Upgrading Plans of the Upgrading Plans of the Chinese SLR NetworkChinese SLR Network
Yang FuMin(1), Wu Bin(1), Zhang ZhongPing(1), Guo TangYong(2), Yang FuMin(1), Wu Bin(1), Zhang ZhongPing(1), Guo TangYong(2),
Zhao You(3), Qu Feng(4) and Xiong YaoHeng(5)Zhao You(3), Qu Feng(4) and Xiong YaoHeng(5)
1. Shanghai Observatory, Chinese Academy of Sciences, Shanghai1. Shanghai Observatory, Chinese Academy of Sciences, Shanghai2. Institute of Seismology, China Earthquake Administration, Wuhan2. Institute of Seismology, China Earthquake Administration, Wuhan3. Changchun Observatory, Chinese Academy of Sciences, Changchun3. Changchun Observatory, Chinese Academy of Sciences, Changchun4. Chinese Academy of Surveying and Mapping, Beijing4. Chinese Academy of Surveying and Mapping, Beijing5. Yunnan Observatory, Chinese Academy of Sciences, Kunming5. Yunnan Observatory, Chinese Academy of Sciences, Kunming
History of the ProjectHistory of the Project Period of the Project of Crustal Movement Period of the Project of Crustal Movement
Observation Network of China (CMONOC) : Observation Network of China (CMONOC) :
1997-20001997-2000
Main techniques of the project: Main techniques of the project:
Main technology: GPS Network Main technology: GPS Network
Other technologies: VLBI, SLR Gravity, Leveling Other technologies: VLBI, SLR Gravity, Leveling
Improvements of Chinese SLR Network during the Improvements of Chinese SLR Network during the
project:project:
Precision: Single shot from 3-6cm upgraded to 1.5-3cm Precision: Single shot from 3-6cm upgraded to 1.5-3cm
Stability: from 3-5cm upgraded to 1.5-3cmStability: from 3-5cm upgraded to 1.5-3cm
The second stage of the Project:The second stage of the Project:
Period: 2008--2011
The same technologies with the first stage
More core GPS stations (from 25 increase
to 260)
Precision: Precision: single shot (rms) single shot (rms) <10mm for Starlette, …<10mm for Starlette, …
<15mm for Lageos<15mm for Lageos
normal point (rms) 3-5mm for Lageosnormal point (rms) 3-5mm for Lageos
Stability: Stability: 10-15mm 10-15mm
Ranging capability:Ranging capability: >25000Km (Compass, >25000Km (Compass,
Galileo, GPS, …)Galileo, GPS, …)
Daylight tracking capability: Daylight tracking capability: All stationsAll stations
Goals of the Upgrading of SLRGoals of the Upgrading of SLR
Main Technical UpgradingMain Technical Upgrading
New lasers New lasers
kHz diode pumping lasers (10ps pulse width, 1 KHz repetition)
for Shanghai, Changchun, Beijing, Wuhan and TROS-2
Candidates: Photonics (US), HighQ Laser (Austria ), China …
Kunming to be determined
Due to T/R with the same telescope (1.2 meter)
Event timer – for all stationsEvent timer – for all stations Timing accuracy: 10ps Timing repetition: >1kHz
Daylight tracking package – for all stationsDaylight tracking package – for all stations Made by ourselves
kHz ranging controller – for all stationskHz ranging controller – for all stations Made by ourselves
TROS-1TROS-1
The TROS-1 now is in KASI, Daejeon, Korea in The TROS-1 now is in KASI, Daejeon, Korea in
August 2008.August 2008.
The details of TROS-1 observations in KASI will be The details of TROS-1 observations in KASI will be
presented by Dr. Lim of KASI on this Workshop.presented by Dr. Lim of KASI on this Workshop.
The TROS-1 system will not be included in the The TROS-1 system will not be included in the
upgrading plan of the CMONOC.upgrading plan of the CMONOC.
Situation of Mobile SLR Station
TROS-2TROS-2 In the project of the second stage of CMONOC, a new In the project of the second stage of CMONOC, a new
powerful mobile SLR system, TROS-2, will be made powerful mobile SLR system, TROS-2, will be made by 2011. The Institute of Seismology in Wuhan is in by 2011. The Institute of Seismology in Wuhan is in charge to develop the system.charge to develop the system.
The main parameters of TROS-2 will be:The main parameters of TROS-2 will be: 80 cm aperture telescope80 cm aperture telescope kHz laserkHz laser C-SPAD receiverC-SPAD receiver Event timerEvent timer
The capability of TROS-2 mobile SLR system will be:The capability of TROS-2 mobile SLR system will be: GEO tracking GEO tracking Sub-cm range precisionSub-cm range precision Daylight tracking routinelyDaylight tracking routinely
A new fixed SLR system supported by Chinese A new fixed SLR system supported by Chinese
Academy of Sciences will be installed in Urumqi Academy of Sciences will be installed in Urumqi
station by 2010. Shanghai Observatory is in charge to station by 2010. Shanghai Observatory is in charge to
develop the system.develop the system.
The station will be located at Nanshan, 60 km away in The station will be located at Nanshan, 60 km away in
the south of Urumqi city, above sea level 2000m. The the south of Urumqi city, above sea level 2000m. The
weather condition is excellent. weather condition is excellent.
The location of the station is of importance both in The location of the station is of importance both in
Chinese and global network. Chinese and global network.
There are a VLBI system and a GPS station already, There are a VLBI system and a GPS station already,
so the station will be a multi-technique collocation site.so the station will be a multi-technique collocation site.
A new fixed SLR station in Urumqi by 2010
The main parameters of the new SLR system will be:The main parameters of the new SLR system will be:
1 meter aperture telescope
kHz laser
C-SPAD receiver
Event timer
The capability of the new system in Urumqi will be:The capability of the new system in Urumqi will be:
GEO tracking
Sub-cm range precision
Daylight tracking routinely
San Juan SLR Station
San Juan SLR Station
ILRS ID7406
Cooperation between the National University of San Juan and the National Astronomical Observatory of China (NAOC)
Operational since Feb. of 2006 with excellent productivity, but the precision and stability are to be upgraded.
The upgrading proposal for the San Juan SLR system is The upgrading proposal for the San Juan SLR system is
under serious consideration by the Ministry of Science under serious consideration by the Ministry of Science
and Technology of China.and Technology of China.
The main upgrading:The main upgrading:
kHz ranging
Event timer
Daylight tracking
Sub-cm range precision
Summary
Under the support of the National Project “CMONOC”, the Chinese SLR network will be upgraded in two years
1 fixed station in Urumqi and 1 mobile system will be added into the CSN
All systems will go to kHz ranging and daylight tracking, the performance of the CSN will be great upgraded
San Juan station will get the funding for same upgrading soon.