Production Schedule
Tuesday 26 th January 2016
Scene: School; all of scene recorded in school
Call Time: All cast to be on scene for 3:15pm
Crew required at Location: Camera Operator, Director, Actors & Costume
Actors Required: Sam, Lucy, Chloe, Danni, Danielle, Zoe and others
Set Up Start Time: 3:10pm
Set Up Finish Time: 3:25pm
W/S of boy walking through corridor: 3:26pm-3:37pm
W/S of students laughing at boy-3:38pm-3:41pm
C/U panning in M/S of boy running down to the toilets: 3:42pm-3:48pm
M/S & W/S of boy placing VO5 on his hair: 3:49pm-3:55pm
C/U panning into M/S of boy leaving toilet: 3:56pm-4:00pm
W/S, M/S & C/U’s of boy walking back to class, being surrounded and taken out by screaming girls: 4:01pm-4:20pm
Set de-rigged between 4:21pm-4:30pm
Crew free to go at 4:30pm