Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - 2049 2050 Global Targets set under the Kyoto Agreement. European Union Targets imposed under various EU policies and directives. United Kingdom Targets set under the Climate Change Act 2008. Scotland and Wales targets set by devolved parliaments. European Union Emissions Trading Scheme (EUETS) Largest multi-country, multi-industry emissions trading scheme initially focussed on Greenhouse Gas reduction. UK National Allocation Plan (NAP) Plan which defines the UK allocation of EU Allowances (EUA) across the spectrum of carbon emitting sectors. Waste Incineration Directive (WID) Limits emissions from incineration and co-incineration of waste with a focus on dioxins, mercury and particulate matter. Large Combustion Plant Directive (LCPD) EU Directive imposing limits on Sulphur Dioxide, Nitrogen Oxides and Dust. UK National Emissions Reduction Plan (NERP) UK specific implementation of Large Combustion Plant Directive. Industrial Emissions Directive (IED) Recasting of seven existing emissions directives, including LCPD and IPPC into a single legislative item. Electricity Market Reform (EMR) Legislation across generation and supply markets aimed at attracting investment, reducing impacts on consumers and improving energy security. Renewables Obligation Banding Differentiated banding of various forms of renewable generation under the Renewables Obligation. Four yearly cycle of renewable banding levels. Renewables Obligation (RO) Increasing requirement for suppliers to source electricity from renewable sources within the UK. Feed in Tariff (FIT) Incentive to support small-scale renewable electricity generation up to a capacity of 5MW. Renewable Heat Incentive (RHI) Proposed incentivisation for the generation of heat from renewable and low carbon sources. Climate Change Levy (CCL) A charge on non-domestic consumers’ energy use. Discounts to energy intensive sectors available under Climate Change Agreements (CCA). Carbon Emissions Reduction Target (CERT) Obligation on large energy suppliers to make efficiency savings by support to residential customer base. Replaced by Green Deal and ECO October 2012. Community Energy Savings Programme (CESP) Obligation on energy suppliers to provide ‘whole house’ energy saving to domestic consumers in low income areas. Replaced by Green Deal and ECO October 2012. Carbon Reduction Commitment (CRC) Energy Efficiency Scheme Mandatory energy efficiency and emission reductions scheme for large public and private sector organisations. Building Regulations Statutors instrument defining the standards for new and replacement building developments in the UK. Code for Sustainable Homes (CSH) Sustainability assessment process for new homes incorporating performance standards in England and Wales. Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - 2049 2050 Edition No.6 September 2012 We would be pleased to receive your views and comments or for further information, please contact: [email protected] Disclaimer: This publication is intended to provide a high level selective overview of emissions, energy and energy efficiency legislation and should not be relied upon by any third party and no responsibility is undertaken to any third party in relation to it. www.arup.com/ukenergyposter Emissions Energy Efficiency UK Legislation Timeline Key THESE SYMBOLS IN ALL COLOURS DENOTE EXISTING LEGISLATION THESE SYMBOLS IN ALL COLOURS DENOTE LIKELY OR PLANNED FUTURE LEGISLATION Qualification period Qualification period Efficiency discount on climate change levy available to energy intensive industry through Climate Change Agreements (CCA) Energy Efficiency Commitment (Phase II) 139 TWh energy consumption reduction Climate Change Agreements extended to 2023 80% discount on climate change levy for electricity through CCAs 65% discount for all other commodities Intention to work alongside the Green Deal Obligation on energy companies to support energy efficiency measures for homes and businesses ECO targets Carbon Saving Obligation to reduce CO 2 emissions by 0.52MtCO 2 /yr by March 2015 Affordable Warmth Obligation to a reduce notional heating costs for low income and vulnerable consumers by £3.4bn by March 2015 Energy Company Obligation 80% 65% CERT 293 MtCO 2 19.25 MtCO 2 30 Sep 2010 end registration Consultation on scheme simplification Consultation on scheme simplification 50% improvement in CO 2 emissions in Scotland Building Regulation powers devolved to Welsh Assembly expected overall installation lifetime reduction through domestic energy saving interventions reduction in carbon emissions through ‘whole house’ or ‘whole street’ approach 40% energy efficiency improvement (baseline 2006 Part L) Pathway to ‘zero carbon’ 25% energy efficiency improvement (baseline 2006 Part L) Applicable if > 6,000MWh per year or on 1/2 hourly metered electricity in 2008 Part L (Conservation of Fuel and Power) updated Code for Sustainable Homes (CSH) introduced All new homes to be given a CSH rating Publicly funded housing to be CSH 3 30% improvement in CO 2 emissions in Scotland CSH energy requirements aligned with Part L 2010 Introductory Phase Second Phase 68% achieved through insulation measures 40% targeted at low income and over 70 years of age 15% targeted at high Fuel Poverty risk group All new buildings to be ‘zero carbon’ 01 Apr 2005 01 Apr 2008 31 Dec 2008 01 Oct 2010 01 Oct 2009 31 Dec 2012 2013 2016 2019 31 Dec 2012 01 Apr 2011 01 Apr 2013 01 Apr 2001 01 Jan 2008 01 Oct 2006 01 Apr 2007 01 May 2008 01 Apr 2010 Qualification period 30 Sep 2012 end registration 30 Sep 2017 end registration (Third Phase) Third Phase Footprint year 3 year introductory phase (including footprint year) 7 year second phase (including footprint year) Footprint year 7 year third phase (including footprint year) 31 Mar 2013 01 Apr 2016 2008 Green Deal begins 2012 2010 Mar - Jun 2012 Nov 2010 Allowable solutions for ‘zero carbon’ introduced 31 Dec 2011 discount on climate change levy through Climate Change Agreements (CCA) Expected 55% improvement in CO 2 emissions on 2006 levels in Wales 2016 New schools to be ‘zero carbon’ New buildings to be ‘zero carbon’ in Scotland 2018 New public sector buildings to be ‘zero carbon’ 2030 All new buildings to be total life ‘zero carbon’ Footprint year Apr 2012 First sale of allowances Smart meter roll-out begins 2014 Smart meter roll-out ends 2019 Energy 2009 - 2013 Banding Years 1&2 2013 - 2017 Banding Onshore Wind (1 ROC) Wave, Tidal, PV (2 ROC) Dedicated Biomass (2 ROC) Biomass (2.1-8.3 p/kWh) Heat Pumps (3.4-4.7 p/kWh) Biomass & Bioliquid CHP heat 4.1p/kWh (consultation) Solar Thermal (8.9 p/kWh) Biomethane (7.1 p/kWh) AAHP 0.97p/kWh (consultation) AWHP 1.7 p/kWh (consultation) Biomass Direct Air Heating 1-2.1 p/kWh (consultation) Domestic support through Renewable Heat Premium Payment Scheme PV (8.5-41.3 p/kWh) Wind (4.5-34.5 p/kWh) Hydro (4.5-19.9 p/kWh) AD (9.0-11.5 p/kWh) Renewables obligation vintaged Generators can choose between RO and Contracts for Difference (CfD) between 2014 and 31 Mar 2017, when only CfD will be available Offshore Wind (1.75 ROC) except 2 ROC if accredited (operational) between 01 Apr 2010 and 31 Mar 2014 5% - 8% return on investment PV (8.9-21 p/kWh) Wind (4.5-21 p/kWh) Hydro (4.5-21 p/kWh) AD (9.9-14.7 p/kWh) Multi-site tariff introduced for PV energy efficiency requirements introduced as eligibility criteria FIT Tariff lifetime: 20 years RHI Tariff lifetime: 20 years 01 Apr 2009 01 Apr 2010 Nov 2011 2014 31 Mar 2013 01 Apr 2013 01 Apr 2012 Eligibility date July 2009 31 Mar 2017 01 Apr 2017 31 Mar 2021 5.0% Fixed 10% Headroom 4.27 ROCs/100MWh (Actual) 13.4% Fixed 10% Headroom 14.4% Fixed 10% Headroom 12.4% Fixed 10% Headroom 11.4% Fixed 10% Headroom 5% Fixed 10% Headroom 3.5 ROCs/100MWh (Actual) 9.7 ROCs/100MWh (Actual) 11.1 ROCs/100MWh (Actual) From Apr 2002 - 3.0% GB (England, Wales & Scotland) NI (Northern Ireland) 6.3% Fixed 10% Headroom 15.4% Fixed until 31 Mar 2027 6.3% Fixed until 31 Mar 2027 01 Apr 2012 Less than 20 years ROC provision for any new facility before 2037 Less than 20 years ROC provision for any new facility before 2033 ROCs end for existing (accredited before 25 Jun 2008) facilities on 31 Mar 2027 GB RO Ends 31 Mar 2037 From Apr 2005 - 2.5% 15.4% Fixed 10% Headroom NI RO Ends 31 Mar 2033 ROC uplift in Scotland to 3 for tidal and 5 for wave, to replace the Marine Supply Obligation Oct 2010 Summer 2011 Aug 2011 Autumn 2011 Marine Supply Obligation introduced in Scotland Apr 2007 Apr 2009 First Banding Review Consultation Feed-in Tariff contract for difference introduced Generators may choose between FiT CfD and ROCs Apr 2014 Apr 2017 Renewables obligation closed to new generation Apr 2017 First review Jan 2014 Accelerated Review Offshore Wind 2 ROCs (13-15); 1.9 (15/16); 1.8 (16/17) Onshore Wind 0.9 ROCs (13-17) PV 1.5 ROCs (13/14); 1.3 (14/15); 1.1 (15/16); 0.9 (16/17) Banding consultation closing 19 Oct 2012 Dedicated Biomass 1.5 ROCs (13-16); 1.4 (16/17) Biomass CHP 2 ROCs (closed from 2015) PV (7.1-16.0 p/kWh) Three degression bands introduced for PV operating by deployment thresholds Wind & Hydro (4.48-21.0 p/kWh) AD (8.96-14.7 p/kWh) Community tariff introduced 01 Aug 2012 01 Dec 2012 Emissions EMR 01 Jan 2005 01 Jan 2005 01 Jan 2008 31 Dec 2012 01 Jan 2013 01 Jan 2013 01 Jan 2008 01 Jan 2008 01 Jan 2014 Jul 2020 21% CO 2 reduction (2005 baseline) Phase I (3 years) Phase II (5 years) Phase III (7 years) 1.74% CO 2 reduction per year EU Allocation Plan UK NAP 2 UK NAP 1 ‘New New’ Plants licensed after 27 Nov 2002 Plants licensed between 1 Jul 1987 and 27 Nov 2002 ‘Existing’ Plants licensed before 1 Jul 1987 ‘New New’ ‘New’ ‘Existing Opt-In’ Integrated Pollution Prevention and Control (IPPC) Directive; Large Combustion Plant Directive (LCPD); Waste Incineration Directive (WID); Directive limiting Volatile Organic Compounds; and Various Titanium Dioxide directives IED combines directives: Large Electricity Producers (>20 MW) Offshore facilities (including flaring) Refineries and partial inclusion of other industries Large Electricity Producers; Offshore facilities; Refineries; Iron & Steel; Cement; Lime; Ceramics; Glass; Pulp & Paper; Chemicals; Food & Drink; Aluminium; Services; Other Electric; Downstream Gas; Gypsum; Mineral Wool; Aerospace; Vehicle Manufacture; Textiles; Tyres; Munitions. 246.2 MMT CO 2 per year limit ~7% Auctioned EUA ~52% of UK CO 2 emissions covered Comply with LCPD Emission Limit Values (ELV’s) and/ or trade emission allowances in NERP Decision to opt out ‘Older Plant’ National Allocation Plans (NAPs) superceded by EU wide allocation plan 100% auctioning or sale of EUAs in Large Electricity Producer (LEP) sector 245.3 MMT CO 2 per year limit EU approved 29 Nov 2006 Free allocation Plants larger than 50 MWth Transitional National Plans ‘Older Plant’ Comply with tighter emission controls by 30 Jun 2020 Limit operation from 1 Jan 2016 to 17,500 hours or close by 31 Dec 2023 1 Jan 2016 NO x limit for >500 MW th solid fuel (coal) drops from 500 to 200 mg/Nm 3 driving SCR retrofit Plants opting-out to close by 2023 ‘Existing Opt-Out’ Limit operation from 1 Jan 2008 to 20,000 hours or close by 31 December 2015 Plants close by 31 Dec 2015 at the latest 31 Dec 2007 31 Dec 2012 31 Dec 2020 31 Dec 2007 31 Dec 2020 01 Jan 2016 Imposes Emission Limit Values (ELV’s) for incineration and co-incineration of waste, including limits on: Dust; Heavy Metals; Dioxins; Carbon Monoxide; Poly Aromatic Hydrocarbons; SO 2 ; NO x . Continues unless superseded by IED or other From 04 Dec 2000 ‘New’ Plants close by 31 Dec 2023 at the latest Estimated 500MtCO 2 e saving per annum 50% of allowanced to be auctioned Use of non-EU allowances capped at 50% 80% free allocation in 2013, declining to 30% in 2020 and 0% in 2027 Sectors at risk of carbon leakage receive free allocation Aviation Aviation emissions capped at 95% of average 2004-2006 emissions Restrictive CO 2 emissions for coal power plants driving CCS operation? Emissions Performance Standards (450g/kWh limit) until 2045 Grandfathering for plant consented prior to 2015 Introduction of Carbon Price Floor April 2013 Report on Decarbonisation and CCS progress 2015 Report on Decarbonisation and CCS progress 2018 Capacity associated with CM expected to be in place Feed-in Tariff contract for difference introduced Clarification of capacity mechanism Energy bill 2012 Apr 2014 Capacity Mechanism (CM) introduced Renewables obligation closed to new generation Apr 2017 2012 2012 SO 2 limits drove requirement for FGD Kyoto Protocol came into force CoP16 Cancun CoP17 Durban CoP18 Doha Targets 4 TWh of electricity produced from renewable sources in Wales 31% of gross electricity consumed from renewable sources in Scotland 5.2% 8.0% 20-20-20 80% 12.5% legally binding reduction in CO 2 equivalent Kyoto Protocol Annex I country GHG (Carbon Dioxide, Methane, Nitrous Oxide, Sulphur Hexafluoride) and Hydrofluorocarbons and Perfluorocarbons by 2012 (1990 baseline) reduction in CO 2 equivalent Kyoto Protocol European Union 20% EU Renewable Energy 20% EU GHG Reduction (1990 baseline) 20% Less Energy Consumption 15% UK Renewable Energy (~ 32% Renewable Electricity) Carbon (equivalent) Reduction Budget from 1990 baseline reduction in CO 2 equivalent Kyoto Protocol United Kingdom Carbon Reduction Budget (CRB) 3018MtCO 2 e (midpoint 2010) from 1990 baseline 22.9% CRB (midpoint 2020) 2544MtCO 2 e from 1990 baseline 35.0% 7 TWh of electricity produced from renewable sources in Wales 80% of gross electricity consumed from renewable sources in Scotland Carbon Budgets Carbon Budget 1 Carbon Budget 2 Carbon Budget 3 CRB 2782MtCO 2 e (midpoint 2015) from 1990 baseline 28.9% 01 Apr 2018 31 Mar 2018 31 Mar 2023 16 Feb 2005 2010 2011 2020 01 Apr 2008 31 Mar 2013 01 Apr 2013 1 Apr 2023 31 Mar 2027 50% CRB 1950MtCO 2 e from 1990 baseline Carbon Budget 4

Transcript of UKLegislation Timeline - Envirotrain...Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014...

Page 1: UKLegislation Timeline - Envirotrain...Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - 2049 2050 Global Targets set …

Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - 2049 2050

GlobalTargets set under the Kyoto Agreement.

European UnionTargets imposed under various EU policies and directives.

United KingdomTargets set under the Climate Change Act 2008. Scotland and Wales targets set by devolved parliaments.

European Union Emissions Trading Scheme (EUETS)Largest multi-country, multi-industry emissions trading scheme initially focussed on Greenhouse Gas reduction.

UK National Allocation Plan (NAP)Plan which defines the UK allocation of EU Allowances (EUA) across the spectrum of carbon emitting sectors.

Waste Incineration Directive (WID)Limits emissions from incineration and co-incineration of waste with a focus on dioxins, mercury and particulate matter.

Large Combustion Plant Directive (LCPD)EU Directive imposing limits on Sulphur Dioxide, Nitrogen Oxides and Dust.

UK National Emissions Reduction Plan (NERP)UK specific implementation of Large Combustion Plant Directive.

Industrial Emissions Directive (IED)Recasting of seven existing emissions directives, including LCPD and IPPC into a single legislative item.

Electricity Market Reform (EMR)Legislation across generation and supply markets aimed at attracting investment, reducing impacts on consumers and improving energy security.

Renewables Obligation BandingDifferentiated banding of various forms of renewable generation under the Renewables Obligation. Four yearly cycle of renewable banding levels.

Renewables Obligation (RO)Increasing requirement for suppliers to source electricity from renewable sources within the UK.

Feed in Tariff (FIT)Incentive to support small-scale renewable electricity generation up to a capacity of 5MW.

Renewable Heat Incentive (RHI)Proposed incentivisation for the generation of heat from renewable and low carbon sources.

Climate Change Levy (CCL)A charge on non-domestic consumers’ energy use. Discounts to energy intensive sectors available under Climate Change Agreements (CCA).

Carbon Emissions Reduction Target (CERT)Obligation on large energy suppliers to make efficiency savings by support to residential customer base. Replaced by Green Deal and ECO October 2012.

Community Energy Savings Programme (CESP)Obligation on energy suppliers to provide ‘whole house’ energy saving to domestic consumers in low income areas. Replaced by Green Deal and ECO October 2012.

Carbon Reduction Commitment (CRC) Energy Efficiency SchemeMandatory energy efficiency and emission reductions scheme for large public and private sector organisations.

Building RegulationsStatutors instrument defining the standards for new and replacement building developments in the UK.

Code for Sustainable Homes (CSH)Sustainability assessment process for new homes incorporating performance standards in England and Wales.

Drivers 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - 2049 2050

Edition No.6 September 2012We would be pleased to receive your views and comments or for further information, please contact: [email protected] Disclaimer: This publication is intended to provide a high level selective overview of emissions, energy and energy efficiency legislation and should not be relied upon by any third party and no responsibility is undertaken to any third party in relation to it. www.arup.com/ukenergyposter

Emissions Energy EfficiencyUKLegislation Timeline

KeyTHESE SYMBOLS IN ALL COLOURS DENOTE EXISTING LEGISLATION

THESE SYMBOLS IN ALL COLOURS DENOTE LIKELY OR PLANNED FUTURE LEGISLATION

Qualification period

Qualification periodEffic

ienc

y

discount on climate change levy available to energy intensive industry through Climate Change Agreements (CCA)

Energy Efficiency Commitment (Phase II)

139 TWhenergy consumption reduction

Climate Change Agreements extended to 202380% discount on climate change levy for electricity through CCAs65% discount for all other commodities

Intention to work alongside the Green DealObligation on energy companies to support energy efficiency measures for homes and businesses

ECO targetsCarbon Saving Obligation to reduce CO2 emissions by 0.52MtCO2/yr by March 2015Affordable Warmth Obligation to a reduce notional heating costs for low income and vulnerable consumers by £3.4bn by March 2015

Energy Company Obligation

80% 65%

CERT 293 MtCO2

19.25 MtCO2

30 Sep 2010 end registration

Consultation on scheme simplification

Consultation on scheme simplification

50% improvement in CO2 emissions in Scotland

Building Regulation powers devolved to Welsh Assembly

expected overall installation lifetime reduction through domestic energy saving interventions

reduction in carbon emissions through ‘whole house’ or ‘whole street’ approach

40% energy efficiency improvement (baseline 2006 Part L) Pathway to ‘zero carbon’

25% energy efficiency improvement (baseline 2006 Part L)

Applicable if > 6,000MWh per year or on 1/2 hourly metered electricity in 2008

Part L (Conservation of Fuel and Power) updated

Code for Sustainable Homes (CSH) introduced

All new homes to be given a CSH rating

Publicly funded housing to be CSH 3

30% improvement in CO2 emissions in Scotland

CSH energy requirements aligned with Part L 2010

Introductory Phase

Second Phase

68% achieved through insulation measures40% targeted at low income and over 70 years of age15% targeted at high Fuel Poverty risk group

All new buildings to be ‘zero carbon’

01 A

pr 2

005

01 A

pr 2

008

31 D

ec 2

008

01 O

ct 2

010

01 O

ct 2

009

31 D

ec 2

012

2013

2016

2019

31 D

ec 2

012

01 A

pr 2

011

01 A

pr 2

013

01 A

pr 2

001

01 J

an 2

008

01 O

ct 2

006

01 A

pr 2

007

01 M

ay 2

008

01 A

pr 2

010

Qualification period30 Sep 2012 end registration

30 Sep 2017 end registration (Third Phase)

Third Phase

Footprint year

3 year introductory phase (including footprint year)

7 year second phase (including footprint year)

Footprint year 7 year third phase (including footprint year)

31 M

ar 2

013

01 A

pr 2

016

2008

Green Deal begins

2012

2010

Mar

- Ju

n 20

12

Nov

201

0

Allowable solutions for ‘zero carbon’ introduced

31 D

ec 2

011

discount on climate change levy through Climate Change Agreements (CCA)

Expected 55% improvement in CO2 emissions on 2006 levels in Wales

2016 New schools to

be ‘zero carbon’New buildings to be ‘zero carbon’ in Scotland 20

18 New public sector buildings to be ‘zero carbon’ 20

30 All new buildings to be total life ‘zero carbon’

Footprint year

Apr 2012 First sale of allowances

Smart meter roll-out begins 20

14 Smart meter roll-out ends20

19

Ener

gy

2009 - 2013 Banding

Years 1&2

2013 - 2017 Banding

Onshore Wind (1 ROC)Wave, Tidal, PV (2 ROC)Dedicated Biomass (2 ROC)

Biomass (2.1-8.3 p/kWh)Heat Pumps (3.4-4.7 p/kWh)Biomass & Bioliquid CHP heat 4.1p/kWh (consultation)

Solar Thermal (8.9 p/kWh)Biomethane (7.1 p/kWh)AAHP 0.97p/kWh (consultation)

AWHP 1.7 p/kWh (consultation)Biomass Direct Air Heating 1-2.1 p/kWh (consultation)

Domestic support through Renewable Heat Premium Payment Scheme

PV (8.5-41.3 p/kWh)Wind (4.5-34.5 p/kWh)Hydro (4.5-19.9 p/kWh)AD (9.0-11.5 p/kWh)

Renewables obligation vintaged Generators can choose between RO and Contracts for Difference (CfD) between 2014 and 31 Mar 2017, when only CfD will be available

Offshore Wind (1.75 ROC) except 2 ROC if accredited (operational) between 01 Apr 2010 and 31 Mar 2014

5% - 8% return on investment

PV (8.9-21 p/kWh)Wind (4.5-21 p/kWh)Hydro (4.5-21 p/kWh)AD (9.9-14.7 p/kWh)

Multi-site tariff introduced for PV energy efficiency requirements introduced as eligibility criteria

FIT Tariff lifetime: 20 years

RHI Tariff lifetime: 20 years

01 A

pr 2

009

01 A

pr 2

010

Nov

201

1

2014

31 M

ar 2

013

01

Apr

201

3

01 A

pr 2

012

Eligibility dateJuly

200

9

31 M

ar 2

017

01 A

pr 2

017

31 M

ar 2

021

5.0% Fixed 10% Headroom4.27 ROCs/100MWh (Actual)

13.4% Fixed 10% Headroom 14.4% Fixed 10% Headroom12.4% Fixed 10% Headroom11.4% Fixed 10% Headroom

5% Fixed 10% Headroom3.5 ROCs/100MWh (Actual)

9.7 ROCs/100MWh (Actual) 11.1 ROCs/100MWh (Actual)From Apr 2002 - 3.0% GB (England, Wales & Scotland)

NI (Northern Ireland) 6.3% Fixed 10% Headroom

15.4% Fixed until 31 Mar 2027

6.3% Fixed until 31 Mar 202701 Apr 2012

Less than 20 years ROC provision for any new facility before 2037

Less than 20 years ROC provision for any new facility before 2033

ROCs end for existing (accredited before 25 Jun 2008) facilities on 31 Mar 2027

GB RO Ends 31 Mar 2037

From Apr 2005 - 2.5%

15.4% Fixed 10% Headroom

NI RO Ends 31 Mar 2033

ROC uplift in Scotland to 3 for tidal and 5 for wave, to replace the Marine Supply Obligation

Oct 2010Summer 2011

Aug 2011

Autumn 2011Marine Supply Obligation introduced in ScotlandA

pr 2

007

Apr

200

9 First Banding Review

ConsultationFeed-in Tariff contract for difference introduced

Generators may choose between FiT CfD and ROCs

Apr

201

4 Renewables obligation closed to new generationA

pr 2

017 Renewables

obligation closed to new generationA

pr 2

017

First review

Jan

2014Accelerated

Review

Offshore Wind 2 ROCs (13-15); 1.9 (15/16); 1.8 (16/17) Onshore Wind 0.9 ROCs (13-17)PV 1.5 ROCs (13/14); 1.3 (14/15); 1.1 (15/16); 0.9 (16/17) Banding consultation closing 19 Oct 2012Dedicated Biomass 1.5 ROCs (13-16); 1.4 (16/17) Biomass CHP 2 ROCs (closed from 2015)

PV (7.1-16.0 p/kWh)Three degression bandsintroduced for PV operatingby deployment thresholds

Wind & Hydro(4.48-21.0 p/kWh)AD (8.96-14.7 p/kWh)Community tariff introduced01

Aug

201

2

01 D

ec 2

012

Emis

sion

sEM

R

01 J

an 2

005

01 J

an 2

005

01 J

an 2

008

31 D

ec 2

012

01 J

an 2

013

01 J

an 2

013

01 J

an 2

008

01 J

an 2

008

01 J

an 2

014 Jul 2020

21% CO2 reduction (2005 baseline)

Phase I (3 years)

Phase II (5 years)

Phase III (7 years)

1.74% CO2 reduction per yearEU Allocation PlanUK NAP 2UK NAP 1

‘New New’ Plants licensed after 27 Nov 2002

Plants licensed between 1 Jul 1987 and 27 Nov 2002

‘Existing’ Plants licensed before 1 Jul 1987

‘New New’‘New’‘Existing Opt-In’

Integrated Pollution Prevention and Control (IPPC) Directive; Large Combustion Plant Directive (LCPD); Waste Incineration Directive (WID); Directive limiting Volatile Organic Compounds; and Various Titanium Dioxide directives

IED combines directives:

Large Electricity Producers (>20 MW)Offshore facilities (including flaring)Refineries and partial inclusion of other industries

Large Electricity Producers; Offshore facilities; Refineries; Iron & Steel; Cement; Lime; Ceramics; Glass; Pulp & Paper; Chemicals; Food & Drink; Aluminium; Services; Other Electric; Downstream Gas; Gypsum; Mineral Wool; Aerospace; Vehicle Manufacture; Textiles; Tyres; Munitions.

246.2 MMT CO2 per year limit~7% Auctioned EUA~52% of UK CO2 emissions covered

Comply with LCPD Emission Limit Values (ELV’s) and/ or trade emission allowances in NERP

Decision to opt out ‘Older Plant’

National Allocation Plans (NAPs) superceded by EU wide allocation plan100% auctioning or sale of EUAs in Large Electricity Producer (LEP) sector

245.3 MMT CO2 per year limitEU approved 29 Nov 2006Free allocation

Plants larger than 50 MWth

Transitional National Plans

‘Older Plant’

Comply with tighter emission controls by 30 Jun 2020

Limit operation from 1 Jan 2016 to 17,500 hours or close by 31 Dec 2023

1 Jan 2016 NOx limit for >500 MWth solid fuel (coal) drops from 500 to 200 mg/Nm3 driving SCR retrofitPlants opting-out to close by 2023

‘Existing Opt-Out’ Limit operation from 1 Jan 2008 to 20,000 hours or close by 31 December 2015 Plants close by

31 Dec 2015 at the latest

31 D

ec 2

007

31 D

ec 2

012

31 D

ec 2

020

31 D

ec 2

007

31 D

ec 2

020

01 J

an 2

016

Imposes Emission Limit Values (ELV’s) for incineration and co-incineration of waste, including limits on: Dust; Heavy Metals; Dioxins; Carbon Monoxide; Poly Aromatic Hydrocarbons; SO2; NOx.

Continues unless superseded by IED or other

From 04 Dec 2000

‘New’

Plants close by 31 Dec 2023 at the latest

Estimated 500MtCO2e saving per annum 50% of allowanced to be auctionedUse of non-EU allowances capped at 50%

80% free allocation in 2013, declining to 30% in 2020 and 0% in 2027Sectors at risk of carbon leakage receive free allocation

AviationAviation emissions capped at 95% of average 2004-2006 emissions

Restrictive CO2 emissions for coal power plants driving CCS operation?

Emissions Performance Standards (450g/kWh limit) until 2045Grandfathering for plant consented prior to 2015

Introduction of Carbon Price Floor

Apr

il 20

13 Report on Decarbonisation and CCS progress

2015

Report on Decarbonisation and CCS progress

2018 Capacity associated

with CM expected to be in place

Feed-in Tariff contract for difference introduced

Clarification of capacity mechanismEnergy bill 2012

Apr

201

4

Capacity Mechanism (CM) introduced

Renewables obligation closed to new generationA

pr 2

017

2012

2012

SO2 limits drove requirement for FGD

Kyoto Protocol came into force

CoP16 Cancun

CoP17 Durban

CoP18 Doha

Targ

ets

4 TWh of electricity produced from renewable sources in Wales

31% of gross electricity consumed from renewable sources in Scotland

5.2%

8.0% 20-20-20

80%

12.5%

legally binding reduction in CO2 equivalent Kyoto Protocol Annex I country GHG (Carbon Dioxide, Methane, Nitrous Oxide, Sulphur Hexafluoride) and Hydrofluorocarbons and Perfluorocarbons by 2012 (1990 baseline)

reduction in CO2 equivalent Kyoto Protocol European Union20% EU Renewable Energy

20% EU GHG Reduction (1990 baseline)20% Less Energy Consumption

15% UK Renewable Energy (~ 32% Renewable Electricity)

Carbon (equivalent) Reduction Budget from 1990 baseline

reduction in CO2 equivalent Kyoto Protocol United Kingdom

Carbon Reduction Budget (CRB) 3018MtCO2e (midpoint 2010) from 1990 baseline 22.9% CRB (midpoint 2020) 2544MtCO2e

from 1990 baseline 35.0%

7 TWh of electricity produced from renewable sources in Wales

80% of gross electricity consumed from renewable sources in Scotland

Carbon BudgetsCarbon Budget 1 Carbon Budget 2 Carbon Budget 3CRB 2782MtCO2e

(midpoint 2015) from 1990 baseline 28.9%

01 A

pr 2

018

31 M

ar 2

018

31 M

ar 2

023

16 F

eb 2

005

2010

2011

2020

01 A

pr 2

008

31 M

ar 2

013

01 A

pr 2

013

1 A

pr 2

023

31 M

ar 2

02750%

CRB 1950MtCO2e from 1990 baseline

Carbon Budget 4