Sound Transit Board Meeting August 22, 2013
University Link Project Briefing
![Page 2: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/2.jpg)
• 3.15-mile extension of Central Link – twin bored tunnels – Capitol Hill Station – UW Station and crossover
• Schedule: – Final Design: 2007-2010 – Construction: 2009-2016 – System testing: 6 months – Open for service: Fall 2016
• Project budget: $1.948 billion (including finance cost)
2 2
Project Snapshot
2
![Page 3: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/3.jpg)
Financials as of July 2013
• Awarded construction contracts exceed $909 million • Active work on two heavy civil contracts, two station finishes
contracts (UWS and CHS), the rail/systems contract ,and a fiber retrofit contract
• Estimated Final Cost (EFC) trending approximately $107M under Project Budget
Financial Snapshot Millions
Project Budget $1,948
Committed $1,569
Incurred $1,191
3
Financial Snapshot
3
![Page 4: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/4.jpg)
• Presently, Project is approximately 75% complete overall • Sound Transit’s Revenue Service Milestone remains
September 24, 2016 • Project schedule contains 169 days of project-wide float
4
Schedule Snapshot
4
![Page 5: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/5.jpg)
• Four major heavy civil contracts – I-5 Undercrossing Pits – UW to Capitol Hill – Capitol Hill to Pine Street – Yard Expansion
• Two major station finishes contracts – UW Station (GC/CM) – Capitol Hill Station (GC/CM)
• Three major systems/track contracts – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring
• Maintenance of Way Building • Procurement of light rail vehicles
Complete Active Pending
5
Implementation
5
![Page 6: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/6.jpg)
MOW Bldg
AIRPORT WAY
Maintenance of Way Building
STOR
AGE
6
![Page 7: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/7.jpg)
7
Capitol Hill Station to Pine Street Stub Tunnel
7
![Page 8: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/8.jpg)
Permanent Track Installation
8
![Page 9: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/9.jpg)
9
49’-5”
55’-0”
9
JOH
N
N
BROADWAY Capitol Hill Station
9
![Page 10: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/10.jpg)
10
Capitol Hill Station
10
![Page 11: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/11.jpg)
11
Capitol Hill Station
11
![Page 12: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/12.jpg)
University of Washington Station to Capitol Hill Station
12
![Page 13: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/13.jpg)
Rail Installation
13
![Page 14: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/14.jpg)
14
University of Washington Station
![Page 15: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/15.jpg)
University of Washington Station
15
![Page 16: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/16.jpg)
University of Washington Station
16
![Page 17: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/17.jpg)
Pedestrian bridge and bike path
17
Montlake Triangle Project
![Page 18: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/18.jpg)
University of Washington Station
18
![Page 19: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/19.jpg)
Top Five Risks • Civil to Civil Contract Interface • Civil to Systems Contract Interface • Systems Long Lead Item • Software Development • Systems Final Design, Installation, Testing and Rail
Activation (Systemwide)
19
![Page 20: University Link Project Briefing · – U-Link Systems and Track (GC/CM) – Network – EMI/Vibration/Wheel Flat Monitoring • Maintenance of Way Building • Procurement of light](https://reader036.fdocuments.us/reader036/viewer/2022071217/6049907c75fcfa5a467f65e6/html5/thumbnails/20.jpg)