UC-02 / 2.9
UC-01 / 3.6
UC-07 / 4.1
UC-06 / 3.5
Area 3
Area 2
Landsvirkjun DesignDrawnChk.Appr.
ScaleHH
April 2002
DrawingÁgG
JFS - 47
Location map
Urriðafoss Hydroelectric Project
Intake lake area
Jarðfræðistofan Ehf
JFS Geological services Ltd
2
0 1,0 km
UC-01 / 5.0 Cobra hole number / Thickness (m) of loose sediment
ULO-56 / 5.0 Percussion hole number / Thickness (m) of loose sediment
Þjórsá river bed
UC - 1
0
5
Depth (m)
Sandy gravel - fine gravel.0-1 m 10 sec.1-2 m 15 sec.
3.6 m bottom in high resistance,easy to pull up.
2-3 m 20 sec.3-3.6 m 15 sec.
X: 425530.820 Y: 386843.190
Elev.: ?
The hole is 4 m from the river.Ground ice is in 3 digged holes closer to the river at 0.2-0.3 m depth,no ice found in the hole.
UC - 2
0
5
Depth (m)
0-1 m 15 sec., loose gravel. Ice at 0.3-0.4 m.
1-2 m 20 sec. Low resistance, higher resistance at 1.4-1.6 m.2-2.9 m 15 sec. Low resistance2.9 m bottom, hard high resistance.
X: 425598.063 Y: 386864.703
Elev.: ?
The hole is ~100 m from the river.
UC - 3
0
5
Depth (m)
0-1 m low resistance. Ice lens at 0.4-0.5 m.1-2 m 30 sec.
2-2.5 m 30 sec.2.5-2.7 m 30 sec.
X: 425737.928 Y: 386800.164
Elev.: ?
2.7 m bottom, very slow drilling.The hole is 200 m from UC-2,west of small channel.
UC - 5X: 425977.312 Y: 386711.424
UC - 6X: 425813.174 Y: 386356.241
Sandy gravel. Sandy gravel.
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
AgG
JFS - 47
Cobra drilling
April 2002
Drawing
Landsvirkjun
UC-1 through UC-9
Drill. contr.
Time of drilling April 2002 Intake lake area - East bank
Jarðfræðistofan Ehf
JFS Geological services Ltd
UC - 4
0
5
Depth (m)
0-0.6 m loose gravel. Ice lens at 0.4-0.5 m.0.6-1 m increasing resistance.
1-2 m 60 sec. high resistance, silt?2-3 m 80 sec. high resistance, silt?
X: 425861.654 Y: 386762.517
Elev.: ?
3-3.1 m high resistance, silt?3.1 m bottom, high resistance, harder to pull up than before.
Sandy gravel.
3-3.3 m 60 sec. then stop.
0
5
Depth (m)
3.3 m bottom in hard material.Easy to pull up.
0-1 m loose sand and gravel.1-1.5 m 20 sec. low resistance.
2.7-3 m 60 sec. high resistance
1.5-2 m 40 sec. higher resistance.2-2.7 m 60 sec. higher resistance.
Elev.: ?
The hole is at the west bank of channelca. 100-150 m from the east bank andsmall hill.
3.2-3.4 m 60 sec.
0
5
Depth (m)
3.4-3.5 m 60 sec. high resistance.3.5 m bottom.
0-1 m 15 sec low resistance,ice lens at 0.4-0.5 m.1-1.5 m 15 sec.
3-3.2 m 20 sec.
1.5-2 m 30 sec. higher resistance.2-3 m 40 sec.
Elev.: ?
The hole is ~200 m downstream from previously drilled line.
Sandy gravel. Sandy gravel.
UC - 9
0
5
Depth (m)
0-1 m 10 sec. low resistance. Ice lens at 0.4-0.5 m.1-2 m 20 sec. low resistance.
2-3 m 30 sec. low resistance.3-3.5 m 30 sec. low resistance.
X: 425783.965 Y: 387230.789
Elev.: ?
3.5 m bottom, stopped on hard surface.Easy to pull up.
Sandy gravel.
3.6-4 m 40 sec.
UC - 7
0
5
Depth (m)
4-4.1 m 30 sec.
0-1 m 10 sec low resistance,ice lens 5-10 cm.1-2 m 10 sec. low resistance.
3-3.6 m 30 sec.
4.1 m bottom.
2-3 m 20 sec. higher resistance.
X: 425619.515 Y: 386455.738
Elev.: ?
The hole is in front of a summerhouseon the west bank of the river.
Sandy gravel.
4-4.5 m 80 sec. high resistance
UC - 8
0
5
Depth (m)
4.5-4.6 m 30 sec.
0-1 m 15 sec low resistance.1-2 m 30 sec. higher resistance.
3-4 m 45 sec.
4.6 m bottom very high resistance.Hard to pull up.
2-3 m 40 sec.
X: 426090.494 Y: 386684.510
Elev.: ?
The hole is 50 m from the upstreamend of rock hill and ~100 m fromUC-5 in drilling line 1.
Sandy gravel.
Urriðafoss Hydroelectric Project JFS - 47LandsvirkjunJarðfræðistofan Ehf
JFS Geological services Ltd
Note: Drilling time in seconds.
UC-1 to UC-10 location based on orthophoto. Elevation not surveyed.
UC - 10
0
5
Depth (m)
0-1 m low resistance.
1-2 m 15 sec. low resistance.
2-3 m 20 sec. low resistance.3-4 m 40 sec. higher resistance.
X: 426058.315 Y: 387117.846
Elev.: ?
4-4.3 m 15 sec.4.3 bottom stopped on hard surface.
UC - 11
0
5
Depth (m)
0-1 m low resistance.Ice lens at 0.4-0.5 m.1-2 m 25 sec. low resistance.2-3 m 40 sec. higher resistance.3-4 m 45 sec.
X: 426195.6463 Y: 387556.2157
Elev.: 50.7518
4-4.5 m 30 sec.4.5-5 m 35 sec.5-6 m 70 sec. higher resistance at 5.5 m.6-6.8 m 70 sec.6.8 m bottom, stopped in high resistance,hard to pull up.
UC - 12
0
5
Depth (m)
0-1 m low resistance.Ice lens at 0.2-0.4 m.1-1.3 m 10 sec. low resistance.
2-3 m 40 sec. 3-3.4 m 25 sec.
X: 426294.1736 Y: 387505.2989
Elev.: 50.3289
3.4-3.8 m 40 sec.3.8-4 m 15 sec. higher resistance.4-4.2 m 35 sec.
4.2 m bottom, stopped in high resistance,hard to pull up.
New drilling line, 8 m from the river bank.
1.3-2 m 25 sec. higher resistance, silt?
UC - 13
0
5
Depth (m)
0-1 m 20 sec. low resistance. Ice lens at 0.2-0.3 m.1-2 m 20 sec. 2-2.5 m 15 sec.
3-3.6 m 35 sec.
X: 426419.2020 Y: 387401.0349
Elev.: 51.2632
3.6-4 m 30 sec. 4-4.4 m 30 sec. 4.4-5 m 40sec.
~100 m east of UC-11.
2.5-3 m 30 sec. higher resistance.
5-5.2 m 20 sec. 5.2 m bottom, stopped in veryhigh resistance, hard to pull up.
UC - 14
0
5
Depth (m)
0-1 m low resistance.
1-2 m 15 sec.
2-3 m 25 sec.
3.6-4 m 35 sec. increasing resistance.
X: 426294.1377 Y: 387866.5270
Elev.: 50.3325
4-4.1 m stopped in high resistance.Bottom at 4.1 m.
3-3.6 m 30 sec.
UC - 15
0
5
Depth (m)
0-1 m low resistance. Ice lens at 0.2-0.5 m.1-2 m 15 sec.2-3 m 25 sec.
3.6-4 m 40 sec.
X: 426416.0804 Y: 387760.6409
Elev.: 51.1056
4-4.1 m 40 sec.Bottom at 4.1 m.
3-3.6 m 60 sec. increasing resistance.
UC - 17
0
5
Depth (m)
0-1 m 5 sec.1-2 m 15 sec.
2.6-3 m 20 sec. 3-3.6 m 60 sec. increasing resistance.
X: 426470.2267 Y: 388373.5725
Elev.: 50.9264
3.6-4 m 30 sec.4-4.2 m 20 sec. 4.2-4.4 m 30 sec.4.4-4.6 m 30 sec
2-2.6 m 20 sec.
6-6.05 m stopped in high resistance.
4.6-5 m 60 sec. 5-5.6 m 50 sec.5.6-6 m 50 sec
UC - 18
0
5
Depth (m)
0-1 m low resistance.Ice 0.3-0.4 m.1-2 m 20 sec.
3-4 m 100 sec. increasing resistance. 4-4.7 m 60 sec.
X: 426656.4480 Y: 388276.7965
Elev.: 51.1968
4.7-5 m 20 sec.5-5.4 m 50 sec. 5.4-5.5 m 20 sec.5.5 m bottom in high resistance.
2-3 m 40 sec.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Sandy gravel.
y jDesign
Drawn HH
AgG
Cobra drilling
April 2002
Drawing
UC-10 through UC-18
Drill. contr.
Time of drilling April 2002 Intake lake area - East bankg
UC - 16
0
5
Depth (m)
0-1 m 10 sec. low resistance.
1-2 m 15 sec.2-3 m 40 sec.
3.4-3.6 m 30 sec. increasing resistance.
X: 426341.2016 Y: 388454.3942
Elev.: 50.9027
3.6-4 40 sec.
3-3.4 m 20 sec.
4-4.2 m 30 sec.4.2-4.8 60 sec.4.8-5 m 20 sec.5-5.15 m 35 sec.Stopped in high resistance.
Sandy gravel.
Urriðafoss Hydroelectric ProjectDesign AgG/HH
JFS - 47
April 2002
LandsvirkjunDrill. contr.
i f d illi Intake lake area - East bank
Jarðfræðistofan Ehf
JFS Geological services Ltd
Sandy gravel. Sandy gravel.
Note: Drilling time in seconds.
UC - 21
0
5
Depth (m)
0-1 m 10 sec. low resistance. 1-1.3 m 10 sec.
2-3 m 60 sec.
4-4.5 m 60 sec.
X: 426760.1403 Y: 388942.1824Elev.: 51.3869
4.5-4.8 m 60 sec.
3-4 m 60 sec.
4.8-4.9 m 25 sec.4.9 m bottom in high resistance.
1.3-2 m 50 sec. increasing resistance.
Drawn HHCobra drilling Drawing
UC-19 through UC-27
Time of drilling April 2002 Intake lake area East bank
UC - 19
0
5
Depth (m)
0-1 m 10 sec.1-2 m 15 sec.
3-3.4 m 40 sec. increasing resistance.3.4-4 m 40 sec.
X: 426451.8476 Y: 388698.1828Elev.: 51.1511
4-4.4 m 40 sec.4.4-4.5 m 25 sec. 4.5 m bottom in high resistance.
2-3 m 25 sec.
UC - 20
0
5
Depth (m)
0-1 m 10 sec.1-2 m 15 sec.
3-3.4 m 15 sec. 3.4-4 m 90 sec. increasing resistance.
X: 426628.5057 Y: 389061.0333Elev.: 51.4971
4-4.2 m 30 sec.4.2-4.4 m 60 sec. 4.4 m bottom in high resistance.
2-3 m 20 sec.
UC - 22
0
5
Depth (m)
0-1 m 10 sec. low resistance. 1-2 m 20 sec.
2.7-3 m 40 sec. increasing resistance.
3.2-3.4 m 40 sec.
X: 426950.4990 Y: 388762.4332Elev.: 52.0121
3.4-3.6 m 60 sec.
3-3.2 m 30 sec.
3.6 m bottom in high resistance.
2-2.7 m 30 sec.
UC - 23
0
5
Depth (m)
0-1 m low resistance. 1-1.6 m 20 sec.
1.9-2.9 m 75 sec. increasing resistance.
3.9-4.9 m 62 sec.
X: 426884.1625 Y: 389372.2034Elev.: 51.6676
4.9-5.1 20 sec.
2.9-3.9 m 116 sec.
5.2 m bottom in high resistance.
1.6-1.9 m 20 sec.
5.1-5.2 m 35 sec.
UC - 24
0
5
Depth (m)
0-1 m low resistance.
1-2 m 20 sec.
3-3.6 m 48 sec. increasing resistance.
4-5 m 96 sec.
X: 427040.9654 Y: 389259.9561Elev.: 51.8009
5-5.5 42 sec.
3.6-4 m 25 sec.
5.8 m bottom in high resistance.
2-3 m 37 sec.
5.5-5.8 m 60 sec.
UC - 25
0
5
Depth (m)
0-1 m low resistance1-2 m < 10 sec.
2.6-2.9 m 15 sec. 2.9-3.2 m 20 sec.
X: 427354.1264 Y: 389570.7628Elev.: 51.6170
3.2-3.9 m 60 sec. increasing resistance.3.9-4.9 m 120 sec. 4.9-5.9 m 100 sec.
2-2.6 m 20 sec.
5.9-6.3 m 63 sec.6.3 m bottom in high resistance.
UC - 26
0
5
Depth (m)
0-1 m low resistance.Ice 0.4-0.5 m.1-2 m 12 sec.
3-4 m 55 sec. 4-4.4 m 50 sec. increasing resistance.
X: 427049.6575 Y: 389931.7908Elev.: 52.1102
4.4-4.5 m 40 sec.
2-3 m 20 sec.
4.5 m bottom in high resistance.
UC - 27
0
5
Depth (m)
0-1 m low resistance.1-2 m 25 sec.
2.6-3 m 50 sec. 3-3.4 m 11 sec.
X: 427180.8994 Y: 389836.7722Elev.: 51.1447
3.4-4 m 55 sec.
2-2.6 m 20 sec.
4-4.6 m 130 sec.
4.6 m bottom in high resistance.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Sandy gravel.
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
HH
JFS - 47
Cobra drilling
April 2002
Drawing
Landsvirkjun
UC 28 through UC 33
Drill. contr.
Time of drilling April 2002 Intake lake area - East bank
Jarðfræðistofan Ehf
JFS Geological services Ltd
Note: Drilling time in seconds.
Note: Drilling time in seconds.
UC-28 through UC-33
UC - 28
0
5
Depth (m)
0-1 m low resistance.Ice lens at 0.3-0.4 m.1-2 m 10 sec.
2.3-3 m 65 sec. 3-4 m 90 sec.
X: 427491.9892 Y: 390458.4610Elev.: 51.2988
4-5 m 100 sec.
2-2.3 m 15 sec.
5-6 m 100 sec.
6.4 m bottom in high resistance.6-6.4 m 60 sec.
UC - 29
0
5
Depth (m)
0-1 m low resistance.
1-2 m < 10 sec.
2.7-3 m 12 sec.
3.3-3.7 m 75 sec.
X: 427633.9300 Y: 390327.8412Elev.: 51.7698
3-3.3 m 20 sec.
3.7 m bottom in high resistance.
2-2.7 m < 10 sec.
UC - 30
0
5
Depth (m)
0-1 m low resistance.
1-2 m < 10 sec.
2.7-3 m 12 sec.
3.2-3.4 m 40 sec.
X: 427759.4011 Y: 390094.4299Elev.: 51.8210
3-3.2 m 30 sec.
4.8 m bottom in high resistance.
2-2.7 m 10 sec.
3.9-4.8 m 120 sec.3.4-3.9 m 58 sec.
UC - 31
0
5
Depth (m)
0-1 m low resistance.Ice lens at 0.2-0.3 m.1-2 m < 10 sec.
3-4 m 83 sec.
5-5.6 m 40 sec.
X: 428107.9871 Y: 390706.5181Elev.: 51.8153
4-5 m 67 sec.
5.8 m bottom in high resistance.
2-3 m 35 sec.
5.6-5.8 m 30 sec.
UC - 32
0
5
Depth (m)
0-1 m low resistance.
1-2 m < 10 sec.
3-3.5 m 40 sec.
X: 428215.0097 Y: 390438.4801Elev.: 52.2177
3.5-3.9 m 70 sec.3.9 m bottom in high resistance.
2-3 m 21 sec.
UC - 33
0
5
Depth (m)
0-1 m low resistance.
1-2 m 7 sec.
3-4 m 17 sec. 4-4.4 m 10 sec.
X: 428654.6932 Y: 390594.1779Elev.: 52.1886
4.4 m bottom probably on hard basalt.
2-3 m 10 sec.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Gravel at surface.
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
AgG/HH
JFS - 47
Cobra drilling
April 2002
Drawing
Landsvirkjun
UC-34 through UC-42
Drill. contr.
Time of drilling April 2002 Intake lake area - West bank
Jarðfræðistofan Ehf
JFS Geological services Ltd
Urriðafoss Hydroelectric Project JFS - 47LandsvirkjunJarðfræðistofan Ehf
JFS Geological services Ltd
5-5.2 m 40 sec.
UC - 34
0
5
Depth (m)
0-1 m <10 sec.
1-2 m <10 sec.
4-5 m 70 sec.
2-3 m 10 sec.
3-4 m 30 sec.
X: 426375.2603 Y: 389587.3788Elev.: 51.4032
5.2 m bottom, stopped inhigh resistance, easy to pull up.
UC - 37
0
5
Depth (m)
0-1 m 3 sec.
1-2 m 12 sec.
2-3 m 30 sec. 3-3.9 m 25 sec.
X: 426900.0269 Y: 390126.9699Elev.: 51.8026
4.4-4.9 m 55 sec.4.9-5.2 m 25 sec.
5.4 m bottom in high resistance,hard to pull up at the bottom.
5.2-5.4 m 40 sec.
3.9-4.4 m 70 sec. increasing resistance
3.9-4.4 m 33 sec.
UC - 40
0
5
Depth (m)
4.4-4.6 m 45 sec.
0-1 m 5 sec.
1-2 m 8 sec.
2.9-3.9 m 65 sec.
4.6-4.65 m 25 sec.
2-2.9 m 16 sec.
X: 426670.4314 Y: 390462.2758
Elev.: 51.8452
4.65 m bottom in high resistance,hard to pull up at the bottom.
UC - 35
0
5
Depth (m)
0-1 m 8 sec. Ice lens at 0.2-0.3 m.
1-2 m 20 sec.
2-2.7 m 17 sec. 2.7-3 m 15 sec.
X: 426759.2732 Y: 389942.3019Elev.: 51.7247
3-4 m 70 sec.4-4.3 m 60 sec.4.3 m bottom in high resistance,easy to pull up
3.6-3.8 m 30 sec.
UC - 38
0
5
Depth (m)
3.8-3.9 m 25 sec.
0-1 m 5 sec. Ice lens at 0.3-0.4 m.1-2 m 7 sec.
2.9-3.6 m 50 sec.
2-2.6 m 20 sec. increasing resistance.2.6-2.9 m 20 sec.
X: 426725.8876 Y: 390351.9095Elev.: 51.1918
3.9-4.15 m 70 sec.4.15 m bottom, stopped inhigh resistance,easy to pull up.
3.9-4.6 m 65 sec.
UC - 41
0
5
Depth (m)
4.6-4.9 m 40 sec.
0-0.9 m 4 sec.
0.9-1.9 m 9 sec.
2.9-3.9 m 50 sec.
4.9-5.2 m 25 sec.
1.9-2.9 m 17 sec.
X: 427139.1326 Y: 390592.8462
Elev.: 51.8372
5.2-5.35 m 40 sec.5.35 m bottom in high resistance.
UC - 36
0
5
Depth (m)
0-1 m 6 sec.1-2 m 10 sec.2-2.4 m 15 sec. increasing resistance.
3-3.6 m 72 sec.
X: 426364.6005 Y: 390121.2401Elev.: 51.3180
4 m bottom in high resistance,easy to pull up.
3.6-3.8 m 15 sec.
2.4-3 m 40 sec.
3.8-4 m 45 sec.
3.9-4.4 m 35 sec.
UC - 39
0
5
Depth (m)
4.4-4.5 m 33 sec.
0-1 m 10 sec.
1-2 m 10 sec.
3.4-3.9 m 40 sec.
2-2.9 m 17 sec.2.9-3.4 m 12 sec.
X: 427025.6905 Y: 390418.0175Elev.: 51.8309
4.5 m bottom, almost stop,easy to pull up.
3.9-4.2 m 40 sec.
UC - 42
0
5
Depth (m)
4.2-4.4 m 18 sec.
0-0.9 m 3 sec.
0.9-1.9 m 37 sec.
2.9-3.9 m 125 sec.
4.4-4.9 m 53 sec.
1.9-2.9 m 60 sec.
X: 427000.1879 Y: 390725.0337
Elev.: 51.4351
4.9-5.1 m 50 sec.5.1 m bottom in high resistance,hard to pull up.
Note: Drilling time in seconds.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Sandy gravel.
Sandy gravel. Sandy gravel. Sandy gravel.
y jDesign
Drawn HH
AgG/HH
Cobra drilling
April 2002
Drawing
j
UC-43 through UC-51
Drill. contr.
Time of drilling April 2002 Intake lake area - West bank
JFS Geological services Ltd
Note: Drilling time in seconds.
4.9-5.2 m 85 sec.4.6-4.9 m 43 sec.
5.2 m stopped in high resistance.
2-3 m 13 sec.
4.4-4.6 m 37 sec4.2-4.4 m 40 sec.3.9-4.2 m 30 sec. 3.6-3.9 m 60 sec.
Elev.: 50.8832
Y: 389239.5113X: 426420.3748
3.4-3.6 m 60 sec.3-3.4 m 20 sec.
1-2 m <10 sec.0-1 m <10 sec.
Depth (m)
5
0
UC - 49
UC - 46
0
5
Depth (m)
0-0.9 m 11 sec.
0.9-1.9 m 20 sec.1.9-2.9 m 32 sec.
3.9-4.4 m 60 sec.
X: 427827.5815 Y: 391296.9753
Elev.: 52.7001
4.4-4.9 m 92 sec.4.9-5.4 m 67 sec.5.4-5.5 m 30 sec.
2.9-3.9 m 52 sec.
5.5 m bottom in high resistance.
UC - 43
0
5
Depth (m)
0-0.9 m 17 sec. Ice at 0.3-0.4 m.
0.9-1.9 m 24 sec.1.9-2.4 m 14 sec. 2.4-2.9 m 58 sec.
X: 427469.9506 Y: 390864.2657
Elev.: 52.5774
2.9-3.6 m 97 sec.3.6-3.9 m 53 sec.3.9-4.9 m 155 sec. 4.9-5.1 m 55 sec.5.1 m bottom in high resistance.
Sandy gravel.
Sandy gravel.
Sandy gravel.
Urriðafoss Hydroelectric ProjectDesign HH
JFS - 47
April 2002
LandsvirkjunDrill. contr.
Ti f d illi A il 2002 Intake lake area - West bank
Jarðfræðistofan Ehf
JFS Geological services Ltd
UC - 51
0
5
Depth (m)
X: 426078.2580 Y: 388423.4247
Elev.: 50.4381
0-1 m 5 sec.1-2 m 7 sec.
3-3.6 m 20 sec. 3.6-3.95 m 32 sec.3.95-4.2 m 20 sec.4.2-4.4 m 33 sec. 4.4-4.6 m 30 sec.
5.9-6.6 m 70 sec.
2-3 m 15 sec.
4.6-4.9 m 41 sec.4.9-5.2 m 30 sec.5.2-5.4 m 30 sec. 5.4-5.6 m 20 sec.5.6-5.9 m 40 sec.
6.8 m bottom in high resistance.6.6-6.8 m 50 sec.
UC - 48
0
5
Depth (m)
0-0.9 m 8 sec.0.9-1.9 m 11 sec.1.9-2.6 m 15 sec.
2.9-3.2 m 40 sec.
X: 428444.9215 Y: 391193.7438
Elev.: 52.9286
3.2-3.4 m 20 sec.
2.6-2.9 m 35 sec.
3.4-3.6 m 15 sec.3.6-3.9 m 35 sec.
4.4-4.9 m 87 sec.4.9-5.15 m 70 sec.5.15 m bottom in high resistance,easy to pull up.
3.9-4.4 m 55 sec.
UC - 45
0
5
Depth (m)
0-0.9 m 14 sec.0.9-1.9 m 24 sec.
2.6-2.9 m 20 sec.2.9-3.6 m 77 sec.
X: 427858.1574 Y: 390986.9723
Elev.: 52.4755
3.6-3.9 m 63 sec.3.9-4.4 m 66 sec.4.4-4.9 m 60 sec.4.9-5.4 m 42 sec.
1.9-2.6 m 35 sec.
5.4-5.6 m 28 sec.5.6-5.9 m 55 sec.5.9-6.4 m 60 sec.6.4-6.6 m 60 sec.6.6 m bottom in high resistance,hard to pull up.
Sandy gravel.
Sandy gravel.
Sandy gravel.
UC - 50
0
5
Depth (m)
0-1 m 5 sec.1-2 m 15 sec.
2.9-3.9 m 75 sec. 3.9-4.2 m 30 sec.
X: 426209.8351 Y: 388716.1866
Elev.: 50.6505
4.2-4.4 m 33 sec.4.4-4.6 m 60 sec. 4.6 m bottom in high resistance.
2-2.9 m 65 sec.higher resistance at 2.6 m.
UC - 47
0
5
Depth (m)
0-0.9 m 13 sec.0.9-1.9 m 30 sec.
1.9-2.9 m 35 sec.
3.6-3.9 m 22 sec.
X: 428424.7277 Y: 390792.5867
Elev.: 53.0114
3.9-4.6 m 35 sec.
2.9-3.6 m 20 sec.
4.6-4.9 m 48 sec.
5.2-5.3 m 35 sec.5.3 m bottom in high resistance.
4.9-5.2 m 50 sec.
UC - 44
0
5
Depth (m)
0-0.9 m 7 sec.
0.9-1.9 m 12 sec.
1.9-2.9 m 20 sec.2.9-3.2 m 20 sec.
X: 427343.6091 Y: 391015.6449
Elev.: 51.9799
3.2-3.9 m 45 sec.3.9-4.6 m 66 sec.4.6-4.9 m 35 sec.4.9-5.2 m 25 sec.5.2-5.35 m 40 sec.5.35 m bottom in high resistance.
Sandy gravel.
Sandy gravel.
Sandy gravel.
UC - 52
0
5
Depth (m)
0-1 m 6 sec.1-1.6 m 12 sec.
1.9-2.2 m 40 sec. 2.2-2.4 m 20 sec.
X: 425854.5933 Y: 388597.1485
Elev.: 50.7573
2.4-2.9 m 72 sec.2.9-3.2 m 25 sec.
3.7 m bottom in high resistance.
1.6-1.9 m 26 sec.
3.2-3.6 m 75 sec.3.6-3.7 m 40 sec.
Sandy gravel.
Drawn HHCobra drilling Drawing
UC-52 and UC-53
Time of drilling April 2002 Intake lake area West bank
Note: Drilling time in seconds.
UC - 53
0
5
Depth (m)
0-2 m 15 sec.
2-2.4 m 25 sec.
2.9-3.2 m 15 sec.
3.4-3.9 m 50 sec.
X: 425991.7033 Y: 388976.0524
Elev.: 50.4244
3.9-4.6 m 60 sec.
3.2-3.4 m 15 sec.
4.6-4.8 m 55 sec.4.8 m bottom in high resistance.
2.4-2.9 m 45 sec.
Sandy gravel.
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
AgG
JFS - 47
Percussion drilling
April 2002
Drawing
Landsvirkjun
ULO - 56 through ULO - 61
Drill. contr.
Time of drillingRFSApril 2002 Intake lake area
Jarðfræðistofan Ehf
JFS Geological services Ltd
Urriðafoss Hydroelectric Project JFS - 47LandsvirkjunJarðfræðistofan Ehf
Note: Steady pressure at 50 bars for all the drilling holes from ULO-57.
ULO - 56
0
5
Depth Coarse grained gravel 1-5 cm, sandy.
m
10
0-2.7 m low resistance.
8.7 m bottom in high resistance.hard to pull up.
2.7-5.7 m higher resistance.Only pushed down and rotation,scattered stones,pressure 40 bar.
5.7-8.7 percussion hammering used.Higher resistance, probably scoria.
X: 430611.0658 Y: 391411.5288
Elev.: 53.6982
ULO - 58
0
5
Depth Sandy gravel.
m 0-2.7 m low resistance.Only pushed down and rotation, pressure 50 bar.
5.2-5.7 m high resistance, stony.Percussion hammering used, possibly scoria.Bottom at 5.7 m.
2.7-4 m low resistance,scattered stones.4-5.2 increasing stones,low resistance in between.
X: 430255.3587 Y: 391239.3314Elev.: 53.3603
ULO - 60
0
5
Depth Sandy gravel
m 0-3.5 m low resistance.Only pushed down and rotation,pressure 50 bar.
4.2-5.0 m stony, higher resistance.3.5-4.2 m stony, low resistance.
5.0-5.7 m percussion hammering used.Probably scoria.
X: 429879.9769 Y: 391413.8608Elev.: 53.5751
ULO - 59
DepthSandy, fine grained gravel.0-3 m low resistance.Only pushed down and rotation,pressure 50 bar.
3-3.5 m higher resistance.
0
5
m
3.5-5.7 m stony material,probably a mix of scoria and gravel.Hard to pull up.No percussion hammering used.
X: 430216.3279 Y: 391375.6727Elev.: 53.7182
ULO - 61
DepthGravel0-4.5 m low resistance.Only pushed down and rotation,pressure 50 bar.
4.5-5.7 m stony, higher resistance,possibly loose scoria.
0
5
m
10
5.7-6.7 m higher resistance, probably scoria.
X: 429791.7636 Y: 391267.8128Elev.: 52.7607
6.7-8.7 m percussion hammering used,probably continuous vesicular basalt lava.
ULO - 57
DepthSandy, fine grained gravel.0-2.7 m low resistance.Only pushed down and rotation,pressure 50 bar.
2.7-4.5 scattered stones,low resistance.
0
5
m
4.5-5.7 m percussion hammering used.Higher resistance, probably scoria.5.7 m bottom in high resistance.
X: 430353.5482 Y: 391531.0872
Elev.: 54.3103
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
AgG
JFS 47
Percussion drilling
April 2002
Drawing
Landsvirkjun
ULO - 62 through ULO - 67
Drill. contr.
Time of drillingRFSApril 2002 Intake lake area
JFS Geological services Ltd
Urriðafoss Hydroelectric ProjectDesign
D HH
AgG
JFS - 47
April 2002
LandsvirkjunDrill. contr.
Time of drillingRFSApril 2002 Intake lake area
Jarðfræðistofan Ehf
JFS Geological services Ltd
Note: Steady pressure at 50 bars for all the drilling holes from ULO-57.
ULO - 64
0
5
Depth Sand.
m 0-3.5 m low resistance.Only pushed down and rotation,pressure is 50 bar.
3.5-3.7 m stony, low resistance.
3.7-5.7 m percussion hammering used.Probably scoria.
X: 428920.0720 Y: 390695.2344Elev.: 53.1244
ULO - 66
0
5
Depth Sandy fine gravel.
m
10
0-4.5 m low resistance.Only pushed down and rotation, pressure 50 bar.
6.2-6.8 m percussion hammering used,jerky drilling.
4.5-5.3 m low resistance,jerky drilling.
5.3-6.2 m higher resistance,jerky drilling.
X: 428445.4630 Y: 391090.8839Elev.: 52.8954
6.8-8.0 m low resistance,only pushed down and rotation.
8.0-8.7 m percussion hammering used,low resistance.Like cave at 6.8-8.0 m depth.
ULO - 67
DepthSandy, fine gravel.0-3.5 m low resistance.Only pushed down and rotation,pressure 50 bar.
3.5-4.0 m low resistance,jerky drilling.
0
5
m
4.0-5.7 m percussion hammering used,high resistance, probably scoria.
X: 428425.1206 Y: 390800.0568Elev.: 52.9735
ULO - 65
DepthSandy fine gravel.0-2.7 m low resistance.Only pushed down and rotation,pressure 50 bar.
3.5-4.0 m jerky, higher resistance.
0
5
m
4.0-5.7 m percussion hammering used.Higher resistance, probably scoria.Jerky drilling, hard to pull up.
X: 428915.4162 Y: 391179.0806Elev.: 53.1355
2.7-3.5 m low resistance, jerky.
ULO - 63
DepthSandy, fine gravel.0-3.5 m low resistance.Only pushed down and rotation,pressure 50 bar.
3.5-4.2 m higher resistance.
0
5
m
4.2-5.7 m percussion hammering used,jerky drilling, probably scoria.Hard to pull up.
X: 429254.9776 Y: 390879.1020Elev.: 52.5539
ULO - 62
0
5
Depth Sandy gravel.
m
10
0-4.5 m low resistance.Only pushed down and rotation, pressure 50 bar.
6.5-7.2 m percussion hammering used, high resistance, jerky drilling.
4.5-5.7 m low resistance,scattered stones.
5.7-6.5 m high resistance,stony.
X: 429485.8937 Y: 391188.8957Elev.: 53.0903
7.2-7.9 m probably basalt lava.
Drawn HHPercussion drilling Drawing
ULO - 68 through ULO - 73
Time of drilling April 2002
Urriðafoss Hydroelectric ProjectDesign
Drawn HH
AgG
JFS - 47
Percussion drilling
April 2002
Drawing
Landsvirkjun
ULO 74 and ULO 75
Drill. contr.
Time of drillingRFSApril 2002 Intake lake area
Jarðfræðistofan Ehf
JFS Geological services Ltd
ULO - 69
DepthSandy fine gravel.
0-4 m low resistance.Only pushed down and rotation,pressure 50 bar.
0
5
m
5.0-5.7 m percussion hammering used.Higher resistance, probably scoriapacked with sand.Jerky drilling, hard to pull up.
X: 427859.2803 Y: 390987.9983
ULO - 68
0
5
Depth Sand.
m 0-5.5 m low resistance.Only pushed down and rotation,pressure is 50 bar.
5.5-5.7 m jerky drilling, possibly scoria.5.7-6.3 m percussion hammering used.Probably solid lava, stopped in hard rock.
X: 428143.2769 Y: 391141.8602Elev.: 52.9845 Elev.: 52.5759
ULO - 71
DepthSandy, fine gravel.0-5.9 m low resistance.Only pushed down and rotation,pressure 50 bar.
5.9-7.0 m slowly increasing resistance.
0
5
m
10
7.0-8.7 m percussion hammering used,low resistance, probably scoria.
X: 427503.5281 Y: 390883.0293
ULO - 70
0
5
Depth Sandy fine gravel.
m0-5.0 m low resistance.Only pushed down and rotation, pressure 50 bar.
5.0-5.7 m low resistance,jerky drilling, easy to pull up.
X: 427641.4265 Y: 391118.2743Elev.: 52.7720 Elev.: 52.4558
4.0-5.0 m higher resistance, jerky.
8.7-9.5 m percussion hammering not used,low resistance.
10.7-11.1 m high resistance,massive layer.
9.5-10.7 m percussion hammering used,low resistance.
ULO - 73
DepthSandy fine gravel.
0-2.7 m low resistance.Only pushed down and rotation,pressure 50 bar.
0
5
m
10
4.0-5.7 m percussion hammering used in 2 short intervals but otherwise only pushed down and rotation.
X: 426891.4292 Y: 390109.1326
ULO - 72
0
5
Depth Sandy fine gravel.
m
10
0-2.7 m low resistance.Only pushed down and rotation,pressure is 50 bar.
2.7-7.5 m slowly increasing resistance.
7.5-8.7 m low resistance,jerky drilling.Easy to pull up.No percussion used.
X: 426832.7234 Y: 390561.7673Elev.: 51.6293 Elev.: 51.9341
2.7-4.0 m little higher resistance.
5.7-7.5 m low resistance.Only pushed down and rotation,pressure 50 bar.7.5-8.7 m percussion hammer used,massive layer, scoria or basalt lava.
Note: Steady pressure at 50 bars for all the drilling holes from ULO-57.Note: Steady pressure at 50 bars for all the drilling holes from ULO-57.
ULO - 74 and ULO - 75
Urriðafoss Hydroelectric ProjectDesign
Drawn WaF
WaF
JFS - 47
Percussion drilling
Jun. 2001
Drawing
Landsvirkjun
ULO - 2 and ULO - 3
Drill. contr.
Time of drillingRFSJun. 2001 Dam area
Jarðfræðistofan Ehf
JFS Geological services Ltd
ULO - 75
DepthSandy, fine gravel.0-7.5 m low resistance.Only pushed down and rotation,pressure 50 bar.
7.5-8.7 m slowly increasing resistance.
0
5
m
10
15
8.7-9.0 m higher resistance, jerky drilling.
X: 426420.3825 Y: 389242.8960
ULO - 74
0
5
Depth Sandy fine gravel.
m
10
0-8.1 m low resistance.Only pushed down and rotation, pressure 50 bar.
8.1-8.7 m higher resistancebut only pushed down and rotation.
X: 426321.4709 Y: 389858.7377Elev.: 51.4060 Elev.: 50.9233
9.0-11.4 m percussion hammering used in thin hard layers, low resistance in between only pushed down and rotation.11.4-11.7 m percussion used,probably soft basalt lava,easy to pull up.
Note: Steady pressure at 50 bars for all the drilling holes from ULO-57.