UM Addendum Format ADDENDUM #2 DATE: September 21, 2015 Page 1 of 3 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: WOMEN’S AND CHILDREN’S HOSPITAL – AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132 ADVERTISEMENT DATE: AUGUST 28, 2015 PREPARED FOR: The Curators of the University of Missouri CONSULTANT: McClure Engineering 4545 Oleatha Avenue St. Louis, MO 63116 (314) 645-6232 Drawings and Specifications for the above noted project and the work covered thereby are herein modified as follows, and except as set forth herein, otherwise remain unchanged and in full force and effect: SPECIFICATION CHANGES: 1. Modify SECTION 1.A , BID FOR LUMP SUM CONTRACT, subsection 4. PROJECT COMPLETION, as follows: Replace paragraph “c” with the following: “c. Liquidated Damages In event that Contractor shall fail to substantially complete the work as defined in Contract Documents within time fixed for such completion set forth in Contract Documents, Contractor shall pay to Owner as damages for each calendar day of delay in completing work, sum of FOUR THOUSAND DOLLARS ($4000) dollars PER DAY IN THE INCREMENT OF FIVE HUNDRED DOLLARS ($500) dollars PER HOUR. In view of difficulty of accurately ascertaining loss that Owner will suffer by reason of delay in completion of work, said sum is hereby fixed and agreed as liquidated damages that Owner will suffer by reason of such delay and not as penalty.” 2. Modify SECTION 1.A , BID FOR LUMP SUM CONTRACT, subsection 6. SUPPLIER DIVERSITY GOALS, as follows: Replace paragraph a with: “a. The Contractor shall have as a goal subcontracting with Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), Service Disabled Veteran Owned Business and/or Veteran Owned Business of TEN PERCENT (10%) of awarded contract price for work to be performed.” Replace paragraph c with: “c. The Undersigned proposes to perform work with following MBE/WBE participation level: MBE , WBE, DBE, SERVICE DISABLED VETERAN, and/or VETERAN PERCENTAGE PARTICIPATION: ______ percent ( %)” Note, please find revised Bid Form attached to this Addendum.

Transcript of UM Addendum Format - Contact Us | Campus...

Page 1: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

UM Addendum Format

ADDENDUM #2 DATE: September 21, 2015

Page 1 of 3

TO CONTRACT DOCUMENTS ENTITLED:

PROJECT MANUAL FOR:

WOMEN’S AND CHILDREN’S HOSPITAL – AIR HANDLER UNIT #2 REPLACEMENT

PROJECT NUMBER: CP150132

ADVERTISEMENT DATE: AUGUST 28, 2015

PREPARED FOR: The Curators of the University of Missouri

CONSULTANT: McClure Engineering 4545 Oleatha Avenue St. Louis, MO 63116 (314) 645-6232

Drawings and Specifications for the above noted project and the work covered thereby are herein modified  as follows, and except as set forth herein, otherwise remain unchanged and in full force and effect: 

 SPECIFICATION CHANGES:   1. Modify SECTION 1.A , BID FOR LUMP SUM CONTRACT, subsection 4. PROJECT COMPLETION, as follows: Replace paragraph “c” with the following: “c.  Liquidated Damages ‐ In event that Contractor shall fail to substantially complete the work as defined in Contract Documents within time fixed for such completion set forth in Contract Documents, Contractor shall pay to Owner as damages for each calendar day of delay in completing work, sum of FOUR THOUSAND DOLLARS ($4000) dollars PER DAY IN THE INCREMENT OF FIVE HUNDRED DOLLARS ($500) dollars PER HOUR. In view of difficulty of accurately ascertaining loss that Owner will suffer by reason of delay in completion of work, said sum is hereby fixed and agreed as liqui‐dated damages that Owner will suffer by reason of such delay and not as penalty.”  2. Modify  SECTION  1.A  ,  BID  FOR  LUMP  SUM  CONTRACT,  subsection  6.  SUPPLIER DIVERSITY GOALS,  as follows:    Replace paragraph a with: “a. The Contractor shall have as a goal subcontracting with Minority Business Enterprise  (MBE), Women  Business  Enterprise  (WBE),  Disadvantage  Business  Enterprise  (DBE),  Service Disabled  Veteran Owned  Business  and/or  Veteran Owned  Business  of  TEN  PERCENT  (10%)  of  awarded contract price for work to be performed.”  Replace paragraph c with: “c. The Undersigned proposes to perform work with following MBE/WBE participation level:     MBE  , WBE,  DBE,  SERVICE  DISABLED  VETERAN,  and/or  VETERAN  PERCENTAGE  PARTICIPATION:  ______ percent ( %)”  Note, please find revised Bid Form attached to this Addendum.  

Page 2: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

3. Modify SECTION 1.E SPECIAL CONDITIONS, add subsection 28. FIRESTOPS and SMOKESTOPS, fire rated/smoke partitions as follows: 

“28.  FIRESTOPS AND SMOKESTOPS, FIRE RATED/SMOKE PARTITIONS. 

All penetrations through rated assemblies, walls, shafts, floors, roofs, etc., shall be firestopped in accordance with Local Building Codes, NFPA, U.L. Fire Resistant Directory, and manufacturer’s instructions. Where Building Automation System cabling passes through fire rated partitions and floors, furnish and install a minimum of (1) one cable pathway device.  Device shall be Specified Technologies, Inc. EZDP33WR Single Capacity, 3M QuickPass, or equivalent. 

Provide a FIRESTOP PRODUCT SCHEDULE consisting of the following minimum information: 

1. Type – indicate the type of materials, or system. 

2. Manufacturer – manufacturer’s name, product name and product number. 

3. Mechanical System – indicate which Divisions 20 ‐ 23 items the product is utilized for. 

4. Rating – indicate the fire rating and UL detail numbers.  Submit the following with the above FIRESTOP PRODUCT SCHEDULE: 

1. Manufacturer’s specifications and technical data including installation instructions. 

2. Details of each proposed assembly. 

3. Manufacturer’s representative who shall provide qualified engineering judgments and drawings for non‐standard applications. 

4. Contractor’s qualifications and related experience.  Materials shall be stored per the manufacturer’s recommendations and as specified for General Project storage in Division 20. 

QUALITY ASSURANCE 

1. Fire‐Test‐Response Characteristics: Provide firestopping System Design Listing by a testing and inspection agency in accordance with the appropriate ASTM Standard(s) per article1.04. A qualified testing and inspection agency may be UL, FM Research, Intertek Testing Services, Omega Point Laboratories (OPL) or another agency performing testing and followup inspection services for firestop materials that is acceptable to the authority having jurisdiction. 

2. Contractor Qualifications: Acceptable installer firms shall be one of the following: 

a. FM Approved in accordance with FM Standard 4991 – Approval of Firestop Contractors 

b. UL Qualified Firestop Contractor 

c. Licensed by the State or local authority, where applicable. 

d. Shown to have successfully completed not less than 5 comparable scale projects. 

3. Single Source Responsibility: Obtain firestop systems for each kind of penetration and construction condition indicated from a single primary firestop systems manufacturer. 

a. Materials of different manufacture than allowed by the tested and listed system shall not be intermixed in the same firestop system or opening. 

b. Tested and listed, classified firestop systems are to be used. If another manufacturer has a tested and listed system, then that system shall be used prior to an Engineering Judgment (EJ) or Equivalent Fire Resistance Rated Assembly (EFRRA).” 

 3. Modify SECTION 075100 BUILT‐UP BITUMINOUS ROOFING, as follows:  Replace the 075100 section of the spec in it’s entirety with the version attached to this Addendum.  DRAWING CHANGES: 1. Add the following sheets to the drawing set: 

M0.1  LIFE SAFETY FIRST FLOOR PLAN M0.2  LIFE SAFETY SECOND FLOOR PLAN IC1.5  INFECTION CONTROL DETAILS 

Page 3: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

 2. Modify Sheet CS‐1 to add the following drawings to the “Index of Drawings”: 

M0.1  LIFE SAFETY FIRST FLOOR PLAN M0.2  LIFE SAFETY SECOND FLOOR PLAN IC1.5  INFECTION CONTROL DETAILS 

 3. Modify Sheet DM2.1 as follows: See Sheet SD‐DM2.1.1 attached to this addendum for the addition of a keyed note.  4.  Modify Sheet M1.3 as follows: See Sheet SD‐M1.3.1 attached to this addendum for the addition of a smoke damper detail.  5. Modify Sheet M2.1 as follows: See Sheets SD‐M2.1.1, SD‐M2.1.3 and SD‐M2.1.4 attached to this addendum for the addition of a keyed note.  See Sheet SD‐M2.1.2 which adds air device labels for clarification.  6. Modify Sheet M2.2 as follows: See Sheet SD‐M2.2.1 attached to this addendum for the addition of a keyed note.  7. Modify Sheet M2.3 as follows: See Sheets SD‐M2.3.1 and SD‐M2.3.2 attached to this addendum for the addition of a call‐out to an existing keyed note.  8. Modify Sheet M5.1 as follows: See Sheet SD‐M5.1.1 attached to this addendum for the addition of an Air Device Schedule.  9. Modify Sheet IC1.2 as follows: See Sheet SD‐IC1.2.1 attached to this addendum for the addition of areas to the Infection Control Plan and Sheet SD‐IC1.2.2 for the addition to Infection Control Schedule.  10. Modify Sheet IC1.3 as follows: See Sheet SD‐IC1.3.1 attached to this addendum for the addition of areas to the Infection Control Plan.  CLARIFICATIONS:  1. Contractor posed questions: “On drawing S‐01, Special inspections Para, are we to provide third party 

inspector?” And “#2 states: Sprayed Fire‐resistive Materials, is there fireproofing spray required from 

us on this project?” 

Response to First Question: No, the University will provide the special inspections.  The installing contractor will be responsible for coordinating with and accommodating the University’s Inspector.  Response to Second Question: Refer to “TYPICAL BAR JOIST REINFORCING DETAIL.” This detail is to be used when the new curb for the AHU‐2 is greater than 6” from a panel point on the existing bar joist.  Should the unit’s curb require the reinforcing of the bar joist (due to the distance of the curb from a panel point), then yes fire‐proofing spray will be required.  The new 2‐1/2” angles shown in the detail will need to be fire‐proofed and the areas of the existing bar joist where the existing fire‐proofing is removed to allow the welds to be made will require fire‐proofing spray.  

 2. Contractor posed questions: “Is the chilled water piping on located on drawings M2.1 & M2.2 Low 

Temp Chilled Water or Chilled Water?”  Response to Question: Chilled Water.  

END OF ADDENDUM # 2

Page 4: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

1.A - 1 AUGUST 28, 2015

SECTION 1.A BID FOR LUMP SUM CONTRACT Date:____________________________ BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of , a partnership* consisting of , an individual* trading as , a joint venture* consisting of . *Insert Corporation(s), partnership or individual, as applicable.

TO: Curators of the University of Missouri Room L100, General Services Building University of Missouri-Columbia Columbia, MO 65211

1. Bidder, in compliance with invitation for bids for construction work in accordance with Drawings and Specifications prepared by MCCLURE ENGINEERING, entitled "WOMEN’S AND CHILDREN’S HOSPITAL – AIR HANDLER UNIT #2 REPLACEMENT", project number CP150132, dated AUGUST 28, 2015 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of Missouri’s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part.

Bidder acknowledges receipt of following addenda:

Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated 2. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words and figures, words shall govern.

3. BID PRICING

a. Base Bid: The Bidder agrees to furnish all labor, materials, tools, and equipment required to replace the existing air handling unit AHU-2 at the Women’s and Children’s Hospital all as indicated on the Drawings and described in these Specifications for sum of:

DOLLARS ($ ).

Page 5: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

1.A - 2 AUGUST 28, 2015

b. Additive Alternate Bids:

Above Base Bid may be changed in accordance with following Alternate Bids as Owner may elect. Alternates are as described in Section 1.H of Project Manual. Alternates are written in a priority order, but Owner is not required to accept or reject in order listed. This is a one (1) contract project, therefore, Alternates shall be studied by each Bidder to determine effect on Bids of Contractor and each Subcontractor and/or Material supplier.

(1) Additive Alternate No. 1: The ultraviolet lights and controllers in the Rooftop AHU are to be provided under this add-alternate. The power feed to serve the UV lights is to be included in the Base Bid, as defined in the drawings. All for sum of:

DOLLARS ($ ).

(2) Additive Alternate No. 2: Demo of existing unit as defined by the drawings and specifications. All for sum of:

DOLLARS ($ ).

(3) Additive Alternate No. 3: Provide factory mounted, System Optimization Control panels for the supply fan and return fan sections as defined the AHU specification. All for sum of:

DOLLARS ($ ).

4. PROJECT COMPLETION

a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within ONE HUNDRED NINETY FOUR (194) calendar days from receipt of aforementioned documents. Fifteen (15) calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder.

b. Commencement - Contractor agrees to commence work on this project after the "Notice to Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph 4.a. above.

c. Liquidated Damages - In event that Contractor shall fail to substantially complete the work as defined in Contract Documents within time fixed for such completion set forth in Contract Documents, Contractor shall pay to Owner as damages for each calendar day of delay in completing work, sum of FOUR THOUSAND DOLLARS ($4000) dollars PER DAY IN THE INCREMENT OF FIVE HUNDRED DOLLARS ($500) dollars PER HOUR. In view of difficulty of accurately ascertaining loss that Owner will suffer by reason of delay in completion of work, said sum is hereby fixed and agreed as liquidated damages that Owner will suffer by reason of such delay and not as penalty.

5. SUBCONTRACTOR LIST:

Bidder hereby certifies that the following subcontractors will be used in performance of Work:

NOTE: Failure to list subcontractors for each category of work identified on this form or listing more than one

Page 6: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

1.A - 3 AUGUST 28, 2015

subcontractor for any category of work without designating the portion of work performed by each shall be grounds for rejection of bid. List name, city, and state of designated subcontractor, for each category of work listed in Bid For Lump Sum Contract. If work within a category will be performed by more than one subcontractor, Bidder shall provide name, city, and state of each subcontractor and specify exact portion of work to be performed by each. If acceptance/non-acceptance of Alternates will affect designation of a subcontractor, Bidder shall provide information, for each affected category, with this bid form. If Bidder intends to perform any designated subcontract work by using Bidder's own employees, then Bidder shall list their own name, city, and state. The bidder may petition the Owner to change a listed subcontractor only within 48 hours of the bid opening. See Information For Bidders Section 16 List of Subcontractors for requirements.

___________________________________________________________________

Work to be performed Subcontractor Name, City, State ___________________________________________________________________ Mechanical Contractor Electrical Contractor Temperature Controls Contractor Structural Steel Contractor UL Listed Fire-stopping Contractor

6. SUPPLIER DIVERSITY GOALS

a. The Contractor shall have as a goal subcontracting with Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), Service Disabled Veteran Owned Business and/or Veteran Owned Business of TEN PERCENT (10%) of awarded contract price for work to be performed.

b. Requests for waiver of this goal shall be submitted on the attached Application For Waiver form. A determination by the Director of Facilities Planning & Development, UM, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid. c. The Undersigned proposes to perform work with following MBE/WBE participation level:

MBE , WBE, DBE, SERVICE DISABLED VETERAN, and/or VETERAN PERCENTAGE PARTICIPATION: ______ percent ( %)

d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project.

7. BIDDER'S ACKNOWLEDGMENTS

a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof;

Page 7: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

1.A - 4 AUGUST 28, 2015

that he has carefully examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifications, revisions or correction of bid after scheduled closing time for receipt of bids.

b. Bidder agrees that bid shall not be withdrawn for a period of NINETY (90) days after sched-uled closing time for receipt of bids.

c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities in bidding.

d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable letter of credit, or a cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates.

e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of Bidder to submit the Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file.

f. It is understood and agreed that bid security of two (2) lowest and responsive Bidders will be retained until Contract has been executed and an acceptable Performance Bond and Payment Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned.

8. BIDDER'S CERTIFICATE

Bidder hereby certifies:

a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation.

b. He has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid.

c. He has not solicited or induced any person, firm or corporation to refrain from bidding.

d. He has not sought by collusion or otherwise to obtain for himself any advantage over any other Bidder or over Owner.

e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work.

f. By virtue of policy of the Board of Curators, and by virtue of statutory authority, a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of Missouri. By virtue of policy of the Board of Curators, preference will also be given to all Missouri firms, corporations, or individuals, all as more fully set forth in "Information For Bidders."

Page 8: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

1.A - 5 AUGUST 28, 2015

9. BIDDER'S SIGNATURE

Note: All signatures shall be original; not copies, photocopies, stamped, etc.

Authorized Signature Date

Printed Name Title

Company Name Mailing Address City, State, Zip Phone No. Federal Employer ID No.

Fax No. E-Mail Address

Circle one: Individual Partnership Corporation Joint Venture If a corporation, incorporated under the laws of the State of__________ Licensed to do business in the State of Missouri? ____yes _____no

(Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications.")

END OF SECTION

Page 9: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-1 AUGUST 28, 2015

SECTION 075100 – BUILT-UP BITUMINOUS ROOFING

PART 1 - GENERAL

1.1 DESCRIPTION

A. This section includes bituminous built-up roofing, aggregate surfacing, with base flashing for repairs and alterations to existing construction.

1.2 RELATED WORK

A. Wood cants, blocking, and wood edge strips: Section 06 10 00, ROUGH CARPENTRY.

B. Wood sheathing: Section 06 10 00, ROUGH CARPENTRY.

C. Metal base flashing, pipe flashing, counter flashing: Section 07 62 00, FLASHING AND SHEET METAL.

1.3 APPLICABLE PUBLICATIONS

A. Applicable publications listed below form a part of this Specification as referenced. Publications are referenced in the text by the number designation only.

B. American Society for Testing and Materials (ASTM):

1. A167-99(R2004) Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet and Strip

2. B209-07 Aluminum and Aluminum-Alloy Sheet and Plate

3. D41-05 Asphalt Primer Used in Roofing, Dampproofing and Waterproofing

4. D43-00(R2006) Coal Tar Primer Used in Roofing, Dampproofing and Waterproofing

5. D227-03 Coal-Tar Saturated Organic Felt Used in Roofing and Waterproofing

6. D312-00(R2006) Asphalt Used in Roofing

7. D448-08 Sizes of Aggregate for Road and Bridge Construction

8. D450-07 Coal-Tar Pitch Used in Roofing, Dampproofing and Waterproofing

9. D751-06 Test Methods for Coated Fabrics

10. D1863-05 Mineral Aggregate Used on Built-Up Roofs

11. D2178-04 Asphalt Glass Felt Used in Roofing and Waterproofing

Page 10: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-2 AUGUST 28, 2015

12. D3884-07 Abrasion Resistance of Textile Fabrics (Rotary Platform Double-Head Method)

13. D3909-97(R2004) Asphalt Roll Roofing (Glass Felt) Surfaced with Mineral Granules

14. D4586-07 Asphalt Roof Cement, Asbestos Free

15. D4601-04 Asphalt Coated Fiberglass Base Sheet Used In Roofing

16. D4897-01 Asphalt Coated Glass Fiber Venting Base Sheet Used in Roofing

17. D6163-00 Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements

18. F1667-05 Driven Fasteners: Nails, Spikes, Staples

C. FM Global (FMG):

1. P7825C-05 Approval Guide Building Materials

2. 4450: Approved Standard for Class 1 Insulated Steel Deck Roofs

3. 4470: Approved Standard for Class 1 Roof Coverings

D. National Roofing Contractors Association (NRCA):

1. "Quality Control Guidelines for the Application of Built-up Roofing."

2. "The NRCA Roofing and Waterproofing Manual"

1.4 WARRANTY

A. Work performed to repair or alter the existing roof shall be approved by the manufacturer.

1.5 QUALITY CONTROL

A. Applicator Qualifications: Installer experienced in installation of systems similar in complexity to that required for this Project, including specific requirements indicated:

1. Work shall be performed by installer approved in writing by roofing material manufacturer.

2. Work shall comply with printed instructions of the roofing materials manufacturer.

B. Product/Material Qualifications:

1. Provide manufacturer’s label on each container or certification with each load of bulk bitumen, indicating Flash Point (FP), Finished Blowing Temperature (FBT), Softening Point (SP), Equiviscous Temperature (EVT).

Page 11: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-3 AUGUST 28, 2015

2. Provide manufacturer’s certification that field applied bituminous coatings and mastics, and field applied roof coatings comply with limits for Volatile Organic Compounds (VOC) per the National Volatile Organic Compound Emission Standards for Architectural Coatings pursuant to Section 183(e) of the Clean Air Act with limits as follows:

a. Bituminous Coatings and Mastics: 500 g/l (4.2#/gal.).

b. Roof Coatings: 250 g/l (2.1#/gal.).

3. Obtain products from single manufacturer or from sources recommended by manufacturer for use with roofing system.

C. Comply with the recommendations of the NRCA "Roofing and Waterproofing Manual" applicable to built-up roofing for storage, handling and installation.

D. FMG Listing: Provide roofing membrane, base flashing, and component materials that comply with requirements in FMG 4450 and FMG 4470 as part of a roofing system and that are listed in FMG "Approval Guide" for Class 1 or noncombustible construction, as applicable. Identify materials with FMG markings.

1. Fire/Windstorm Classification: Class 1A-90.

2. Hail Resistance: MH .

1.6 SUBMITTALS

A. Submit in accordance with Division 1.

B. Product Data:

1. Asphalt materials, each type.

2. Coal-tar materials, each type.

3. Roofing cement, each type.

4. Fastening requirements.

C. Certificates:

1. Indicate materials and method of application of roofing system meet requirements of FMG.

2. Statements of qualification for manufacturers and installers.

3. Inspection Report: Copy of roofing system manufacturer's inspection report certifying completed roofing complies with manufacturer’s warranty requirements.

Page 12: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-4 AUGUST 28, 2015

D. Warranty: As specified in Part 1 of this Section:

1. Warranty sample form with specific language to address Contract provisions.

E. Contract Close-out Submittals:

1. Maintenance Manuals.

2. Warranty signed by installer and manufacturer.

1.7 DELIVERY, STORAGE AND MARKING

A. Deliver roofing materials to the site in original sealed packages or containers marked with the name and brand or trademark of the manufacturer or seller.

B. Keep roofing materials dry and store in a dry, weather-tight facility or under canvas covers. Do not use polyethylene or plastic covers to protect materials. Store above ground or deck level on wood pallets. Cover ground under pallet stored materials with plastic.

1. Store rolled materials (felts, base sheets, and paper) on end. Do not store hems on top of rolled materials.

2. Aggregates shall be maintained surface dry as defined by ASTM D1863.

C. Protect from damage due to handling, weather and construction operations before, during and after installation.

1.8 ENVIRONMENTAL REQUIREMENTS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

B. Protection of interior spaces: Refer to Division 1.

PART 2 - PRODUCTS

2.1 ROOFING SYSTEM

A. Install built-up roofing membrane system according to roofing system manufacturer's written instructions and applicable recommendations of NRCA "Quality Control Guidelines for the Application of Built-up Roofing."

B. Glass sheet, asphalt bitumen, mineral surfaced.

1. Substrate: Roof Insulation Cast-In-Place Concrete.

2. Components: Quantity.

Page 13: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-5 AUGUST 28, 2015

a. Ventilating Base Sheet: 1 Ply.

b. Ply Sheet: 3 Plies

c. Mineral Surfaced Cap Sheet: 1 Ply

d. Asphalt Between Substrate and First Ply: 10-17.5 kg/10 meters 20-35 lbs/100 sq. ft.

e. Asphalt Between Each Ply 10-17.5 kg/10 sq. meters 20-35 lbs/100 sq. ft.

3. Provide asphalt quantities within the indicated ranges, unless recommended otherwise in the roofing materials manufacturer's printed data.

2.2 MATERIALS

A. Primer: ASTM D41.

B. Venting Base Sheet: ASTM D4897, Type II, venting, nonperforated, heavyweight, asphalt-impregnated and coated, glass-fiber base sheet with coarse granular surfacing or embossed venting channels on bottom surface.

C. Asphalt: ASTM D312, Type III or IV for roof membrane. Use Type I for pour coat unless specified otherwise.

D. Ply Sheet/Backer Sheet: ASTM D2178, Type VI, heavy-duty ply sheet.

E. Cap Sheet: ASTM D3909, asphalt-impregnated and coated, glass-fiber cap sheet, with white coarse mineral-granule top surfacing and fine mineral surfacing on bottom surface.

F. Roof Cement: ASTM D4586, Type I [Type II].

G. Flashing Sheet: ASTM D6163, Type I or II, glass-fiber-reinforced, SBS-modified asphalt sheet; granular surfaced; suitable for application method specified.

2.3 COAL-TAR MATERIALS

A. Primer: ASTM D43.

B. Organic Felt: ASTM D227, except bitumen shall be low fuming, non-blooming type.

C. Coal-Tar Bitumen: ASTM D450, Type III.

D. Roof Cement: Roofing manufacturer’s standard, asbestos free.

2.4 MISCELLANEOUS MATERIALS

A. Aggregate:

Page 14: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-6 AUGUST 28, 2015

1. ASTM D1863, except the use of crushed stone is prohibited.

2. Slag or gravel. Use slag on slopes over 1:10 (1 inch per foot).

B. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to attach roof insulation crickets to substrate or to another insulation layer.

C. Tapered Roof Insulation Crickets:

1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass. Use only one insulation material for tapered sections. Use only factory-tapered insulation.

2. Cut to provide high and low points with crickets and slopes as shown.

3. Minimum slope 1:24 (1/2 inch per 12 inches).

2.5 FASTENERS

A. Nails and Staples: ASTM F1667.

B. Nails for Securing built-up Flashing and Base Sheets to Wood Nailers and Deck:

1. Zinc coated steel roofing nails with minimum head diameter of 10 mm (3/8 inch) through metal discs at least 25 mm (1 inch) across.

2. One-piece nails with an integral flat cap at least 24 mm (15/16 inch) across.

C. Fasteners for Securing Dry Felt Edge Strips to Wood Nailer and Decks:

1. Zinc coated steel roofing nails, 16 mm (5/8 inch) minimum head diameter.

2. Staples, Flat top Crown, zinc coated may be used.

D. Nails for Plywood:

1. Use annular thread type at least 19 mm (3/4 inch) penetration of plywood.

2. 16 mm (5/8 inch) minimum head diameter.

3. Nails with flat cap at least 24 mm (15/16 inch) across.

E. Nails for Securing Base Sheet to Poured Gypsum Roof Deck:

1. Special shaped nail providing diverging or hooking point.

2. Flat cap not less than 32 mm (1-1/4 inch) across.

Page 15: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-7 AUGUST 28, 2015

3. Withdrawal resistance of not less than 18 Kg (40 pounds) per fastener.

2.6 PROTECTION MAT OR SEPARATION SHEETS

A. Protection Mat:

1. Water pervious; either woven or non-woven pervious sheet of long chain polymeric filaments or yarns such as polypropylene, black polyethylene, polyester, or polyamide; or, polyvinylidene-chloride formed into a pattern with distinct and measurable openings.

2. Filter fabric equivalent opening size (EOS): Not finer than the U.S.A. Standard Sieve Number 120 and not coarser than the U.S.A. Standard Sieve Number 100. EOS is defined as the number of the U.S.A. Standard Sieve having openings closest in size to the filter cloth openings.

3. Edges of fabric selvaged or otherwise finished to prevent raveling.

4. Abrasion resistance:

a. Abrade in conformance with ASTM D3884 using rubber-hose abrasive wheels with 1 kg load per wheel and 1000 revolutions.

b. Result; 25 kg (55 pounds) minimum in any principle direction.

5. Puncture strength:

a. ASTM D751 - tension testing machine with ring clamp; steel ball replaced with a 8 mm (5/16 inch) diameter solid steel cylinder with a hemispherical tip centered within the ring clamp.

b. Result; 57 kg (125 pounds) minimum.

6. Non-degrading under a wet or humid condition within minimum 4° C (40° F) to maximum 66° C (150° F) when exposed to ultraviolet light.

7. Minimum sheet width: 2400 mm (8 feet).

2.7 BALLAST AND PAVERS

A. Aggregate:

1. Conform to ASTM D1863.

2. Gradation conform to ASTM D448:

a. Size 2 for 146 kg/m2 (30 pounds per square foot) or more.

b. Size 3 for 122 kg/m2 (25 pounds per square foot) or more.

Page 16: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-8 AUGUST 28, 2015

c. Size 5 for 73 kg/m2 (15 pounds per square foot) or more.

d. Size 6 for 49 kg/m2 (10 pounds per square foot) or more.

PART 3 - EXECUTION

3.1 GENERAL

A. Do not apply if deck will be used for subsequent work platform, storage of materials, or staging or scaffolding will be erected thereon.

B. Phased construction is not permitted. The complete installation of roofing system is required in the same day except for area where temporary protection is required when work is stopped. Complete installation includes pavers and ballast for ballasted systems.

3.2 EXAMINATION

A. Verification of Conditions: Examine substrates, areas and conditions under which Work is to be performed and identify conditions detrimental to proper or timely completion:

1. Do not proceed until unsatisfactory conditions, including moisture, have been corrected.

2. Do not install roofing materials over wet insulation.

3. Do not install roofing materials unless roof openings, wood nailers, edge venting, insulation board, flashing, curbs, and roof joints are constructed.

4. Do not install roof materials unless deck and/or insulation provides designed drainage to working drains.

B. Insulating Concrete: Allow deck to dry before installing materials.

C. Do not apply roof system if roofed deck will be used as a work platform.

D. Existing Intake Louvers:

1. Use large fans during placement to direct airflow away from existing intake louvers.

2. If required to install roof near intake louvers after work hours, it shall be done so without additional cost to the Government.

3.3 PREPARATION

A. Sweep substrate to broom clean condition. Remove all dust, dirt and debris.

B. Remove surface irregularities that may damage materials or cause installation defects.

C. Prime concrete deck or precast units.

Page 17: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-9 AUGUST 28, 2015

1. Keep primer back 100 mm (4 inches) from joints in precast units.

D. Cover wood sheathing, gypsum, gypsum plank and cement wood fiber plank with a layer of asphalt building paper.

E. Coordinate operations with roof insulation and sheet metal work to permit continuous roofing operations.

3.4 INSTALLATION

A. Comply with roofing system manufacturer's written instructions and applicable recommendations of NRCA "Quality Control Guidelines for the Application of Built-up Roofing."

B. Cooperate with inspection and test agencies required to perform services in connection with built-up roofing system installation.

C. General:

1. Provide uniform and positive adhesion between all installed materials, including adhesion to insulation or substrate, and between each ply of felt.

2. Substrate Penetrations: Do not allow bitumen to penetrate joints or enter building. Where mopping is applied directly to a substrate, tape joints. When applying steep asphalt, hold mopping back 50 mm (2 inches) from each side of joint.

D. Asphalt Coal-Tar Products Schedule:

1. Use asphalt only with asphalt-saturated or asphalt-impregnated felts.

2. Use Type I asphalt for pour coats up to 1:10 (1 inch per foot) slope.

3. Coats on slopes oven 1:10 (1 inch per foot).

4. Use asphalt roof cement with asphalt products.

5. Use coal tar and coal tar roof cement with coal-tar-saturated felts, except asphalt- saturated felt base flashing with asphalt roof cement may be used in conjunction with coal-tar roofing.

E. Bitumen Schedule:

1. Per square, unless otherwise specified.

2. Between substrate and plies of organic felt:

a. Coal tar, 9 to 14 Kg (20 to 30 pounds).

3. Between substrate and plies of glass fiber felts asphalt, 9 to 14 kg (20 to 30 pounds).

Page 18: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-10 AUGUST 28, 2015

4. Glaze Coats:

a. Coal tar, 9 to 14 Kg (20 to 30 pounds).

5. Pour Coats:

a. Coal tar, 32 to 36 Kg (70 to 80 pounds).

F. Heating Bitumen:

1. Heat the asphalt to the equiviscous temperature (EVT) plus or minus 4 degrees C (25 degrees F) at the time of application.

a. Do not heat asphalt greater than 38 C (100 degrees F) above the EVT.

b. When the EVT is not furnished do not heat asphalt above 246 C (475 degrees F) for Type I and 275 C (525 degrees) F for Type II and IV, with an application not less than 218 C (425 degrees F) and 246 C (475 degrees F) respectively.

2. Do not heat coal-tar bitumen above 218 C (425 degrees F) with an application temperature ranging from 163 C (325 degrees F) to 204 C (400 degrees F).

3. Do not heat bitumen above the flash point temperature.

4. Provide heating kettles with a thermometer kept in operating condition. Attend, during heating, to insure the bitumen is heated within the temperatures specified.

5. Do not mix different types of bitumen in kettle.

G. Terminations:

1. Where cants occur at vertical surfaces, cut off plies of membrane 50 mm (2 inches) above top of cant strip, (except at prefabricated curbs, scuttles and other roof accessories having integral cants) extend membrane over cant and up vertical surface to top of curb or blocking.

2. Where wood blocking occurs at penetrations to receive base flashing, nail a continuous strip of 400 mm (16 inch) wide, loose applied organic felt envelope over the blocking before the first ply sheet is applied.

a. Install strip on top of venting base sheet.

b. After membrane is installed, turn the dry felt back over the roofing and secure in place with hot bitumen before gravel stops or metal flanges extending onto the membrane are installed.

H. Base Sheet:

Page 19: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-11 AUGUST 28, 2015

1. One ply of venting base sheet. Fasten base sheet down dry on deck. Lap and seal with roof cement.

I. Roof Ply Installation:

1. Install, asphalt, glass fiber feltcoal tar bitumen, organic felt construction. Base sheet is not considered a ply.

2. Extend the first ply 100 mm (4 inches) beyond the insulation and the second ply 75 mm (3 inches) beyond the first. Lap ends 75 mm (3 inches) with joints broken 450 mm (18 inches) in each ply.

J. Laps for felts and base sheet:

1. Base sheet, lapped 50 mm (2 inches).

2. Four plies of felt with 230, 460, 690 and 900 mm (9, 18, 27 and 36 inch) starting widths, lapped 700 mm (27-1/2 inches).

3. End joints of felt and base sheet, lapped 50 mm (2 inches). Stagger end joints in relation to joints in adjacent and proceeding plies.

K. Flashing:

1. Apply flashing on top of built-up roofing, up face of cant and vertical surfaces, at least 200 mm (8 inches) above the roof, full height beneath counter flashing or top of curb flashing:

a. At cants, extend to top of cant and cut off.

2. Except at metal cants, secure top edge of base flashing with nails on a line approximately one inch below top edge, spaced not more than 200 mm (8 inches) on center.

a. Cover all nail heads with roof cement.

b. Cover the top of the base flashing with counter flashing as specified in Section 07 62 00, FLASHING AND SHEET METAL. At the cants secure the top edge of the flashing with fascia compression clamp as specified in Section 07 62 00, FLASHING AND SHEET METAL.

3. Install flashing using longest pieces practicable. Complete splices between flashing and main roof sheet before bonding to vertical surface. Seal splice not less than 76 mm (3 inches) beyond fasteners that attach membrane to blocking. Apply bonding adhesive to both flashing and surface to which flashing is being adhered per manufacturer recommendations. Nail top of flashing 300mm (12 inches) on center under metal counter flashing or cap.

4. Install flashing over cants to make system watertight.

Page 20: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-12 AUGUST 28, 2015

3.5 REPAIR AND ALTERATIONS TO EXISTING ROOF

A. Areas to be altered or repaired, remove loose aggregate and aggregate not firmly embedded where new penetrations occur or repairs are required:

1. Remove aggregate 900 mm (3 feet) beyond areas to be cut.

a. Clean, dry and store aggregate away from roof area until ready to reuse.

b. Remove unsuitable and excess aggregate not used from Project.

B. Cut and remove existing roof membrane for new work to be installed. Clean cut edges and install a temporary seal to cut surfaces. Use roof cement and one layer of 7 Kg (15 pound) felt strip cut to extend 150 mm (6 inches) on each side of cut surface. Bed strip in roof cement and cover with roof cement to completely embed the felt.

C. Bend up cap flashing or temporarily remove at built-up base flashing to be repaired. Brush and scrape away deteriorated and loose bitumen, felts or surface material of built-up base flashing.

D. Repairs to existing membrane and base flashing:

1. Remove temporary patches prior to starting new work.

2. Blisters and fish mouths:

a. Cut blisters open and turn membrane back to fully adhered portion. Cut fish mouths so membrane can be turned back and subsequently laid flat.

b. Heat membrane to facilitate bending and to dry surface of exposed blister areas.

c. Mop turned back membrane in hot bitumen. Roll to insure full adhesion and embedment in substrate.

d. Cover cut areas with two plies of felt. Extend first ply 100 mm (4 inches) beyond cut area edge. Extend second 100 mm (4 inches) beyond first ply. Mop down in hot bitumen as specified for new work. Resurface to match existing.

3. Exposed Felts:

a. Cut away exposed deteriorated edges of sheets.

b. Glaze coat felt edges.

c. Resurface to match existing.

4. Built-up Base Flashing:

a. Restore felts and cap sheet removed, lapping 100 mm (4 inches) over existing.

Page 21: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-13 AUGUST 28, 2015

b. Install new felts and cap sheet as specified for new work.

5. Horizontal Metal Flanges:

a. Remove loose, buckled or torn stripping.

b. Remove loose fasteners and install new fasteners.

c. Restrip flanges as specified for new work.

6. Resurfacing:

a. Over repaired membrane, embed aggregate as specified for new work.

b. Cover all membrane areas. Do not leave any exposed membrane surface.

E. Match existing roofing materials and construction. Use bitumen compatible with existing for roof repair and alteration.

F. Perform alterations, maintenance and repairs to roof membrane immediately after membrane has been cut or damaged, with permanent new work as specified in this specification. Repair items damaged in surface preparation and aggregate removal.

G. Installation of Roof Crickets:

1. Install roof insulation in accordance with roofing system manufacturer's written instructions.

2. Install roof insulation in accordance with requirements of FM Approval's Listing for specified roofing system.

3. Base Sheet: Where required by roofing system, install one lapped base sheet specified in Division 07 roofing section by mechanically fastening to roofing substrate prior to installation of insulation.

4. Cant Strips: Install //preformed insulation cant strips// //wood cant strips specified in Division 06 Section ROUGH CARPENTRY// at junctures of roofing system with vertical construction.

5. Use same insulation as existing for roof repair and alterations unless specified otherwise.

Page 22: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

PROJECT MANUAL FOR: Women’s & Children’s Hospital-AIR HANDLER UNIT #2 REPLACEMENT PROJECT NUMBER: CP150132

BUILT-UP BITUMINOUS ROOFING 075100-14 AUGUST 28, 2015

3.6 INSTALLATION OF BALLAST SYSTEM

A. Install as soon as roof membrane is laid.

B. Replace any aggregate that is disturbed during alterations at the rate and size to match the existing aggregate.

END OF SECTION 075100

Page 23: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",
Page 24: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",
Page 25: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",
Page 26: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

AIR

CO

MPR

ESSO

R

FAN

SEC

TIO

N

FILT

ER H

OU

SIN

G

DU

CT

TRAN

SITI

ON

CO

OLI

NG

PREH

EAT

FILT

ER H

OU

SIN

G

BLAN

K

ACC

ESS

56"x30"

MM

80"x20"

101"

x20"

60"x16" M

2AHU

2RF X

UH

HWS

CWS

CWR

3"

3

HWR3/4"

LPS

2" 1/2"

1/2"

310

6

16

15

14

16

1717

16

11

19

20

20

20

22

2

OWNER.

BASE BID

UNDER BASE BID, REMOVE EXISTING RETURN,RELIEF, AND OUTSIDE AIR DUCTWORK FROMRETURN FAN OVER TO UNIT. CUT RELIEF DUCTRISING UP TO LOUVER AND SEAL AIR TIGHTWITH SHEET METAL AND 1" INSULATION BOARD.CUT OUTSIDE AIR DUCT DOWN STREAM OFDAMPER.

202

SCALE: 1/4"=1'-0"FIRST FLOOR MECHANICAL DEMO

Page 27: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

SMOKE DAMPER DETAILNO SCALE

2

Page 28: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

AIR

CO

MPR

ESSO

R

3"

FILT

ER

1-1/2"

FAN

SEC

TIO

N

DU

CT

TRAN

SITI

ON

CO

OLI

NG

PREH

EAT

FILT

ER H

OU

SIN

G

BLAN

K

ACC

ESS

60"x16" M

2AHU

LPS

3"

2

2

3

12

MOTORIZED DAMPER

7

M

18 2

ROOF IN MECHANICAL ROOM.

WIRE DAMPER ON EXISTING OUTSIDE AIR DUCTAND NEW DAMPER ON EF-103 TO OPEN ANDCLOSE WHEN FAN IS ON.

18

2

SCALE: 1/4"=1'-0"FIRST FLOOR MECHANICAL

Page 29: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

36"x12"

10"Ø

6"Ø

XVAV

XVAV

7"Ø

10"Ø

46"x

18"

60"x20"

46"x18"

D D

D

12"Ø

A450

60"x20"RA,UP

60"x20"SA,UP6

11 11

D12"Ø

A450

18"x18"

E- -16

2

2

2

CLOSE WHEN FAN IS ON.

REBALANCE EXISTING SUPPLY, RETURN, OREXHAUST GRILLE TO AMOUNT SHOWN ONPLAN.

19

2

SCALE: 1/4"=1'-0"FIRST FLOOR MECHANICAL

Page 30: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

18"x10"

14"x

10"

16"x12"

10"x10"

SA250

2-02VAV

SA75

SA325

SA300

2-01VAV

T

T

HOOD

XEF

F475

F325

SA100

10"Ø

10"Ø

1919

19

19 19

2

2

2

22

CLOSE WHEN FAN IS ON.

REBALANCE EXISTING SUPPLY, RETURN, OREXHAUST GRILLE TO AMOUNT SHOWN ONPLAN.

19

2

SCALE: 1/4"=1'-0"FIRST FLOOR MECHANICAL

Page 31: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

18"x10"

16"x10"

8"Ø

H

10"x

10"

8"Ø

10"Ø

SA225

RA420

2-08VAV

T

RA170

SA170

SA170

19

19

19

19

19

2

2

2

2

2

CLOSE WHEN FAN IS ON.

REBALANCE EXISTING SUPPLY, RETURN, OREXHAUST GRILLE TO AMOUNT SHOWN ONPLAN.

19

2

SCALE: 1/4"=1'-0"FIRST FLOOR MECHANICAL

Page 32: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

NEW 4"RD

2AHU

FILT

ERS

HU

MID

IFIE

R

PREH

EAT

CO

OLI

NG

SUPP

LY F

AN

FILT

ERS

5 6

HB-A

1

1037

4" CWS/CWR3" HWS/HWR2"LPS&1-1/4"LPC 3" CWS/CWR

CO

OLI

NG

16

2

LAYING DOWN 1/2" PLYWOOD.

PROVIDE/INSTALL NEW PIPE CURB FOR ROOFPEDESTAL HOSE BIBB.

16

2

SCALE: 1/4"=1'-0"ROOF MECHANICAL PLAN

Page 33: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

44x30RA, DN

24x1

0

24x14EXH, UP

40x16

46x1

8

10Ø

10Ø 10x1

2

DN

12Ø

12"x12"

8"Ø

8"Ø12

CAV

C200

200

D

D

RA300

D

D

8"Ø

8"Ø

12"x

12"

SV

3/4"

1-1/4"

RA200

42

SCALE: 1/4"=1'-0"SECOND FLOOR PLAN

Page 34: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

10x10

10x12

(TYP 7)

(TYP 4)

EX-H175

SA-X155

SA-X205

RA-X825

2-1CAV

SA-X

10Ø

EXH-X175

B

B

B

10"Ø

C

RA-X450

98MSD

A2

SCALE: 1/4"=1'-0"SECOND FLOOR PLAN

Page 35: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

MO

DEL

NU

MBE

RD

ESIG

N.

A

TYPE

TITU

S TD

C

SER

VIC

E

LOU

VER

SUPP

LY

NO

. OF

SLO

TSTH

RO

W

SEE

PLAN

SN

A

NEC

KSI

ZE

12"Ø

FIN

ISH

FAC

ESI

ZE

24"x

24"

WH

ITE

REM

ARKS

-

BTI

TUS

TDC

LOU

VER

SUPP

LYSE

E PL

ANS

NA

10"Ø

24"x

24"

WH

ITE

-

CTI

TUS

TDC

LOU

VER

SUPP

LYSE

E PL

ANS

NA

8"Ø

24"x

24"

WH

ITE

- -

ETI

TUS

TDC

LOU

VER

RET

UR

N4-

WAY

NA

18"x

18"

24"x

24"

WH

ITE

-

FTI

TUS

TDC

LOU

VER

RET

UR

N4-

WAY

NA

10"Ø

24"x

24"

WH

ITE

-

DTI

TUS

TDC

LOU

VER

SUPP

LY4-

WAY

NA

6"Ø

24"x

24"

WH

ITE

GTI

TUS

TDC

LOU

VER

RET

UR

N4-

WAY

NA

8"Ø

24"x

24"

WH

ITE

-

--

--

--

--

--

--

--

--

--

--

2

Page 36: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

E

F

2

SCALE: 1/8"=1'-0"FIRST FLOOR INFECTION CONTROL

Page 37: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",
Page 38: UM Addendum Format - Contact Us | Campus Facilitiesoperations-webapps.missouri.edu/pdc/adsite/projects/cp150132/...UM Addendum Format ADDENDUM #2 DATE: ... AIR HANDLER UNIT #2 REPLACEMENT",

A

A

A

AA

2

2

SCALE: 1/"=1'-0"SECOND FLOOR I.C. PLAN